October 27, 1971
Burlington International Airport
Airport Drive
South Burlington, Vermont 05401
Attention: Mr. Thomas Schmidt
Dear Mr. Schmidt:
This is to advise that approval has been granted by
the South Burlington Planning Commission to the
proposed hangar to be constructed off from Airport
Drive.
The Commission has stipulated that a two year main-
tenance bond in the amount of lj% of total construction
cost be posted.
Prior to any building permite applications the owner
will have to enter into an agreement with the City
regarding landscaping, drainage, road opening, etc.
Very truly,
Richard Ward
Zoning Administrator
RW/j
LAW OFFICES OF
EWING & SPOKES
86 ST PAUL STREET
BURLINGTON, VERMONT 05401
JOHN T. EWING October 11, 1971 AREA CODE 802
RICHARD A. SPOKES 663-2877
Richard R. Ward,
Zoning Administrator
south Burlington City Offices
Williston Road
South Burlington, Vermont 05401
Re: Applicability of South Burlington Zoning Ordinance
to Burlington International Airport
Dear Dick:
You asked us to comment on the above question, in
connection with the construction of a hangar at the air-
port. The question concerns the possible exemption of
the City of Burlington from the zoning ordinance as a
municipal corporation performing a governmental function.
It is the type of question that could only be
answered with certainty by the courts. However, we believe
that persuasive arguments exist in favor of the applicabi-
lity of the South Burlington ordinance, and we would re-
commend that position by the Planning Commission and
Zoning Board.
It is also my opinion that the airport is in the
Planned District under the ordinance, as shown on the
zoning map, except for the properties purchased recently
by the City of Burlington easterly of Airport Drive, some
of which may be in residence District B.
Please let me know any further questions you may
have concerning this.
Very truly yours
45��. John T. Ewing
JTE/d
Received by the South Burlington Planning Commission, 1181 Williston Road,
South Burlington, Vermont, this 12th day of October, 1971 a letter and a
copy of an application for a Development Permit.
SOUTH BURLINGTON PLANNING COMISSION
October 12, 1971
9 "
Consulting Engineers
July 15, 1999
PO Box 2246 1025 Airport Drive . South Burlington, VT 05407 . Tel: 802.864.0223 . Fax: 802.864.0165 . E-mail: wmi@together.net
Mr. William J. Szymanski
City Engineer
City of South Burlington
S. Burlington, VT 05403
RE: Burlington International Airport - North Hangar
Oil/Water Separator connection to Municipal Sewer
D-H Project #6380009
Dear Bill:
Thank you for meeting with me on Thursday the 8h, concerning the above referenced project.
Enclosed is a site plan with details and notes which propose the elimination of an underground
drywell fed by a floor drain and oil -water separator. The oil/water separator will be connected to
the existing sewer on Airport Drive.
We propose a 6" SDR 28 PVC sewer line at constant slope with clean -outs at bends of 45
degrees or more, and approximately every 100 ft. As discussed, I think the sewer as-builts are a
reliable indication that the unused stub exists at station 59+17 on Airport Drive, and based on the
elevation given for the stub to the north (shown as 7.3 ft. deep), should be at a similar depth. The
contractor is required to verify this first thing (see notes on plan), and the exact slope of the pipe
will be determined at that time. It should be greater than I%, and considering the low flow and
lack of solids, should be sufficient for this purpose. I will verify their findings myself in the field
during the exploratory excavation.
As the airport is on a very tight schedule relating to the necessity of completing this work we
would appreciate your review as soon as your schedule allows. Please don't hesitate to call if
you have any questions.
Sincerely,
Mark Smith, P.E.
Project Engineer
encl.
cc: Bob McEwing
file 6380009
Corporate Headquarters:
North Springfield, Vermont
www.d-hinc.com
0 Pr,Med - Re�d,d P,p,,
Area Offices: Portland, Maine Newburgh, Now York Port Charlotte, Florida
Boston, Massachusetts Manchester, New Hampshire Pawling, New York Naples, Florida
Greenfield, Massachusetts Montpelier, Vermont Rochester, New York Sarasota, Florida
Westford, Massachusetts South Burlington, Vermont Saratoga Springs, New York
A 0 R E I M E N T
THIS AGREEbMT made this 29th day of October 19T1, by and
between the CITY OF SOUTH BURLINGTON, hereinafter referred to
as the CITY, mod AIR NORTH, INC., hereinafter referred to as
the DEVMFIM.
