Loading...
HomeMy WebLinkAboutSD-10-02 - Decision - 0250 Quarry Hill Road#SD-10-02 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING BULLROCK CORPORATION — 250 QUARRY HILL ROAD PRELIMINARY PLAT APPLICATION #SD-10-02 FINDINGS OF FACT AND DECISION Bullrock Corporation, hereafter referred to as the applicant, is seeking preliminary plat review to amend a previously approved planned unit development consisting of five (5) multi -family dwellings for a total of 160 units and a 40 unit congregate housing facility. The amendment consists of constructing a 100 unit assisted living facility, 250 Quarry Hill Road. The Development Review Board held a public hearing on December 15, 2009 and on February 2, 2010. Andy Thomas represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is seeking preliminary plat review to amend a previously approved planned unit development consisting of five (5) multi -family dwellings for a total of 160 units and a 40 unit congregate housing facility. The amendment consists of constructing a 100 unit assisted living facility, 250 Quarry Hill Road. 2. The owner of record of the subject property is the Cupola Golf Course Inc. 3. The application was received on November 12, 2009. A revised application was received on January 27, 2010. 4. The subject property is located in the R12 Zoning Districts. 5. The plan submitted consists of an eight (8) page set of plans, page one (1) entitled, "Quarry Hill Subdivision South Burlington Vermont Proposed Master Plan", prepared by Llewellyn -Howley, Inc., dated 11/19/2009, last revised on 12/15/2009. Zonin_q District & Dimensional Requirements Table 1. Dimensional Reauirements R12 Zoning District Required Proposed �l Min. Lot Size 3,500 SF 2.71 acres Max. Density* 12 units/acre ** Max. Building Coverage 40% 22.4% Max. Total Coverage 60% 51.2% 1ADevelopment Review Board \ Findings_Decisions\201 Otullrock_SD1002_ffd.doc #SD-10-02 �l Min. Front Setback 30 ft. >30 ft. �l Min. Side Setback 10 ft. >10 ft. �l Min. Rear Setback 30 ft. >30 ft. �l Max. Building Height__]40 ft. 40 ft. �l zoning compliance ** assisted living facilities are not included in residential density calculations The applicant has submitted a revised application which states that they are seeking approval for a pitched roof building that is 40 feet high. The entire Quarry Hill subdivision was approved as a planned unit development and therefore all development approved on any of the lots will be viewed as cumulative development on the 25.67 acre property. PLANNED UNIT DEVELOPMENT STANDARDS Pursuant to Section 15.18 of the South Burlington Land Development Regulations PUDs shall comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. According to Section 15.13(B)(1) of the South Burlington Land Development Regulations, the existing public utility system shall be extended to provide the necessary quantity of water, at an acceptable pressure, to the proposed additional dwelling units. The South Burlington Water Department reviewed the plans and provided comments in a letter dated December 2, 2009. According to Section 15.13 of the South Burlington Land Development Regulations, the subdivider or developer shall connect to the public sewer system or provide a community wastewater system approved by the City and the State in any subdivision where off -lot wastewater is proposed. The South Burlington City Engineer reviewed the plans and provided comments in a memo dated November 19, 2009 . Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. 2 I:\Development Review Board\Findings_Decisions\2010\bullrock_SD1002_ffd.doc #SD-10-02 Access to the subdivision is proposed via Quarry Hill Road, which is currently privately owned and maintained. Quarry Hill Road is approved as a future city street and will extend from Spear Street to East Terrace, with the latter portion limited to emergency access only and regulated through signage. Access to the proposed buildings is via a 25 foot wide access drive from Quarry Hill Road. A 25 foot wide service drive is also proposed via Quarry Hill Road. The Board finds this to be sufficient and preliminary conversations with the Fire Chief have indicated that the layout is acceptable. The applicant submitted a traffic impact study performed by Wilbur Smith Associates in October, 2003 with the original subdivision, of which the subject property was part of. This traffic study analyzes the traffic impacts of 281 units, which is the maximum number of units allowed under the density requirement of the Land Development Regulations for the entire property. Fuss & O'Neill Inc. was contracted to perform technical review of that traffic impact study for the City. The traffic mitigation measures for the entire property were established during previous approvals (condition #9, application #SD-04-26). This condition shall remain in effect. The applicant has submitted a traffic impact report dated November 4, 2009 from Lamoureux & Dickinson Consulting Engineers which indicates that the proposed assisted living facility will add 26 pm peak hour trip ends to the previously approved 155 pm peak hour trip ends. The Development Review Board previously invoked a technical review of this traffic study. The City's consultant reviewed the plans and the traffic study, and responded in a memo dated January 21, 2010 (from BFJ consultant Georges Jacquemart). The applicant's traffic consultant submitted a response to the City technical review with a Technical Memorandum dated 1/29/2010. The City's consultant has yet to comment on this latest report. