Loading...
HomeMy WebLinkAboutDR-02-19 SP-02-62 - Decision - 0023 San Remo DriveCITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING DEVELOPMENT REVIEW BOARD SITE PLAN #SP 02-62 DESIGN REVIEW #DR 02-19 FINDINGS OF FACT, CONCLUSIONS & DECISION Bill Michaud, hereafter referred to as the applicant, is requesting site plan and design review approval for 4089 sq. ft. of new construction to contain 2089 sq. ft. of medical use and two 1000 sq. ft. dwelling units. The South Burlington Development Review Board (DRB) held a public hearing on January 21, 2003. Michael Dee and Architect Ted Montgomery represented the applicant. Based on the testimony given at the above mentioned public hearing and on the plans and supporting materials contained in the document file for this application, the DRB finds, concludes and decides as follows: FINDINGS OF FACT The applicant is requesting site plan and design review approval for 4089 sq. ft. of new construction to contain 2089 sq. ft. of medical use and two 1000 sq. ft. dwelling units. The subject property contains an existing 7200 sq. ft. structure including 3600 sq. ft. of medical office use and 4 dwelling units. 2. Four Boys, LLC, received Site Plan approval from the DRB on October 17, 2000, for the addition of two 1200 sq. ft. dwelling units and two 600 sq. ft. dwelling units to the existing structure, subject to 10 conditions. However, two of these previously approved dwelling units were not built. 3. The Design Review Committee (DRC) reviewed the current proposal on December 23, 2002. 4. Four Boys, LLC, is the record owner of the property (warranty deed in Volume 471, Page 356 of the city land records). The property is identified as Tax Parcel 1490 00023 C. 5. The subject lot contains 22,356 sq. ft. and is located in the Central District 2 (CD2) and Design Overlay District 2 at 23 San Remo Drive. CONCLUSIONS DIMENSONAL REQUIREMENTS The proposed density for the property is an F.A.R. of 0.5. This is the maximum allowed F.A.R. for the CD2 District. Therefore, the proposed density complies with the zoning regulations. 2. The proposed building coverage for the lot is 25%. The maximum allowed building coverage for the CD2 District is 40%. The proposed overall coverage for FINDINGS OF FACT, CONCLUSIONS & DECISION #SP 02-62 & #DR 02-19 the lot is 72%. The maximum allowed overall coverage for the CD2 District is 90%. The proposal complies with the lot coverage requirements of the zoning regulations. The DRB notes that the proposed garden roof will mitigate the proposed lot coverage. 3. Pursuant to Section 14.402(b) of the zoning regulations, allowable building envelopes along San Remo Drive shall be between 32 ft. from the centerline of the right-of-way and 80 ft. from the nearest edge of the right-of-way. The building envelope is greater than 80 ft. from the San Remo Drive right-of-way, but this is a condition of the existing structure and not the proposed new structure. The plans indicate that the new structure is at least 32 ft. from the centerline of the right-of- way on the north and the east sides. 4. The maximum height for a pitched roof in the CD2 District is 45 ft. The maximum height for a flat roof is 35 ft. The proposed structure will be 34 ft. 3 '/2" to the top of the pitched stairwell roof. The flat roof will be 24 ft. high. Therefore, the proposed addition complies with the height requirements of the CD2 District. 5. Access is provided via a 26 ft. ingress and egress curb cut, and a 13 ft. wide egress -only curb cut. Both access points are on San Remo Drive. The site also provides access to an adjacent lot to the southwest. There are no proposed changes to access or circulation. The DRB concludes that existing access and circulation conditions are adequate. 6. No new signage is proposed, but there is an illegal wall sign on the western elevation. No design review approval or permit has been issued for this sign. This violation must be corrected prior to the issuance of a zoning permit for the proposed addition. DESIGN REVIEW CRITERIA The DRB must find that the proposal conforms substantially to the building and site design criteria outlined in Section 24.40 of the zoning regulations. 7. Consistent Design. The proposed addition is inventive and departs from the form of the existing structure. However, the architect incorporated many of the design elements of the existing structure into the proposed addition. The architect also proposes a covered walkway along the western side of the existing structure, which matches the setback of the proposed addition and encloses a small garden space. Likewise, on the southeast corner, a garden wall extends out and matches the setback of the existing structure. The DRB concludes that the color palette, proposed textures, scale, and design elements of the addition function to integrate the two structures and create a unified look for the entire property. 