WMMS, Developer has applied to the City for construction
of a hangar and support facilities on a portion of the airport
promises of Burlington International Airport; and
WHERMS, the City, acting through its Planning Commission,
is willing to accept said application, subject to certain condi-
tions hereinafter set forth.
NOW THEWORE, it Is hereby agreed as follows:
1. The Developer will comply with the "General Subdivision
Requirements" and the "Subdivision Improvement Rtquirments"
and any other applicable provisions contained in the Subdivision
Regulations of the City, effective September 23, 1963, as since
amended, unless expressly waived by action of the Planning
Commission or otherwise set forth in this Agreement.
2. In addition, Developer will complete the following
improvements in connection with said development:
(a) Construction of a building to serve as a hangar,
and to house offices and shops and
(b) Installation of payed are" for parking aircraft
and automobiles.
3. All final development plans, specifications and like
document* OM file with the Flaming Cr misSion are hereby referred
-2-
to and incorporated herein for the purpose of further determining
the obligations of the Developer.
4. For the guarantee of the performance of all requirements
set forth or referred to herein, Developer shall deliver to the
City a bond as required by the Subdivision Regulations of the
City, in the principal amount or $2,925.00.
IN VITNESS WHERMY, the parties have executed this Agreement
the date above recited.
CITY OF SOUTH BURLINOTON
by,;
Duly_Author ed agent
Developer
PIZZAGALLI CORPORATION
JOY DRIVE/ SOUTH BURLINGTON. VERMONT 05401
802/658-4100
October 11, 1971
South Burlington City Council
1181 Williston Road
South Burlington, Vermont
Gentlemen:
Pursuant to the provisions of 10 VSA 6084 (a),
we hereby transmit to you a copy of an application for
a Development Permit which has been filed with the
District Commission for Chittenden County Regional
Planning Commission, Richmond, Vermont.
Sincerely yours,
Z� ko", -X) 2 1; � 41 � � �' - -2 -- -, 0 �' I
Paul E. Marcotte
PEM: sc
Enclosure
PLANNER
658-7955
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
December 27, 1994
Mr. Mike Wiesel
Donald Hamlin Consulting Engineers, Inc.
P.O. Box 9
Essex Junction, Vermont 05452
ZONING ADMINISTRATOR
658-7958
Re: Burlington Airport Sewage Pumping Station & Force Main
Dear Mike:
I have reviewed the plans for a sewage pumping station to serve the
Metro Hangar at Burlington International Airport and have the
following comments:
1. The sewage pumping station should have piping for an
auxiliary pump in the event of an extended power failure or
pump failure and a fill station. This piping is preferred in
a separate vault just outside the station.
2. The station control panel should be at a location so that
the pumps can be manually operated and at the same time the
operator can observe their operation.
3. Manual and parts list must be in English and replacement
parts obtainable in the United States or Canada.
4. The audio alarm should be placed inside of the adjacent
building.
The anticipated flow of 600 gallons per day can be treated at our
Airport Parkway Sewage Treatment plant where there is sufficient
reserve capacity.
Sincerely,
'6/(
A
d
William J. Szymanski,
City Engineer
WJS /mcp
cc: Donald Whitten
I
Districts #1 & #8
RR #2, Box 2161
Pittsford, VT 05763
(802) 483-6022 A
Districts #2 & #3
RR #1, Box 33 r�-, 40
N. Springfield, VT 05150
(802) 886-2215
Districts #4, #6 & #9 STATE OF VERMONT
Ill West Street Environmental 13oard
Essex Junction, VT 05452 District Environmental Commission
(802) 879-6563
January 17, 1995
Mr. Robert McEwing, Airport Engineer
Burlington International Airport
1200 Airport Drive, Box 1 '
South Burlington, VT 05403
District #5
324 North Main Street
Barre, VT 05641
(802) 479-3621
District #7
184 Portland Street
St. Johnsbury, VT 05819
(802) 748-8787
Environmental Board Office
120 State Street
Montpelier, VT 05620-3201
(802) 828-3309
RE: Land Use Permit application for Metro Hanger sewage pump
I station and pressure sewer.
Dear Mr. McEwing,
An application for the above named project was received on
January 6, 1995. After reviewing the application, visiting the
site and reviewing previous land use permits for the airport
properties, I have determined that the project does not represent
a "material change," thus does not require a permit amendment.
