Loading...
HomeMy WebLinkAboutMS-18-06 - Supplemental - 1068 Williston Road (6)November 2, 2018 Marla Keene, P.E. Development Review Planner City of South Burlington 575 Dorset St. South Burlington, VT 05403 RECEIVED NOV 0 5 2018 ow of as. lLwwqxn Re: Hampton Inn and Suites, 1068 Williston Road, South Burlington E 0 u v c 3 3 #0 �'0 �hb® Miscellaneous Application Submittal for Alternative Compliance for Building Entrances Dear Marla, Please find enclosed the Miscellaneous Application for the Hampton Inn and Suites Project. This application is being submitted to request a review and determination by the South Burlington Development Review Board (DRB) regarding eligibility of the Project to utilize the provisions of Article 8 Section 8.06 H of the South Burlington Land Development Regulations for Alternate Compliance for Entrances within the T4 Form Based Code District. This application is being submitted in advance of the site plan applications for the Project as the above determination has potential to impact both building and site plan layout. We hereby request to be placed on the agenda for the December 4, 2018 DRB meeting. In support of the DRBs review under Section 8.06H (3), the applicant offers the following description of the proposed approach to building entry points for the Hampton Inn Building: Glazed entrances have been provided along the North, East and South facades as allowable for the hotel uses in these spaces. The exterior doors facing East toward the new connector street can fully engage with the streetscape to provide unimpeded access to hotel guests and the public at large as well as the main hotel entrance facing North towards the Holiday Inn. The security of guests is of paramount importance in the hotel industry and visual control of the doors facing the new connector street can be accomplished from the front desk for greeting, interaction, and controlled access to private guestroom sleeping areas. The hotel doors facing South towards Williston Road can provide all important visual and physical access for an engaging street presence. Direct public access at these Williston Street doors can be provided to registered hotel guests via electronic card key and the public may enter these doors at will when accompanied by a hotel guest. Other glazed entrances are provided but are designated for employee use only and will not be accessible to hotel guests nor the general public. 401DX Drive, Building 100 Suite 200 Engineers I Scientists I Planners I Designers South Burlington, Vermont 05403 P 802.497.6100 ��,nn�nnp,yl5s�rt,yr«�s»13niu,a,xd�iu+�n«t�oH„N,um.,<e,�hµ+�x F 802.495.5130 App!rzronUm+-ng 1ppk.z Crn-UtWze Hampton Inn and Suites Ref: 57913.01 November 2, 2018 Page 2 Please see attached the following items: • Miscellaneous Application Form and Application Fee • (3) Full size, and (1) 11x17 size plan sets of the following sheets:. o. Sheet AP-201 depicting building elevations o Sheet LA1.00 - Overall Site Plan Thumb Drive contain electronic version of the above plans � ,, `�'vhb Please feel free to contact me with any questions or if any additional materials are required. Sin cerely,� Peter Smiar, PE Director of Land Development - Vermont psmiar@vhb.com \\thb\9MiprglS£ufagton\5J91301 ta+n WdJ \does\Pem't\IaA l.!3tMA\M.s< W<aW VQoi ApPP.Cst ncv.x lAts-ud