Loading...
HomeMy WebLinkAboutSP-97-0000 - Decision - 0007 0005 Aspen DriveFINDINGS OF FACT & DECISION STATE OF VERMONT 0000 COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Dorset Land Company to amend a previously approved planned unit development consisting of 88,740 square feet of medical and general office use and a 124 unit nursing/convalescent home, 421 Dorset Street. The amendment consists of: 1) constructing a 79 unit extended stay hotel building in place of a 48,000 square foot medical/general office building (building "B"), and 2) converting building "A" from medical/general office use to all general office use. On the 28th day of January, 1997, the South Burlington Planning Commission approved the request of Dorset Land Company for revised final plat approval under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of amending a previously approved planned unit development consisting of 88,740 square feet of medical and general office use and 124 units of congregate housing. The amendment is to substitute a 79 unit extended stay hotel building in the place of a 49,440 square foot medical and general office building (building "B"). The building would also include meeting space and a business center. The preliminary plat was approved on 11/26/96. The ZBA on November 25, 1996 approved a request from the applicant for a conditional use permit for the extended stay hotel. Also approved was the request under Section 29.007 of the zoning regulations to extend the regulations for the CD3 District 50 feet beyond the district line into the R7 District on lot #2. 2. During preparation of a Parking Management Plan, the applicant discovered that there are not enough strategically located parking spaces on the property for the extended stay hotel and medical/general office building. In order to reduce the parking requirement, the applicant is proposing to convert building "A" from medical/general office use to all general office use. 3. This property located at 421 Dorset Street lies within the CD3 and R-7 Districts. It is bounded on the south by a multi -family residential development and GMP sub -station, on the east by Dorset Street, on the north by Sherry Road and some residences and on the west by Oakwood Drive and some residences. 4. Access/circulation: Access will be provided via two (2) curb cuts on the east side of Aspen Drive to service the building and one (1) curb cut on the west side to serve a parking lot. Circulation on the site is adequate. 1 5. Coverage/setbacks: CD3 District (excluding proposed public street): Building coverage is 27.2% (maximum allowed is 40%). Overall coverage is 57.5 (maximum allowed is 90%). R7 District: Building coverage is 20 % (maximum allowed is 25%). Overall coverage is 45.6% (maximum allowed is 60%). 6. Setback requirements are not being met. A portion of the building does not comply with the building setback/envelope requirements provided in Section 14.402(c) of the zoning regulations. The Planning Commission under Section 14.606 of the zoning regulations may modify the setback requirements where limitations of a site may cause unusual hardship. The applicant submitted a statement justifying the setback modification. The primary difficulty with complying with the setback requirements cited by the applicant is due to the small size of the block. Staff agrees with this argument. The project as designed complies with the general intent and goals of the City Center plan. The Commission modified this requirement as part of the preliminary plat approval. 7. The four (4) foot wide covered walkway on lots #2 and 4 does not meet the setback requirements for the R7 District. The Commission may modify this setback requirement under Section 10.404 of the zoning regulations. 8. Parking: The extended stay hotel requires a total of 95 spaces and 89 spaces are proposed. The entire project, including the extended stay hotel, requires a total of 307 spaces and the plan indicates that 340 spaces are available. Staff counted the spaces and f inds that the plan is three (3) spaces short of the 340 spaces. The plan was revised before the meeting to add the missing spaces. A bike rack is being provided for the extended stay hotel as required under Section 26.253(b) of the zoning regulations. 9. Preliminary plat condition #11 required the applicant to prepare a parking management plan which identifies the designated parking spaces for each of the various uses and buildings in the PUD. This document was submitted. The applicant is requesting that 6 spaces required for the extended stay hotel be shared with the adjacent general office building. This should not be a problem since the peak parking time for the hotel is at night and the peak for the office during the day. The "Parking Easement Agreement" document should be approved by the City Attorney and recorded in the land records prior to issuance of a permit for the extended stay hotel. 10. Sewer: The additional sewer allocation requested is 5079 gpd. This will result in a total sewer allocation of 33,592 gpd. The applicant will be required to pay the per gallon fee prior to permit issuance. 2 11. Traf f ic: An updated traffic analysis was submitted. This study concludes that "the 80 room hotel, which will replace a 48,300 square foot medical/general office building, will result in a net reduction in trips generated at the site by approximately 25% to 35%.11 12. Based on the new projected trip generation, the required traffic mitigation fee for the entire P.U.D. will be reduced from $46,293 to $26,608. 13. Floor Area Ratio (F.A.R.): The F.A.R. for the area of the project zoned CD3 (including the additional area approved by the ZBA) is being reduced from 0.72 to 0.71 (maximum allowed is 0.5). An F.A.R. of up to 0.7 may be permitted as a bonus for the provision of additional public space or amenities. The Planning Commission determined in the previous approval that a new City street was an additional amenity and granted an F.A.R. of 0.72. An F.A.R. of 0.72 was approved because at that time the regulations allowed an F.A.R. of up to 1.2 as a bonus. The regulations have since been amended to now only allow a maximum of 0.7 as a bonus. The applicant is therefore "grandfathered" at 0.72. 14. Landscaping: The landscaping plan (sheet SP2) was revised to reflect the landscaping for the Pines approved by the Commission on 5/14/96 as required by the preliminary plat approval. The minimum landscaping requirement, based on the revised building costs, is $111,011 which is not being met. Proposed landscaping is $19,890 short of this requirement. The Commission previously approved landscaping credits of $17,999 on 5/14/96 and $19,742 on 10/24/95. 