HomeMy WebLinkAboutZB-88-0000 - Decision - 0000 Quarry Hill RoadFINDINGS OF FACT
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of Synon Group for
construction of a 9800 square foot day care/office building for
MCHV, Quarry Hill Road.
On the 31st of May 1988, the South Burlington Planning Commission
approved the request of Synon Group for site plan approval under
Section 19.10 of the South Burlington Zoning Regulations based on
the following findings:
1. TRAFFIC ACCESS: Access shall be provided by a 22 foot wide
driveway off Quarry Hill Road.
2. CIRCULATION AND PARKING: Circulation is shown on two sides of
the building with a drop off area on the south side of the
building. 40 parking spaces are approved.
3. LANDSCAPING & SCREENING: A $14,500 landscaping bond shall be
posted prior to permit. The plan shall be revised prior to
permit to reflect this amount and shall be submitted to the
Planner for approval.
4. OTHER: A bond shall be posted prior to permit for
construction of the Quarry Hill Road to city standards including
30 feet of pavement, curbs and a sidewalk on one side from Spear
Street to the entrance of the Quarry Hill Club, with a city
standard size cul de sac. These road improvements shall be
recorded on the plan and approved by the City Planner prior to
recording. A bond shall be posted for this prior to permit for
any development or construction in an amount determined by the
City Engineer. Street details shall be submitted to the City
Engineer for approval prior to permit.
5. OTHER: A 1305 gpd sewer allocation is granted. The
applicant shall pay the $2.50 per gallon fee prior to permit.
The sewer line and water service shall be shown on the plans
prior to permit. Water shall be approved by the Water Department
and final sewer plans shall be approved by the City Engineer prior
to permit. The building permit shall be obtained with 6 months
or this approval is nnu an ynid.
Clerk or OC
irman,
South Burlington Pning Commission