HomeMy WebLinkAboutZB-88-0000 - Supplemental - 0000 Quarry Hill RoadState of Vermont,
Water Supply and Wastewater Disposal
CASE NO. WW-4-0026
APPLICANT Synon Group
ADDRESS 112 Lake Street
Burlington, Vermont 05401
LAWS/REGULATIONS INVOLVED
ENVIRONMENTAL PROTECTION RULES
Chapter 4, Public Buildings
This project, consisting of constructing an office building for
20 employees on an existing lot located off Quarry Hill Road in
the City of South Burlington , Vermont is hereby approved under
the requirements of the regulations named above, subject to the
following conditions.
GENERAL
(1) This permit does not constitute Act 250 approval (Title
V.S.A., Chapter 151). The permittee is hereby reminded to
procure all relevant State and local permits prior to
proceeding with this project.
(2) The project shall be completed as shown on the plans
Project 88137, sheet 5 of 8 "Details" dated 8/08/88, sheet 6
of 8 "Details" dated 8/8/88, and sheet 8 of 8 dated May
revised 6/7/88, prepared by Robert C. Krebs, P.E., which
been stamped "approved" by the Division of Protection. The
project shall not deviate from the approved plans without
prior written approval from the Division of Protection.
(3) A copy of the approved plans and this Permit shall remain on
the project during all phases of construction and, upon
request, shall be made available for inspection by State or
local personnel.
(4) In the event of a transfer of ownership (partial or whole)
of this project, the transferee shall become permittee and
subject to compliance with the terms and conditions of this
permit.
(5) By acceptance of this permit, the permittee agrees to allow
representatives of the State of Vermont access to the
property covered by the permit, at reasonable times, for the
purpose of ascertaining compliance with Vermont
environmental/health statutes and regulations, and with this
permit.
WATER
(6) The water main extension is approved provided the water main
extension is constructed in strict accordance with the
Department of Health's "Letter of Approval" (WSID # 5091) to
Mike Keller dated December 27, 1988.
SEWAGE
(7) The project is approved for connection to the City of South
Burlington Airport Parkway wastewater treatment facility for a
maximum of 300 gallons per day.
Synon Group
ww-4-0026
Page 2
(8) A professional engineer, registered in the State of Vermont,
is to generally supervise the construction of the sanitary
sewer line extensions and, upon completion of construction,
the supervising engineer is to submit to the Protection
Division a written certification stating all construction has
been completed in accordance with the stamped approved
plans. The engineer's certification is to be submitted to
the Division prior to the occupancy of any unit and the
certification shall include, but not be limited to, the
numerical results of all leakage testing performed on each
segment of the sanitary sewer extension and all manholes,
as described in Appendix A, of the Environmental Protection
Rules.
Patrick A. Parenteau, Commissioner
Department of Environmental
Conservation
By
Ernest P. Christianson
Regional Engineer
Dated at Essex Jct., Vermont this 9th day of February 1989.
cc: Donald Robisky
City Planning Commission
Department of Health
Department of Labor & Industry
Robert C. Krebs, P.E.
Construction Management Inc.
State UA Vermont
AGENCY OF ENVIRONMENTAL CONSERVATION
Department of Fish and Wildlife
Department of Forests, Parks and Recreation
Department of Water Resources & Environmental Engineering
.
Natural Resources Conservation Council
October 3, 1988
Synon Group
112 Lake Street
Burlington, VT 05401
Gentlemen:
Department of Water Resources
and
Environmental Engineering
Essex Junction Regional Office
III West Street
Essex Junction, Vermont 05452
1-8i9-6563
RE: Application WW-4-0026; New building for Daycary and Office,
Quarry Hill Road, South Burlington, Vermont.
Our office has completed an initial review of the above
referenced project and have determined that the additional
information listed below will be needed before approval can be
granted.
(1) Please submit a copy of the "letter of approval" from the
Department of Health for the water main extensions.
Please submit two copies of any revised plans.
Please note that no construction is granted until written
approval is issued by the Division and all other authorities.
Upon receipt of the above items, we shall continue our review.
Should there be any further questions, please do not hesitate to
contact me.
Sincerely,
Ernest P. Christianson
Regional Engineer
cc: City of South Burlington
Department of Health
Department of Labor and Industry
Robert C. Krebs
Construction Management Inc.
A.
J''
M E M O R A N D L,`l `
TO: South Burlington Planning Commission
FROM: Jane B. Lafleur, City Planner
RE: May 31, 1988 Agenda Items
DATE: May 27, 1988
2. Synon Group Subdivision, Cupola Golf Course, Quarry Hill Road
The Synon Group proposes to subdivide a 1.55 acre parcel from the
26+ acre golf course property. The area is zoned Residential
Seven.
Streets: Access is proposed from Quarry Hill Road that also
serves Horizon Heights and the Quarry Hill Club. In the Horizon
Heights approval it is clear that the road must be upgraded to a
City Street upon any further development in this area. Ralph
Deslauriers is requesting that this upgrading be phased with
development of this lot and additional lots. I believe the
street should be 30 feet of pavement width with curbs and
sidewalk on one side with no waiver to this requirement.
(See enclosed minutes from 1976 and 1977.)
Utilities: The plans show sewer lines. Water has not been
located accurately yet but should be shown prior to recording.
See Bill Szymanski's comments regarding this.
Other: As requested by the Planning Commission at sketch plan,
the closest Horizon Heights building is shown on the subdivision
plan. The Zoning boundaries are not shown but should be
available at the meeting as the Commission requested.
See Bill Szymanski's comments.
3. Synon Group Day Care, Quarry Hill Road
The Synon Group proposes to construct a 9800 square foot
daycare/office building on two floors (4900 square feet per
floor) for MCHV. The property is zoned R7 and this conditional
use was approved by the Zoning Board.
Access: Access is shown from Quarry Hill Road. This should be
upgraded to a City Street and a bond posted prior to permit. The
driveway into the property is 22 feet wide.
Circulation: Circulation is shown on two sides of the building
with a cul de sac / drop off area on the south side of the
building.
1
l
Memorandum
May 27, 1988
Page 2
Parking: The 4900 square foot office
care for 60 children requires 12
standards for 32 total spaces. The
dumpster blocks one of these spaces.
requires 20 spaces. The day
spaces using Burlington's
plan shows 41 spaces but a
Landscaping: The $700,000 building requires $14,500 in new
landscaping. The plan is valued at approximately $10,200 and
should be revised to reflect the required amount prior to permit.
Traffic: En osed is a traffic study by Roger Dickinson. The
study conc des that 78 trip ends will be generated during the
p.m. pea hour. It estimates that 75% will access from Spear
Street. Quarry Hill Road will have a level of service A both
with and without the project in 1988 and 1993. Although the
study finds that no additional turning lanes are needed, the
width of Quarry Hill Road is substandard, according to the study.
Upgradilu)
it a C I(� Street will solve this pro lem.
Gl-G J (M QVCw (A �1 �
Craig Leiner has reviewed the study and has no comments on it.
Sewer: The office requires 300 gallons per day sewer allocation;
the day care requires 1005 gpd for children and staff for 1305
total. The $2.50 per gallon fee must be paid prior to permit.
Setbacks: The proposed building does not infringe on the 50 foot
setback from the interstate ramp or the setback from the brook
(Conservation Zone).
Other: See Bill(Szymanski's and Chief Goddette's comments.
4) Village at Dorset Park, Southsett Partnership, 900 Dorset
Street
Southsett Partnership proposes to develop 108 multi -family units
in 27 buildings and 70 single-family lots on 40 acres. The area
is zoned Agricultural- Rural Residential.
Access: Access is shown from the 32 foot wide Swift Street
Extension within an 80 foot right-of-way that will be deeded to
the City. Two streets run northerly from Swift Street extension
to serve the development.
Circulation: Circulation is adequate with all public streets
throughout the project.
Parking: The multi -family buildings show 12 spaces for every 4
units including garage spaces. The single family units will have
a two car garage and two spaces in each driveway.
2
�4 SyM ton Cyr
State of Vermont
Department of Fish and Wildlife
Department of Forests, Parks and Recreation
Department of Environmental Conservation
State Geologist
Natural Resources Conservation Council
October 8,1991
Mr. Mike Keller
Synon Group
289 College Street
Burlington, VT 05401
AGENCY OF NATURAL RESOURCES
Department of Environmental Conservation
111 West Street
Essex Jct., VT 05452
(802) 879-6563
Re: Project WW-4-0026; Office & Day Care Building, Quarry Hill
Road, South Burlington, Vt.
Dear Mr. Keller:
Our office has received a copy of a letter from Mr. Kris
Khatri, Ph.D., Environmental Engineer, to you dated September
16,1991. Basically, Mr. Khatri's letter voids his office's
"Letter of Approval" dated December 27,1988 to construct a water
system to serve the above referenced project.
Permit WW-4-0026 was issued conditioned upon constructing
the water line referenced in the "Letter of Approval". If this
water line is not to be constructed, our office needs to be
advised how you intend to provide water to the building. Permit
WW-4-0026 will need to be amended to reflect the new water supply
for the building. Enclosed, please find an application form.
Please contact this office ,should you have any questions.
Sincerely,
=rnest. P. Cnristianson
Regional Engineer
CC: City of South Burlington
Water Supply Division
Robert C. Krebs
Regional Offices - Barre/Essex Jct./Pittsford/N. Springfield/St. Johnsbury
Goldstein, Manelld 3urak & Gabel
Counsellors at Law
TWO Waterfront Place O 86 Lake Street
Burlington. Vermont 05402
Telephone 802 862-0500
Telecopier 802 862-8176
265 Franklin Street.
Boston. 1lamachusetls 02110
Telephone 617 439 8900
The G&M Law Group
with affiliated ottit•e.s in
Benton. MIA
Burlington. VT
Hartford, l,T
Kitten. ME
Portsniouth, NH
Pmvicience. HI
Michael L Burak'
Andrew L Eisenberg
PatriclaGabel'
Robert B. Carpenter. P. c.
Jon Anderson
Martin S. Allen. P. C.
David Hyman'
Rosemarie Sbaratta, r. C.
OfCouns+•1
Peter E. Leman
H. Kenneth Merritt. Jr.'t
Robert U. Cu
n
Jetl4ry L Slusiman
Michael E. Meesas
Gayle M. Slerhng
'Also admitted in New York
Warren 1. Green
t Also adirdUed In New Jersey
Janet E. Bostwick
Michael Unger
Goldstein & Manello
Natalie B. Choate
Joseph B. Monello, r. c.
.Joseph S. Ayoub. Jr.
Gerard D. Goldstein, r. C.
Ralph K. stone
RiehardJ.Snyder. P.c.
Michael F.Callahan
Stephen M. Honig. P. C.
George W. M,vkulak
Carl K. King. P c.
Donald C. RRinan
Michael R_Bmwn
Mark A. Berthiaume
Gary R. Greenberg, P. c.
RobertC. Horner
AnthonvD.Martin,r•.c.
LouisJ.1AvrmJr.
Robert Sonimr.
.lames A.Ilghtman
January 24, 1989
Steven F. Stitzel, Esq.
Stephanie Pax Flanigan
Jonathan L. Moll
Michael H. Riley
Peter SI. Golemme
Elliot K.Gordon
Paul C. BUkernma
Beverly A. Kogut
Isaac Lvumkls
Lawrence R. Kulig
Lauren Jennings
Vicki L Kauhnan
Garb' A. Cohen
Arta ur L Streeter
BrooksS.Thaver
Stan' E. McNerney
Slichael B. Cohen
David A. Scigel
Steven L Manche[
Thomas P. LaFrance
,JetTrtgvM. Wolf
Steven St. E1IN
Of Counsel
Joseph S. Ayoub, Sr., P.c.
Richard B. Parker
David P.1'iln
JAH26 r�
McNeil, Murray $ Sorrell N"ANAG=''S OF'F►CF
271 South Union Street
Burlington, Vermont 05401
Re: Cupola Golf Course, Inc. to City of South Burlington
Dear Steve:
Thank you for your January 11, 1989 letter. In that letter,
you propose three changes to Cupola Golf Course ("Cupola")'s
proposed deeds. The first simply corrects metes and bounds
descriptions. Although I am unsure what you mean by "QHR #10," I am
willing to make any techincal changes that are necessary. The
second and third changes are more difficult as outlined below. I
suggest our clients' business representatives, you and I meet. In
that way, we can better understand what you want and agree on what
we can give.
I am troubled by your second proposal regarding the need for
sure access to Cupola's lands. On the one hand, the issue is
important to Cupola. The land Cupola is granting is the only sure
access Cupola has to its lands. That land is valuable if access
exists and next to worthless if it does not. Any well thought out
developer is going to be concerned with knowing that access is
available. This is especially true for any developer facing
opposition.
Steven F. Stitzel, Esq.
January 24, 1989
Page 2
As you know, Bill Szymanski and Ralph DesLauriers met some
time ago on this issue. Ralph believes that Bill agreed the roadway
Cupola is granting could be used in all events for access to
Cupola's lands. Access would be available even if Cupola's lands
were developed commercially as your zoning ordinance requires. This
protection is minimal since as you and I both know, the planning
process will require Cupola to demonstrate adequate access to any
development it might construct on its lands.
On the other hand, the issue should be unimportant to the City
of South Burlington. Townships are generally in the business of
maintaining access -- not of taking it away. Indeed, they spend
millions of dollars each year to maintain access to the lands of the
taxpayers in their townships. I serve as an Alderman in
Montpelier. I cannot imagine trying to reserve a right to tell
people they cannot access our highways. If Montpelier asked me as a
private citizen to convey land along a roadway, I would not do so at
the risk of leaving my house without access.
Yet, leaving the City of South Burlington in a position to
deny access is exactly what your second proposal appears to do. The
sum and substance of your proposal is that Cupola would not
relinquish any rights it has to use the roadway. I am unaware of
any formal legal rights Cupola has to use the roadway unless we
reserve them now. Your language then offers Cupola nothing. If, on
the other hand, you are aware of such rights and Cupola would
reserve something through your language, what is the problem with
spelling out that reservation as I have tried to do in Cupola's deed?
As you know, Cupola has from time to time conveyed to others
rights -of -way in the roadway. The conveyance to the City of South
Burlington will be subject to those rights -of -way. I am having
difficultly explaining to Cupola why the City of South Burlington
would take the roadway subject to rights -of -way to some but not to
Cupola.
Your third request is also troublesome. In effect, you
propose that Cupola guarantee the continued operation of the day
care center. If, for any reason, the day care center does not open
or its operation ends, Cupola loses the right to advertise its
business. Either Cupola's desire to advertise its business is
acceptable, or it is not. Ralph tells me Bill says it is. The need
to advertise does not rise and fall with the operation of the day
care center. I see no reason for Cupola to bet the success of its
business on the operation of the day care center.
-• -.' ..: T?�---�' _�. a�.F�Ct-�M.-f. �+w:�-,T. r:-�+.. y__- a-^r^4 �. :^_Y_c�"_�� f'x�w-Ys �::� f�.:.u.rk•�: `r�✓'4'4 ti".G^-::i^�T^vv-�!-' v_�'2�:. 'r'T"f:_"+��.+; ems- .... .�'.
Steven F. Stitzel, Esq.
January 24, 1989
Page 3
I respect your desire to serve your client's interests. It is
unfair for you to use the City of South Burlington's monopoly
position, however, to extract unreasonable concessions from Cupola.
It is also unfair to further delay the day care center. Nearly a
month has passed between our tender of a deed and your review of
it. Can we meet with our clients in the next few days to resolve
outstanding issues?
Best wishes for your wife's recovery.
Very truly yours,
L
J
Jon Anderson
JA/sgw
!bc: Ralph DesLauriers!
5750/90751
correspo28
/wp/cupola
MCNEIL, MURRAY & SORRELL, INC.
ATT —YS AT LAW
271 SO /` 'REET
BURLIP�"�.��
r �`
JOSEPH C. McNEIL (1919-1978)
JOSEPH E.McNEIL
FRANCIS X. MURRAY
WILLIAM H.SORRELL
JOHN T. LEDDY
NANCY GOSS SHEAHAN
STEVEN F. STITZEL
PATTI R. PAGE'
WILLIAM F. ELLIS
LINDA R. LEROY
(ALSO ADMITTED IN N.Y.)
Jon Anderson, Esq.
Goldstein, Manello,
86 Lake Street
P.O. Box 1506
Burlington, VT 05402
"I Q
PI_ JA+
MA^tAG ; OFFICE
1NGTO'
OF COUNSEL
ARTHUR W.CERNOSIA
Re: Cupola Gulf Course, Inc. to City u- ?outh Burlington
Dear Jon:
I have reviewed the proposed legal documents which were
delivered to my office on December 13, 1988. I have also briefly
examined the documents which were delivered on January 3, 1989.
I have not had an opportunity to review all of the encumbrances
which you identified in the revised documents.
I request that the documents which you tendered on December
13th be modified as follows:
1. The metes and bounds description on both warranty deeds
should be modified to make the corrections noted on the attached
photocopy.
2. I request that the proposed reservation of access
rights be addressed in the following manner:
Grantor and Grantee acknowledge that
Grantor retains lands which adjoin the lands
conveyed hereby and Grantor does not by this
conveyance relinquish any rights which it now
has or may acquire in the future under the
general law of Vermont to use the granted
roadway for any lawful purpose.
3. I request that paragraph 2 of the proposed Offer of
Dedication for the ten foot (101) wide strip be modified as
follows:
The owner agrees that said formal offer
of dedication is irrevocable and can be
accepted by the City at the earliest or first
of the following dates to occur:
Jon Anderson, Esq.
January 11, 1989
Page Two
a. December 31, 1990 if a day care center
providing full time day care services to at
least 40 children has not been placed into
service on property adjoining Quarry Hill
Road.
b. The date on which there ceases to be
located on property adjoining Quarry Hill
Road a full time day care center providing
services to at least 40 children if such a
day care center was placed into service prior
to December 31, 1990.
C. December 31, 1998
The owner further agrees that if the owner
does not remove any sign that may be
constructed on the land within 60 days after
the acceptance of the land by the City, the
City may remove the sign at the owner's
expense.
Please let me know your comments regarding these proposed
changes. In the meantime, I will attempt to review the
encumbrances identified in the proposed deed you tendered on
January 3rd.
