Champlain Water District, hereafter referred to as the applicant, is seeking approval to
amend a previously approved site plan for a water treatment plant, chemical storage
facility, maintenance garage, and other accessory facilities. The amendment consists of
constructing a 343 sq ft office addition, 403 Queen City Park Road. The Development
Review Board held a public meeting on November 9, 2004. Wayne Elliott represented
the applicant.
Based on testimony provided at the above mentioned public meeting and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS of FACT AND DECISION
1. The applicant is seeking approval to amend a previously approved site plan for a
water treatment plant, chemical storage facility, maintenance garage, and other
accessory facilities. The amendment consists of constructing a 343 sq ft office
addition, 403 Queen City Park Road.
2. The owner of record of the subject property is Champlain Water District.
3. The subject property is located in the Commercial 1 (Cl) Zoning District.
4. The plans consist of a plan entitled, "Champlain Water District South Burlington,
Vermont Water Treatment Plant Office Expansion Contract No 8/B" prepared by
Forcier Aldrich & Associates, dated October, 2004.
Zoning District & Dimensional Requirements:
Table 1. Dimensional Requirements
C1 Zoning District
Required
Proposed
�l Min. Lot Size
40,000 SF
498,679 SF
�l Max. Building Coverage
40%
10.6%
�l Max. Overall Coverage
70%
23.3%
�l Max. Front Yard Coverage
30%
3.8%
Min. Front Setback
30'
>30'
Min. Side Setback
10,
>10'
Min. Rear Setback
30'
>30'
4 zoning compliance
- 1 -
SITE PLAN REVIEW STANDARDS
Section 14.06 of the South Burlington Land Development Regulations establishes the
following general review standards for all site plan applications:
(a) The site shall be planned to accomplish a desirable transition from structure
to site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
The layout of the subject property is not changing, as the proposed expansion is completely
within the existing building footprint.
Pursuant to Section 13.01 of the Land Development Regulations, the proposed 343 square
foot office space will require a minimum of 1.2 parking spaces. The subject property
currently contains 45 parking spaces. Staff does not feel that an additional parking space is
necessary as a result of the proposed project-
(b) Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
The parking spaces on the property are already in existence.
Pursuant to Section 13.01(G)(5) of the Land Development Regulations, the plans shall be
revised to depict a bicycle rack.
(c) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and
existing or adjoining buildings.
The height of the building will not change through the proposed project-
(d) Newly installed utility services and service modifications necessitated by
exterior alterations or building expansions shall, to the extent feasible, be
underground.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(e) The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual
interruptions to create attractive transitions between buildings of different
architectural styles.
The exterior of the building is not changing, so no additional buffers or visual interruptions
are necessary.
(f) Proposed structures shall be related harmoniously to themselves, the terrain,
and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures.
-2-
The existing building is consistent with the terrain and the surrounding buildings in the area.
Site plan applications shall meet the following specific standards as set forth in Section
14.07 of the South Burlington Land Development Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial of collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation
in the area.
It is not necessary to require the reservation of land for the provision of an access to
adjacent properties.
(b) Electric, telephone and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall
be located so as to have a harmonious relation to neighboring properties and
to the site.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not
escape the enclosure(s).
The plans do not depict a dumpster on the subject property.
(d) Landscaping and Screening Requirements
Pursuant to Table 13-9 of the Land Development Regulations, the proposed project will
require a minimum of $1,200 of landscaping. The application has requested a landscape
waiver for the full minimum landscaping requirement. The site is well landscaped so the
Board is willing to grant the waiver.
Pursuant to Section 13.06(B) of the Land Development Regulations, snow storage areas
must be specified and located in an area that will minimize the potential for run-off. The
plans do not depict proposed snow storage areas.
Lighting
Pursuant to Section 13.07(A) of the Land Development Regulations, all exterior lighting
shall be shielded and downcasting to prevent light from spilling onto adjacent properties
and rights -of -way. The applicant is not proposing any changes.
Access/Circulation
Access to the subject property is currently provided by a 35' wide curb -cut and a 25'
wide curb -cut on Queen City Park Road No changes are proposed.
-3-
Circulation on the site is adequate.
Traffic
No changes in traffic generation are estimated to result from the proposed project.
Other
The City Engineer reviewed and approved the plans on October 21, 2004.
// DECISION
Motion by seconded by
to approve Site Plan Application SP-04-43 of Champlain Water District, subject to the
following conditions:
1) All previous approvals and stipulations, which are not superseded by this approval,
shall remain in effect.
2) This project shall be completed as shown on the plans submitted by the applicant, as
amended by this decision, and on file in the South Burlington Department of Planning
& Zoning.
3) The plan shall be revised to show the changes below and shall require approval of
the Administrative Officer. Three (3) copies of the approved revised plan shall be
submitted to the Administrative Officer prior to permit issuance.
a) The plan shall be revised to depict a bicycle rack.
b) If a dumpster is existing or proposed on the subject property, the plan shall be
revised to depict the dumpster, adequately screened.
c) Pursuant to Section 13.06(B) of the Land Development Regulations, the plan
shall be revised to clearly depict the proposed snow storage areas.
4) Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility
lines, services, and service modifications shall be underground.
5) The Development Review Board grants the applicant a landscape credit of $1,200.
6) If necessary, the applicant shall obtain wastewater allocation approval from the
Director of Planning and Zoning, Juli Beth Hoover, prior to issuance of a zoning
permit.
7) The applicant shall obtain a zoning permit within six (6) months pursuant to Section
17.04 of the Land Development Regulations or this approval is null and void.
8) The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to the use of the newly constructed space.
9) Any change to the site plan shall require approval by the South Burlington
Development Review Board.
Chuck Boltonj
ay/abstain/not present
Mark Bouchernay/abstain/John Dinklagenay/abstain/no esent
Roger Farley — yea/na abstai of resent
Michele Kupersmith — ea ay/abstain not resent
Larry Kupferman — ea nay/abstain of present
Gayle Quimby —nay/abstain/not presen
Motion carried by a vote of 5 - v-
Signed this / day of November, 2004 by
John Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).
-5-