Loading...
HomeMy WebLinkAboutSP-07-85 - Decision - 0000 Quarry Hill Road#SP-07-85 CITY of SOUTH BURLINGTON DEPARTMENT of PLANNING & ZONING RALPH DESLAURIERS, JR, LOT 2 SITE PLAN APPLICATION #SP-07-85 FINDINGS of FACT AND DECISION Ralph Deslauriers, Jr., hereafter referred to as the applicant, is requesting site plan approval to construct one (1) 32-unit multi -family dwelling on a 1.85 acre lot, Quarry Hill Road. The South Burlington Development Review Board held a public hearing on December 11, 2007. Skip McClellan represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is requesting site plan approval to construct one (1) 32-unit multi -family dwelling on a 1.85 acre lot, Quarry Hill Road. 2. The owner of record is Cupola Golf Course, Inc. 3. The subject property contains 1.85 acres and is located in the Residential 12 Zoning District. 4. The plans consist of a five (5) page set of plans, page one (1) entitled, "Quarry Hill Subdivision South Burlington Vermont Site Plan QHC-Lot #2", prepared by Llewellyn - Howley, Inc., dated 10/25/07, last revised on 10/25/07. -1- Zoning District & Dimensional Requirements Table 1. Dimensional Requirements R12 Zoning District Required Proposed Min. Lot Size 3,500 SF 1.85 acres A Max. Density 12 units/acre 3.74 units/acre �l Max. Building Coverage 40% 11.2% Max. Total Coverage 60% 25.2% Min. Front Setback 30 ft. ±30 ft. �l Min. Side Setback 10 ft. >10 ft. Min. Rear Setback 30 ft. >30 ft. + Max. Building Height 40 ft. 56 ft. 2 in. zoning compliance a. waiver required pursuant to Section 3.07(F)(2) of the Land Development Regulations The coverage calculations listed in Table 1 are based on the entire 25.67 acre PUD, including existing and previously approved development. SITE PLAN REVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations, any PUD shall require site plan approval. Section 14.06 of the South Burlington Land Development Regulations establishes the following general review standards for all site plan applications: The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. The proposed project accomplishes a desirable transition from structure to site and from structure to structure. The site provides for adequate planting and safe pedestrian movement. According to Table 13-1 of the South Burlington Land Development Regulations, the proposed project will require 72 parking spaces (2 parking spaces per dwelling unit plus 1 parking space for every 4 dwelling units). A total of 72 parking spaces are proposed for the subject building: 25 underground parking spaces, 33 aboveground parking spaces, and 14 overflow parking spaces on the adjacent lot (Quarry Hill Club). 2 According to Table 13-7 of the South Burlington Land Development Regulations, the proposed project will require three (3) handicapped -accessible parking spaces. These three (3) handicapped -accessible parking spaces are depicted on the plans. The proposed parking lots conform to the Parking Lot Dimension Requirements, as outlined in Section 13-8 of the South Burlington Land Development Regulations. Parking shall be located to the rear or sides of buildings to the greatest extent practicable. The proposed project contains three (3) parking areas. One is located on the southerly side of the proposed building, one (1) is located on the northerly side of the proposed building, and one (1) is located under the proposed building, resulting in 25 parking spaces under the building and 33 surface parking spaces. In addition, there is a parking lot across the street that serves the Quarry Hill Club, which has 14 parking spaces designated for the subject building. Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. The height of the proposed building is 56'2" above average pre -construction grade. The maximum height for buildings with peaked roofs in South Burlington is 40'. Therefore, the applicant must obtain waiver of 16'2". Pursuant to Section 3.07(F)(2) of the Land Development Regulations, for structures proposed to exceed the maximum height for structures specified in Section 3.07(D) of the Land Development Regulations, as part of a planned unit development or master plan, the DRB may waive the requirements of this section as long as the general objectives of applicable zoning district are met. A request for approval of a taller structure shall include the submittal of a plan(s) showing the elevations and architectural design of the structure, pre -construction grade, post -construction grade, and height of the structure. Such plan shall demonstrate that the proposed building will not detract from important public scenic views from adjacent public roadways and other public rights -of -way. The applicant has submitted building elevation plans that indicate the pre -construction grade and the post -construction grade for the subject property. Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. The DRB shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. 3 This criterion is being met. Proposed structures shall be related harmoniously to themselves, the terrain, and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. This criterion is being met. Site plan applications shall meet the following specific standards as set forth in Section 14.07 of the South Burlington Land Development Requlations: The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. The layout of the proposed project would create a total of five (5) curb -cuts between Quarry Hill Club Lot #2, Quarry Hill Club Lot #3, and Larkin Lot #1. The applicant has designed the parking layout to create a shared access between the surface parking lot of the proposed project and the surface parking lot to south of the building on Larkin Lot #1. Electric, telephone and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). The plans depict an adequately screened dumpster in the northeasterly corner of the proposed parking area to the north of the proposed building. Landscaping and Screening Requirements Pursuant to Section 13.06(A) of the proposed Land Development Regulations, landscaping and screening shall be required for all uses subject to site plan and PUD review. According to the applicant, the proposed project will cost approximately $1,920,000. Based on this number, and in accordance with Table 13-9 of the South Burlington Land Development Regulations, the