Very truly yours,
Steven F. Stitzl�
SFS/kb
cc: William Szymanski
WARRANTY DEED
KNOW ALL PERSONS BY THESE PRESENTS that Cupola Golf Course,
Inc., a Vermont corporation with principal place of business in the
City of South Burlington in the County of Chittenden and State of
Vermont, Grantor, in the consideration of TEN AND MORE DOLLARS paid
to its full satisfaction by the City of South Burlington, a
municipal corporation incorporated under the laws of and existing in
the State of Vermont, Grantee, by these presents, does freely GIVE,
GRANT, SELL CONVEY AND CONFIRM unto the said Grantee, City of South
Burlington, and its successors and assigns forever, a certain piece
of land in the City of South Burlington in the County of Chittenden
and State of Vermont, described as follows, viz:
Being an irregularly shaped parcel of land fifty feet wide and
approximately 1437 feet long together with all improvements located
thereon (the "Land"). The land is more particularly described as a
portion of a parcel of land depicted on a Plat ("the Plat") entitled
"Right -of -Way and Easement Locations Quarry Hill Road, South
Burlington, Vermont." The Plat was prepared by Krebs & Lansing
Consulting Engineers, Incorporated, is dated August 8, 1988 and is
recorded at Book , Page of the City of South Burlington Land
Records. The parcel of land depicted on the Plat is described as
follows:
Beginning at a point marked by a one half inch rebar set
by Green Mountain surveys, which point is labelled "IP101" on
the Plat and is both the westernmost point of the land herein
conveyed and a point in the easterly boundary of Spear Street,
so-called; thence N81°-18'-35"E a distance of 337.53 feet
/ passing through two concrete monuments set by Trudell
Li"1 v Consulting Engineering labelled '�MC/107" and "CM 109" on the
Plat to a third concrete monument set by Trudell Consulting
Engineering labelled "CM 100" on the Plat; thence turning to
the left and proceeding N73°-39'-36"E a distance of 152.22
feet to a nail at the base of a stake labelled "Spike 1" on
the Plat; thence turning to the left and proceeding
N21°-58'-08"E a distance of 621.36 feet through another
concrete monument set by Trudell Consulting Engineering to a
point labelled 11QHR8" on the Plat; thence turning to the right
and proceeding N41°-29'-4111E a distance of 80.83 feet to
another point labelled 11QHR9" on the Plat; thence turning to
the left and proceeding N34°-04'-43"E a distance of 220.00
feet to the most northerly point of land herein conveyed;
thence turning to the right and proceeding S55°-55'-17"E a
distance of 60.00 feet to the most easterly point of land
herein conveyed; thence turning to the right and proceeding
S34°-04'-43"W a distance of 223.89 feet to a one-half inch
rebar, labelled "IP1" on the Plat, set by Green Mountain
Surveys flush with the ground; thence turning to the right and
proceeding S41°-29'-41"W a distance of 74.39 feet to a
five -eighths inch rebar, labelled 11IP2" on the Plat, set by
PLANNING COMMISSION
The South
Tuesday,
Hall, 575
�'1':.�4111
31 MAY 1988
Burlington Planning Commission held a meeting on
31 May 1988, at 7:30 pm, in the Conference Room, City
Dorset Street,
Members Present
Peter Jacob, Chairman; William Burgess, Ju Hurd, Mary -Barbara
Maher, Catherine Peacock, Ann Pugh, John Belter
Also Present
Jane Lafleur, City Planner; Sid Poger, the Other Paper; Steve
Hastings, Robin Worn, Terrence Boyle, Ralph Deslauriers, Jr.,
Charles Deslauriers, Ralph Deslauriers, Sr, Peter Doremus, Mike
Keller, Robert Krebs, Dave Cable, Jean H. Bressor, Lee Nelson,
George Crooks, Lance Llewellyn, Barbara Laing, Reba Drabble,
Lorraine Kaplan, Barbara Bull, Mary & George De Farge, Phyllis &
Henry Atherton, Nancy Bell, Gillian Bell, Jack Provencher, Joe
Randazzo, Rita Randazzo, James Smullen, John Crabbe, Jr., John
Floyd, Howard Fitzpatrick, Richard Feeley, Bob Marcellino, Eugene
Szatkowski, Ed Granai, Art Ross, Barbara Pell, Madeline Yandow,
Mildred & Bobbi Jo Estey, Vernon Wamsganz, Rich Connelly, Regina
O'Flaherty, Gretchen Wamsganz, Thomas Davis, Richard Bigham,
John Hausner
1. Minutes of 10 May 1988
Mrs. Maher moved the Minutes of 10 May be approved as written.
Mr. Burgess seconded. Motion passed unanimously.
2. Request of Kenneth Smith for extension of site plan on Lot #8,
Ethan Allen Drive.
Mrs. Lafleur noted the site plan expires tomorrow, and the
applicant has requested an extension.
Mrs. Maher moved to grant Kenneth Smith a 6 month extension to the
site plan approval for Lot #8, Ethan Allen Drive. Mr. Burgess
seconded. Motion pdsseu 5-0 with Mr. Belter ahstaininq as he is
an adjacent property owner.
3. Public Hearing: Final Plat application of Synon Group for sub-
division of 1.55 acre lot from the 26+ acre Cupola Golf Course
property, Quarry Hill Road
Peter Doremus said this is the plan for the Day Car facility and
office building which the Commission had seen as a sketch plan.
PLANNING COMMISSION
31 May 1988
page 2
Mrs. Maher raised the question of what the developer or owner of
the entire property should do about the street from the ingress at
Spear Street to the property in question. Mrs. Lafleur said there
is some controversy about this. Based on previous minutes, it is
clear to her that Quarry Hill Rd. should be fully upgraded at any
further development in this area. It was her feeling the road
should be upgraded from Spear St. to Quarry Hill Club and that it
should be part- of the Appro-val motions for both the subdivision
and the building proposal. The road should be to City standards,
30 feet of pavement, curbs, with an appropriate base for a city
street. Mrs. Maher asked about sidewalks. Mrs. Lafleur said she
hadn't considered on which side the sidewalk should go.
Mrs. Lafleur noted the sewer line had been shown but the water
line was not located accurately and should be properly indicated
prior to recording of the plan. The City Manager would also have
to see plans for sewering the building prior to permit as the building
may require. -the sewage to be pumped rather than gravity lines.
Mr. Deslauriers, Jr. said he would like to do the road in 2
phases, the first to be the sub -base and 26 ft. of pavement. The
second phase would occur on development or improvement on Quarry
Hill. He said they were asking this because of cost. He did not
dispute the need to upgrade the road, but asked to not have to put
in curbs, sidewalks, and storm sewer until there was more de-
velopment.
Mrs. Lafleur stressed that the stipulation to upgrade the road was
placed on the Deslauriers not on the developers of Horizon Heights
and was part of the original subdivision stipulations. Ralph, Jr.
said the Minutes of 3/22/77 seem to say the opposite. Mr. Burgess
noted this was in discussion. The motion calls for the upgrading.
Mrs. Lafleur said the motion passed was to fully upgrade on
further development, and it was passed unanimously.
A poll of the commission showed all members wanted the upgrading
done now. -
Ralph, Jr. asked if it could be done only to the Synon entrance.
They are now using some of the other land for overflow parking for
Quarry Hill. ,Mrs. Lafleur felt they should see a design to kn6w
what the affects would be. There would have to be a turn -around
for snowplows if the road doesn't go all the way. Mr. Belter said
he would like to see where the overflow parking is and where fire
access would be, etc. Mrs. Lafleur said the volume of traffic is
a problem. The Club produces traffic, and it may be preferable to
go all the way down to the Club. Ralph, Sr. said it would help
from a financial point of view to have the road end at Synon.
Mrs. Hurd asked how the sidewalk could ever get the rest of the
way to Quarry Hill. She couldn't see another developer paying for
it. Ms. Pugh felt the office building would generate business for
Quarry Hill, and that the sidewalk should go all the way.
PLANNING COMMISSION
31 May 1988
page 3
Mrs. Maher felt the sidewalk should go at least to the far end of
the Synon property line. Ms. Pugh felt if the Quarry Hill lot
were to be used for a snowplow turnaround, there should be a stip-
ulation that Quarry Hill not be open year round. Ms. Peacock sug-
gested approving the application with a full city street and city
standard cul de sac and then having the applicant come back in 2
weeks if they want it amended and if the Planning Commission
agrees after getting more information. Mrs. Hurd stressed the
City had to be protected so that in 5 vears Gnmenne Armen l f- flr%vno
in and ask where the sidewalk is and the City would then havevto
build it at taxpayers expense.
Mr. Bigham said he is troubled because the owners of the Cupola
have planted 20 trees to block the views of residents of Horizon
Heights and felt this was an act of spite on the part of the
Deslauriers.
Mrs. Hurd moved the Planning Commission approve the Final Plat a
placation of the Synon Group, Peter Doremus, agent, for
subdivision of a 1.59 acre arcel from the cupola Golf Course
Property located south of Gaynes as depicted on a plan entitled
"Final Plat: Synon Group, Quarry Hill Road, South Burlington, VT"
Prepared by Krebs and Lansing dated May 1988 with the following
stipulations:
1. Quarry Hill Road shall be constructed to City standards with 30
feet of pavement, curbs and -a sidewalk on one side fronm Spear
Street to the Quarry Hill Club ar_ lot with a city standard
size cul de sac. These road im rovements shall be recorded on the
plan and approved by the City Planner prior to recording A bond
shall be posted for this prior to permitfor any develo meet or
construction.
+/l/ • i/ G�I?'R7" �i .. -' irb�C.s-r-c .w./� = CSC .. r('3'� �:.� S..
2. Legal documents for the offer of dedication and deed for Quarry
Hill Road shall be submitted to the City Attorney for approval
prior to permit.
Y
3. The water and sewer lines shall be shown on the plans prior to
recording.
4. Street details shall be approved by the City Engineer prior to
ermit.
5. It is the applicant's responsibility to record the corrected
final plat within 90 days or this approval is null and void It
must be approved by the Planner and signed by the Chairman or
Clerk of the Commission rior to recording
Mr. Burgess seconded the motion which passed unanimously.
4. Site plan application of the Synon Group for construction of a
9800 sq. ft., 2 story day-care and office building for MCHV,
Quarry Hill Road
PLANNING COMMISSION
31 May 198
page 4
Mr. Boyle said the engineer felt they could get a sewer tap at
gravity across the adjacent lot. If this is not possible, they
will have to lift to Quarry Hill Rd. They have also now shown
a hydrant at the near corner of the access drive as required by
the Chief. They day care play area will be fenced. Mrs. Hurd
asked if the day care play area includes the pond. Mr. Boyle said
the pond would be part of a nature area for the day care (with
frogs, etc). Children will be well supervised.
39 parking spaces are shown with the dumpster in the 40th space.
This will be relocated, if possible. Parking is mostly for the
office building use. The day care facility is on the first floor.
Mr. Doremus said VNA will operate the day care, and pond areas
will all be fenced for safety.
Mrs. Maher asked if the day care can be made accessible for wheel
chairs. Mr. Boyle said it can be. Mrs. Lafleur said the
parking layout is OK, but a dropoff area is essential. Members
felt there should be handicapped spaces for the office and day
care accesses.
Mrs. Maher asked what it will look like from the Interstate. Mr.
Boyle said they have increased the size of trees for better
screening from the Interstate. They will use 2-1/2" caliper
willows which grow fast. Mrs. Lafleur confirmed they meet the
setbacks from the Interstate ramp and from the brook.
Mr. Fitzpatrick, architect, said the building will be 50' x 100'
and will be brick with concrete block. The roof will be copper or
a paint finished metal. The east elevation will'be 2 stories, the
west one story. There is a stairway within but there will
probably be minimal communication between the 2 uses. Mr. Doremus
said the Medical Center is the tenant for the whole building. The
office use will be for general office space, not physicians'
offices. Mrs. Maher asked if it would be a non-profit, non -tax-
paying facility. Mr. Doremus said they will pay taxes. The
facility will be owned by the development group and leased to
MCHV. The day care is for MCHV employees' children, and they do
not propose a night facility for late shift workers' children.
VNA will not give up its other day care facility.
Traffic: Lance Llewellyn said they estimate 480 bars per day. At
peak hour, the 78 cars per day will just abotrt-double what is
there today. The 509 ft. site distance requirement at the inter-
section with Spear St. is exceeded in both directions. The inter-
section operates at level "A" today, and this will not change with
the development. No turning lanes are warranted, he felt. Mr.
Llewellyn noted Craig Leiner had reviewed the plans and concurred.
Mrs. Lafleur added there is not enough volume to require a signal
but they are getting close.
PLANNING COMMISSION
31 May 1988
page �a - n n
Mrs,,J�t expressed concern for runners, bikers, roller skiers,
etc, on Spear St, and said it is an accident waiting to happen.
Mr. Jacob suggested the Commission discuss this with the Council
the next time they meet together to suggest a wide shoulder with a
white line. He agreed it was very dangerous. Mrs. Lafleur felt
this should extend all the way to the town line.
Mrs. Stigney expressed concern with the traffic back-up to
Williston Rd. This is already a problem, particularly from 7:30
to 8:30 in the morning, and residents can't get out of East
Terrace. Mr. Bigham said he felt that allowing piecemeal de-
velopment of this property was perpetuating a mistake and that
what was needed was an overall plan. He questioned the wisdom of
dumping a lot -of traffic into a cul de sac. He said the property
owners created problem after problem, and this was not in the
interest of the City. Mrs. Maher explained the limitations of the
Commission. She said she would prefer R-7 development here, but
the applicant had the right to go to the Zoning Board for a var-
iance, which they received. Mrs. Lafleur noted the Commission saw
a plan a few weeks ago for the whole parcel and will see it again
soon. She said the Commission has asked for this over and over
again. She understood the neighbors' frustration, but said the
City could not force development. Mr. Brigham again raised the
question of the trees planted to block views and felt this was not
the way to cultivate neighbors. Ralph, Jr, said they were plated
as a buffer between residential and commercial. Neighbors
protested that 40 foot trees are not a buffer.
Mrs. Bolt noted the Zoning Board said there could be no future
commercial traffic using Quarry Hill Rd, but the large plan seen a
few weeks ago showed a through road. She asked how both can be
true. Mrs. Hurd said there is a major concern with this. She
noted the Minutes of Nov., 1976 indicated the Commission expected
the land to be developed residential and that there could be no
commercial traffic through a residential area. She questioned
whether the.Commission could approve this commercial application.
Mr. Poger, who was on the Commission at that time, 'recalled the
Board felt as Mrs. Hurd does and that there should not be com-
mercial traffic through Horizon Heights and no more commercial
development. Mrs. Maher asked how a conditional use could then
have been granted in opposition to a previous Planning Commission
decision. Mr. Doremus said this is an R-7 zone and this is a
conditional use in that zone. He said the languaged referred to
was for the land "zoned commercial." He said the proposed use is
not a dense commercial use such as retail.
As clerk of the Commission, Mrs. Hurd moved the Planning
Commission approve the site plan application of the S non Group
for construction of a 9800 sq. ft. day care office building (4900
sq. ft. per floor) as depicted on a plan entitled "Site-Landsca e
Plan - S non Group" dated May 20, 1988 prepared by TJ Boyle and
s-scciatea dated May 20, 1988 with the following sti ulations
PLANNING COMMISSION
31 May 1988
page 6
1. A bond shall be posted prior to permit for construction of the
Quarry Hill Road to city standards including 30 feet of pavement,
curbs and -aa sidewalk on one side from Spear Street to the entrance
of the Quarry Hill Club, with_a city standard size cul de sac.
These road improvements shall be recorded on the plan and approved
by the City Planner prior to recording. A bond shall be posted
for this ' prior to permit for any development or construction in an
amount determined by the City Engineer. Street details shall be
submitted to the City Engineer for approval prior to permit.
2. Legal documents (offer of dedication and deed) shall be
submitted to the City Attorney for approval prior to permit.
3. A $14,560 landscaping bond shall be posted prior to
The plan shall be revised prior to permit to reflect t
and shall be submitted to the Planner for approval.
ermit.
s amount
4. A 1305 gpd sewer allocation is granted and teh $2 50 per gallon
fee shall be paid prior to permit.
5. The sewer line and water service shall be shown on the plans
prior to permit. Water shall be approved by the Water Depart-ment
and final sewer plans shall be approved by the City Engineer prior
to permit.
6. One fire hydrant shall be installed by the main drive Prior to
permit.
7. The building permit shall be obtained within 6 months or this
approval is null and void.
Mrs. Maher seconded. Motion passed 6-1, Mrs. Hurd opposing
5. Public Hearing: Final Plat application of Southsett Partnershi
for 178 unit planned develo ment of 108 multi -family units in 27
buildings and 70 single family lots on 40 acres, an existing farm-
house and 68 acres of recreation land deeded to the Citv, 900
Dorset Street
Mr. Marcellino said they reworked all the setbacks so they now
conform with everything the Commission wanted. They took out the
cul de sacs. All roads are 30 ft. wide. They have preserved the
trees between the "fingers" on the lots. Mrs. Lafleur noted the
First Chief wants 12 hydrants. The City Manager is still
concerned with the liability of the ponds and wants a stipulation
that they are not the City's responsibility. Mr. Llewellyn said
the Fire Chief is happy with the siting of hydrants. Mrs. Lafleur
noted the Water Dept. must seethe plans. Mrs. Hurd asked the
price range of single family homes. Mr. Hausner said 150-200,000.
PLANNING COMMISSION 6 SEPTEMBER 1988
The South Burlington Planning Commission held a regular
meeting on Tuesday, 6 September 1988, at 7:30 pm, in the
Conference Room, City Hall, 575 Dorset Street.
Members Present
William Burgess, Acting Chairman; Mary -Barbara Maher, John
Belter, William Craig, Catherine Peacock, Ann Pugh
Also Present
Joe Weith, City Planner; Sid Poger, The Other Paper; Stephen
Stitzel, Ctiy Attorney;Gary Riggs, J. C. Oppenlander, Peter
Collins, Dave Cable, Robert O'Neill, Catherine Kronk, Brian
Gragnolati, Barbara Bull, Peg McGowan, Barbara Church, Doug
Fitzpatrick, Ralph Deslauriers, Jr., J. SMullen, M.L. Burak,
John Dowling
1. Minutes of 17 August 1988
Ms. Peacock moved the minutes of 17 August be approved as
written. Mr. Craig seconded. Motion passed unanimously.
2. Request of Synon Group to amend both the Final Plat appli-
cation for subdivision of 1.55 acre parcel from the 26+ acre
Cupola Golf Course property on Quarry Hill Rd. and the Site
Plan approval for construction of a 9800 sq. ft. day care/
office building on Quarry Hill Road.