A material change is defined by Environmental Board Rule 2(P) As:
.Any,alteration to a project which has a significant
im,pact on any finding, conclusion, term or condition of the
project's permit and which affects one or more values sought
to be protected by the Act.
As long as construction and maintenance of the proposed sewer
system conforms with the findings and conditions of Land Use
Permit #4CO034 and amendments no permit amendment is necessary -
We ask that you submit to this office, the Water Supply and
Wastewater Disposal Permit for this project when it is issued by
the Wastewater Management Division of the Agency of.Natural
Resources. The Wastewater Permit will be incorporated into ' the
Land Use Permit as an administrative amendment. If you have any
questions about this,,please feel free to contact me at 879-6563.
S incerely,
U L--O�
a �it lsrlu
cc: Chittenden Coupty Regional Planning Commission
city of South Burlington, Aldermen and Planning Commission
Agency of Natural Resources, Planning Division
State of Vermont
WATER SUPPLY
AND
WASTEWATER DISPOSAL PERMIT
LAWS/REGULATIONS INVOLVED
Case #: WW-4-0809 Environmental Protection Rules
Applicant: Burlington International Effective September 10, 1982
Airport
Address: 1200 Airport Drive, Bo ' x 1
South Burlington, VT 05403
This project, consisting of construction of a new pump station
and force main to connect the existing building referred to as
Metro Hanger with a maximum of 30 employees to the municipal
sewer system located at the Burlington International Airport off
Williston Road in the City of South Burlington, Vermont is hereby
approved under the requirements of the regulations named abo,.,e,
subject to the following conditions.
This Permit does not constitute Act 250 approval under Case
Number 4CO331.
GENERAL
1. This permit does not relieve the permittee from obtaining
all other approvals and permits as may be required from the
Act 250 District Environmental Commission, the Department of
Labor and Industry (phone 828-2106 or 658-2199), the Vermont
Department of Health (phone 863'-7,220), and local officials
PRIOR to proceeding with this project.
2. The project shall be completed as shown on the plans Job 94-
430 Drawing 1 of 1 "Metro Hanger Pressure Sewer Site Plan"
dated 12/12/94 revised 12/22/94; Drawing 2 of 3 "Metro
Hanger Pressure Sewer Profile" dated 12/12/94 revised
12/22/94; and Drawing 3 of 3 "Typical Details" dated
12/12/94 prepared by Donald L. Hamlin Consulting Engineers,
Inc. and which have been stamped "approved" by the
Wastewater Management Division. The project shall not
deviate from the approved plans without prior written
approval from the Wastewater Management Division.
3. No alterations to the building other than those indicated on
the approved plan or Water Supply and Wastewater Disposal
a
Water Supply and Wastewater Disposal Permit
WW-4-0809
Page 2
Permit, which would change or affect the exterior water
supply or wastewater disposal or the approved use of the
building shall be allowed without prior review, and approval
from the Agency of Natural Resources.
4. The Wastewater Management Division now reviews the sewage
and water systems for public buildings under 10 V.S.A.,
Chapter 61 - Water Supply and Wastewater Disposal Permit.
WASTEWATER DISPOSAL
5. The project is approved for connection to the South
Burlinton Airport Parkway wastewater treatment facility for
a -maximum of 600 gallons of sewage per day.
6. A professional engineer, registered in the Stat - e of Vermont,
is to generally supervise the construction of the pump
station, force main and new manhole and, upon completion of
construction, the supervising engineer is to submit to the
Wastewater Management Division a written certification
stating all construction has been completed in accordance
with the stamped approved plans. The engineer's
certification is to be submitted to the Division prior to
utilizing the pump station and the certification shall
include, but not be limited to, the numerical results of all
leakage testing performed on the manhole, pump station and
force main as described in Appendix A, of the Environmental
Protection Rules.
Dated at Essex Junction, Vermont this 9th day of January, 1995.
William C. Brierley, Acting Commissioner
Department of Environmental conservation
By
Erfiest P. Christianson
Regional Engineer
c For the Record
South Burlington Planning Commission
Souzk—bor-iington Selectboard
Act 250 Coordinator -Louis Borie
Water Supply,Division
Department of Labor and Industry
Donald L. Hamling Consulting Engineers, Inc.