8. Materials. High quality materials shall be used on all buildings. The applicant proposes to use faux wood grain siding (same as existing) on the first floor of the proposed addition. The second floor siding is 8" wide vinyl without a texture. The roof top garden wall and peak over an enclosed stairwell is sheeted in a synthetic insulating compound that resembles stucco (DrivitTM). The proposed materials comply with the requirements of Section 24.401(b) of the zoning regulations. \sit\michaud\SP#02-62.fcd.doc 2 FINDINGS OF FACT, CONCLUSIONS & DECISION #SP 02-62 & #DR 02-19 The plans must show that the dumpster will be screened with the addition of a gate across the front of the enclosure. d. The plans must show that the streetlights will be mounted on16 ft. poles pursuant to the San Remo Drive Streetscape Plan. e. The plans must indicate where the roof drains will discharge. The plans must show the dimensions of the angled parking on the south side of the building. The spaces must provide a minimum 9.8 ft. curb length. g. The plans must show that the soffit lights will not cause illumination at the sidewalk to exceed 5 foot candles. 10. The applicant must meet the requirements outlined by Water Superintendent Jay Nadeau in his letter dated December 16, 2002. 11. The applicant shall obtain a certificate of occupancy/compliance from the Administrative Officer prior to the use of the new building addition. 12. Any change to this approved site plan shall require review and approval by the DRB. Chuck Bolton —yea/nay/abstain Mark Boucher —yea/nay/abstain John Dinklage —yea/nay/abstain Roger Farley —yea/nay/abstain Larry Kupferman —yea/nay/abstain Gayle Quimby —yea/nay/abstain MOTION CARRIED by a vote of 6-0-0. Ve Signed this `� day of �' 2003, by JohfDChair age, \sif\m ichaud\S P#02-62.fcd.doc 8 FINDINGS OF FACT, CONCLUSIONS & DECISION #SP 02-62 & #DR 02-19 uses on the site. This results in an increase of 12 trips per weekday PM peak hour of an adjacent street. 29. Water Superintendent Jay Nadeau has reviewed the plans and provided a number of comments regarding water service connection and sprinklering. DECISION MOTION by Mark Boucher, seconded by Gayle Quimby, to approve site plan application #SP 02-62 and design review application #DR 02-19, subject to the following conditions. - All previous approvals shall remain in effect except as amended herein. 2. This project shall be completed as shown on the plans dated December 10, 2002, as amended by this decision and on file in the Department of Planning & Zoning. 3. The proposal will likely generate approximately 33 trips per weekday PM peak hour of an adjacent street, and increase of 12 trips per weekday PM peak hour of an adjacent street. 4. Pursuant to Section 26.256(b) of the zoning regulations, the DRB hereby approves a total of 24 on -site parking spaces and grants an 18 space or 43% waiver. 5. Pursuant to Section 27.302 of the zoning regulations, the applicant must obtain a zoning permit from the Administrative Officer within six (6) months of the date of this decision. 6. Prior to the issuance of a zoning permit, the existing sign violation must be corrected. 7. Prior to the issuance of a zoning permit, the applicant shall post a landscape bond in the amount of $9582.50. The bond shall remain in effect for three (3) years to guarantee survival of all plantings. 8. Prior to the issuance of a zoning permit, Four Boys, LLC, shall record an easement to the City of South Burlington for the portions of sidewalk extending onto the property. The easement must be approved by the City Attorney. 9. Prior to the issuance of a zoning permit, the applicant must submit three (3) full sets of plans, which must be revised as follows: a. The elevation drawings must show rooftop mechanical elements of the proposed addition. b. The plans must show that the electrical cabinet will be covered with the same siding as the building. \sAmichaud\SP#02-62.fcd.doc 7 FINDINGS OF FACT, CONCLUSIONS & DECISION #SP 02-62 & #DR 02-19 (a) Pedestrian & Vehicular Access. 24. Vehicular access to the site will remain unchanged. Pedestrian access will be enhanced with new sidewalks and inviting site design elements as discussed above. (b) Circulation. 25. No changes to the existing traffic circulation patterns are proposed. (c) Parking. 26. The Site Plan shows 31 parking spaces, including 4 reserved handicapped parking spaces and 7 on -street parking spaces. All but 3 of the off-street spaces are existing. Pursuant to Section 26.252 of the Zoning Regulations, a total of 42 parking spaces must be provided. This amounts to a shortfall of 18 off-street spaces or 43%. Pursuant to Section 26.256(b) of the zoning regulations, the DRB may reduce the requirement by up to 50% if overlapping uses or other characteristics of the site cause the requirements to be unnecessarily stringent. Because the building contains a mix of office use with residential use, it is likely that nighttime residential parking and daytime business parking will be compatible on the site. Therefore, the DRB concludes that a reduction in the parking requirements is warranted. Parking on the south side of the building is 60 degree angled parking. Pursuant to Section 26.251 of the Zoning Regulations, curb length for these spaces must be 9.8 ft. with a depth of 19.8 ft. The plans do not indicate the dimensions of these spaces, but they appear to meet the depth and aisle width requirements. Pursuant to section 26.253(b), bicycle parking shall be provided for employees of residents on the subject property. Bicycle parking is provided on the north side on the enclosed stairwell. (d) Landscaping & Screening. 