Mr. Doremus noted the road is owned by Cupola Gold Course,
Inc., and that Synon has agreed to accept a private road. It
was their understanding the stipulation was to upgrade the
road to City standards, which is consistent with the Horizon
Heights approval of 10 years ago. The question is whether
the road has to be dedicated to the City. The Deslauriers
would prefer not to, and if the stipulation stands, there is
a chance the project cannot go on. Mr. Doremus felt their
1.5 acres was a very small part of the Cupola property and
that the dedication issue could be addressed when development
of the rest of the property occurs. He added that Synon will
provide bonds, etc, until Deslauriers is ready to offer the
road to the City. The road will be extended and they would
guarantee maintenance of it. He said he understood there is
a questionof whether the City would be left without the road
but noted the City Manager is willing to wait a few years
until further development happens, as long as the road
doesn't create a maintenance problem for the City.
Mr. Burgess said his main concern is the people on Horizon
Heights who have a right to get to their homes and will want
assurance the road will be maintained. Mr. Doremus stressed
they will improve the road significantly.
PLANNING COMMISSION
6 SEPTEMBER 1988
PAGE 2
Mrs. Maher asked when Synon was told by Deslauriers of this
problem. Mr. Doremus said it is their contention they re-
ceived a letter from the Deslauriers' attorney the second
week in August. Site Plan approval was 5/31/88. Mrs. Maher
said the Deslauriers were present at the approval. She asked
what Synon has done since that date. Mr. Doremus said they
have drawings by an architect, have ordered steel, etc. They
have not closed on the property. Deslauriers says there is a
clause in the contract that says the road will be built to
City standards but not be dedicated to the City. The
contract is dated in April. Mr. Burgess stressed that
everyone knew it was the Commission's position that the road
be dedicated, and there is no question of interpretation.
The seller knew this for 10 years. Mrs. Maher said she felt
Synon had been "taken" just as the Commission had.
Mr. Belter asked why Deslauriers changed his mind. Mr. Des-
lauriers said they haven't and that it is their interpreta-
tion of the contract that the road not be dedicated but that
they improve it. Mr. Burgess said he wasn't asking for their
interpretation but was asking if they knew that before any
further development could occur on this land that the road
would have to be dedicated to the City. Mr. Deslauriers said
they never wanted to do that but they knew it was a stipula-
tion. Mrs. Maher said for the Commission to make a change
there would have to be a substantial reason. Mr. Deslauriers
said they are concerned with loss of signage on Spear St. and
with potential loss of density. Mr. Burgess said the road
would not be counted in density anyway. Attorney Burak, who
has been working with attorney Ralph Foote and has been di-
rectly involved in the Synon contract, said it was not his
understanding that any development would require the dedica-
tion of the road. He said they didn't want to jeopardize the
ability to develop the larger piece by selling this piece and
that this was a stiuplation in the contract with Synon. Mr.
Burgess asked if it didn't dawn on the Deslauriers in May
that there was a problem with the stipulation. Mr. Burak
said he wasn't there then but that the contract raised the
issue specifically. He added that to his knowledge there was
no attempt to maneuver the Planning Commission.
Ms. Bull, representing residents of East Terrace, read a
letter from attorney William Dorsch expressing concern that
abuttors were not notified of this meeting. Mr. Dorsch also
felt this was an attempt to maximize development of the rest
of the Cupola land and that Deslauriers may want to move the
road later. He stressed the Commission should make no de-
cision without full disclosure by the Deslauriers. Ms. Bull
added they are sympathetic with Synon and feel they have been
used as pawns. Mr. Burgess said the Commission is in the
PLANNING COMMISSION
6 SEPTEMBER 1988
PAGE 3
same positon as the abuttors in not knowing what is planned
for this property in the future.
Mr. Gragnolati, administrator at the Medical Center,
explained the impact of this situation on the Center. He
said they have been planning for the day care center for
their employees and have held meetings and have a very long
pre -application list. They feel this is a very good location
for them and they are concerned they are getting mired in an
historical issue. He said they are willing to insure
maintenance of the road to City standards. Mr. Burgess said
that if the road isn't maintained by the owner, the Medical
Center will be among those in the City Manager's office
demanding the City maintain it. He said the Commission is
trying to get the road under the maintenance protection of
the City the best way possible. Mr. Gragnolati said he hoped
there could be a compromise.
A poll of Commission members showed: Mr. Craig was sympa-
thetic with Synon and understood the need for the day care
facility but was more concerned with future problems
resulting from keeping the road private. Mrs. Maher felt it
would be unwise to reconsider and that the Commission had to
send a message to the owner that things must be done as the
Commission plans them. She added she felt there was a
"design" in all of this. Mr. Burgess said he agreed with Mr.
Craig and Mrs. Maher but was sympathetic with Synon and that
if in some way the City Attorney and City Manager could be
satisfied things could be worked out, he would reluctantly
vote in favor. Mr. Belter agreed with Mr. Burgess that the
Commission should try to save the project and take up its
quarrels with the Deslauriers later. He added he wants to
see a specific time period for the road to be dedicated, not
an indefinite period. Ms.Peacock said she was very sympa-
thetic with Synon but did not see how the City would get
dedication of the road and thus was opposed to reconsider.
Ms. Pugh, having arrived late, abstained from comment.
Before a formal vote could be taken, Mr. Doremus withdrew the
request in order to bring it before a full Commission.
3. Continuance of Revised Final Plat application of Heathcote
Associates to construct and 11.460 sq• ft. addition to the
South Burlington Factory Outlet Mall on Shelburne Road
Mr. Collins said they agree to change the perpendicular
spaces on the north and south of the building to parallel.
They have aproblem with changing the compact car spaces but
noted the spaces are larger than usual compact spaces and
moderate and medium cars will fit. The spaces could be made
PLANNING COMMISSION 20 SEPTEMBER 1988
The South Burlington Planning Commission held a regular
meeting on Tuesday, 20 September 1988, at 7:00 pm, in the
Conference Room, City Hall, 575 Dorset Street.
Members Present
Peter Jacob, Chairman; William Burgess, Mary -Barbara Maher,
William Craig, Catherine Peacock, Ann Pugh, John Belter (only
through Item #1)
Also Present
Joe Weith, City Planner; Stephen Stitzel, City Attorney;
Peter Collins, Peter Doremus, Gregory Jeffery, Dave Cable,
Brian Gragnolati, John Dooley, William Dorsch, Phyllis
Atherton, Wilbur Bull, Mike Keller, Bob O'Neill, Michael
Burak, Lee Quick, Mary Sigler, K. Kronk, Dennis Webster,
Joe Oppenlander, John Dowling, Avis Porter, Herm Atherton,
Steve Friedman
1. Minutes of 30 August
Ms. Pugh moved the minutes of 30 August be approved as
written. Mr. Craig seconded. Motion passed unanimously.
2. Minutes of 31 August
It was noted that in the last paragraph on p. 2, 5th line,
the word "budding" should read "abutting." On the same page
the title of Item #2 should read: "Discussion of possible
amendments to the Zoning Ordinance south of the proposed
Holmes Road Extension and East of Spear Street."
Mr. Craig moved the Minutes of 31 August be approved as
amended. Mr. Burgess seconded. Motion passed unanimously.
3. Request of Synon Group to amend both the Final Plat
approval for subdivision of a 1.55 acre parcel from the 26+
acre Cupola Golf Course property on Quarry Hill Road and the
site plan approval for construction of a 9,800 sq. ft. day
care/office building on Quarr Hill Road
Mr. Doremus said the 1977 approval said the road had to be
upgraded but was unclear about dedication. The City Manager
has said a maintenance agreement can be worked out. He
stressed the road will be upgraded with curbs, sidewalk, etc,
and residents of the area will have an improved road to go
over. He cited the pluses of the project: a socially
responsible use, upgrading of the existing road, additional
tax revenues, maintenance of the road to city standards. The
minuses to nod approving the project are disabling of a re-
sponsible project, the substandard road remaining, no new tax
PLANNING COMMISSION
20 SEPTEMBER 1988
PAGE 2
revenues and the question of adequate maintenance. The feel
the road should be dedicated at a time in the future since
this is only 5% of the total land involved.
Mr. Dooley, abutting land owner opposed the request. He
stressed they are not against the day care facility.
However, they do not agree that road will be opened
eventually. He cited the Horizon Heights stipulation which
said the road should never be opened for commercial traffic.
The Planning Commission, he said, did a very important thing
to land that was being very poorly planned when it looked at
the Horizon Heights development: they told the developer he
could have another residential development but must give up
using this road as access for a commercial development on the
inside land. Mr. Doremus said the issue is still that the
Commission controls access to those 30 acres and controls
what happens to them. He felt this was a quality project,
not an impact project.
Mrs. Maher noted the Deslauriers have never contested that
when Horizon Heights got its approval this road was to be
dedicated to the City. The City Attorney, she said, has
pointed out the difficulty he has had in representing the
City on roads that were supposedto become City roads.
Mr. Dorsch, attorney for East Terrace residents) said the
Commission has already planned appropriately and this
development should meet those requirements or not be allowed.
Mr. Jeffery said the Commission will have the ability to
decide whether the road should be dedicated at a later date
and where the access will be. Mr. Dooley said if the Com-
mission accepts their point of view, there will never be
another crack at this road. This is the only time they will
be able to get dedication to the City. Mr. Kelley of Synon
said if there never is another crack at the road, at least
they will get an upgraded road by granting this request.
Mr. Gragnolati pointed out the the project is a very re-
sponsible one that serves a need. He felt they were being
squeezed because of an historical relation between the Des-
lauriers and the Commission. He hoped the Commission would
see fit to look at what the City will get: a road that meets
city standards and an opportunity to look at the remaining
development. He didn't want to see a project of this nature
get caught in a trap.
Ms. Atherton of East Terrace said if the Commission bends
the rule now, what is to prevent them for bending the rules
in the future. She noted that 400 extra cars a day is a lot.
PLANNING COMMISSION
20 SEPTEMBER 1988
PAGE 3
Mr. Burgess said he would vote against the application
tonight and said it is the Planning Commission that is being
squeezed. He said this was started as Q n item of other
business and the Commission has now gotten into a public
hearing. He felt none of the facts have changed and the
Commission has wasted its time. Ms. Peacock said she has
sympathy for Synon but that this is a problem between Synon
and the land owners. It was clear the road had to be ded-
icated and both Synon and Deslauriers knew this. A poll of
Commission members showed a majority opposing.
Mr. Burgess moved that the request of Synon Group to amend
both the Final Plat approval for subdivision of a 1.55 acre
parcel from the 26+ acre Cupola Golf Course property on
Quarry Hill Road and the site plan approval for construction
of a 9,800 square foot daycare/office building on Quarry Hill
Road be denied. Mrs. Maher seconded. Motion passed 6-1 with
Mr. Jacob opposing.
Mr. Belter left the meeting after this item.
3. Continuation of Revised Final Plat application of
Heathcote Associates for construction of an 11,460 sq. ft.
addition to the South Burlington Factory Outlet Mall located
on Shelburne Road
Mr. Collins said they agree this is not a perfect plan, but
they have to work with what they have. He felt they had made
a good faith attempt to address the issues, and that they
will end up with something better than what is there now.
Mr. Collins said they could have 642 parking spaces, but that
would not be as aesthetically pleasing. He added that it was
clear to him that in all but the worst week of the year (be-
fore Xmas) there is no problem because there is enough
parking. Every parking center in the city is crowded before
Xmas, he said. He acknowledged there will be some times in
the worst week when they couldn't take care of the spaces for
Club New England, but that would be assuming they use all
their spaces. Mr. Craig asked if it was fair to assume the
parking arrangement with Club New England won't be renewed.
Mr. Collins guaranteed that it wouldn't. He also noted that
although the deed allows the Mall to bill Club New England
for such things as lighting for those spaces, there has never
been such a billing. Mr. O'Neill contended that is because
there were no expenses, not because there was no usage of the
spaces. Mr. Collins said if you look at the spaces, you can
see they are not being used.
So.
Ms. Pugh noted that there is a requirement for 11,000„ft. of
loading dock space and only 2400Aft. is provided. Mr. Weith
5$.
City of Sottth iKn1-11nt;t()II
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658.7955
Marach 15, 1989
Synon GRoup
c/o Peter Doremus
112 Lake Street
Burlingotn, VT 05401
Dear Doremus:
ZONING ADMINISTRATOR
658.7958
Enclosed please find ,your copy of Findings of Fact. If you have
any questions please call me.
Sincerely,
Joe Weith,
City Planner
JW/mcp
1 Encl
CITY OF SOUTH BURLIN(,TON
SITE PLAN APPLICATION
1) OWNER OF RECORD (name, address, phone #) —Cupol-a-Golf__Club_ Inc.
2) APPLICANT (name, address, phone #) __ynon Group__ _
c/o Peter M. Doremus, 112 Lake Street, Burlington 863-9603
3) CONTACT PERSON (name, address, phone #) Terrence J. Boyle_
T.J.Boyle & Associates, 301 College Street, Burlington, VT 658-3555
4) PROJECT STREET ADDRESS:
5) LOT NUMBER (d f applicable).. NA -----------
6) PROPOSED USE(S) Medical Center _---$Ddta1 ._of -Vermont_-4ay_Car.e.
and Office Facility
7) SIZE OF PROJECT (i.e. total building square footage, # units,
maximum height, and # floors, square feet per floor)____._
Two-story, 91'x54' masonry buildins4,900 SF
__-.per flog
------ .. - - -- -
(p0 c1n�1d�YCh
8) NUMBER OF F.MPLOYEES_Day Care- 6-7 staff: office ._±��_ -0 _
9) LOT COVERAGE: building 7.59�; landscaped areas 69.-%
building, parking„ outside storage-.__31_%
10) COti'I' ESTIMATES: Buildings $_700�000......... , Landscaping $12_,0.00 ..
Other Si t.P Improvements (please list with cost) $
11) EST1M,1TFI) PROJFC'T COMPLETION DAT'F.: Fall 1988
12 EST I MA'I'Fl) A%'1?RAGE DA I LY TI?AFF 1 C ( i n anti ottt. )
See Traffic Report
E: tim:ttrd trill t,nds (in and out.) durin; the f'ollt,t..I11'1
`Io1-1 da.% t h r•'tttt4h FI- i da.v
I- 1'2' 1)(")II 1 2 - 1 1-2
1 - l
13) I'1:\I; !Iti('Irti ov tti'1-'1 \T1()N: Day Care 6:30-3:30; Office 8:00-5:00
1 1 1 t?!- Monday - Friday
Si 1011 May 20, 1988 ti l t;N:A'!'l ll! t tl �: Tl ;
N
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658-7955
October 5, 1988
Synon Group
c oremus
112 Lake Street
Burlington, Vermont 05401
Re: Synon Group, Quarry Hill Road
Dear Mr. Doremus:
ZONING ADMINISTRATOR
658-7958
Enclosed are the September 6 and September 20, 1988 Planning
Commission meeting minutes. Please call if ,you have any
questions.
Sincerely),
Joe Weith,
City Planner
JW/mcp
1 Encl.
DOREMUS ASSOCIATES
ATTORNEYS AND COUNSELLORS AT LAW
WATERFRONT PLACE
ONE TWELVE LAKE STREET
BURLINGTON, VT 05401
(802) 863-9603
August 29, 1988
Mr. Peter Jacobs, Chairman
So. Burlington Planning Commission
City Hall
So. Burlington, VT 05403
Re: Cupola Golf Course, Inc. to Synon Group
Dear Peter:
Thanks for talking with me last week regarding the problems
that Synon is encountering regarding their contract to purchase
lands and premises on Quarry Hill Road from Cupola Golf Course,
Inc. (DesLauriers)
As you know, Synon Group intends to construct a 10,000
square foot building on the easterly side of Quarry Hill Road for
use by the Medical Center Hospital of Vermont as a day care
facility and general office space. After Planning Commission
approval on May 31, 1988, Synon went forward with plans for
construction and development. Unfortunately, the sellers have
taken the position that the Planning Commission's requirement for
Dedication of the existing Quarry Hill Road together with any
extension thereof to Synon's development site is prohibited by the
contract and therefore they have refused to close. I have enclosed
copies of portions of the contract which contain language regarding
construction of the road. Although Synon interprets the language
differently, a legal contest at this point would doom the project.
The closing is presently scheduled for September 13th with a
ground breaking ceremony during the following week.
Although the sellers have taken the position that an "Offer
for Dedication" will violate the contract, they fully agree to
construct the road to city standards and meet all other require-
ments that the Planning Commission imposed at their May 31st
meeting. I have also enclosed a copy of a letter from Michael
Burak dated August 17, 1988 addressed to me wherein he explains
the sellers' concerns regarding dedication of the road. Although
I am not convinced that the reasons for not wishing to dedicate
the road are valid, it has created an impediment that I am hopeful
can be removed.
Since Cupola has agreed to construct Quarry Hill Road to
city standards as required by the Planning Commission and has
further agreed to post a bond to insure said construction, the
Planning Commission could waive dedication at this time and still
accomplish dedication in the future as the DesLauriers' further
develop the balance of their property. The purchasers are
Mr. Peter Jacobs
August 29, 1988
Page 2
willing to explore the possibility of providing a maintenance bond
or letter of credit that could be an agreed amount running to the
benefit of the City until such time as the road is offered and
accepted as a public street. Since the DesLauriers family and
Cupola Golf Course, Inc. will have ongoing plans for development
which the Planning Commission will be reviewing, it seems that
the Commission could find that Synon's proposal does not trigger
a road dedication and amend their findings of May 31st accordingly.
Synon is caught between a construction schedule for the
Medical Center, unwarranted concerns of future development
impacts on the part of seller, and the Planning Commission's
requirement of dedication. It appears that the only solution to
save the project rests with the Planning Commission.
As you can tell from Mr. Burak's letter, the seller has
placed the burden of resolving this problem upon Synon. Inasmuch
as the purchasers have expended a significant amount of money
planning this project and have already ordered construction
materials, I hope that the Planning Commission will give our
request serious consideration and help us arrive at a creative
solution which will allow a very desirable project to go forward.
Thank you and the Commission in advance for giving your
time and thoughts to these matters.
Sincerely yours,
Zeel/t/e��XM. Doremus
PMD/mo
PLANNER
658-7955
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
September 21, 1988
Peter Doremus
Attorneys and Counsellors at Law
Waterfront Place
One Twelve Lake Street
Burlington, Vermont 05401
Re: Synon Group, Quarry Lake Road
Dear Mr. Doremus:
ZONING ADMINISTRATOR
658-7958
Enclosed are the August 30, 1988 Planning Commission meeting
minutes. Please call if ,you have any questions.
Sincerely,
CD-r' U-')� ��
Joe Weith,
C_i t,,y Planner
JW/mcp
1 Encl
cc: Ralph Deslaurier
1
PLANNING COMMISSION
30 AUGUST 1988
PAGE 3
Gordon Harlow explained that there ire n,; structure on lot
at present. Mr. Pizzagalli's vacant lot is behind the Brown
lot. There will be no structures on the new Brown or
Pizzagalli lots. Mr. Weith noted they will be creating a lot
with no frontage on a public street and that the Zoning
Ordinance requires a 20 ft. right of way to reach the rear
lot. Mr. Maher asked that there be a stipulation that only
the southernmost driveway be used if these lots are ever
developed so there will be no more curb cuts on Allen Rd.
