HomeMy WebLinkAboutSP-05-22 - Decision - 1200 Airport DriveCITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
BURLINGTON INTERNATIONAL AIRPORT -1200 AIRPORT DRIVE
NORTH TERMINAL EXPANSION
SITE PLAN APPLICATION #SP-05-22
FINDINGS OF FACT AND DECISION
Burlington International Airport, hereafter referred to as the applicant, is seeking
approval to expand the existing 111,965 sq. ft. airport terminal building by 9,475 sq. ft.
for a total of 121,440 sq. ft., 1200 Airport Drive. The Development Review Board held a
public meeting on June 7, 2005. Bob McEwing represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1) The applicant is seeking approval to expand the existing 111,965 sq. ft. airport
terminal building by 9,475 sq. ft. for a total of 121,440 sq. ft., 1200 Airport Drive.
2) The subject property is located in the Airport (AIR) Zoning District.
3) The owner of record of the subject property is the City of Burlington.
4) The plans submitted consist of a three (3) page set of plans, page one (1)
entitled, "North Terminal Phase Expansion Site Plan Review Exhibit `A'
prepared by Campbell & Paris Engineers, dated 4/5/05.
ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
Table 1. Dimensional Requirements
AIR-1 Zoning District
Min.
Lot Size
_Max.
Building Coverage
Max.
Total Coverage
Max.
Front Yard Coverage
Min.
Front Setback
_Min.
Side Setback
Min.
Rear Setback
Required
Propose
3 acres
27.1 acres
30%
n/a
50%
n/a
_
30%
_ 29.3%_-
57 ft.
>57 ft.
50 ft.
>50 ft. _ J
zoning compliance
n/a coverages are unknown for the Airport's property
- 1 -
SITE PLAN REVIEW STANDARDS
Section 14.06 of the South Burlington Land Development Regulations establishes the
following general review standards for all site plan applications:
(a) The site shall be planned to accomplish a desirable transition from structure
to site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
The proposed project accomplishes a desirable transition from structure to site and from
structure to structure. This site is part of the Burlington International Airport, so the
proposed structure will be integrated with the surrounding structures.
The layout of the proposed project provides for adequate planting and pedestrian
movement. The parking for the airport is provided by the parking garage, so additional
parking will not be required.
(b) Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
The parking spaces on the subject property are already in existence.
(c) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and
existing or adjoining buildings.
The height of the proposed structure will be 35'.
(d) Newly installed utility services and service modifications necessitated by
exterior alterations or building expansions shall, to the extent feasible, be
underground.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(e) The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual
interruptions to create attractive transitions between buildings of different
architectural styles.
This requirement is being met through the proposed project.
(t) Proposed structures shall be related harmoniously to themselves, the terrain,
and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures.
The proposed structure relates harmoniously to the existing buildings on the airport
property.
-2-
Site plan applications shall meet the following specific standards as set forth in Section
14.07 of the South Burlington Land Development Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial of collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation
in the area.
It is not necessary to create any additional access points to the properties that abut the
subject property.
(b) Electric, telephone and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall
be located so as to have a harmonious relation to neighboring properties and
to the site.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not
escape the enclosure(s).
No additional dumpsters will result from the proposed project.
(d) Landscaping and Screening Requirements
Pursuant to Table 13-9 of the Land Development Regulations, the minimum landscaping
requirement for the proposed expansion is $36,915. The applicant is not proposing any
additional landscaping on the subject property. The applicant is proposing to construct
a $243,000 screening wall in lieu of landscaping. The substitution of the wall for
landscaping is acceptable. This substitution is allowed under Section 13.06(G)(3) of the
Land Development Regulations.
Lighting
The lighting proposed by the applicant is adequate. Although the proposed fixtures are
not in compliance with Appendix D of the Land Development Regulations, the applicant
has demonstrated that the proposed fixtures will not result in lighting levels spilling over
the airport property lines.
Traffic
Traffic impacts related to the airport have been reviewed in conjunction with the parking
garage, so they are not applicable to the proposed project.
-3-
Other
The City Engineer reviewed the plans and provided comments in a memorandum dated
May 26, 2005.
DECISION
Motion by Gail Quimby, seconded by Chuck Bolton, to approve Site Plan application
#SP-05-22 of Burlington International Airport, subject to the following conditions:
1) All previous approvals and stipulations, which are not superseded by this
approval, shall remain in effect.
2) This project shall be completed as shown on the plans submitted by the
applicant, as amended herein, and on file in the South Burlington Department of
Planning and Zoning.
3) Pursuant to Section 15.13(E) of the Land Development Regulations, any new
utility lines, services, and service modifications shall be underground.
4) The Board approves the substitution of a screening wall for landscaping pursuant
to Section 13.06(G)(3) of the Land Development Regulations.
5) 17.04 of the Land Development Regulations, or this approval is null and void.
6) The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to the use of the newly constructed terminal addition.
7) Any change to the site plan shall require approval by the South Burlington
Development Review Board.
Mark Behr — yea/nay/abstain/not present
Chuck Bolton — yea/nay/abstain/not present
John Dinklage — yea/nay/abstain/not present
Roger Farley — yea/nay/abstain/not present
Larry Kupferman — yea/nay/abstain/not present
Gayle Quimby — yea/nay/abstain/not present
Motion carried by a vote of 6-0-0
Signed this day of June 2005, by
John Dinklage, Chair
-4-
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).
WE