Loading...
HomeMy WebLinkAboutZB-93-0000 - Supplemental - 0099 Proctor AvenueRICE MEMORIAL HIGH SCHOOL STANKEVICH, Ronald 99 Proctor Avenue Area zoned R-4 District. Section 9.20 Conditional uses, sub section 9.201, Educational facilities, Section 19.05 Conditional uses, sub section 19.056 alteration/change. Proposed, construction of a new soccer field 180'x300' and expansion of a parking area (57 spaces). Fill area approximately 1.5 acres to a maximum depth of ten (10) feet. f Total area of high school 30 acres. �� ,/ SOZONN NG NOT ICE In accordance with the South Burlington Zoning Regulations and Chapter 117 Title 24, V.S.A. the South Burlington Zoning Board of Adjustment will hold a public hearing at the South Burlington Mu- nicipal Offices, once Room, 575 Dorset Street, South Burlington, Vermont on June 14, 1993 at 7:00 P.M. to consider the fol- lowing: #1 Appeal of Rice Memo- rial High School, Ronald w Stankech seeking ap- proval from Section 9.20 Conditional uses sub sec- tion 19,056 alteration and extensions of thSoul Burlington Regulations. Request is for permission to construct a soccer field (area approximately acres) and expand exist - in parking area by an additionallofc -seven at RSce spaces, Memorial High School, 99 Proctor Avenue. #2 Appeal of Herb Good rich and Vera Gaskill seeking a variance from Section 19.00 Non , con- formingg uses, sub 19 section 004 19.002 and changes/alterations of the South Burlington Zoning Regulations. Request is for permission to replace an existing 10'x44' mobile home with a 12" 5F' unit on a lot containir 9 1,,64a4 square feet, located 4001 Williston Road. IRichard Ward Zoning Acministrative Officer May 29, 1993 SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT CONDITIONAL USE REVIEW Findings in accordance with Section 19.05 of the South Burlington Zoning Regulations: (1) That the proposed use complies with the stated purpose of the district in which the proposed is to be located; (2) That the proposed use will not adversely affect: a. The capacity of existing or planned municipal or educational facilities; b. The essential character of the neighborhood or district in which the property is located, nor the ability to develop adjacent property for appropriate uses; C. Traffic on roads and highways in the vicinity; d. Bylaws in effect; or e. Utilization of renewable energy resources. __ q Hearing # C" C Date Applicant _ AC% ( � Vote: Yes (IW Signed List fi i gs below: " No = t:�1 `7 o SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT CONDITIONAL USE REVIEW Findings in accordance with Section 19.05 of the South Burlington Zoning Regulations: (1) That the proposed use complies with the stated purpose of the district in which the proposed is to be located; (2) That the proposed use will not adversely affect: a. The capacity of existing or planned municipal or educational facilities; b. The essential character of the neighborhood or district in which the property is located, nor the ability to develop adjacent property for appropriate uses; C. Traffic on roads and highways in the vicinity; d. Bylaws in effect; or e. Utilization of renewable energy resources. Hearing # Date Applicant Vote: Yes 1 No Signed List findings below: 2. 3. SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT CONDITIONAL USE REVIEW Findings in accordance with Section 19.05 of the South Burlington Zoning Regulations: (1) That the proposed use complies with the stated purpose of the district in which the proposed is to be located; (2) That the proposed use will not adversely affect: a. The capacity of existing or planned municipal or educational facilities; b. The essential character of the neighborhood or district in which the property is located, nor the ability to develop adjacent property for appropriate uses; C. Traffic on roads and highways in the vicinity; d. Byl.aws in effect; or e. Utilization of renewable energy resources. Hearing # Date Appli nt Vote: Ye No nlBlo' Signed - List 2. 3. SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT CONDITIONAL USE REVIEW Findings in accordance with Section 19.05 of the South Burlington Zoning Regulations: .(1) That the proposed use complies with the stated purpose of the district in which the proposed is to be located; (2) That the proposed use will not adversely affect: a. The capacity of existing or planned municipal or educational facilities; b. The essential character of the neighborhood or district in which the property is located, nor the ability to develop adjacent property for appropriate uses; C. Traffic on roads and highways in the vicinity; d. Bylaws in effect; or e. Utilization of renewable energy resources. Hearing # Date /V //� Applicant �� /�{e►�%d Vote: Y"es No Signed l List findings be ow: 1. lf'CYP Y'�JioG�c ._1 C-) cc u --- 2. 