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. The plans submitted by the applicant depict Cathy O'Brien's wetland delineations. Although the planned unit development as a whole contains various wetlands, it does not appear that the lot proposed for development contains any wetlands. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. According to Section 4.05 of the South Burlington Land Development Regulations, the purpose of the R12 District is to encourage high -density residential use and planned unit developments shall be required. This project conforms to the planned development patterns in the area and the stated purpose of the R12 District. I:\Development Review Board\Findings_Decisions\2010\bullrock_SD1002_ffd.doc #SD-10-02 Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. The open space areas have been planned in accordance with the original subdivision of the Planned Unit Development. The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. The previously -approved public road will serve the proposed development. A sidewalk was previously -approved along the easterly side of the roadway. In addition, a 20' wide recreation path easement has been established along the southerly and easterly property boundary, connecting the Horizon Heights condominiums to the subject property. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. The location and height of all proposed exterior lighting, as submitted, are acceptable. The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The proposed project is consistent with South Burlington's Comprehensive Plan and Land Development Regulations. SITE PLAN REVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations, any PUD shall require site plan approval. Section 14.06 of the South Burlington Land Development Regulations establishes the following general review standards for all site plan applications: The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. The proposed project accomplishes a desirable transition from structure to site and from structure to structure. The applicant has addressed concerns about safe pedestrian movement through the parking lot with sidewalks which serve the entrance to the building from both the street and the parking area, as well as improvements to the parking area which facilitate movement through the access aisles. There is also a break in the center island and a striped safe crosswalk area. 4 I:\Development Review Boa rd\Findings_Decisions\2010\bullrock_SD1002_ffd.doc #SD-10-02 According to Table 13-1 of the South Burlington Land Development Regulations, the proposed 100-unit congregate care facility will require 60 parking spaces (0.6 parking spaces per dwelling unit). The applicant is proposing to provide 74 parking spaces on site. According to Table 13-7 of the South Burlington Land Development Regulations, the proposed project will require three (3) handicapped -accessible parking spaces; four are currently depicted on the plans. Parking: (a) Parking shall be located to the rear or sides of buildings. (b) The Development Review Board may approve parking between a public street and one or more buildings if the Board finds that one or more of the following criteria are met. The Board shall approve only the minimum necessary to overcome the conditions below. (i) The parking area is necessary to meet minimum requirements of the Americans with Disabilities Act; (ii) The parking area will serve a single or two-family home; (iii) The lot has unique site conditions such as a utility easement or unstable soils that allow for parking, but not a building, to be located adjacent to the public street; (iv) The lot contains one or more existing buildings that are to be re -used and parking needs cannot be accommodated to the rear and sides of the existing building(s); or, (v) The principal use of the lot is for public recreation. (c) Where more than one building exists or is proposed on a lot, the total width of all proposed parking areas that are both to the side of a building and between the front lot line and the building line of the building on the lot that is closest to the public street shall not exceed one-half of the total building width of all buildings on the lot that are located adjacent to the public street. Buildings separated from the front lot line by parking approved pursuant to 14.06(C)(2)(b) shall be considered adjacent to the public street. Buildings separated from the front lot line by any other parking areas shall not be considered adjacent to the public street. (d) The DRB shall require that the majority of the parking on through lots and corner lots be located between the building(s) and the side yards or between the building and the front yard adjacent to the public street with the highest average daily volume of traffic. Where the rear yard of a lot abuts an Interstate or its interchanges, the majority of parking shall be located between the building and the side yards or between the building and the yard that is adjacent to the Interstate. The subject property is considered a corner lot. Subject to section (d) above, the DRB may allow parking between the building and the public street provided that the parking is located between the building and side yards. The parking on this lot is proposed to be what the Board has deemed a side yard and therefore in compliance with this regulation. The site plan does include parking for four spaces to the front of the building. This is specifically prohibited under the Land Development Regulations. The plans should be revised to remove these parking spaces. Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. As already stated, the applicant has not requested a height wavier as part of this application. I:\Development Review Board\Findings_Decisions\2010\bullrock_SD1002_ffd.doc #SD-10-02 Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. The DRB shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. The applicant has submitted typical building elevations for multiple sides of the proposed buildings. Proposed structures shall be related harmoniously to themselves, the terrain, and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. The applicant has submitted typical building elevations for the proposed buildings. Site plan applications shall meet the following specific standards as set forth in Section 14.07 of the South Burlington Land Development Regulations: The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. The proposed project is part of a larger residential planned unit development. It is not necessary to require any specific access easements at this time. Electric, telephone and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). All dumpsters and solid waste facilities shall be accessible, secure, and screened to the satisfaction of the Development Review Board. Landscaping and Screening Requirements Pursuant to Section 13.06(B) of the Land Development Regulations, in all off-street parking areas with twenty (28) or more parking spaces, at least ten percent (10%) of the interior of the parking area shall be landscaped with trees, shrubs, and other plants. At 6 I:\Development Review Board\Findings_Decisions\2010\bullrock_SD1002_ffd.doc #SD-10-02 least one (1) major deciduous shade tree, whose caliper is equal to or greater than two and one-half (2.5) inches when measures six (6) inches above ground at the time of planting, shall be provided for every five (5) parking spaces. The applicant has submitted a landscaping plan in accordance with Sections 13.06(F) and 13.06(G) of the Land Development Regulations. The City Arborist has reviewed the plans and provided comments in a memo dated November 30, 2009. / DECISION Motion by / A " QUIOV seconded by � Fm to approve Preli inary Plat App (cation #SD-10-02 of the Bullrock Corpora ion, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plat submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. The plans shall be revised prior to final plat submittal as follows a. The plans shall be revised to remove the four (4) parking spaces proposed to the front of the building. b. The plans shall be revised to include a bicycle rack. c. The plans shall be revised to show the parking areas in compliance with the "Internal Landscaping of Parking Areas" requirements outlined in Section 13.06(B) of the South Burlington Land Development Regulations. d. The plans shall be revised to depict all proposed dumpsters and solid waste facilities, adequately screened. e. The plans shall be revised to show the location of snow storage areas. 4. The applicant shall adhere to the comments of the South Burlington Water Department. Where necessary, the plans shall be revised prior to final plat approval. 5. The applicant shall obtain preliminary wastewater allocation approval from the Director of Planning and Zoning prior to submittal of the final plat application and final wastewater allocation prior to issuance of a zoning permit. 6. The applicant shall adhere to the comments of the South Burlington City Engineer per the memo dated November 19, 2009. Where necessary, the plans shall be revised to comply with these comments. 7. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, 7 I:\Development Review Boa rd\Findings_Decisions\2010\bullrock_SD1002_ffd.doc #SD-10-02 the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 8. The applicant shall provide confirmation as to whether or not the lot proposed for development contains wetlands, with the final plat application. 9. The South Burlington Fire Chief should review the proposed plans, prior to final plat approval. 10. The size of the elevators in the proposed buildings shall be sufficient to hold a stretcher. 11. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. 12. The applicant shall adhere to the comments of the South Burlington City Arborist per the memo dated November 30, 2009. Where necessary, the plans shall be revised to comply with those comments. 13. The final plat application shall be submitted within 12 months. Mark Behr — e nay/abs in/not present Matthew Birmnha — et$nay/abstain/not present John Dinklage — nay/abstain/not present Roger Farley — e nay/abstain/not present Eric Knudsen — ye nay/abstai not resen Gayle Quimb — ea nay/abstain/not present Bill Stuono — e nay/abstain/not present Motion carried by a vote of-Q-0 Signed this ;� day of 2010, by John Dinklage, C airman Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRECP 5 in writing, within 30 days of the date this decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). I:\Development Review Board\Findings_Decisions\2010\bullrock_SD1002_ffd.doc