Loading...
HomeMy WebLinkAboutSP-10-52 - Supplemental - 0152 Quarry Hill Road07 23/2010 15:16 FAX 8028601014 HEIIVDEL NOYES U 002 Permit # -L—_ APPLICATION FOR THE DEVELOPMENT REVIEW BOARD All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. I understand the presentation procedures required by State Law (Section 4468 of the Planning & Development Act)_ Also that hearings are held twice a month. That a legal advertisement must appear a minimum of fifteen (1 S) days prior to the hearing. I agree to pay a hearing tee which is to off -set the cost of the hearing. Type of application (check one): ( ) Appeal from decision of the Administrative Officer (includes appeals from Notice of Violation ( } Request for a conditional use ( } Request for a variance (X) Other - Approval for >20 cubic yards of excavation PROVISION or ZONING ORDINANCE IN QUESTION (IF ANY), - WHAT ACTION OF THE ADMINISTRATIVE OFFICER ARE YOU APPEALING ? 1) OWNER OF RECORD (Name as shown on deed, maiteng address, phone & fax #): Horizon Heights Condominium Association c/o Nathan Dagesse PO Box 222 Waterbury Ct;r., VT 05677 683-9967 2) LOCATION OF LAST RECORDED DEED (book & page #) 3) APPLICANT (name, mailing address, phone and fax #) same as Comer of ReCO2 - see above 4) CONTACT PERSON (person who will receive staff correspondence. Include name, mailing address, phone & fax # if different from above): Shane M. Mullen - Heindel & Noyes, Inc. PO Box 4503, Burlinqton, VT 05406 658-0820 x23 5) PROJECT STREET ADDRESS: 152 Quarry Hill Road 6) TAX PARCEL ID #: 1420-00350 L 7) PROJECT DESCRIPTION A. Existing Uses on Property (including description and size of each separate use): Seven multifamily building condominium complex B. Proposed Uses on Property (include description and size of each new use and existing uses to remain): Proposed upgrade to existing grass channel behind carports, potential repairs to existing catch basins C. Total building square footage on property (proposed buildings & existing building to remain): Remains the same - 44,285 sf D. Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement & mezzanine): Remains the same E. Number of residential Units (if applicable, new units & existing units to remain): Remains the same - 77 units F. Number of employees & company vehicles (existing & proposed, note office vs. non -office employees): Not applicable G. Other (list any other information pertinent to this application not specifically requested above, please note if overlay districts are applicable): 8) LOT COVERAGE A. Total parcel size: 470,448 +/ - Sq. Ft. B. Buildings: Existing 10.2 %/ 48,382 Sq. Ft Proposed 10.2 % / 48,382 Sq. Ft. C. Overall impervious coverage (building, parking, outside storage, etc) Existing 26.9 % / 126, 324 + / - Sq. Ft. Proposed 2 6 . 9 % /12 6, 3 2 4 + / -Sq. Ft. D. Total area to be disturbed during construction: 16,271 +/- Sq. Ft. * * Projects disturbing more than one-half acre of land must follow the City's specifications for erosion control in Article 16 of the Land Development Regulations. Projects disturbing more than one acre require a permit from the Vermont Department of Environmental Conservation. 9) COST ESTIMATES A. Building (including interior renovations): $ B. Landscaping $ C. Other site improvements (please list with cost): _0,000 for swale improvements (estimated 10) ESTIMATED TRAFFIC: A. Average daily traffic for entire property (in and out): Remains the same B. A. M. Peak hour for entire property (in and out): Remains the same C. P.M. Peak hour for entire property (in and out): Remains the same 11) PEAK HOURS OF OPERATION Remains the same 12) PEAK DAYS OF OPERATION Remains the same 13) ESTIMATED PROJECT COMPLETION DATE October 2011 14) LIST ABUTTING PROPERTY OWNERS: (list names and address of all abutting property owners, including those across any street or right-of-way. You may use a separate sheet of paper if necessary): I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATURE OF APPLICANT SIGNA`WRE OF PROPERTY OWNER "17r lv /'N &-E SSA. Do not write below this line DATE OF SUBMISSION: 7 Ld- REVIEW AUTHORITY_ Development Review Board Director, Planning & Zoning I have reviewed this application and find it to be: C] COMPLETE ❑ Incomplete Director of Planning & Zoning or Designee Obate Horizon Heights Abutting Landowners UVM & State Agricultural College 85 South Prospect Street Burlington VT 05401 University Mall LLC 155 Dorset Street, South Burlington VT 05403 Joel & Hinda Miller 84 Deforest Heights, Burlington, VT 05401 Wang Qingbin 72 East Terrace, South Burlington, VT 05403 Kevin & Margaret Sleeper 46 Cliff Street, Burlington, VT 05401 Larkin Realty & Cupola Golf Course Larkin — 410 Shelburne Road, South Burlington, VT 05403 Cupola Golf Course — 360 Spear Street, South Burlington, VT 05403 u:\projects\horizon heights\2010\local permitting\hor hts abuttors.docx Consulting Hydrogeologists Engineers HVN Heindel & Noyes, Inc. • Environmental Scientists P.O. Box 4503 Burlington, VT 05406-4503 Voice 802-658-0820IFax 802-860-1014 July 16, 2010 Mr. Ray Belair Administrative Officer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: Horizon Heights Condominiums Stormwater Improvements Dear Ray: The Horizon Heights Condominium Association (HHCA) was notified by the ANR Stormwter Section that it is subject to stormwater permit 3-9030 ("RDA permit"). Heindel & Noyes was selected to perform an Engineering Feasibility Analysis (EFA) to determine what stormwater system improvements are necessary to bring the site into compliance with the terms and conditions of the RDA permit. We evaluated the site in the winter of 2009 and proposed a swale improvement as the most effective measure to comply with the permit. On July 13, the ANR gave its approval to the design. During the review process, Tom DiPietro, South Burlington's Stormwater Superintendent, was involved and has approved the design concept. Enclosed with this letter are an application for Development Review Board approval, list of abutting landowners, application fee ($88), five full-size drawing sets and one reduced drawing set. Please review the enclosed information and place us on the first available opening for a DRB hearing. Let me know if you have any questions on this matter. Sincerely, Shane M. Mullen, P.E. Project Engineer cc: Nathan Dagesse — HHCA u:\projects\horizon heights\2010\1ocal permitting\drb misc app trans Itr.docx