Mr. Harlow said he didn't see any objection to that. Mr.
Craig emphasized that the City will not maintain any of the
right of way.
Ms. Peacock moved the South Burlington Planning Commission
approve the Final Plat application of Robert & Windy Brown
and Angelo & Patricia Pizzagalli for readjustment of the
common property line between their 1.2 acre lots as depicted
on a plan entitled "Property Survey, Robert C. & Windy L.
Brown and Angelo P. & Patricia H. Pizzagalli" prepared
Gordon G. Harlow and dated August, 1988 with the following
stipulations:
1. If and when a driveway is put in the 20 ft. right of way,
a 5 foot buffer will be maintained along with west property
line for snow storage
2. If and when development occurs on these 2 lots, the access
shall be shared.
3. It is the applicant's responsibility to record the final
Plat with the City Clerk within 90 days or this approval is
null and void. It shall be approved by the City Planner and
signed by the Chairman or Clerk of the Commission prior to
recording. — —
Mr. Burgess seconded. Motion passed unanimously.
4. Cupola Golf Course/Syron situation
Mr. Weith explained that on 31 May, the Commission approved
the subdivision of a 1.5 acre lot for Synon and also the site
plan for the day care facility for Synon. In the approvals,
there was a stiuplation that the road from Spear St. to the
Synon lot be upped to city standards and deeded to the City.
Mr. Deslauriers feels this is not in their best interest
since the location of the road might be changed when the rest
of the parcel is approved. They want to wait until then to
deed the road. They also have indicated they do not want to
go with the Synon proposal if this stipulation holds. Synon
has asked the Commission to waive the stipulation as they
PLANNING COMMISSION
30 AUGUST 1988
PAGE 4
have spent a lot of money on this project. Mr. Weith said
that one suggest;oh is to require that 15% of the bond be
maintained until the road is upgraded. Mr. Belter said that
might result in having money to build a street but not having
the land. He said there is a problem there and he feels it
should be done correctly. Mrs. Maher said a lot of people
from East Terrace were at that hearing and she did not feel a
decision or discussion should be held until they are
notified. She felt the Commission should have both Synon and
Deslauriers back in for a hearing. Mr. Burgess agreed and
said he was uneasy about a stipulation "until the rest of the
land is developed." Mr. Stitzel said the first question to
consider is why the Commission wanted a street and if they
now want to change it. There is also the question of the
current road remaining private with increased use. He said
whatever the Commission decides there should be an
appropriate maintenance agreement though he didn't know who
should sign it. He noted the City had experience in the past
with allowing a road to remain private and then having to go
to Court later to try to make a public road.
Mrs. Maher moved that action on this request be postponed
until this is a regularly scheduled item on the agenda and
the developer and property owner are present to explain the
details of the project.
5. Revised Final Plat application of Heathcote Associates to
construct a 11,460 sq. ft. addition to the South Burlington
Factory Outlet Mall on Shelburne Rd.
Mr. Collins gave an overview of their presentation. He noted
that Joe Openlander had been retained to explore 2 issues:
the problem with a private covenant in a deed from Farrell to
the predecessor of the present owner, and the actual
requirements for the shopping center itself. Mr. Collins
said the plan they are presenting is the one approved several
weeks ago by the Commission. Mr. Burgess and other
Commission members stressed they did not at any time approve
a plan.
Mr. Collins said they have had discussions with the Planner,
Fire Chief and City Manager. One issue they discussed was
making a better access to the rear. They have thus changed
some perpendicular spaces to parallel parking. On the
question of snow removal, a letter has been given to the City
Planner indicating permission from the neighbor to the east
to put snow on that property until it is developed. After
that time, they will truck it away. ^ Lot coverage isAow 90.9%
with building coverage at 30%. rar,- ,c d
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658.7955
September 16, 1988
Synon Group
C/o Peter Doremus
112 Lake Street
Burlington, Vermont 05401
Re: Request to Amend 5/31/77 Approval
Dear Mr. Doremus:
ZONING ADMINISTRATOR
658-7958
Enclosed are the agenda item and my comments to the Planning
Commission.
Please be sure someone is present on Tuesday, September 20, 1988
at 7:30 P.M. to represent your request.
Sincerely,
Joe Weith,
City Planner
JW/mcp
Encls
M
E
M
O
R
A
N
D
U
M
To: South Burlington Planning Commission
From: Joe Weith, City Planner
Re: September 20, 1988 agenda items
Date: September 16, 1988
2) SYNON, REQUEST TO AMEND FINAL PLAT AND SITE PLAN APPROVALS
Synon came before the Planning Commission at the 9/6/88 meeting
to request an amendment to both the Final Plat and Site Plan
approvals for their project on Quarry Hill Road. Mr. Doremus
withdrew the request prior to the Commission`$ decision because he
wanted to return when all the Planning Commission members were
present. Therefore, Synon will again request that the
stipulation which requires dedication of the roadway be waived.
As a matter of interest, enclosed is a copy of the minutes from
the 3/22/77 meeting when Horizon Heights subdivision was
approved. Stipulation No. 5 specifically requires that the
roadway be improved to City standard upon further subdivision or
development of the parcel, however, it does not specifically
require the road to be dedicated to the City. Even though
dedication was not specifically stipulated, it might have been
talked about and understood during the course of the meetings.
3) HEATHCOTE ASSOCIATES, FACTORY OUTLET MALL, SHELBURNE ROAD
I will provide at next Tuesday's meeting (9/20/88) answers and
information to the various questions and requests which were
rniseci at the 9/14/88 Planning Commission meeting.
4) BANK OF VERMONT ADDITION, SHELBURNE ROAD
The Bank of Vermont proposes to construct a 500 square foot
addition in the attic; of the existing building. The addition
would be a mezzanine in the existing building, thereby, the
existing building footprint would remain the same. The property
is Zoned Commercial 1. The building is currently non -conforming
because it does not meet. side and rear yard setbacks or front
yard coverage.
The property is bounded by Commercial uses on the south and
residential uses on the east. Shelburne Road runs along the west
property line and Brewer Parkway along the north property line.
1
9/20/88
JW
MOTION OF APPROVAL
I move the South Burlington Planning Commission amend the May 31,
1988 Site Plan application approval for Synon Group's proposed
construction of a 9,800 square foot day care/office building on
Quarry Hill Road and the May 31, 1988 Final Plat application
approval for Synon's proposed subdivision of a 1.55 acre lot from
the 26+ acre Cupola Golf Course property. Both approvals shall
be amended as follows:
1. Stipulation No. 1 of the approvals shall include the
requirement that the applicant post prior to permit a separate
bond to cover the cost of maintaining the improved Quarry Hill
Road. This bond will be maintained for years or until
dedication of the roadway to the City. The amount of the bond
shall be determined by the City Engineer.
2. Stipulation No. 2 of the approvals shall be waived.
3. A stipulation shall be added requiring the owner of Quarry
Hill Road to sign a private roadway agreement with the City. The
owner shall submit a private roadway agreement to the City
Attorney for review and approval prior to permit for the day
care/office building.
3
9/20/8b)
JW
MOTION OF APPROVAL
I move the South Burlington Planning Commission amend the May 31,
1988 Site Plan application approval for Synon Group's proposed
construction of a 9,800 square foot day care/office building on
Quarry Hill Road and the May 31, 1988 Final Plat application
approval for Synon's proposed subdivision of a 1.55 acre lot from
the 26+ acre Cupola Golf Course property. Both approvals shall
be amended as follows:
1. Stipulation No. 1 of the approvals shall include the
requirement that the applicant post prior to permit a separate
bond to cover the cost, of maintaining the improved Quarry Hill
Road. This bond will be maintained for ,years or until
dedication of the roadway to the City. The amount of the bond
shall. be determined by the City Engineer.
2. Stipulation No. 2 of the approvals shall be waived.
3. A stipulation shall be added requiring the owner of Quarry
Hill Road to sign a private roadway agreement with the City. The
owner shall submit a private roadway agreement to the City
Attorney for review and approval prior to permit for the day
care/office building.
c / /It (mac / / l f !n A•�
/LCi G';�,c �C-i'_. ✓�. f�'�t�--Lrc-�-i.t rf �"c.� ,�tj /'�.
E
3
9/20/8or
JW
MOTION OF
I move the South Burlington Planning Commission amend the May 31,
1988 Site Plan application approval for S•vnon Group's proposed
construction of a 9,800 square foot day care/office building on
Quarry Hill Road and the May 31, 1988 Final Plat application
approval for Synon's proposed subdivision of a 1.55 acre lot from
the 26+ acre Cupola Golf Course property.
��F-N-�...-�- G:� `cz 1 c� �r Lyme. �zcy-c•/
1. Stipulation No. 1 of the approvals shall include the
requirement that the app.li_cant post prior to permit a separate
bond to cover the cost, of maintaining the improved Quarry Hill
Road. This bond will be maintained for _ ,years or until
dedication of the roadway to the City. The amount of the bond
shall be determined bythe City Engineer.
2. Stipulation No. 2 of the approvals shall be waived.
3. A stipulation shall be added requiring the owner of Quarry
Hill Road to sign a private roadway agreement with the City. The
owner shall submit a private roadway agreement to the City
Attorney for review and approval prior to permit for the day
care/office building.
AGREEMENT
This three-way Agreement, in triplicate, between Richard H. Bruce,
Lawrence A. Leveillee and Douglas C. Pierson ("Developers"), Cupola
.Golf Course, Inc. ("Cupola" herein) and City of South Burlington,
Vermont ("the City" herein), WITNESSETH:
Whereas, Cupola conveyed to Developers a certain 11.3 acre parcel
of land by Warranty Deed dated December 3, 1976 and recorded in
Vol. 127, Pages 506-509 ("Subject Property" herein); and
Whereas, the City's Planning Commission has granted Developers
preliminary and final major subdivision approval for the purpose of
constucting on Subject Property, 76 two bedroom apartment units as
shown on a plan entitled "Site Plan for Horizon Heights" dated
September 30, 1976 and revised October 19, 1976; and
Whereas, Cupola granted Developers access to Subject Property by
virtue of the following provision of said Warranty Deed:
"Also included in this conveyance is a right-of-way, in
common with the Grantor herein and others, over a strip of
land having a uniform width of 60 feet, leading easterly from
Spear Street to the westerly terminus of land and premises so
retained by the Grantor herein, which have previously been
identified as 160' R.O.W.' (the southwesterly point of said
westerly terminus is also the westerlymost northwest corner
of Parcel 1).
"Also included in this conveyance is a right-of-way for
passage of persons and vehicles, in common with the Grantor
herein and others, over a strip of land having a uniform width
of 60 feet, located adjacent to the westerly boundaries of
Parcels 1 and 2, hereinabove identified as said '60' R.O.W.'"; and
Whereas, the Planning Commission's (November 16, 1976) preliminary
approval provides in pertinent part as follows:
"9. . . . The roadway serving the project shall be
upgraded to City design and construction standards, except
for curbs, from Spear Street to the primary entrance to the
project . . . "; and
Whereas, the( grading of said roadway is to be performed by
Developers at their expense, consistent with the following provision
contained in Cupola's aforesaid Warranty Deed to Developers:
"Also included in this conveyance is the right in the
Grantees, at their expense, to make whatever improvement within
the rights -of -way specified above may be required by municipal
and governmental authorities having jurisdiction over the
project to be constructed on the land and premises herein
conveyed."; and,
Whereas Developers and Cupola have entered into an Agreement, dated
April 7, 1977, and recorded in the City of South Burlington Land Records,
relating to mutual rights and responsibilities for maintenance and upkeep
of the sixty (60)-foot right-of-way concerned in this Agreement, and
relating to Developers' rights of use of the roadway, which Agreement is
in no way affected by this Agreement; and,
Whereas, the parties desire to record their mutual understanding to
the effect that, by granting said approvals and otherwise authorizing
said project, the City has not assumed, but rather has specifically dis-
avowed, any intention or obligation to plow, repair or otherwise maintain
said roadway or to accept the same as a public street; and,
Whereas, Cupola granted Developers additional access to Subject
Property, which Developers shall use for the purpose of establishing a
secondary entrance to Subject Property, by virtue of the following
provision contained in Cupola's aforesaid Warranty Deed to Developers:
"Also included in this conveyance is a right-of-way for
passage of persons and vehicles, in common with the Grantor
herein and others, over a strip of land having a uniform width
' of 60 feet, located adjacent to the westerly boundaries of
Parcels 1 and 2, hereinabove identified as said '60' R.O.W.'."
Now, therefore, in consideration of said municipal approvals, the
parties hereby covenant and agree as follows:
1. Neither Developers nor Cupola shall take any action which shall
require the City to maintain or provide any services on the above -
described roadway, without first obtaining the City's written consent and
- 2 -
0
y
approval.
2. Developers and Cupola shall fully maintain said roadway and keep
the same in good repair in accordance with their April 7, 1977, Agreement
with regard to the division of said responsibility between themselves.
3. If for some reason or cause unforeseen as of this date or if by
some process of law the City should hereafter accept the dedication of
said roadway as a public street, then and in that event, to the extent
that the same shall be required, said roadway shall be upgraded to City
requirements as to design and construction, without cost or obligation to
the°City, and Developers and Cupola shall then convey the same and all
their rights therein to the City for the sum of One Dollar. Nothing
contained in this paragraph shall be construed as obligating either
Developers or Cupola, or both of them, to dedicate any portion of Quarry
Hill Road as a public street and, similarly, nothing contained in this
paragraph shall be construed as obligating the City to accept any such
proffered dedication.
4. The parties confirm the fact that the above -described secondary
entrance to the Subject Property shall at all times be kept accessible
for the use of emergency vehicles, but acknowledge that it will be closed
by a gate to prevent use by normal traffic.
5. This Agreement may be amended or revoked only upon written
consent and approval by the City.
6. This Agreement shall not only be binding upon the parties
signatory, but also upon their respective heirs, executors, administrators,
successors and assigns.
r � �
��
• - 1 1:0
DATED April 1977.
In Jsrn e O-� `C� c{,o�
l 'tit 4,4
STATE OF VERMONT
CHITTENDEN COUNTY, SS.
RICHARD H. BRUCE
In
CUPOLA GOLF COURSE, INC
By:.fCC.
Duly Authorized Officer
CITY OF SOUTH BURLINGTON
By:
At Burlington this /,-// day of April, 1977 Richard H. Bruce,'
Lawrence A. Leveillee and Douglas C. Pierson personally appeared
and they acknowledged this instrument, by them sealed and subscribed,
to be their free act and deed.
,Notary Public
STATE OF VERMONT
CHITTENDEN COUNTY, SS.
At South Burlington this 14.-a day of April, 1977 Ruth Deslaurier
personally appeared, and she acknowledged this instrument, by her
sealed and subscribed, to be her free act and deed and the free
act and deed of Cupola Golf Course, Inc.
'�•�--�
Notary Public
STATE OF VERMONT '
CHITTENDEN COUNTY, SS.
At South Burlington this day of April, 1977
personally appeared, and he acknowledged this
instrument, by her sealed and subscribed, to be her free act and
deed and the free act and deed of City of South Burlington.
Notary Public
-5-
U
l
�.:C„M91� 0�P .. �,a &�iC_R 2.2. 1977
the Ruth Burltnktnn PlanningCommission held a regular meeting on
Ode6day, March 42, 1977 in the Conferenoe doom, Municipal Offices,
1175 Williston Road.
Mtabors Propyat
William -Wessel, Chairman; Ernest Levesque, Sidney Poger, Kirk Woolery,
canes ' Zwin� •.�
No"Oba Abe
David " K*"mcp
Others Pres6at
Stephen-Page;•Plannins Assistant; Richard Bruce, Jerry Xyler, Ralph
DesLaurier.Ilrs. DesLaurier, Richard Thomas, Judson Babcock, Michael
iwth,�.rJim Holbrook, Richard Xnghamt Xr. and Xre. Laurence Leutilee
Mt. Pierson, Ralph teve, Paul Simms; Bill,Schusle, Bill Duff, Walt
Platteborse, !'ree Press
Reading of Minutes of March 8, 1977 and March 15, 1977
In the Minutes of March 8, 1977, the following is to be added to stip-
ulation 10 on page 2: The right of way along the southerly ling shall
Ae'reservedti=in an appropriate mganer,_for a potential future City
street. In'•the Minutes of -March 15• the following is to be added at
thi- top of page 3: The swktgti xas s000nded: by Kr. Levosyue 4 mased
ui�tiaously.
Mr: Poor- then, moved thgt the PI*wUg Commission accept the Kjuutoa of
March-8. 1977 and March 15. 1977. as corrected.
•r. Levesque seconded the motion,.and it was passed unanimously.
Pdb1Iy He#ring: filial Pla& 40cliO4tions of Cupola Golf Course.-luc.
}nd'°�iohard Brygo et #l. #o set off one 11 gore lot, and consttuC.t.76
opartent units- ba said lot, east of Spear Street. north of the Uairersity
Ft17,
Mr. Myler gave a,general introduction to the project and then Bill Duff
outlined tine architectural ohanges:•made since the last meeting. He said
that the parking shelters had been deleted because of cost, although
they cftld''be put in later, that the emergency exit had been lengthened
and Vrtenied to the south because of the steepness of the slope, and that
U4 261, or of units had gone from 77 to 76.
Xr: Poger pointed out that at the last meeting. the Commission had said
that the road was too close to the parking shelters and he wished to
know whether, if the shelters were later built,they would be too clogs.
He was told that there would now be enough room.
Mr. Myler said that every change in the plans had been approved by Mr.
Page and Mr. Syzmanski.
2.
V- Went through Mr. Paie,'s &977 ; paae fpF the
,,was. discussed, with fir. k'a ...poix►tlag Out t� :•ao► !t be
od.by the Commission and oannot.,be too, close, in„son�to, another
-; #y, mines that could eause;,eWusion on the-Qart.of.the cost
p Quarry Hill was, osed wXih theieb ind�or the Fire De artment.�t prep ,
$Nignation. of street, road, etc. to4o added later. ,., :
I[r..ifessel•warned the developers that they would be subject to the new
recreation policy, but pointed out that it would be applied fairly to
all developers* k
ii=,lI4rler then went through ,Dick Ward's memo of larch, 18, 1977. In
response to paragraph 2, he said that the existing vegetation will be
placed on the site plan aad.that the gees will be proteote4 during
construction.
