Loading...
HomeMy WebLinkAboutSP-96-0000 - Decision - 0007 0005 Aspen DriveFINDINGS OF FACT & DECISION STATE OF VERMONT 96 oboO COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Dorset Land Company to amend a previously approved planned unit development consisting of 88,740 square feet of medical and general office use and a 124 unit nursing/convalescent home, 421 Dorset Street. The amendment consists of constructing an 80 unit extended stay hotel building in place of a 49,440 square foot medical/general office building (building "B"). On the 26th day of November, 1996, the South Burlington Planning Commission approved the request of Dorset Land Company for preliminary plat approval under Section 203 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of amending a previously approved planned unit development consisting of 88,740 square feet of medical and general office use and a 124 unit nursing/convalescent home. The amendment is to substitute an 80 unit extended stay hotel building in the place of a 49,440 square foot medical and general office building (building "B"). The building would also include meeting space and a business center. The sketch plan was reviewed on 8/27/96. The ZBA on November 25, 1996 considered a request from the applicant for a conditional use permit for the extended stay hotel. Also requested was approval under Section 29.007 of the zoning regulations to extend the regulations for the CD3 District 50 feet beyond the district line into the R7 District. The ZBA did not render a decision at that meeting. 2. This property located at 421 Dorset Street lies within the CD3 and R-7 Districts. It is bounded on the south by a multi -family residential development and GMP sub -station, on the east by Dorset Street, on the north by Sherry Road and some residences and on the west by Oakwood Drive and some residences. 3. Access/circulation: Access will be provided via two (2) curb cuts on the east side of Aspen Drive to service the building and one (1) curb cut on the west side to serve a parking lot. Circulation on the site is adequate. 4. Coverage/setbacks: CD3 District (excluding proposed public street): Building coverage is 30% (maximum allowed is 40%). Overall coverage is 60% (maximum allowed is 90%). R7 District: Building coverage is 13.4% (maximum allowed is 25%). Overall coverage is 31.5% (maximum allowed is 60%). This coverage information will change if the ZBA approves extending the CD3 District boundary line into the R7 District. 1 5. Setback requirements are not being met. A portion of the building does not comply with the building setback/envelope requirements provided in Section 14.402(c) of the zoning regulations. The Planning Commission under Section 14.606 of the zoning regulations may modify the setback requirements where limitations of a site may cause unusual hardship. The applicant submitted a statement justifying the setback modification. The primary difficulty with complying with the setback requirements cited by the applicant is due to the small size of the block. Staff agreed with this argument. The project as designed complies with the general intent and goals of the City Center plan. 6. Parking: The extended stay hotel requires a total of 97 spaces and 85 spaces are proposed. The entire project, including the extended stay hotel, requires a total of 324 spaces and 442 spaces are available. A bike rack is being provided for the extended stay hotel as required under Section 26.253(b) of the zoning regulations. 7. The parking area on lot #2 has been modified since sketch plan to meet the requirement for a 15 foot green strip along the road frontage. 8. Sewer: The additional sewer allocation requested is 5319 gpd. This will result in a total sewer allocation of 33,592 gpd. The applicant will be required to pay the per gallon fee prior to permit issuance. 9. Traffic: An updated traffic analysis was submitted. This study concludes that "the 80 room hotel, which will replace a 48,300 square foot medical/general office building, will result in a net reduction in trips generated at the site by approximately 25% to 35%." 10. Floor Area Ratio (F.A.R.): The F.A.R. for the area of the project zoned CD3 is increasing from 0.72 to 0.8 (maximum allowed is 0.5). An F.A.R. of up to 0.7 may be permitted as a bonus for the provision of additional public space or amenities. The Planning Commission determined in the previous approval that a new City street was an additional amenity and granted an F.A.R. of 0.72. An F.A.R. of 0.72 was approved because at that time the regulations allowed an F.A.R. of up to 1.2 as a bonus. The regulations have since been amended to now only allow a maximum of 0. 7 as a bonus. The applicant is therefore "grandfathered" at 0.72. Since the F.A.R. is proposed to be increased to 0.8 which is not permitted, the applicant is requesting the ZBA to extend the regulations for the CD3 District 50 feet beyond the district line into the R7 District. This will have the effect of increasing the amount of land area in CD3 thus reducing the F.A.R. If approved by the ZBA, the F.A.R. would be reduced to 0.69. 