27. The applicant has provided an estimated construction cost of $300,000. Pursuant to Section 26.105 of the zoning regulations, minimum planting costs must exceed $8500. According to cost estimates listed in Table 2, plantings will cost about $3833. With installation, landscaping will cost an estimated $9582.50. (e) Traffic Generation. 28. The calculation of impact fees will be based on increased trip generation for the site. According to data provided by the Institute of Traffic Engineers (ITE), medical offices generate an average of 5.18 trips per 1000 sq. ft. per weekday PM peak hour of an adjacent street. Apartments generate 0.62 trips per dwelling unit. Existing approved uses (3600 sq. ft. of medical office and 4 dwelling units) generate approximately 21 trips per weekday PM peak hour of an adjacent street. The applicant proposes 2089 sq. ft. of medical office space and 2 additional dwelling units. Based on ITE data, with the proposed expansions 33 trips per weekday PM peak hour of an adjacent street would be generated by the \sit\m ich and\S P#02-62 Jcd.doc 6 FINDINGS OF FACT, CONCLUSIONS & DECISION #SP 02-62 & #DR 02-19 vehicles and pedestrians are adequately separated, and the proposal provides for vehicular and pedestrian interconnections between adjacent properties. 21. Outdoor Lighting. The applicant proposes using 100W recessed can lights, two wall mounted exterior light fixtures, and one 12 ft. Lumec "New Westminster" light within the project parking lot. The DRC requested that the soffit lights be reduced in wattage such that the illumination at the sidewalk not exceed 5 foot candles. The DRB agrees that illumination at the sidewalk should not exceed 5 foot candles. 22. Provide for Nature's Events. The proposed rooftop garden is designed to provide stormwater retention. When saturation measures are achieved, two internal roof drains will provide flow. However, the plans do not indicate where these drains will discharge. City Engineer Bill Szymanski has reviewed the proposed plans and also commented that stormwater drainage plans should be detailed. 23. Streetscape Improvements. Proposed streetscape improvements along San Remo Drive include the installation of seven (7) street trees, construction of a seven (7) foot wide sidewalk on the east side and widening the north sidewalk to eight (8) feet, and installation of three 12 ft. metal halide Lumec "New Westminster' lighting fixtures. The applicant proposes curved sidewalk at the corner of San Remo Drive to align with the building's curved facade. The Streetscape Plan for San Remo Drive includes a Honey Locust tree on the northern leg of San Remo Drive approximately 40 ft. from the corner. Instead, the applicant proposes two Chanticleer Callery pear trees of equivalent size. In addition, the applicant proposes two pear trees along the eastern leg of San Remo Drive in excess of the pear trees shown on the Streetscape Plan. The DRB concludes that the proposed trees are desirable. To meet conditions of a previous DRB approval, sidewalk was installed on the north side of the property along San Remo Drive. The sidewalk requirements for San Remo Drive have since changed. The applicant proposes widening the existing sidewalk on the north side of the property to comply with the current Streetscape Guidelines. On the north side of the property approximately 3 ft. of the sidewalk extends onto the Four Boys, LLC, property. On the east side, approximately 5 ft. of the proposed sidewalk extends onto the Four Boys, LLC, property. The Streetscape Plan for San Remo Drive includes 16 ft. Lumec New Westminster poles and luminaries. The applicant's plans show 12 ft. poles. The plans need to be revised to show the streetlights will be mounted on16 ft. poles pursuant to the San Remo Drive Streetscape Plan. SITE PLAN REVIEW STANDARDS Pursuant to Section 26.102 of the zoning regulations, the DRB may consider the following in its review of a site plan application: \sMmichaud\S P#02-62.fcd.d oc 5 FINDINGS OF FACT, CONCLUSIONS & DECISION #SP 02-62 & #DR 02-19 building opens into a foyer, which provides access to both the medical office space and the residences upstairs. This entrance is directly off the proposed public sidewalk. The DRB concludes that these design elements serve to relate the building better to the public street. 14. Conceal Rooftop Devices. Air conditioning, vent stacks, and other mechanical elements necessary for the operation of the building should be hidden from view on the roof of the building. However, these elements are not shown on the elevation plans. The DRC has requested that the air conditioning unit be shown on the elevation drawings. The DRB notes that other mechanical elements should also be shown on the plans. 15. Promote Energy Efficiency. Casement windows are proposed for the addition instead of the double hung windows that exist on the present structure. The architect believes this style of window is more energy efficient. Most windows are south and east facing. Deciduous trees and awnings provide summer shade of first floor windows. The soil on the garden roof will provide insulative cooling in summer and heat retention in the winter. In addition, the garden roof will alleviate the heat island effect and provides cooling and evaporation. The DRB concludes that the proposal includes energy efficient design features. 