In response to the final paragraph, Mr. Kyler-said that the figure of
112 orf 1� iof the total. dsyslopment cost for engineering inspection fees
would amount-.to.about S7.000 and that that seemed rather high. Mr.
Wessel said that it could be omitted as a provision of final plat
approval until the proper p*ople could- take care of setting a Rare
reasonabl4f es.
Mr. Myler then went through Mr. Symmanski'■ memo of March 18, 1977.
He said that the things discussed in the memp wi4a be worked out before
building permits are received.
Mr. Wessel asked if the Fire Chief had looked at the proposed project
and was told that he had looked at the preliminary plat but not at this.
Mr. Wessel said that he was reluctant to give final approval until this
was taken care of.
Mr. Myler returned to Mr. Page's Remo of March 18 and pedestrian ease-
ment was discussed. At this point Richard Thomas, stating that he rep-
resented Kra. DesLaurier and the Cupola Golf Course, raised a question
,about the pedestrian -easement that Cupola was providing to Horizon Heights.
He was afraid that the easement would be on Cupola grounds, but was
told that it would not; it will be on Horizon Heights,land. He also
o4voted to the first -four lium ., as' page 2 of Mr. Page's Aaroh -18 memo. .
He wanted the Commission to withhold a final requirement to bring the
road up to city standards until a .major_,subdivloiou ..AA of f pred. He
said that tbie.road passes 3-acres of H7 Quarry.Rill property which may
be developed later but that the cost of upgrading the road to city
standards would be so high that it.would.not be feasible to, develop the
3 L acres. He further said that if the Commission requires upgrading on
.the entire road he wants it to be,no more stringent than the requirement
for Horizon Heights (i.e. city standards without curbs and with asphalt
sidewalks. �[r. �1�oolsry;.po, „qt►+d;<out that, Cupola. Q*U,,CQurit.4alsa awms
20 more ao 4 iness ;acres aird A that if th«t+ ` + lup•d
;tha`,rau taken' thatotriffio . - Mr. Poger • reaoabe
disaussed,when and if there is further development.
Mr. Wessel said that he would like to wait a week before giving final
approval , a ntil the Fequiremeals for approval had been doaXt with more
completely. Mr. Xyler said that they,Ae*ded the final plat on-, -.March
30 for the Act 250 approval*.. Mr. Poger felt that the ;pplieant had
fulfilled all the requirements and that he should not be held up because
the Commission had not worked out several issues yet. Mr. Poger then
moved that the South Burlington Planning Commission approve the final
3
plat application of Horizon Heights and Cupola Golf Course, Inc.. Plan
I final subdivision approval as on the Horizon Heights plaA.of`21
sheets and a landscaping lan to be submitted later, b .Green Mount
Surveys and Trudell Consulting FMineers dated 9 3Q 76, revised 11 29 1
and Plan II ginal subdivision approval to a plan en tled 'Cupola.r.01L
Course, Inc." by Green Mountain Surveys, dated 3 2 77 with the follows
stipulations
1) that a final landscape plan be submitted to the Planning
-Commission.
2) that liorisoa Heights. bo subiect to- the regreatiomfgjk- jQ,be,
got by the P1an4ing Commission and apprdr#d by the«Citr,;CoumciI
3) that the stipulations in Bill Syzmanski's memo of -March 18.
1977 be agreed to by the city engineer.
4) that a proper landscaping bond as required by the zoning
ordinance be posted.
15) that on Plan II of the Cupola Golf Course the following
statements be entereds "Quarry Hill Road so-called, shall be fully_
upgraded to oity dtaign, ,and colatruotion standards in the evgt of z -
a) sddUional subdivision, or,
b) substantial further develomant"
6) that the road be called Quarry Hill and the final designation
of road, atreet. boulevard _ be added.
7) that a pedestrian right-of-way free Horizon Heights to the
Quarry Hill ad, so called, be made.
8) thAt the drafts of the utility easements, from Cupola Golf
Course and Horizon Height* be reviewed by the Qtty-lt16rnes.
9) that the City Attorney review the documents relating to the
private road utility easements and that these be submitted7for review
and approval by the Plsmning Commission..
The motion► was seconded by Xr. Levesque and passed unanimausly.
Chairman Wessel noted that he felt that it was premature to make approval
on the final plat because so many of the administrative approvals have
yet to be given.
Public Hearing: Preliminary Plat applications of Burlington Indoor
Tennis Cuter, Inc., and A. Judson Babcock ,ta set off -a lot of 35-k
acres, and construct 196 apartment units on said lot, east of Twin
Oaks Terrace.
0
City of south Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658.7955
September 13, 1988
T.J. Boyle and Associates
301 College Street
Burlington, Vermont 05401
Re: Synon/MCHV, Revised Site Plan
Dear e
ZONING ADMINISTRATOR
e!)8.7958
This letter is to inform you that I approved the revised site -
landscaping plan for a 10,000 square foot daycare/office building
as depicted on a plan entitled "Synon/MCHV Site -Landscape Pl.ari"
prepared by ,your firm and dated 8/11/88, last revised 8/12/88.
If you have any questions, please do not hesitate to contact n►e.
Sincerely,
Z'Joe Weith,
City Planner
JW/mcp
City (A' h Burl i np,;tc�rl
WATER DEPARTMENT
403 QUE.FN CITY PARK ROAD
SOUTH BURLINGTON. VERMONT 05403
TEL. 864-4361
September 9, 1988
Mr. Robert C. Krebs
Krebs & Lansing
10 Main Street
Colchester, Vermont 05446
RE: Synon Group - MCHV Day Care, Quarry Hill Rd
Project #88114, Plans Dated May 1988
Dear Bob,
I have reviewed the above referenced plans and approved them
with the following changes which must be made to comply with
South Burlington Water Department specifications and
regulations.
1. An 8" valve must be installed west of the 6" service
line tapping point (see enclosed sketch).
2. 3/4" threaded rod and duc lugs must be installed
between the hydrant inlet connection and the valve
3. The hydrant for this project shall be one of the
following with National Standard Thread:
a. Mueller Centurion A-423
b. U.S. Pipe Metropolitan
c. Kennedy K81A
4. Gate valves shall be Waterous Series 500 resilient
wedge or equivalent.
Sincerely,
SOUTH BURLINGTON WATER DEPARTMENT
Susan A. Messina
Superintendent
cc: J. Weith
L. Mansfield
wirs" twe 41 77zzzz
Now goo bond
3
3
h
-----_--- /O/ w
w w __— —
Mrw 6 "p.v.
306
New 6 water service -
O.I. c/ 52 �_-
50' Conservation Zone
I
►nelized location
zoning administrator, I �• i
1 ��Mh! lsta,.1�r29.tocQ C �`2Z/77 STD �c �QcQ `t�-mac
YL' A Lc,-*� Lw- v r rcue," �v ' �,� -al. C.t,
PROPOSED AMENDMENTS
CITY OF SOUTH BURLINGTON ZONING REGULATIONS
I. The City of South Burlington Zoning Regulations are amended
to add the following new sections:
1.30 Spear Street View Protection Zone Map defines that area
of the City that is subject to the restrictions set
forth in\Section 19.47 of these regulations. The Spear
Street Vi�w Protection Zone Map is filed in the office
of the City Clerk and is incorporated herein by
reference.
19.47 Spear Street View Protection Zone
In addition to the provisions of any other section(s)
of these regulations, the uses allowed in any district
in the Spear Street View Protection Zone, as shown on
the Spear Street View Protection Zone Map, shall be
subject to the following limitations:
19.471 No part of any structure within the Spear
Street View Protection Zone shall exceed an
elevation of 376 feet above mean sea level
minus 4 feet for each 100 feet that said part
of a structure is horizontally distant from
the base line shown on the above referenced
Spear Street View Protection Zone Map.
19.472 Landscaping and other vegetation located
within the Spear Street View Protection Zone
shall be maintained so that it does not
exceed an elevation of 376 feet above mean
sea level minus 4 feet for each 100 feet that
said landscaping or vegetation is
horizontally distant from the base line shown
on the above referenced Spear Street View
Protection Zone Map.
19.473 The term "structure" when used in this
section (19.47 and sub-s ctions) shall mean
an assembly of materials'for occupancy or
use, including, but not limited to a
building, mobile home or trailer, billboard,
sign, wall or fence, antenna, utility poles
(including towers and lines).
II. These amendments shall become effective 21 days following
their adoption by the City Council.
III. On the date that these regulations become effective, the
9/6/88
JW
MOTION OF APPROVAL
I move the South Burlington Planning Commission amend the May 31,
1988 Final Plat application approval of Synon Group for
subdivision of a 1.55 acre lot from the 26+ acre Cupola Golf
Course property to include the following changes:
1. Stipulation No. 1 of the approval shall include the
condition that 15% of the bond posted for improvements of the
roadway will be maintained after completion of the roadway until
it is dedicated to the City.
2. Stipulation No. 2 of the approval shall be waived.
3. A stipulation shall be added requiring the owner of the
private roadway to sign a private roadway agreement. The owner
shall submit a private roadway agreement to the City Attorney for
review and approval prior to permit for the day care/office
building.
5
9/6/88
JW
MOTION OF APPROVAL
I move the South Burlington Planning Commission amend the May 31,
1988 Site Plan application approval of Synon Group for
construction of a 9,800 square foot day care/office building on
Quarry Hill Road to include the following changes:
1. Stipulation No. 1 of the approvals shall include the
condition that 15% of the bond posted for improvement of the
roadway will be maintained after completion of the roadway until
it is dedicated to the City.
2. Stipulation No. 2 of the approval shall be waived.
3. A stipulation shall be added requiring the owner of the
private roadway to sign a private roadway agreement. The owner
shall submit a private roadway agreement to the City Attorney for
review and approval prior to permit for the day care/office
building.
in
T. J. BOYLE AND ASSQ 1TES
Landscape Architects & Planning-insultants
301 College Street
BURLINGTON, VERMONT 05401
i
TO
ri *5�i% i�' ■�
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via_
❑ Shop drawings ❑ Prints ❑ Plans
❑ Copy of letter ❑ Change order ❑
ILIEUU(, A orFTURSOMOTTIL
DATE �.. JOB NO.
ATTENTION
RE:
the following items:
❑ Samples ❑ Specifications
COPIES
DATEE,
NO.
DESCRIPTION
THESE ARE TRANSMITTED as checked below:
❑ For approval [ I Approved as submitted
For your use ❑ Approved as noted
❑ As requested ❑ Returned for corrections
❑ For review and comment ❑
❑ FOR BIDS DUE 19
REMARKS
❑ Resubmit_ copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
Ll PRINTS RETURNED AFTER LOAN TO US
COPY TO
SIGNED:
PRODUC1240-3 ees Inc, Grow, mass. 01471. If enclosures are not as noted, kindly notify us at once.
I
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658.7955
September 2, 1988
Synon Group
c/o Peter Doremus
112 Lake Street
Burlington, Vermont 05401
Re: Request to Amend 5/31/77 Approval
Dear Mr. Doremus:
ZONING ADMINISTRATOR
658-7958
Enclosed are the agenda item and my comments to the Planning
Commission. Bill Szymanski's comments are also enclosed.
Please be sure someone is present on Tuesday, September 6, 1988
at 7:30 P.M. to represent your request.
Sincerely,
pl'o"e Weith,
City Planner
JW/mcp
Encls
M E M O R A N D U M
To: South Burlington Planning Commission
From: William J. Szymanski, City Manager
Re: September 6, 1988 agenda items
Date: September 2, 1988
2) SYNON, QUARRY HILL ROAD
Construction of the Quarry Hill Road is expected during the 1989
construction season. It is anticipated that the entire road will
be completed except for the one inch surface course which we
request not be placed until the following year 1990. Upon
completion of the surface course, the City will accept the road
and expect to get and record the deed to this road.
Our usual procedure is to get the deeds early before the work
starts and have them available upon acceptance of the street.
The Deslauriers, owners of the road, do not want to prepare the
deeds ahead for reasons not clear to anyone.
Insisting on these deeds may jeopardize the Synon people who have
invested a great deal of time and money on their project and it
is a project that is needed in the area.
I have no objections of waiving the requirement for preparing the
deeds ahead of time and preparing them just before completion of
the road work in 1990.
4) GARY RIGGS STORAGE BUILDING, ETHAN ALLEN DRIVE
1. Site drainage shall be toward the new street to the south.
2. Proposed new road entrance shall have a depressed concrete
curb.
1
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05401
TEL (802) 6SS-7953
September 2, 1988
District Environmental Offices
District #4
111 West Street
Essex Junction, Vermont 05402
Attn: Ernie Christianson
Re: Synon Childcare Center
Quarry Hill Road
South Burlington
Dear Ernie:
OFFICE OF
CITY MANAGER
WILLIAM J SZYMANUI
The above referenced project will be served by the municipal
sewer system and is expected to generate 1305 gallons of sewage
per day.
This sewage will be treated at the City's Airport Parkway
Plant. This plant has sufficient capacity to treat this volume.
Very truly yoo s,
William IV., Sanski
City Manager
WJS/b
M E M O R A N D U M
'1'o: South Burlington Planning Commission
From: Joe Weith, City Planner
He: September 6, 1988 agenda items
Date: September 2, 1988
2) SY"NON, REQUEST TO AMEND APPROVAL
On May 31, 1988 the Planning Commission approved a 1.55 'acre
subdivision from the 26+ acre Cupola Golf Course and the site
plan application for a day care/office building on this 1.55 acre
lot. Both approvals are subject to the stipulation that legal
documents for the Offer of' Dedication and deed for Quarry Hill
Road shall be submitted to the City Attorney for approval prior
to permit. As described in the 8/17/88 letter from Michael
Burak, the Deslauriers find it in their best interest not to
dedicate the road to the City at this time. Therefore, the
stipulation described above will not be met.
As described in Mr. Doremus' 8/29/88 letter to the Planning
Commission, the success of the day care/office building project
depends on the Planning Commission's willingness to waive the
stipulation described above.
The City's policy of no more private roads was generated by the
problems arising from the City being forced to take over private
roads which were substandard and had not been maintained. The
Deslauriers' have agreed to build a street to City standard.
However, they have not agreed to dedicate it to the City at this
time. One proposal which has been made is to require that a
maintenance bond be posted that will cover the cost of
maintenance until future dedication of the road. I will talk
further with Steve Stitzel on this subject.
3) HEATHCOTE ASSOCIATES, FACTORY OUTLET MALL
Based on the literature I have reviewed, and a review of parking
standards for surrounding municipalities, our parking standards
for this size shopping center appear to be high. The Urban Land
Institute recommends a design standard of 4 spaces per 1,000
square feet of gross leasable area (GLA) for this size shopping
center. Based on this standard, the applicants proposed 5.3
spaces/1000 GLA should be sufficient to handle the demand
generated by this facility. Even with the shared parking issue,
there should be enough spaces to accommodate the Shopping Center
and Club New England/TV Station parking demand.
1
City of South BLI t•l ington
WATER DEPARTMENT
403 QUEEN CITY PARK ROAD
SOUTH BURLINGTON, VERMONT 05403
TEL.864-4361
September 6, 1988
District #4 Environmental Commission
111 West Street
Essex Junction, Vermont 05452
RE: M.C.H.V. Office/ Daycare Building
Quarry Hill Road
Dear Sir,
The above referenced project with an estimated daily demand
of 1305 gallons for domestic use will not place a burden on or
hamper the South Burlington Water Department from providing
service to its existing customers.
The results of a fire flow test taken in 1980 by Champlain
Water District personnel at the Horizon Heights project is as
follows:
Static (psi) Residual (psi)
74 62
Sincerely,
SOUTH BURLINGTON WATER DEPARTMENT
-A y r
Susan A. Messina
Superintendent
cc: K. Khatri
B. Szymanski
J. Weith
Discharge (gpm)
1300
NEIL H. MICKENBERG
JAMES J. DUNN
MICHAEL D. SIROTKIN
WILLIAM M DORSCH
JOHN D.SHULLENBERGER
MICKENBERG, DUNN, SIROTKIN & DORSCH
ATTORNEYS AT LAW
P.O. BOX 1531
BURLINGTON, VERMONT 05402
September 6, 1988
Peter Jacob, Chairman
Planning Commission
City of South Burlington
South Burlington, Vermont 05403
Re: Synon Application
Dear Chairman Jacob:
OFFICES AT
29 PINE STREET
BURLINGTON
TELEPHONE
(802)658-6951
I represent land owners on East Terrace whose lands abutt those
of Cupola Golf Course. On their behalf, I register an objection
to a request of Synon, Inc. to amend their final plat approval.
That request seeks to eliminate the condition imposed by the
Planning Commission that the road to the Synon property be
developed as a City street and dedicated to the City of South
Burlington. As I understand it, this application has been caused
by a refusal of Cupola Golf Course to dedicate the land to the
City.
Before I discuss the specifics of our objection, I want to
express concern about the lack of adequate notice of this
request. Although some of my clients are abutting land owners,
they did not receive notice of this request as I believe they
should have. I do not register this as a technical objection but
instead a real concern that interested persons were not able to
get to the Planning Commission to register their objections
because of inadequate notice.
The primary reason for my clients' objection is that the action
of Cupola Golf Course is being taken to maximize an undisclosed
development on the rest of the Golf Course lands. Thus, Cupola
Golf Course is objecting that they will lose density rights for
development whose density needs are undetermined and for which
the adverse consequences of high density development are major.
Cupola's second concern is that their overall development may
require a moving of the access road and such a moving will be
Peter Jacob, Chairman
September 6, 1988
Page 2
prevented by a dedication to the City. As we have consistently
stated to the Planning Commission, the use of Quarry Hill Road as
an access to a development on the rest of the Golf Course lands
would be a direct violation of the restrictions placed on the
Horizon Heights Development. Thus, the placement of the road is
irrelevant to legitimate concerns of Cupola Golf Course.
The above specific objections are only examples of the larger
problem faced by the Planning Commission. Cupola Golf Course is
attempting to induce the Planning Commission to make incremental
decisions and facilitate the development that Cupola has planned
but refused to disclose. Any decision made under these
circumstances is likely to have undesirable consequences. The
Planning Commission should refuse to make any such decisions
without full disclosure from Cupola.
We as taxpayers of South Burlington applaud the decision of the
City Council and the Planning Commission to require all access
streets to meet City standards and be dedicated to the City.
That is the only way to insure that private developers, and not
taxpayers, will pay for the full cost of development. A waiver
of that requirement with no legitimate reason except to maximize
financial returns of a developer is wholly unjustified.
Thank you for allowing to express our concern.