2 11. Landscaping: The landscaping plan (sheet SP2) should be revise-d to reflect the landscaping for the Pines approved by the Commission on 5/14/96. The applicant should indicate the cost of the medical and general office building (building "B") which is being replaced with the extended stay hotel. This information is needed to update the minimum landscaping requirement for the entire project. 12. Building height: The proposed building will meet the height requirements of Section 14.403(c) of the zoning regulations which requires a maximum height of 25 feet to the eave and 45 feet to the roof peak. 13. Other: --- the applicant is required to complete construction of the Sherry Road improvements prior to occupancy of the proposed building or building "A" (condition #3 of the 7/12/94 approval). --- coverage and F.A.R. calculations may need to be updated prior to final plat depending on the outcome of the Pines Housing sketch review. --- applicant should provide information/description of the residential hotel so the Commission can make a positive finding that this proposal is an extended stay hotel as defined in the zoning regulations (i.e., kitchen appliances, types of rooms, common area, etc.). DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the preliminary plat application of Dorset Land Company to amend a previously approved planned unit development consisting of 88,740 square feet of medical and general office use and a 124 unit nursing/convalescent home, 421 Dorset Street. The amendment consists of constructing an 80 unit extended stay hotel building in place of a 49,440 square foot medical/general office building (building "B"), as depicted on a five (5) page set of plans, page one (1) entitled, "Dorset Land Co., Inc. Dorset Street So. Burlington, VT. Subdivision Plat," prepared by Trudell Consulting Engineers, Inc., dated 6/20/94, last revised 10/11/96, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. This approval is conditioned on the ZBA granting approval under Section 29.007 of the Zoning regulations to extend the regulations for the CD3 District 50 feet beyond the district line into the R7 District. The applicant shall obtain this approval prior to final plat review. 3 3. The revised final plat submittal shall include the following additional information: a. Revised coverage information for the CD3 and R7 Districts based on extending the CD3 District boundary line into the R7 District as approved by the ZBA. b . Estimated construction cost of the medical and general office building (building "B") which is being replaced with the extended stay hotel. C. A detailed description of the extended stay hotel (i.e., number of bedrooms, number of units, common area, etc.) and a detailed description of the residential units (i.e., type of appliances, size of refrigerator, etc.). 4. Pursuant to Section 14.606 of the zoning regulations, the Planning Commission modifies the building setback/envelope requirements provided in Section 14.402(c) of the zoning regulations. The Commission finds that the limitation of the site caused by the small city block (207'x 2241) formed by Sherry Road, Aspen Drive and Dorset Street causes an unusual hardship. 5. The Planning Commission approves an additional sewer allocation of 5319 gpd. The applicant will be required to pay the per gallon fee prior to permit issuance. 6. The plans shall be revised prior to revised final plat submittal as follows: a . The landscaping plan (sheet SP2) shall be revised to reflect the landscaping for the Pines approved by the Commission on 5/14/96. b. The landscaping plan shall show more landscaping near the parking lot on lot 2 to adequately screen the parking lot from the residences. C. The plan shall show the proposed location of a fence, including type and height, near the parking lot on lot #2. This fence shall be installed by the applicant at any time the Planning Commission determines it to be necessary. 7. Any new exterior lighting shall be downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. Prior to issuance of a zoning permit, the applicant shall submit for review and approval by the City Planner details of all building mounted lighting fixtures. 8. The issue of traffic mitigation shall be finalized at final plat. 4 9. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the new building. 10. The f inal plat application shall be submitted within 12 months or this preliminary plat approval is null and void. 11. Prior to f inal plat, the applicant shall prepare a parking management plan which identifies the designated parking spaces for each of the various uses and buildings in the P.U.D. A legal document shall be recorded which implements the parking plan. The legal document shall require approval by the City Attorney. Chd i rmdn - cY- Cl erk South Burlington Planning Commission 4121'9,� Dat�e ' W