HomeMy WebLinkAboutSD-88-0000 - Decision - 0000 Quarry Hill RoadPLANNING COMMISSION 31 MAY 1988
The South Burlington Planning Commission held a meeting on
Tuesday, 31 May 1988, at 7:30 pm, in the Conference Room, City
Hall, 575 Dorset Street.
Members Present
Peter Jacob, Chairman; William Burgess, Judith Hurd, Mary -Barbara
Maher, Catherine Peacock, Ann Pugh, John Belter
Also Present
Jane Lafleur, City Planner; Sid Poger, the Other Paper; Steve
Hastings, Robin Worn, Terrence Boyle, Ralph Deslauriers, Jr.,
Charles Deslauriers, Ralph Deslauriers, Sr, Peter Doremus, Mike
Keller, Robert Krebs, Dave Cable, Jean H. Bressor, Lee Nelson,
George Crooks, Lance Llewellyn, Barbara Laing, Reba Drabble,
Lorraine Kaplan, Barbara Bull, Mary & George De Farge, Phyllis &
Henry Atherton, Nancy Bell, Gillian Bell, Jack Provencher, Joe
Randazzo, Rita Randazzo, James Smullen, John Crabbe, Jr., John
Floyd, Howard Fitzpatrick, Richard Feeley, Bob Marcellino, Eugene
Szatkowski, Ed Granai, Art Ross, Barbara Pell, Madeline Yandow,
Mildred & Bobbi Jo Estey, Vernon Wamsganz, Rich Connelly, Regina
O'Flaherty, Gretchen Wamsganz, Thomas Davis, Richard Bigham,
John Hausner
1. Minutes of 10 May 1988
Mrs. Maher moved the Minutes of 10 May be approved as written.
Mr. Burgess seconded. Motion passed unanimously.
2. Request of Kenneth Smith for extension of site plan on Lot #8,
Ethan Allen Drive.
Mrs. Lafleur noted the site plan expires tomorrow, and the
applicant has requested an extension.
Mrs. Maher moved to qrant Kenneth Smith a 6 month extension to the
site plan approval for Lot #8, Ethan Allen Drive. Mr. Burgess
seconded. Motion passed 5-0 with Mr. Belter abstaining as he is
an adjacent property owner.
3. Public Hearing: Final Plat application of Synon Group for sub-
division of 1.55 acre lot from the 26+ acre Cupola Golf Course
property, Quarry Hill Road
Peter Doremus said this is the plan for the Day Car facility and
office building which the Commission had seen as a sketch plan.
PLANNING COMMISSION
31 May 1988
page 2
Mrs. Maher raised the question of what the developer or owner of
the entire property should do about the street from the ingress at
Spear Street to the property in question. Mrs. Lafleur said there
is some controversy about this. Based on previous minutes, it is
clear to her that Quarry Hill Rd. should be fully upgraded at any
further development in this area. It was her feeling the road
should be upgraded from Spear St. to Quarry Hill Club and that it
should be part of the approval motions for both the subdivision
and the building proposal. The road should be to City standards,
30 feet of pavement, curbs, with an appropriate base for a city
street. Mrs. Maher asked about sidewalks. Mrs. Lafleur said she
hadn't considered on which side the sidewalk should go.
Mrs. Lafleur noted the sewer line had been shown but the water
line was not located accurately and should be properly indicated
prior to recording of the plan. The City Manager would also have
to see plans for sewering the building prior to permit as the building
may require. -the sewage to be pumped rather than gravity lines.
Mr. Deslauriers, Jr. said he would like to do the road in 2
phases, the first to be the sub -base and 26 ft. of pavement. The
second phase would occur on development or improvement on Quarry
Hill. He said they were asking this because of cost. He did not
dispute the need to upgrade the road, but asked to not have to put
in curbs, sidewalks, and storm sewer until there was more de-
velopment.
Mrs. Lafleur stressed that the stipulation to upgrade the road was
placed on the Deslauriers not on the developers of Horizon Heights
and was part of the original subdivision stipulations. Ralph, Jr.
said the Minutes of 3/22/77 seem to say the opposite. Mr. Burgess
noted this was in discussion. The motion calls for the upgrading.
Mrs. Lafleur said the motion passed was to fully upgrade on
further development, and it was passed unanimously.
A poll of the commission showed all members wanted the upgrading
done now.
Ralph, Jr. asked if it could be done only to the Synon entrance.
They are now using some of the other land for overflow parking for
Quarry Hill. Mrs. Lafleur felt they should see a design to know
what they*ffects would be. There would have to be a turn -around
for snowplows if the road doesn't go all the way. Mr. Belter said
he would like to see where the overflow parking is and where fire
access would be, etc. Mrs. Lafleur said the volume of traffic is
a problem. The Club produces traffic, and it may be preferable to
go all the way down to the Club. Ralph, Sr. said it would help
from a financial point of view to have the road end at Synon.
Mrs. Hurd asked how the sidewalk could ever get the rest of the
way to Quarry Hill. She couldn't see another developer paying for
it. Ms. Pugh felt the office building would generate business for
Quarry Hill, and that the sidewalk should go all the way.
PLANNING COMMISSION
31 May 1988
page 3
Mrs. Maher felt the sidewalk should go at least to the far end of
the Synon property line. Ms. Pugh felt if the Quarry Hill lot
were to be used for a snowplow turnaround, there should be a stip-
ulation that Quarry Hill not be open year round. Ms. Peacock sug-
gested approving the application with a full city street and city
standard cul de sac and then having the applicant come back in 2
weeks if they want it amended and if the Planning Commission
agrees after getting more information. Mrs. Hurd stressed the
City had to be protected so that in 5 years someone doesn't come
in and ask where the sidewalk is and the City would then have to
build it at taxpayers expense.
Mr. Bigham said he is troubled because the owners of the Cupola
have planted 20 trees to block the views of residents of Horizon
Heights and felt this was an act of spite on the part of the
Deslauriers.
Mrs. Hurd moved the Planning Commission approve the Final Plat ap-
plication of the Synon Group, Peter Doremus, agent, for
subdivision of a 1.59 acre parcel from the cupola Golf Course
property located south of Gaynes as depicted on a plan entitled
"Final Plat: Synon Group, Quarry Hill Road, South Burlington, VT"
prepared by Krebs and Lansing, dated May 1988 with the following
stipulations•
1. Quarry Hill Road shall be constructed to City standards with 30
feet of pavement, curbs and a sidewalk on one side fronm Spear
Street to the Quarry Hill Club parking lot with a city standard
size cul de sac. These road improvements shall be recorded on the
plan and approved by the City Planner prior to recording. A bond
shall be posted for this rior to permit for any development or
construction.
2. Legal documents for the offer of dedication and deed for Quarry
Hill Road shall be submitted to the City Attorney for approval
prior to permit.
3. The water and sewer lines shall be shown on the plans prior to
recording.
4. Street details shall be approved by the City Engineer prior to
permit.
5. It is the applicant's responsibility to record the corrected
final plat within 90 days or this approval is null and void. It
must be approved by the Planner and signed by the Chairman or
Clerk of the Commission prior to recording.
Mr. Burgess seconded the motion which passed unanimously.
4. Site plan application of the Synon Group for construction of a
9800 sq. ft., 2 story day-care and office building for MCHV,
Quarry Hill Road