Sincerely,
r
Willi m M Dorsch
WMD/jam
MCMWIP
Medical Center Hospital of Vermont
MEMO TO: South Burlington Planning Commission
Ralph DesLauriers, et al
FROM: Brian Gragnolati, Vice President
DATE: September 1, 1988
SUBJECT: Child Care Center at Quarry Hill
The Medical Center Hospital of Vermont (MCHV) has recognized the
importance of high quality child care which is accessible and affordable to
its employees. This recognition comes from not only feedback from our
employees, but also an awareness that in a tight labor market, an employer
whose workforce is 85% female will not be able to recruit and retain
healthcare professionals without addressing the child care needs of its
employees.
Our employees are excited about having an employer -sponsored child care
center located within minutes of the hospital. To date, over 100 employees
have expressed interest in anticipation of a March 1, 1989 opening. Groups
of employees have been meeting to deal with the design and operation of the
center and a groundbreaking ceremony is planned for the third week in
September to celebrate this step into the future. It is with this
background that I share with you our concern about the successful
development of this project.
It is our understanding that there is a potential stumbling point in
attainment of our goal due to the dedication of the road which will serve
the child care center. We are hopeful that the Planning Commission and the
DesLauriers will be able to resolve this issue so that we may move forward
with our project. The Medical Center stands ready to assist in any way
possible.
I plan to be present at the Planning Commission meeting scheduled for
Tuesday, September 6 to answer any questions or to address unresolved
concerns or issues.
Thank you for your assistance in this matter.
/er
(802) 656-2345
Burlington, Vermont 05401
AVermont Health Foundation Companv r
vi+w
Voluntary Hosnitals of A—lim Inc
Goldstein, Mani ), Burak & Gabel
Cmill.ti('Ilm-s al I.aw
Two Waterfront Place-86 Lake Street
Post Office Box 1506
Burlington, Vermont 05402
Telephone 802 862-0500
Telecopier 802 862-8176
'165 Franklin Street
Boston, Massachu.m-Its 02110
Telephone 617 439-891N1
DELIVERED BY HAND
Peter M. Doremus, Esq.
Doremus Associates
112 Lake Street
Burlington, VT 05401
Dear Peter:
Michael L. Burak'
Patricia Gabel'
Jon T. Anderson
Pamela C. Kraynak
David Ilyman' +
Of Counsel
II. Kenneth Merritt, Jr.' +
'Also admitted In New York
+Not .dmhled In Vermont
August 17, 1988
The GAKI I.H\\Croup
with affiIIll cd I(ficcs it
ISnslon, fs1A
III IthII;tIll , VT
IlarIfwd, (1
kit lely. k11C
Purtsnunllh, N11
Providcnn•, fit
This letter is in response to our telephone conversation this
morning and summarizes our discussions with respect to the Purchase
and Sale Agreement between my client, The Cupola Golf Course, Inc.
("Cupola"), and the Synon Group of which you are a general partner.
As you know, that agreement is for the sale of a relatively small
parcel of property and must be viewed in the context of my client's
plans to develop the remainder of its 27 acres adjacent to your
parcel. Those plans are in the formative stage and may vary as a
result of the several discussions which are in progress between my
client, the South Burlington Planning Commission and Cupola's
neighbors. Moreover, Cupola's precise requirements will not be
fully finalized until a developer for the principal portion of its
properties is chosen. We anticipate these matters will be resolved
over the next several months and at that time we will file a master
plan.
As you know, it is of paramount importance to my client that
its sale of property to you not have an adverse impact on its
development of the larger parcel. For such reasons, we inserted
language in the contract which would allow us to declare the
contract void "in the event that the review of Purchaser's plan ...
restricts the further use or traffic for development of the balance
of Purchaser's ... property." Similarly, we included in the
contract a provision specifically disavowing any requirement to
dedicate the road to the city.
Therefore, as we have indicated to you, while we are prepared
to build a road to city standards --including curbs, sidewalks and
30' width --we are unprepared to dedicate to the road. Dedication of
;t
+4�'M `hC1 'kr�.^Yd•t � � Y��}•'r 4�
� A Y 4: ;.bV
,
; - i
tip •� 1 �
�'
♦
tlK. <13Y wart �'
y, mPYt^. lo(
�
.. �'i: r)r. 1 i
Lr •�• •�ti ���♦... p[_k- Cq�"Wi $h<$"'.<'
'^ i / A N n+t P ; S
, ' ♦ . i . 6 � -�b
•.
i ' } 7Y ,
x t
itl SX ie Yd�VV' Pa•�if� b t
i plii
�
1 'fy t_�•r < )• l"i �
F ,14
Y
,{t- ,�:_ ire �•Y. �„:,
.,,
_
V
*1 ^ W
'. L � 15 � �r i �`4"t' .�i.
''Fy�.�1�r*y � y�`i^ S t � 5 •'r.. ,:.,�
J
Yy:x
a
! A
+ 3n
Fv
f
r 7.
r• ti � ^
PLANNING COMMISSION
31 May 1988
page 3
Mrs. Maher felt the sidewalk should go at least to the far end of
the Synon property line. Ms. Pugh felt if the Quarry Hill lot
were to be used for a snowplow turnaround, there should be a stip-
ulation that Quarry Hill not be open year round. Ms. Peacock sug-
gested approving the application with a full city street and city
standard cul de sac and then having the applicant come back in 2
weeks if they want it amended and if the Planning Commission
agrees after getting more information. Mrs. Hurd stressed the
City had to be protected so that in 5 years someone doesn't come
in and ask where the sidewalk is and the City would then have to
build it at taxpayers expense.
Mr. Bigham said he is troubled because the owners of the Cupola
have planted 20 trees to block the views of residents of Horizon
Heights and felt this was an act of spite on the part of the
Deslauriers.
Mrs. Hurd moved the Planning Commission approve the Final Plat ap-
plication of the Synon Group, Peter Doremus, agent, for
subdivision of a 1.59 acre parcel from the cupola Golf Course
property located south of Gaynes as depicted on a plan entitled
"Final Plat: Synon Group, Quarry Hill Road, South Burlington, VT"
prepared by Krebs and Lansing, dated May 1988 with the following
stipulations•
1. Quarry Hill Road shall be constructed to City standards with 30
feet of pavement, curbs and a sidewalk on one side fronm Spear
Street to the Quarry Hill Club parking lot. with a city standard
size cul de sac. These road improvements shall be recorded on the
plan and approved by the City Planner prior to recording. A bond
shall be posted for this prior to permit for anv development or
construction.
2. Legal documents for the offer of dedication and deed for Quarry
Hill Road shall be submitted to the City Attorney for approval
prior to permit.
3. The water and sewer lines shall be shown on the plans prior to
recording.
4. Street details shall be approved by the City Engineer prior to
permit.
5. It is the applicant's responsibility to record the corrected
final plat within 90 days or this approval is null and void. It
must be approved by the Planner and signed by the Chairman or
Clerk of the Commission prior to recordin4_
Mr. Burgess seconded the motion which passed unanimously.
4. Site plan application of the Synon Group for construction of a
9800 sq, ft., 2 story day-care and office building for MCHV,
Quarry Hill Road
PLANNING COMMISSION
31 May 198
page 4
Mr. Boyle said the engineer felt they could get a sewer tap at
gravity across the adjacent lot. If this is not possible, they
will have to lift to Quarry Hill Rd. They have also now shown
a hydrant at the near corner of the access drive as required by
the Chief. They day care play area will be fenced. Mrs. Hurd
asked if the day care play area includes the pond. Mr. Boyle said
the pond would be part of a nature area for the day care (with
frogs, etc). Children will be well supervised.
39 parking spaces are shown with the dumpster in the 40th space.
This will be relocated, if possible. Parking is mostly for the
office building use. The day care facility is on the first floor.
Mr. Doremus said VNA will operate the day care, and pond areas
will all be fenced for safety.
Mrs. Maher asked if the day care can be made accessible for wheel
chairs. Mr. Boyle said it can be. Mrs. Lafleur said the
parking layout is OK, but a dropoff area is essential. Members
felt there should be handicapped spaces for the office and day
care accesses.
Mrs. Maher asked what it will look like from the Interstate. Mr.
Boyle said they have increased the size of trees for better
screening from the Interstate. They will use 2-1/2" caliper
willows which grow fast. Mrs. Lafleur confirmed they meet the
setbacks from the Interstate ramp and from the brook.
Mr. Fitzpatrick, architect, said the building will be 50' x 100'
and will be brick with concrete block. The roof will be copper or
a paint finished metal. The east elevation will be 2 stories, the
west one story. There is a stairway within but there will
probably be minimal communication between the 2 uses. Mr. Doremus
said the Medical Center is the tenant for the whole building. The
office use will be for general office space, not physicians'
offices. Mrs. Maher asked if it would be a non-profit, non -tax-
paying facility. Mr. Doremus said they will pay taxes. The
facility will be owned by the development group and leased to
MCHV. The day care is for MCHV employees' children, and they do
not propose a night facility for late shift workers' children.
VNA will not give up its other day care facility.
Traffic: Lance Llewellyn said they estimate 480 cars per day. At
peak hour, the 78 cars per day will just about double what is
there today. The 509 ft. site distance requirement at the inter-
section with Spear St. is exceeded in both directions. The inter-
section operates at level "A" today, and this will not change with
the development. No turning lanes are warranted, he felt. Mr.
Llewellyn noted Craig Leiner had reviewed the plans and concurred.
Mrs. Lafleur added there is not enough volume to require a signal
but they are getting close.
PLANNING COMMISSION
31 May 1988
page 5
Mrs. Bolt expressed concern for runners, bikers, roller skiers,
etc. on Spear St. and said it is an accident waiting to happen.
Mr. Jacob suggested the Commission discuss this with the Council
the next time they meet together to suggest a wide shoulder with a
white line. He agreed it was very dangerous. Mrs. Lafleur felt
this should extend all the way to the town line.
Mrs. Stigney expressed concern with the traffic back-up to
Williston Rd. This is already a problem, particularly from 7:30
to 8:30 in the morning, and residents can't get out of East
Terrace. Mr. Bigham said he felt that allowing piecemeal de-
velopment of this property was perpetuating a mistake and that
what was needed was an overall plan. He questioned the wisdom of
dumping a lot of traffic into a cul de sac. He said the property
owners created problem after problem, and this was not in the
interest of the City. Mrs. Maher explained the limitations of the
Commission. She said she would prefer R-7 development here, but
the applicant had the right to go to the Zoning Board for a var-
iance, which they received. Mrs. Lafleur noted the Commission saw
a plan a few weeks ago for the whole parcel and will see it again
soon. She said the Commission has asked for this over and over
again. She understood the neighbors' frustration, but said the
City could not force development. Mr. Brigham again raised the
question of the trees planted to block views and felt this was not
the way to cultivate neighbors. Ralph, Jr. said they were plated
as a buffer between residential and commercial. Neighbors
protested that 40 foot trees are not a buffer.
Mrs. Bolt noted the Zoning Board said there could be no future
commercial traffic using Quarry Hill Rd, but the large plan seen a
few weeks ago showed a through road. She asked how both can be
true. Mrs. Hurd said there is a major concern with this. She
noted the Minutes of Nov., 1976 indicated the Commission expected
the land to be developed residential and that there could be no
commercial traffic through a residential area. She questioned
whether the Commission could approve this commercial application.
Mr. Poger, who was on the Commission at that time, recalled the
Board felt as Mrs. Hurd does and that there should not be com-
mercial traffic through Horizon Heights and no more commercial
development. Mrs. Maher asked how a conditional use could then
have been granted in opposition to a previous Planning Commission
decision. Mr. Doremus said this is an R-7 zone and this is a
conditional use in that zone. He said the languaged referred to
was for the land "zoned commercial." He said the proposed use is
not a dense commercial use such as retail.
As clerk of the Commission, Mrs. Hurd moved the Planning
Commission approve the site plan application of the Synon Group
for construction of a 9800 sq. ft. day care/office building (4900
sq. ft. per floor) as depicted on a plan entitled "Site -Landscape
Plan - Synon Group" dated May 20, 1988 prepared by TJ Boyle and
Associated dated May 20, 1988 with the following stipulations:
PLANNING COMMISSION
31 May 1988
page 6
1. A bond shall be posted Prior to permit for construction of the
Quarry Hill Road to city standards including 30 feet of pavement,
curbs and a sidewalk on one side from Spear Street to the entrance
of the Quarry Hill Club, with a city standard size cul de sac
These road improvements shall be recorded on the plan and approved
by the City Planner prior to recording. A bond shall be posted
for this prior to permit for any development or construction in an
amount determined by the City Engineer. Street details shall be
submitted to the City Engineer for approval prior to permit.
2. Legal documents (offer of dedication and deed) shall be
submitted to the City Attorney for approval prior to permit.
3. A $14,500 landscaping bond shall be posted prior to permit.
The plan shall be revised prior to permit to reflect this amount
and shall be submitted to the Planner for approval.
4. A 1305 qpd sewer allocation is granted and teh $2 50 per gallon
fee shall be paid prior to permit.
5. The sewer line and water service shall be shown on the plans
prior to permit. Water shall be approved by the Water De art-ment
and final sewer plans shall be approved by the City Engineer prior
to permit.
6. One fire hydrant shall be installed by the main drive prior to
permit.
7. The building permit shall be obtained within 6 months or this
approval is null and void.
Mrs. Maher seconded. Motion passed 6-1, Mrs Hurd opposing.
5. Public Hearing: Final Plat application of Southsett Partnership
for 178 unit planned development of 108 multi -family units in 27
buildings and 70 single family lots on 40 acres, an existing farm-
house and 68 acres of recreation land deeded to the City, 900
Dorset Street
Mr. Marcellino said they reworked all the setbacks so they now
conform with everything the Commission wanted. They took out the
cul de sacs. All roads are 30 ft. wide. They have preserved the
trees between the "fingers" on the lots. Mrs. Lafleur noted the
First Chief wants 12 hydrants. The City Manager is still
concerned with the liability of the ponds and wants a stipulation
that they are not the City's responsibility. Mr. Llewellyn said
the Fire Chief is happy with the siting of hydrants. Mrs. Lafleur
noted the Water Dept. must see the plans. Mrs. Hurd asked the
price range of single family homes. Mr. Hausner said 150-200,000.
M
Seller of every agreement and obligation herein contained or
expressed.
18. Controlling Law. The provisions and effects of this
Agreement shall be controlled by Vermont Law.
19. Notice. Notices required to effect the terms of this
Agreement shall be effective only if sent by certified mail, return
receipt requested, as follows:
If to Sellers:
Ralph DesLauriers
100 Old Farm Road
South Burlington, VT 05403
With a Copy to:
Michael L. Burak, Esq.
Goldstein, Manello, Burak & Gabel
P.O. Box 1506
Burlington, VT 05402
If to Purchaser:
Synon Group
112 Lake Street
Burlington, VT 05401
With a Copy to:
Peter M. Doremus, Esq.
Doremus Associates
112 Lake Street
Burlington, VT 05401
or to such other address as the parties shall designate by written
notice.
20. Road Improvement. The Purchaser agrees to contribute
Twenty Thousand Dollars and No Cents ($20,000.00) for the
improvements to the Quarry Hill Road and any extension thereof at
the time of closing. Said sum shall be paid to said Michael L.
Burak as Escrow Agent. (The Escrow Agent shall be liable only for
its own gross negligence and shall always be fully protected by
paying the escrow sum into a Court of competent jurisdiction.) The
- 10 -
1
Escrow Agent shall pay said sum over to Seller when the improvements
and extension of said Quarry Hill Road has been completed to the
following standard: The road will not be required to have curbs,
sidewalks or be 30 feet wide or be dedicated to the City of South
Burlington. Seller proposes to build a road that has a subbase to
city standards 30' wide and a total width of 26' of black top from
Spear Street to Buyer's site. If the Planning Board shall impose
additional road improvements, Seller shall comply with the same.
The Seller hereby warrants that all such improvements to said Quarry
Hill Road will be completed no later than one hundred twenty (120)
days from the issuance of the necessary permits forth in Paragraph
3a, including, without limitation, any additional permits which may
be necessary for construction of the road subject to causes beyond
Sellers reasonable control including, without limitation, the
weather. This covenant shall survive the closing.
21. Headings. The headings in this Agreement are for
purposes of reference only and shall not limit or otherwise affect
the meaning thereof.
22. Entry Upon Premises Prior to Closing. Purchaser shall
have the right to enter upon the premises at mutually agreeable
times and places for the purposes of inspecting the premises and for
all reasonable purposes all at Purchaser's sole risk and Purchaser
shall defend and hold indemnified and harmless Seller of and from
any and all claims and liabilities arising from such activities and
procure reasonable insurance requested by Seller.
23. Time is of the Essence. The parties hereto agree that
time is of the essence in the performance of all the elements of
this contract.
24. Binding Effect. This Agreement shall inure to the
benefit of and be binding upon each of the parties hereto and its
respective successors and assigns.
25. Use. The Seller shall have the right to approve the
Purchaser's intended use of the property; in the eve:.t that the
Seller does not approve the use, the Seller may declare this
contract void and shall return all deposit money paid hereunder. If
Seller does not approve the intended use of the property, Seller
agrees not to permit the same use or uses on the Premises as
requested by the Purchaser in the same manner (meaning use and
particular style of use) by the party or parties to whom Purchaser
intends to lease or convey the Premises.
26. Further Permits. The Purchaser agrees not to oppose any
future development of the balance of Seller's lands and premises or
to oppose or object to the issuance of any permits therefore. In
the event that the Premises are sold or leased by the Purchaser to
any other party, Purchaser agrees to require such a covenant from
any such purchaser and/or lessee.
In the event that the review of Purchaser's plan triggers a
master plan or master plan review by the City of South Burlington or
restricts the further use or traffic for development of the balance
of Purchaser's or Seller's property; then in that event, the Seller
- 12 -
may declare this contract void and have no further obligations or
liabilities hereunder and will return all of Purchaser's deposit
monies paid pursuant to this Agreement. Purchaser acknowledges that
Seller has disclosed to Purchaser that Seller has not yet reached
firm conclusions as to the manner in which it intends to use the
balance of the land of which the premises are a portion. The
balance of such land may be used in one or more ways which require
permits or changes in zoning.. Purchaser agrees that it is
purchasing the land with full realization that some of said use may
or may not be compatible or beneficial to any use which the
Purchaser intends to make of the Premises from time to time in the
future. Purchaser hereby accepts such risk. Purchaser therefore
agrees that it shall not oppose any requests by the Seller for all
such permits as they may be required by Seller in order to
accomplish its intended uses from time to time of said lands unless
any proposed use shall be one which is commonly considered in the
community to be noxious or offensive. This covenant shall survive
the closing and, in the event that the Premises are sold or leased
by the Purchaser to any other party, Purchaser agrees to require
such a covenant from any such purchaser and/or lessee.