15. The landscaping plan has been revised to incorporate the preliminary plat conditions requiring additional landscaping near the parking lot on lot #2 to screen the parking lot from the residences and a fence near the parking lot on lot #2. 16. Building height: The proposed building will meet the height requirements of Section 14.403(c) of the zoning regulations which requires a maximum height of 25 feet to the eave and 45 feet to the roof peak. 17. Other: --- the applicant is required to complete construction of the Sherry Road improvements prior to occupancy of the proposed building or building "A" (condition #3 of the 7/12/94 approval). a five (5) foot covered walkway is proposed within the Aspen Drive r.o.w. Approval to place this structure within the r.o.w. should be obtained from the City Council. --- staff recommended that the applicant install a bus shelter on Dorset Street in a location approved by CCTA. 3 DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the f inal plat application of Dorset Land Company to amend a previously approved planned unit development consisting of 88,740 square feet of medical and general office use and a 124 unit nursing/convalescent home, 421 Dorset Street. The amendment consists of: 1) constructing a 79 unit extended stay hotel building in place of a 48,000 square foot medical/general office building (building "B") , and 2) converting building "A" from medical/general office use to all general office use, as depicted on a four (4) page set of plans, page one (1) entitled, "Dorset Land Company Dorset Street South Burlington, VT.," prepared by Trudell Consulting Engineers, Inc, dated 9/12/96, last revised 1/15/97, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. Pursuant to Section 14.606 of the zoning regulations, the Planning Commission modifies the building setback/envelope requirements provided in Section 14.402(c) of the zoning regulations. The Commission finds that the limitation of the site caused by the small city block (207'x 224') formed by Sherry Road, Aspen Drive and Dorset Street causes an unusual hardship. 3. The Planning Commission approves an additional sewer allocation of 5079 gpd. The applicant will be required to pay the per gallon fee prior to permit issuance. 4. Any new exterior lighting shall be downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. Prior to issuance of a zoning permit, the applicant shall submit for review and approval by the City Planner details of all building mounted lighting fixtures. 5. Prior to issuance of any more zoning permits for this PUD, the applicant shall record in the land records a "Notice of Condition", or other appropriate document, which references the "421 Dorset Street Parking Management Plan" which is hereby approved by the Commission. The parking management plan shall be revised prior to recording to correctly reference the most recent approved plans for this PUD. 6. In an ef f ort to mitigate potential adverse traf f ic impacts, the following shall be required: a) Applicant shall contribute an amount equal to 1.9% of the City's share of constructing a new northbound on -ramp at Exit 13, not to exceed $3,691. Contribution shall be made prior to issuance of a zoning permit and may be phased in on a schedule 4 accepted by the City Planner. Until such time as the City's share is finalized, applicant's contribution shall be based on the maximum $3,691 contribution. When the City's share is finalized and it is determined that the applicant has contributed more than 1.9% of the City's share, the City shall reimburse the applicant for the overpayment. b) Applicant shall contribute $9,463 to the Williston Road Area I Improvement Fund based on the P.M. peak hour trip ends estimated to be generated by the project. The contribution shall be made prior to issuance of a zoning permit and may be phased in on a schedule accepted by the City Planner. c) Applicant shall contribute $13,454 towards the cost of installing and optimizing the timing of a new traffic signal at the project access/Dorset Street intersection. This contribution shall be made prior to issuance of a zoning permit and may be phased in on a schedule accepted by the City Planner. If the signal is installed prior to issuance of permits, then the applicant shall pay the remainder owed at time of application for the next phase of development. 7. The Planning Commission approves a landscaping credit of $19,890 pursuant to Section 26.105(a) of the zoning regulations. B. Approval to construct the covered walkway within the Aspen Drive r.o.w. must be obtained from the City Council prior to issuance of a permit for the covered walkway. 9. The applicant shall be responsible for constructing a bus shelter within the PUD in a location approved by CCTA. Prior to issuance of a zoning permit for the extended stay hotel, the applicant shall submit a revised plan showing the proposed location and design of the bus shelter. If the City, CCTA and applicant cannot find and/or agree on an appropriate location for a bus shelter, the applicant shall return to the Commission for a final decision regarding the provision of a bus shelter. If a bus shelter is constructed, it shall be constructed prior to occupancy of the extended stay hotel. 10. The applicant shall construct Aspen Drive to City standards and complete the required improvements to Sherry Road prior to occupancy of the extended stay hotel. 11. Prior to start of construction of the improvements described in condition #10 above, the applicant shall post a bond which covers the cost of said improvements. 12. In accordance with Section 301.5 of the subdivision regulations, within 14 days of completion of required improvements (e.g., roads, water mains, sanitary sewers, storm drains, etc.) the 5 developer shall submit to the City Engineer, "as -built" construction drawings certified by a registered engineer. 13. Any changes to the plat plans shall require approval by the South Burlington Planning Commission. 14. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the extended stay hotel. 15. The final plat plans (i.e., subdivision plat, Sheets SP1 and SP3) shall be recorded in the land records within 90 days or this approval is null and void. The plans shall be signed by the Planning Commission Chair or Clerk prior to recording. The plans shall be recorded prior to issuance of a zoning permit. C__ &4� s:crl_ - /-�,'u__—Ghairman or Clerk South Burlington Planning Commission 4V_gZ r Date 7.1