16. Landscape & Plantings. Landscape plantings and amenities should provide integral enhancements to the site. The DRB concludes that the proposed rooftop garden and ground level gardens will enhance the site significantly. 17. Integrate Special Features. The proposal includes the relocation of utility lines underground. The applicant proposes to enlarge an electrical cabinet on the northern facade to accommodate the addition. The enlarged cabinet may require the closure of one of the windows on this elevation. The DRC requested that the plans be revised to show that the expanded electrical cabinet be covered in the same siding as the building. In addition, the property has a single dumpster, which should be screened from view with the addition of a gate across the front of the enclosure. 18. Walls, Fences & Other Screening. An extension of the easterly building wall allows visual and physical access to a small garden space, repeats the fenestration on the proposed addition, and matches the depth of the existing building. In addition, a covered walkway on the westerly side of the existing structure is proposed to match the setback of the proposed addition. The DRB concludes that these features conform to the guidelines outlined in Section 24.402(c). 19. Accessible Open Space. As indicated already, outdoor garden spaces are designed to be visually and physically accessible from the public street. Benches and shade trees are included in the garden area designs. Garden areas are located to take advantage of sunlight. In addition, the ground level garden area is accessible to people with disabilities. 20. Efficient & Effective Circulation. The proposed development is at -grade and provides adequate accessible routes. In addition, the DRB concludes that \s it\m ich au d\S P#02-62.fcd.doc 4 FINDINGS OF FACT, CONCLUSIONS & DECISION #SP 02-62 & #DR 02-19 9. Colors & Textures. Colors of the new structure include teal, which will be applied to the synthetic stucco and is the color of the existing structure's roof, and light gray, which is the siding color of the existing building. The applicant proposes another color, tan, for the 8" wide vinyl siding. The color swatches do not represent a specific manufactured brand of paint, but the intent is to match the existing colors. The DRB concludes that the proposed color and texture will be harmonious with the existing structure. 10. Windows and Doors. The fenestration of the addition mimics the paired metal frame windows of the existing building. A continuation of the paired window openings is repeated within a garden wall allowing visual access to a small garden space. The proposed locations of windows and doorways respond to the interior layout of the addition. The DRB concludes that the fenestration conforms to Section 24.401(d) of the zoning regulations. 11. Human -scale Design Elements. The proposed addition provides human scale design features. The applicant proposes using metal awnings over the windows on the northern and eastern first floor elevation to help relate the 2'/2 story building to the pedestrian. The location of an enclosed stairwell on the interior of the structure does not dominate a public side of the building. The synthetic stucco contains some windows to break up the massive wall found in the peak of the roof. These windows also allow natural light into the stairwell. The applicant proposes extensive plantings, which creates an environment inviting to the pedestrian. 12. Roofs as Design Elements: The proposed roof over the stairwell contains a pitch of 7 on 12. The minimum requirement for a two story structure in the CD2 District is a 5 on 12 pitch. The maximum pitch for the CD2 District is 12 on 12. Therefore, the pitch of the stairwell roof complies with the requirements. However, the proposed pitch needs to be noted on the plans. Where flat roofs are used in the CD2 District on structures of 2 or more stories, they must include architectural elements to improve appearance and provide interest. The proposed flat roof will be an innovative "green" roof containing a garden area and designed to provide stormwater retention. As noted already in this report, the garden wall will be sheeted with a teal colored stucco -like material, which mimics the roof color of the existing structure. The DRB concludes that the roof design conforms to Section 24.401(f) of the zoning regulations. 13. Orient Buildings to Public Street. In the CD2 District, new buildings shall be built to the street property line. However, the configuration of the existing building does not conform to this requirement and the proposed addition does not extend to the property line. Pursuant to Section 24.401(g) of the zoning regulations, the DRB may approve buildings that are setback from the street property line provided that the overall site layout is in conformance with City Center goals. For existing buildings, improvements shall be designed to relate the building better to the public street. The proposal includes eight windows, in pairs of two, across the lower level fronting on San Remo Drive. The windows allow for visual access to the interior of the building from the public street. In addition, paired openings in a wall at the southern end of the proposed addition offer an inviting entryway from the public street into a garden area. An exterior door on the north side of the \sMmichaud\S P#02-62.fcd.doc 3