27. Design Review. Purchaser shall submit all construction
plans to seller for approval of design. Seller shall have five (5)
working days to grant or deny said approval which approval shall not
- 13 -
5/31/88
JBL
MOTION OF APPROVAL
I move that the South
Burlington Planning Commission approve the
site plan application
of he Synon Group for construction of a
9800 square foot day care office building (4900 square feet per
floor) as depicted on
a plan entitled "Site -Landscape Plan -
Synon Group" dated
May 20,1988 prepared by TJ Boyle and
Associates dated May 20, 1988 with the following stipulations:
CJAL
wRl1� Cc
1) A bond shall be posted
prior to perm' for cons ruction of
the Quarry Hill Road
to City standards including 30 feet of
pavement, curbs and a
sidewalk on one s' a from Spear Street to
the entrance of the Quarry
Hill Club The amount should be
determined by the City
Engineer prior to permit. Street details
shall be submitted to
the City Engineer for approval prior to
permit.
2) Legal documents (offer of dedication and deed) shall be
submitted to the City Attorney for approval prior to permit.
3) A $14,500 landscaping bond shall be posted prior to permit.
The plan shall be revised prior to permit to reflect this amount
and shall be submitted to the Planner for approval.
4) A 1305 gpd sewer allocation is granted and the $2.50 per
gallon fee shall be paid prior to permit.
5) The sewer line and water service shall be shown on the plans
prior to permit. Water shall be approved by the Water
Department and final sewer plans shall be approved by the City
Engineer prior to permit.
6) The building permit shall be obtained within 6 months or this
approval is null and void.
ire vmt" - ate-
L
\.r'
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
One Wentworth Drive • Williston • Vermont • 05495 • (802) 878-3000
May 31 1988
Mr. Peter M. Doremus, Esq.
112 Lake Street
Burlington, Vermont 05401
RE: Traffic Impact Evaluation - Proposed Day-Care/Office Building
Quarry Hill Road - South Burlington
FILE: 88052
Dear Mr. Doremus,
At your request, we have analyzed the potential traffic impacts of
the above -referenced 10,000 square feet day-care/office building.
The following analyses specifically evaluate the impact of this
proposed building on Quarry Hill Road and its intersection with Spear
Street.
Three major issues of concern to local and state officials are
addressed herein: Traffic Congestion, Traffic Safety, and Geometric
Improvements. The objective of this evaluation is to identify and
access potential traffic impacts created by this Project in each of
the above areas of concern, for both existing and future traffic
conditions.
TRAFFIC CONGESTION
Information regarding traffic volumes within the aforementioned study
area was obtained from the following sources:
1. Automatic Traffic Recorder Count - Spear Street (Station
D85), Vermont Agency of Transportation, August 20-27, 1985.
2. Turning Movement Count, Spear Street/Quarry Hill Road,
FitzPatrick-Llewellyn Incorporated, April 29, 1988.
Copies of the above counts are enclosed as Appendices A and B,
respectively.
The results of the above -referenced traffic counts were used to
develop average daily traffic volumes (ADT) and design hour volumes
(DHV) within the study area.
Design 0 Inspection 0 Studies 0 Permitting • Surveying
Mr. Peter M. Doremus, Esq.
FILE: 88052
May 3, 1988
Page Two
The above data was adjusted to a 1988 DHV condition, based on an
annual growth rate of 5 percent and DHV/AADT ratios developed by the
Vermont Agency of Transportation. The DHV is defined as the 30th
highest hourly volume occurring on an annual basis, and is used as a
design parameter to design highways, intersections, and traffic
control systems. The DHV typically occurs on a weekday during the
P.M. peak hour.
Because projects such as this are seldom fully developed and occupied
within a one year period, traffic volumes are typically projected to
a future design year, and expected conditions are also analyzed for
that design year. Typically, a five-year projection is made from the
year of completion of construction. An analysis of potential traffic
impacts therefore also requires the development of background traffic
volumes for the design year of 1993. Those volumes were calculated
based on an annual growth rate of 5 percent.
Once existing and future background traffic volumes were determined,
it was necessary to estimate the volumes and directional patterns of
the additional vehicular traffic which this Project will generate.
The major determinants of the volume of traffic which will be
generated by this Project are the type and size of the proposed land
uses. An estimate of the traffic generation was developed through
the use of vehicular trip generation rates from "Trip Generation,
Institute of Transportation Engineers, 4th Edition". That report
outlines the results of trip generation studies for numerous land
uses. Data for average weekdays and periods of peak traffic volumes
were used to estimate the trip generation of the above referenced
lots. Table 1 outlines the projected trip generation of this
Project.
TABLE 1
PROJECTED VEHICULAR TRIP GENERATION
Average Weekday Vehicle Trip Generation 480 vte/day
A.M. Peak Hour Trip Generation
Enter 43
Exit 29
TOTAL 72 vte/hour
P.M. Peak Hour Trip Generation
Enter 33
Exit 45
TOTAL 78 vte/hour
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr. Peter M. Doremus, Esq.
FILE: 88052
May 3, 1988
Page Three
The directional distribution of Project -generated traffic was
estimated using existing traffic patterns and potential origins/
destinations of newly generated traffic. That information indicates
that 75 percent of Project -generated traffic will access it via Spear
Street north.
Projected design hour volumes, both with and without this Project,
are enclosed as Appendices C and D.
Since traffic flow on a street/highway network is typically limited
by available capacity at intersections, the potential traffic
congestion impacts of this Project were determined by performing
capacity analyses at the Spear Street/Quarry Hill Road intersection.
The methodology used to determine intersection capacity was obtained
from the "Highway Capacity Manual, Special Report 209, Transportation
Research Board, 1985". Traffic conditions were analyzed using
projected 1988 and 1993 design hourly volumes.
Table 2 presents the results of the intersection capacity analyses.
TABLE 2
DHV LEVELS OF SERVICE
SPEAR STREET/QUARRY HILL ROAD
1988
1993
W/O
W/
W/O
W/
PROJ.
PROD.
PROJ.
PROJ.
A.M. Peak Hour
LT Enter from Spear Street
A
A
A
A
LT & RT Exiting Quarry Hill Road
A
A
A
A
P.M. Peak Hour
LT Enter from Spear Street
A
A
A
A
LT & RT Exiting Quarry Hill Road
A
A
A
A
Urban local/collector highways and intersections are generally
designed to maintain Level of Service (L.O.S.) D or better during DHV
conditions. The concept of level of service has been defined to
represent reasonable ranges in the degree of loading and
corresponding vehicular delays and average travel speed. L.O.S. A
represents very low loading with ample reserve capacity and no
vehicular delays (free flow); L.O.S. C represents average conditions;
and L.O.S. F represents a street or intersection at capacity, causing
very long queues and vehicular delays (forced flow).
It should be noted that in the case of unsignalized intersections,
turning movements on the minor street approaches often experience
FITZPATRIC K- LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr. Peter M. Doremus, Esq.
FILE: 88052
May 3, 198B
Page Four
lower than desirable levels of service due to their having to yield
to the major street traffic. For such intersections the Highway
Capacity Manual uses L.O.S. E/F as the threshold of unacceptable
traffic congestion conditions.
Based on the results of the intersection capacity analyses, it is
evident that the additional traffic accessing at this proposed
intersection will not create significant adverse impacts on existing
or future levels of traffic congestion within the study area.
TRAFFIC SAFETY
The safety of vehicular traffic traveling to and from this Project is
largely dependent on existing geometric and physical conditions of
nearby roadways and intersections, projected traffic volumes, and on
the presence of adequate traffic control devices.
Available sight distances were visually inspected at the Spear
Street/Quarry Hill Road intersection. Based on prevailing speeds of
40 mph, the recommended minimum intersection sight distance equals
590 feet. This provides a minimum 10 second visibility time of
oncoming traffic. Actual available sight distances exceed that value
in both directions.
Based on the above, the traffic safety impacts of this Project should
be minimal.
GEOMETRIC IMPROVEMENTS
Geometric improvements may be warranted by either additional turning
movements or existing substandard conditions. Where significant
volumes of additional turning movements are generated, exclusive turn
lanes may be warranted to reduce potential traffic congestion and
safety impacts. Such turn lanes serve to prevent disruptions in
traffic flow caused by turning vehicles.
Analyses of the projected 1988 and 1993 design hour volumes indicate
that future peak hour turning movement patterns at the Spear Street/
Quarry Hill Road intersection will not require additional turn lanes.
Potentially substandard geometric conditions also need to be
addressed. In this case, the width of Quarry Hill Road beyond the
first entance to Horizon Heights is of concern. It is our
understanding that this Project includes the rebuilding of that
portion of Quarry Hill Road to current City road construction
standards.
FITZ PATRIC K- LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr. Peter M. Doremus, Esq.
FILE: 88052
May 3, 198B
Page Five
CONCLUSION
This report has evaluated potential traffic impacts of a proposed
10,000 square feet day-care/office building accessing onto Quarry
Hill Road in South Burlington.
No undue adverse traffic impacts were found to result from this
proposed Project. In addition, existing geometrics at the Spear
Street/Quarry Hill Road intersection are adequate to accomodate the
projected additional traffic which this Project will generate.
We wish to thank you for this opportunity to be of service. Should
you have any questions, or if we may be of additional assistance,
please feel free to contact us.
Sincerely,
FITZPATRICK-LLEWELLYN INCORPORATED
6r
cei� '
Rog. Dickinson, P.E.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
APPENDIX A
SPEAR STREET — STATION D05
AUTOMATIC TRAFFIC RECORDER COUNT
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
TRAFFIC COUNT RECORD
VERMONT AGENCY OF TRANSPORTATION
PROJECT PLANNING DIVISION
TRAFFIC RESEARCH SECTION
41
Q
E
o
ti
TOWN: ��
1 2
3
4 5
6 7
8 12
'v a,
a,
ja
~
i
v
+�-)
o
4-)
+
In
n
ROUTE: �L .
fj U z z Z
COUNTER
UMBER:o2J
STATION
a : ,D�.s
Day
Hour
2-3
15.
i
_ 7.+
,.+
3-4
--
359•..
22
/
.+
379:+
.+
7-8
317.
300--
'91r-
12.-
339-+
8-9
.
f 219A.
2?
239-
1.7?-
r .,
186-4'
-- ?60:
-- �83.
277.
?78 -
?
-144-1
--1 +
100 25
335 •
349.
9
338.
201. -
- ??i.
-90.4
-3-4
'1'JJ•
- 450.
- 4),5
431.
- 191.
• 194-.+
452-i
p -97-,PJ
4-5
4 ? 0
206.
? ?,.+
432••+
.�.'/D
5-6
T48-
2 3 3 -
931..
�'"?3-
168.
? ,.+
147•i
7-8
15 -`
173.
133.-
203-
134-+
9
115.
5.
154
8�'.
5. r
88' ►
_
—9
94.1.
122-
yp. -
152• '
71-
61-+
10-11-
11.9-*
4 634-
4 483. •
4 613•
2760.
? 434.4
3 7i8l
1. 584.
ota
T Z CJCJ - Z I
DATA SUMMARY
� 13 -r3
Day of Week
Dail Volumes Week
11
Total
Ave.
Da.
1
2
3
4
5.
Sunday
4.'
on ay
tzco
Tuesday
-
Wednesda
4- A-
4
Thursday
Friday
4_ i
Saturday
Total o
Average Days.
Without
Weekend
4
With Weekend
Adjusted -
Average Day
Without Weekend
-
W i t h W Tee- en
Route•�Classificat•ir)ii•.i
W Wkendn -7 Factor.�5
198 AADT �58c)
Remarks:
zoo
+ zco
i ZOU
421-0Z
3933
Revised November 1981
APPENDIX
SPEAR STREET/QUARRY HILL ROAD
TURNING MOVEMENT COUNT
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
TURNING MOVEMENT COUNT
SPEAR STREET u QUARRY HILL ROAD
APRIL 29, 196B
SOUTH APPROACH
NORTH APPROACH
EAST APPROACH
TOTAL
INTERVAL
SPEAR
ST.
SPEAR
ST.
QUARRY
HILL RD.
APPROACH
BEGINNING
RT
TH
LT
TH
LT
RT
VOLUME
0600
0
9
0
4
0
1
14
0615
0
16
1
2
0
2
21
0630
0
48
0
18
2
0
68
0645
1
46
0
19
1
4
71.
SUBTOTAL
1
119
1
43
3
7
174
0700
0
5B
0
28
0
5
91
0715
1
87
1
29
0
10
128
0730
0
119
1
37
1
7
165
0745
1
120
2
31
1
7
162
SUBTOTAL
2
384
4
125
2
29
546
1540
0
42
5
50
0
5
102
1515
0
37
3
58
0
8
106
1530
2
37
B
69
2
3
121
1545
1
50
6
59
1
10
127
SUBTOTAL
3
166
22
236
3
26
456
1600
2
52
10
64
2
9
139
1615
3 1
36
6
68
0
2
115
1630
3
57
8
83
2
7
160
1645
3
60
5
113
3
2
186
SUBTOTAL
11
205
29
320
7
20
600
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
APPENDIX C
PROJECTED DESIGN HOUR VOLUMES
WITHOUT PROJECT
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
FITZPATRICK-LLEWELLYN INCH IORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: :tiflM2�in1C �U V
LOCATION:
N
NOTE: LABEL APPROPRIATE
DIRECTIONS ON ARROW
ABOVE.
R aGi
L®
REMARKS:
1`I�� q.Y 1, om)
NAW . _
FITZPATRICK-LLEWELLYN INCL. )ORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: �;` 9(A P L I'\K,) 0 IJ
LOCATION: r G0E-,a
i\j
NOTE: LABEL APPROPRIATE
DIRECTIONS ON ARROW
ABOVE.
REMARKS:
/C/66 p1n
jv j3?0jcc
FITZPATRICK-LLEWELLYN INCH PORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
. JPrRn. S; . I
TOWN: S �il,l�� L IfJCTJOIJ
LOCATION: IFCFli r.-'!L
NOTE: LABEL APPROPRIATE
DIRECTIONS ON ARROW
ABOVE.
_R �Cf
l
REMARKS:
J
v
v/'l,/ c✓/o 2 ROic-C
FITZPATRICK-LLEWELLYN INCH `GRATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
NAK[.
�i�C11�. �i•
TOWN:
LOCATION:
N
NOTE: LABEL APPROPRIATE
DIRECTIONS ON ARROW
ABOVE.
�J
777
� 3v
� 11
REMARKS:
J /ll , /�l ✓ wl o 'PY U J C CT
APPENDIX D
PROJECTED DESIGN HOUR VOLUMES
WITH PROJECT
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
FITZPATRICK-LLEWELL . _ i} INCORPORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: 5 B(,(0LINC,
LOCATION:, 01.
/\J
NOTE: LABEL APPROPRIA'
DIRECTIONS ON AR
ABOVE.
REMARKS:
FITZPATRICK-LLEWELL .t) INCORPORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: S•.r5lltQLiNGj
LOCATION:
L C�
REMARKS:
'J
0 1
N
NOTE: LABEL APPROPRIA'
DIRECTIONS ON AR
ABOVE.
l77
FITZPATRICK-LLEWELL. A INCORPORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: �• •� 11) U nJG
LOCATION: 'i5 "S
Rr
L
REMARKS:
U
NOTE: LABEL APPROPRIA
DIRECTIONS ON Al
ABOVE.
lH•t�>
aN ✓ ""/ Pl' OJCc:
M E M O R A N D U M
To: South Burlington Planning Commission
From: William J. Szymanski, City Manager
Re: May 31, 1988 agenda items
Date: May 27, 1987
3) SYNON GROUP = DAY CARE/OFFICE, QUARRY HILL ROAD
1. Sewer line along the west side should be shown on the plan.
It is only partly shown. It may be difficult to sewer the
building by gravity.
2. Water service mains should be shown. This shall be reviewed
and location approved by the City Water Department.
3. Quarry Hill Road is a private street and in need of repair.
4) VILLAGE AT DORSET PARK BRAND PROPERTY)
1. The three ponds will be a liability. The plans should have a
note on each pond stating that these ponds are owned and
maintained by the home owners of the development especially the
plan that is recorded.
2. The most southerly and the middle pond appear to have no
provisions to handle overflow and provisions for draining if need
be especially for the winter when they should be drained or
substantially lowered.
3. The outlet structure for the northerly pond shall not be the
City's responsibility but the responsibility of the home owners.
4. The sewage pumping station site shall have a curb cut for
maintenance equipment to enter and park.
5. The City Water Department shall review the water service
plans.
6. Corner lots shall have their curb cuts away from the corner
as far as possible
7. Telephone and power shall be located outside of the street
r.o.w. in utility easements.
8. A street lighting plan shall be furnished and street lights
shall be in place before lots are sold not after they are sold.
9. There should be a single place for mail. boxes. The location
coordinated with the post office.
1
I
%� ��a75 �inrset street
�i<Titth �urlingtnn, lflermu><tt 115�111
M E M O h A N D U M
To: South Burlington Planning Commission
From: James Goddette, Fire Chief
Re: May 31, 1988 agenda items
Date: May 27, 1988
A
Y
OFFICE OF
JAMES W. GODDETTE, SR.
CHIEF
(802) 658-7960
3) SYNON GROUP DAY CARE/OFFICE COMPLEkI QUARRY Hll,L ROAD
Plans reviewed by this department and the following wi.11. be
required for fire protection.
a) Water main to be extended and one hydrant installed by
the main drive to property.
4) VILLAGE AT DORSET PARK
Plans reviewed by this department and the only problem 1 found
was that 12 hydrants are required for the size of the project.
On Wednesday, May 26, 1988 1 had a meeting with Mr. Lance
L1eweLlyn and corrections are to be made by him for the Plann.in,�Z
Commission meeting on Tuesday, ^gay 31, 1988.
6) l NIVERS1'1'Y MALL TEMPORARY OFFICE TRAILER
Atthis time .I do not. see a problem with the location of th,,
trailer.
T. I BOYLE AND ASSOC' p
Landscape Architects & Planning Colisultants
301 College Street
BURLINGTON, VERMONT 05401
TO
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via_
❑ Shop drawings ❑ Prints Plans
❑ Copy of letter ❑ Change order ❑
DATE JOB NO.
ATTENTION
RE:
the following items:
❑ Samples ❑ Specifications
COPIES
DATE
NO.