minimum landscaping requirement is $26,700. The applicant has submitted a landscape plan and budget prepared by Green Mountain Earth Care, which 10 are in compliance with Section 13.06 of the Land Development Regulations. The landscape budget indicates that only $23,974 worth of new landscaping will be planted on the site. There is a variety of existing landscaping along the southerly boundary of the site, which the applicant is seeking to obtain a credit of $2793 for. This credit is supported, which would bring the applicant's total landscape budget to $26,713. Pursuant to Section 13.06(B) of the Land Development Regulations, in all off-street parking area with twenty (20) of more parking spaces, at least ten percent (10%) of the interior of the parking area shall be landscaped with trees, shrubs, and other plants. At least one (1) major deciduous shade tree, whose caliper is equal to or greater than two and one-half (2.5) inches when measures six (6) inches above ground at the time of planting, shall be provided within each parking area for every three thousand (3,000) square feet of paved area or every ten (10) parking spaces, whichever is greater. The parking area to the north of the proposed building must meet this requirement, as it contains twenty-six (26) parking spaces. The landscape plans prepared by Green Mountain Earth Care depict adequate plantings in this parking area. Pursuant to Section 13.06(B) of the Land Development Regulations, snow storage area must be specified and located in an area that will minimize the potential for run-off. The plans depict adequate snow storage areas for the northerly parking area, but not for the southerly parking area. Pursuant to Section 13.06(C)(1) of the South Burlington Land Development Regulations, any dumpsters and utility cabinets on the site should be effectively screened to the approval of the Development Review Board. The plans depict and adequately screened dumpster to the north of the proposed building. The City Arborist reviewed the final plat plans and provided comments in a letter dated June 30, 2004. Access Access to the proposed building is proposed via two (2) 30' wide curb -cuts along the proposed public road. One (1) curb -cut serves the eight (8) parking spaces to the south of the proposed building. The other curb -cut is shared access with the building to the north and serves the twenty-six (25) surface parking spaces to the north of the proposed building and the twenty-four (25) underground parking spaces. Staff has some concerns regarding the 30' wide curb -cut serving only eight (8) parking spaces, but this seems to be the be the only practical option for serving a parking area to the south of the proposed building. Interstate Highway Overlay District (IHO) All of the proposed development on the subject property is located outside of the 150' wide buffer created by the Interstate Highway Overlay District. 5 DECISION Motion by Gayle Quimby, seconded by Mark Behr, to approve Final Plat Application #SD-04-40 of Ralph Deslauriers, Jr., subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect, except as amended herein. 2. This project shall be completed as shown on the plans submitted by the applicant, as amended by this decision, and on file in the South Burlington Department of Planning & Zoning. 3. The applicant shall comply with the requests of the South Burlington Water Department, as outlined in the letter from Jay Nadeau, dated June 9, 2004, prior to permit issuance. 4. The applicant shall comply with the requests of the South Burlington Fire Department, as outlined in the letter from Chief Brent dated July 1, 2004. 5. The applicant shall comply with the requests of the City Engineer, as outlined in his letter dated June 10, 2004, prior to permit issuance. 6. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 7. The applicant shall comply with the traffic mitigation measures identified during the meeting between staff and the applicant on March 10, 2004, as outlined in the memorandum from Juli Beth Hoover dated March 10, 2004. The applicant shall post a bond, prior to issuance of a zoning permit, sufficient to cover the cost share of the required improvements for a period of four (4) years, or until such time as the improvements are constructed. The timing of construction shall be determined by the Director of Public Works, the applicant, and the University of Vermont. 8. Pursuant to Section 15.13(E) of the South Burlington Land Development Regulations, any new utility lines shall be underground. 9. The applicant shall post a $26,700 landscape bond prior to the issuance of the zoning permit. This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 10. Pursuant to Section 15.08(D) of the South Burlington Land Development Regulations, the applicant shall submit homeowner's association legal documents prior to the issuance of the zoning permit. The documents that include language that: a) prohibits clearing or disturbance of land within wetlands or wetland buffers; b) recreational vehicle parking will be prohibited on the property; AND 0 c) ensures that the association shall assume all maintenance responsibilities for the stormwater drainage facilities until such time as a future City stormwater utility accepts the stormwater infrastructure. 11. Pursuant to Section 3.07(F)(2) of the Land Development Regulations, the Development Review Board grants the applicant a 16'2" height waiver for the building at 264 Quarry Hill Road, for a total building height of 56'2" from average pre -construction grade. 12. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval will become null and void. 13. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to the occupancy of the building. 14. Any change to the final plat plans shall require approval of the South Burlington Development Review Board or the South Burlington Administrative Officer. Mark Behr ye /nay/abs in/not present Matthew Birminpye, e /nay/abstain/not present John Dinklage nay/abstain/not present Roger Farley — ea/nay/abstain of presen Eric Knudsen — Pea y/abstain/not present Peter Plumeau —nay/abstain/not present Gayle Quimby —ay/abstain/not present Motion carried by a vote of 'C" Signed this f ( day of 2) 'Q-4_- 2007, by John Din lage, Chai Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). 7