DESCRIPTION
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted
❑ Fo your use ❑ Approved as noted
requested ❑ Returned for corrections
❑ For review and comment ❑ _
REMARKS
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ FOR BIDS DUE _ 19 _ ❑ PRINTS RETURNED AFTER LOAN TO US
COPY
SIGNED:
PRODUCT2403 Ees Inc., cmma, MIm men. if enclosures are not as noted, kindly notify u
i
Deed References
Rolond B EvofWline OesL ourrer to Cupolo CO# Course
Condermollon order Stole o/ Vermont N,gt,wor Record 63
Cupo/o 601f Course to RiChord Bruce, Lowrence LoWdlee
and DowgICS Pierson 127
gLx giY Botanic 1 H me
MO
5 ; '3, Acer platanoides
3 ! Acer platanoides
i 1 a1 Acer sacchrum
MCHY DAY CARE PLANT LIST
MAY 1988
1-8 510161
506 1219176
�gaeman Name sin
Rsd Qlalmah
Norway maple 2-2.5' cal.
BBB Clear stem to 6'
Norway maple 2.5-3' cal.
B&B Clear stem to 6'
Sugar Maple 2-2.5' cal.
BU
1 Ig p Aesculus glabra Ohio Buckeye 2-2.5' cal. B&B
SYA
3 Fraximus pennsylvonics
lsnceeWta Newport Newport Green Ash 2-2.5' cal. B&B Clear stem to 6'
17 : Malus floribunda
5 3� , \0 Picea abies
12 L-7-UO Pins rngre
1 20 +) MS Pinus strobus
6 ja •1 0 Salix elegantissims
Flowering Crab 6'-B' ht. BBB
Norway Spruce 4-5' ht. BBB 1
Austrian Pine 4-5' ht. BBB .
White Pine 4-5' ht. BBB
Thurlow Weeping 5-6' ht B&B
y
Willow
'
SHRUBS
14
1 j
Euonymus vegetus
Bigleaf Wintsrcreeper
18-24' spread BBB I
41°KUl$
�-y
"e 6
�a?,G�
Juniperus chinensis
Sargents Juniper
15-18' spread 02 can 1
VPOLA GALE COURSE, /AC
Sargent►
�
Vo%tw 66 Pope .w
1
NO a n"If
16
Potentilla frulicosa
Bush Cinquefoil
12-18' spread • 1 can
50
3, °�
Symphoricrpos vulgaris
Coralberry
2'-3' spread BU Q 4
1
v WI0_46>to
6 1J�_'. Taxus cuspidata densi-
formis
l.'11
Dense Yew 16-24' spread BBB -�
- � 1
8
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
One Wentworth Drive • Williston • Vermont • 05495 • (802) 878-3000
May 3, 1988
Mr. Peter M. Doremus, Esq.
112 Lake Street
Burlington, Vermont 05401
RE: Traffic Impact Evaluation - Proposed Day-Care/Office Building
Quarry Hill Road - South Burlington
FILE: 8B052
Dear Mr. Doremus,
At your request, we have analyzed the potential traffic impacts of
the above -referenced 10,000 square feet day-care/office building.
The following analyses specifically evaluate the impact of this
proposed building on Quarry Hill Road and its intersection with Spear
Street.
Three major issues of concern to local and state officials are
addressed herein: Traffic Congestion, Traffic Safety, and Geometric
Improvements. The objective of this evaluation is to identify and
access potential traffic impacts created by this Project in each of
the above areas of concern, for both existing and future traffic
conditions.
TRAFFIC CONGESTION
Information regarding traffic volumes within the aforementioned study
area was obtained from the following sources:
1. Automatic Traffic Recorder Count - Spear Street (Station
D85), Vermont Agency of Transportation, August 20-27, 1985.
2. Turning Movement Count, Spear Street/Quarry Hill Road,
FitzPatrick-Llewellyn Incorporated, April 29, 198B.
Copies of the above counts are enclosed as Appendices A and B,
respectively.
The results of the above -referenced traffic counts were used to
develop average daily traffic volumes (ADT) and design hour volumes
(DHV) within the study area.
Design • Inspection • Studies* Permitting • Surveying
Mr. Peter M. Doremus, Esq.
FILE: 88052
May 3, 1988
Page Two
The above data was adjusted to a 1988 DHV condition, based on an
annual growth rate of 5 percent and DHV/AADT ratios developed by the
Vermont Agency of Transportation. The DHV is defined as the 30th
highest hourly volume occurring on an annual basis, and is used as a
design parameter to design highways, intersections, and traffic
control systems. The DHV typically occurs on a weekday during the
P.M. peak hour.
Because projects such as this are seldom fully developed and occupied
within a one year period, traffic volumes are typically projected to
a future design year, and expected conditions are also analyzed for
that design year. Typically, a five-year projection is made from the
year of completion of construction. An analysis of potential traffic
impacts therefore also requires the development of background traffic
volumes for the design year of 1993. Those volumes were calculated
based on an annual growth rate of 5 percent.
Once existing and future background traffic volumes were determined,
it was necessary to estimate the volumes and directional patterns of
the additional vehicular traffic which this Project will generate.
The major determinants of the volume of traffic which will be
generated by this Project are the type and size of the proposed land
uses. An estimate of the traffic generation was developed through
the use of vehicular trip generation rates from "Trip Generation,
Institute of Transportation Engineers, 4th Edition". That report
outlines the results of trip generation studies for numerous land
uses. Data for average weekdays and periods of peak traffic volumes
were used to estimate the trip generation of the above referenced
lots. Table 1 outlines the projected trip generation of this
Project.
TABLE 1
PROJECTED VEHICULAR TRIP GENERATION
Average Weekday Vehicle Trip Generation 480 vte/day
A.M. Peak Hour Trip Generation
Enter 43
Exit 29
TOTAL 72 vte/hour
P.M. Peak Hour Trip Generation
Enter 33
Exit 45
TOTAL 78 vte/hour
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr. Peter M. Doremus, Esq.
FILE: 88052
May 3, 19HH
Page Three
The directional distribution of Project -generated traffic was
estimated using existing traffic patterns and potential origins/
destinations of newly generated traffic. That information indicates
that 75 percent of Project -generated traffic will access it via Spear
Street north.
Projected design hour volumes, both with and without this Project,
are enclosed as Appendices C and D.
Since traffic flow on a street/highway network is typically limited
by available capacity at intersections, the potential traffic
congestion impacts of this Project were determined by performing
capacity analyses at the Spear Street/Quarry Hill Road intersection.
The methodology used to determine intersection capacity was obtained
from the "Highway Capacity Manual, Special Report 209, Transportation
Research Board, 19B5". Traffic conditions were analyzed using
projected 1980 and 1993 design hourly volumes.
Table 2 presents the results of the intersection capacity analyses.
TABLE 2
DHV LEVELS OF SERVICE
SPEAR STREET/QUARRY HILL ROAD
1988
1993
W/0
W/
W/O
W/
PROJ.
PROJ.
PROJ.
PROJ.
A.M. Peak Hour
LT Enter from Spear Street
A
A
A
A
LT & RT Exiting Quarry Hill Road
A
A
A
A
P.M. Peak Hour
LT Enter from Spear Street
A
A
A
A
LT & RT Exiting Quarry Hill Road
A
A
A
A
Urban local/collector highways and intersections are generally
designed to maintain Level of Service (L.O.S.) D or better during DH�
conditions. The concept of level of service has been defined to
represent reasonable ranges in the degree of loading and
corresponding vehicular delays and average travel speed. L.O.S. A
represents very low loading with ample reserve capacity and no
vehicular delays (free flow); L.O.S. C represents average conditions;
and L.O.S. F represents a street or intersection at capacity, causing
very long queues and vehicular delays (forced flow).
It should be noted that in the case of unsignalized intersections,
turning movements on the minor street approaches often experience
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr. -Peter M. Doremus, Esq.
FILE: 88052
May 3, 1988
Page Four
lower than desirable levels of service due to their having to yield
to the major street traffic. For such intersections the Highway
Capacity Manual uses L.O.S. E/F as the threshold of unacceptable
traffic congestion conditions.
Based on the results of the intersection capacity analyses, it is
evident that the additional traffic accessing at this proposed
intersection will not create significant adverse impacts on existing
or future levels of traffic congestion within the study area.
TRAFFIC SAFETY
The safety of vehicular traffic traveling to and from this Project is
largely dependent on existing geometric and physical conditions of
nearby roadways and intersections, projected traffic volumes, and on
the presence of adequate traffic control devices.
Available sight distances were visually inspected at the Spear
Street/Quarry Hill Road intersection. Based on prevailing speeds of
40 mph, the recommended minimum intersection sight distance equals
590 feet. This provides a minimum 10 second visibility time of
oncoming traffic. Actual available sight distances exceed that value
in both directions.
Based on the above, the traffic safety impacts of this Project should
be minimal.
GEOMETRIC IMPROVEMENTS
Geo etric i ements may be warranted by either additional turning
movements or existing substan ar con 1 ions. Where significant
volumes of additional turning movements are generated, exclusive turn
lanes may be warranted to reduce potential traffic congestion and
safety impacts. Such turn lanes serve to prevent disruptions in
traffic flow caused by turning vehicles.
Analyses of the projected 1988 and 1993 design hour volumes indicate
that future peak hour turning movement patterns at the Spear Street/
Quarry Hill Road intersection will not require additional turn lanes.
Potentially substandard geometric conditions also need to be
addressed. In this case, the width of Quarry Hill Road beyond the
first entance to Horizon Heights i-sof concern. It is our
understanding that this Project includes the rebuilding of that
portion of Quarry Hill Road to current City road construction
standards.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
Mr. Peter M. Doremus. Esq.
FILE: B8052
May 3, 19BB
Page Five
CONCLUSION
This report has evaluated potential traffic impacts of a proposed
10,000 square feet day-care/office building accessing onto Quarry
Hill Road in South Burlington.
No undue adverse traffic impacts were found to result from this
proposed Project. In addition, existing geometrics at the Spear
Street/Quarry Hill Road intersection are adequate to accomodate the
projected additional traffic which this Project will generate.
We wish to thank you for this opportunity to be of service. Should
you have any questions, or if we may be of additional assistance,
please feel free to contact us.
Sincerely,
FITZPATRICK-LLEWELLYN INCORPORATED
7y'-
Dickinson, P.E.
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
APPENDIX A
SPEAR STREET — STATION D85
AUTOMATIC TRAFFIC RECORDER COUNT
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
TRAFFIC COUNT RECORD
VERMONT AGENCY OF TRANSPORTATION
PROJECT PLANNING DIVISION
TRAFFIC RESEARCH SECTION
H „
C
p
U _,
QJ
o
-
TOWN :-
1 2
3
4 5
6 7
8 j
-0 ci
b
Q�
s..
s
-p
o
.
�
V)
ROUTE:
fi U 2 Z Z
COUNTER
UMBER :.2j
STATION
B F : ,0o".5
ay
3
7 i
air
.V
x ;z
a �.
Hour
;3E3-
1 •
6.
41..
?0.4
3q.
f
12-1
-90-X3
1.1-
q-
22
16-+
2-3
0-
. f
7.+
-4
4,-5
1.44.
70.
-.1
123-+
, f
6-7
-- --
359•
- -
/'
r 5 -.1
3791.+
. f
7-8
300.
294-1.
1?4•
339.+
8-9
1J6.
_.1
. 194-+
225-
9-
219.
.22
239 -
1. 7? -
.1
186 . •f-
-,�
1 0-11
-- ?60 .
- - ? E13 .
,, � '-
_ _ f= 10 -
278.
_ _ ? L1�
12
_ _-144--1
1,
_ _ � 2..�+
- WO 2 ;:+
241-
2�6-
?11
?67-
19
l�n_.I
?(-.+
-3_
335-
' 349.
9
33E1•
' 201.
' ?? -
''90,q
3-4
'1-JJ•
- 450•
rr��;.
431.
191.
194.A
4 72.+
-' -,Ps
4-5
461.
420.
4 057-
206.
2-.1
432-1
�.'/D
5-6'
�4f3-
233.
231..
22) 3 -
11)B
- 1
147.
7-8
15 -
173 -
1.33. '
203 .
134 - i
8-9
94-
122-"
90-
152•
71-
61.1
10-11.
11-12
11.9.>E
4-634- f
4 483- -
4 61.3.
? 760.
2 < <..
3
1. 584-4
ota
DATA SUMMARY
Day' of Week
Daily Volumes Week
!1
Total
Ave.
Da.
1
2
3
4
5-
Sunday
4
.Monday
Tuesday
Wednesday
4- A-
ThursdayA_
-
Friday
Saturday
Total of
Average Days
Without
Weekend
With Weekend
Adjusted -
Average Day
Without Weekend
-
With Wie-eFc-nU
Route Classificat•io�ii•�
W Wken14/0 dnd Fa
, r_ Fa
8,5' AADT
Remarks : -L-
, ZOU
f- zc0
,zoo
3933
Revised November 1981
APPENDIX B
SPEAR STREET/QUARRY HILL ROAD
TURNING MOVEMENT COUNT
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
TURNING MOVEMENT COUNT
SPEAR STREET 1. QUARRY HILL ROAD
APRIL 29, 19BB
SOUTH APPROACH
NORTH APPROACH
EAST APPROACH
TOTAL
INTERVAL
SPEAR
ST.
SPEAR
ST.
QUARRY
HILL RD.
APPROACH
BEGINNING
RT
TH
LT
TH
LT
RT
VOLUME
0600
0
9
0
4
0
1
14
0615
0
16
1
2
0
2
21
0630
0
48
0
18
2
0
68
0645
1
46
0
19
1
4
71.
SUBTOTAL
1
119
1
43
3
7
174
0700
0
5B
0
28
0
5
91
0715
1
87
1
29
0
10
128
0730
0
119
1
37
1
7
165
0745
1
120
2
31
1
7
162
SUBTOTAL
2
384
4
125
2
29
546
1500
0
42
5
50
0
5
102
1515
0
37
3
58
0
B
106
1530
2
37
B
69
2
3
121
1545
1
50
6
59
1
10
127
SUBTOTAL
3
166
22
236
3
26
456
1600
2
52
10
64
2
9
139
1615
3
36
6
68
0
2
115
1630
3
57
8
83
2
7
160
1645
3
60
5
113
3
2
186
SUBTOTAL
11
205
29
328
7
20
600
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
APPENDIX C
PROJECTED DESIGN HOUR VOLUMES
WITHOUT PROJECT
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
FITZPATRICK-LLEWELLYN INCUn4ORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN:• 1�uv����ciaN
LOCATION: �60S�q
nJ
NOTE: LABEL APPROPRIATE
DIRECTIONS ON ARROW
ABOVE.
R 9
L�
REMARKS:
I-16F; /l . Y11,vdcc,—
FITZPATRICK-LLEWELLYN INCG«lItORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: I'RUPLINr',)1)n1
LOCATION: `fk0f),a
/\.i
NOTE: LABEL APPROPRIATE
DIRECTIONS ON ARROW
ABOVE.
REMARKS:
/C/66 ?1n
CIO %� OJC:C,
FITZPATRICK-LLEWELLYN INCOn)ORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
F ", ST , I
TOWN: S• Iiii:li���nlC�i(J�J
LOCATION:
k
NOTE: LABEL APPROPRIATE
DIRECTIONS ON ARROW
ABOVE.
� T �
R .Ci
L�
1
REMARKS:
Q
l: UJCc
FITZPATRICK-LLEWELLYN INC(,..)ORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
nnn1Q v-
0�
TOWN: S. �l.4PUNoiUfl
LOCATION:57
N
NOTE: LABEL APPROPRIATE
DIRECTIONS ON ARROW
ABOVE.
REMARKS:
/ �� J P X7 0/) TP,'O J C CT
APPENDIX D
PROJECTED DESIGN HOUR VOLUMES
WITH PROJECT
FITZPATRICK-LLEWELLYN INCORPORATED
Engineering and Planning Services
FITZPATRICK-LLEWELL.i) INCORPORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: A(AIQLING
LOCATION: U '
a
m
MU) AND
Cn
R J,
w
NOTE: LABEL APPROPRIA'
DIRECTIONS ON AN
ABOVE.
y
/N•
c
REMARKS:
9F38 P il'1
rn
L '
VnMT (\ �•- n
FITZPATRICK-LLEWELLI ..INCORPORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: S-, UYQUNGj(
LOCATION: ss5<01M)II
L
N
NOTE: LABEL APPROPRIA'
DIRECTIONS ON AR
ABOVE.
/771
FITZPATRICK-LLEWELL A INCORPORATED
Engineering and Planning Services
One Wentworth Drive
WILLISTON, VERMONT 05495
TOWN: S. �LI1� L11IG
LOCATION: o
� c
REMARKS:
�^ a l '. -
j u
s
n!
NOTE: LABEL APPROPRIA
DIRECTIONS ON Al
ABOVE.
alb ✓ v.�/ -2-Ii1UJCc
00 ` 4 �13 0
V t ffff{
f
t
i
Av
T
a XCU4
1
k
11
a
PLANNER
658-7955
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT05403
FAX 658-4748
October 2, 1990
Ralph DesLauriers, Jr.
360 Spear Street
South Burlington, Vermont 05403
Re: Proposed Subdivision - Quarry Hill Road
Dear Mr. DesLauriers:
ZONING ADMINISTRATOR
658-7958
This is in regards to your proposed subdivision and construction
of an office building on your property located on Quarry Hill
Road. The review process for this development will consist of
obtaining Final Plat approval for a major subdivision and approv-
al of the office building site plan under site plan review.
The major subdivision review should consist of three (3) steps.
These steps are: Sketch Plan review, Preliminary Plat approval
and Final Plat approval. Any extension of Quarry Hill Road would
require conformance with the Street Design Standards provided
under Section 401.1(9) of the City of South Burlington Subdivi-
sion Regulations. Since your property is in both the R7 and C1
zone, you should be aware that cul-de-sac streets are not allowed
in the commercial zones as referenced in Section 401.1(7) of the
Subdivision Regulations.
Please note that when the Planning commission granted preliminary
plat approval for a two (2) lot subdivision in 1976 for the Hori-
zon Heights project they stipulated that "further development of
the 28 acres zoned commercial shall not have access through the
residential neighborhood. Unless further access is found, the
Planning Commission expects those 28 acres to be developed as a
residential area" (see enclosed minutes).
This stipulation was not included in the Final Plat approval
dated 3/22/77. Please note that this approval stipulated that,
"Quarry Hill so-called, shall be fully upgraded to City design
and construction standards in the event of: a) additional
subdivision, or, b) substantial further development." This road
would have to be dedicated to the City as a public street as
required under Section 19.103(b) of the Zoning Regulations.
Mr. Ralph DesLauriers
October 2, 1990
Page 2
The office building would be reviewed under Section 19.10, Site
Plan Review of the City of South Burlington Regulations. In re-
viewing the site plan, the Planning Commission may impose appro-
priate conditions and safeguards with respect to the adequacy of
pedestrian and vehicular access, circulation, parking, landscap-
ing and screening.
Should you have any questions, please feel free to contact me.
icrel
eith,
City Planner
Encl
JWlmcp