3. �/O-ff 71( PcIlloo-(I 14,,f - - - q a / iz) te-- a-y- -� � Pam' ------ -- - - SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT CONDITIONAL USE REVIEW Findings in accordance with Section 19.05 of the South Burlington honing Regulations: (1) That the proposed use complies with the stated purpose of the district in which the proposed is to be located; (2) That the proposed use will not adversely affect: a. The capacity of existing or planned municipal or educational facilities; b. The essential character of the neighborhood or district in which the property is located, nor the ability to develop adjacent property for appropriate uses; C. Traffic on roads and highways in the vicinity; d. Bylaws in effect; or e. Utilization of renewable energy resources. Hearing # Date Applicant Vote: Yes in No Signed List findings below: 2. 3. SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT CONDITIONAL USE REVIEW Findings in accordance with Section 19.05 of the South Burlington Zoning Regulations: (1) That the proposed use complies with the stated purpose of the district in which the proposed is to be located; (2) That the proposed use will not adversely affect: a. The capacity of existing or planned municipal or educational facilities; b. The essential character of the neighborhood or district in which the property is located, nor the ability to develop adjacent property for appropriate uses; C. Traffic on roads and highways in the vicinity; d. Bylaws in effect; or e. Utilization of renewable energy resources. Hearing # O Date Q Applicant Vote: Yes No Signed -Q List findings below. 2. G 3. SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT CONDITIONAL USE REVIEW Findings in accordance with Section 19.05 of the South Burlington Zoning Regulations: (1) That the proposed use complies with the stated purpose of the district in which the proposed is to be located; (2) That the proposed use will not adversely affect: a. The capacity of existing or planned municipal or educational facilities; b. The essential character of the neighborhood or district in which the property is located, nor the ability to develop adjacent property for appropriate uses; C. Traffic on roads and highways in the vicinity; d. Bylaws in effect; or e. Utilization of renewable energy resources. Hearing # Date Applicant _ �{,[�, M7,4( . Vote: Y'es F7-1 A A Signed List findings below: 2. 3. No = 9i A2�?L�os�i� So a Fig D fFq/CD/AJ Cr i4i?-JCA -- '�/ 000 s I= 4 S%) "%/, Do o S K �y s4, _— ���'� ��� ✓�s /�8. 4 70 sx (.y A'L�CGtJ S /l 9'�o0 �J G- -- IV07-gs - 3V 9, oos� (�.VI) / 7 �70ooAte") Acoogs) Att- /12/Y 7"TlNG- ooN7co u 0/i ,azs Tz� tj c 17 0 IU ZZ D erC)1),Aj =1011!� III! . 09 1 .1 2�� -�� -17 e 1SA5016 zo? e 3 q (5- vj— A , AAW BALED HAY OR STRAW I "X I "x3 ' HARDWOOD STAKES (2 PER BALE) TEMPORARY DIVERSION OR EXISTING SWALE HAYBALE DAM DETAL B SCALE: NONE 1, BALES SHALL BE PLACED IN A ROW WITH THE ENDS TIGHTLY ABUTTING ADJACENT BALES. Two ROWS IF REQUIRED BY ENGINEER. 2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES. J. BALES SHALL BE SECURELY ANCHORED IN PLACE BY STAKES OR PINS DRIVEN THROUGH THE BALES. THE FIRST STAKE 1N EACH BALE SHALL BE ANGLED TOWARD THE PREVIOUSLY LAID BALE, TO FORCE BALES TOGETHER. 4. INSPECTION SHALL BE FREQUENT (MINIMUM ONCE A WEEK AND AFTER EVERY RAINFALL) AND REPAIR AND REPLACEMENT SHALL BE MADE PROMPTLY (WITHIN THE SAME DAY) AS NEEDED. 5. UPON STABILIZATION OF THE AREA UPSTREAM FROM THE BALES, THE 84LES SHALL BE REMOVED WITH THE APPROVAL OF THE ENGINEER. HAY BALES CATCH BASIN GRATE 2 STAKES/BALE 1'X1'X3' WOOD STAKES 1. AFTER CATCH BASIN IS IN PLACE, LIFT THE GRATE AND INSTALL FILTER FABRIC (MIRAFI 140) OVER THE FRAME, AND THEN SET GRATE BACK IN PLACE. 2. HAY BALES SHALL BE PLACED AROUND ALL INLETS. 3. INSPECTION SHALL BE FREQUENT (MINIMUM ONCE A WEEK AND AFTER EVERY RAINFALL) AND REPAIR AND REPLACEMENT OF INLET PROTECTION SHALL BE MADE PROMPTLY (WITHIN THE SAME DAY) AS NEEDED. 4. UPON STABILIZATION OF THE AREA UPSTREAM FROM THE INLET, THE PROTECTION SHALL BE REMOVED WITH THE APPROVAL OF THE ENGINEER. SCALE, NONE q SCALE PLAN -7 VARIES DEPENDING ON HEIGHT OF SLOPE AND STEEPNESS OF RESULTING GRADE AT TOE OF SLOPE -EXISTING GROUND INTERSECTION (2) t'x 1'x3' STAKE EACH BALE NIT SLOP OVERLAP EDGES SECTION HAYBAL,E DKE DUAL E SCALE: NONE CON / l7W110 l 07E& 1. SEQUENCE OF CONSTRUCTION (TO BE COMPLETED BEFORE PROJECT SITE WORK IS COMPLETED) A ERECT SILT FENCE AT THE PROPERTY LINE, MAINTAIN ON A CONTINUAL BASIS. B. CONSTRUCT OUTLET WORKS FOR STORMWATER POND WHILE MAINTAINING ADEQUATE FLOW PATTERN FOR DRAINAGE. C. CONSTRUCT EMBANKMENT FOR STORMWATER POND, ROUTE DRAINAGE THROUGH NEW OUTLET WORKS, PROTECT WITH HAY BALE DAMS. D. EXCAVATE REMAINDER OF STORMWATER POND. E. PROCEED WITH PROJECT CONSTRUCTION, MAINTAINING SEDIMENT COLLECTION IN POND. 2. VEGETATION SHALL BE APPLIED BETWEEN MAY I st AND OCTOBER 1st, ON EACH AREA AS SOON AS FINAL GRADES ARE REACHED- J. ALL DISTURBED AREAS NOT WORKED FOR THREE DAYS OR MORE SHALL BE MULCHED. ALL DISTURBED AREAS SHALL BE MULCHED UNTIL FINAL VEGETATIVE COVER IS ESTABLISHED FROM OCTOBER 1, TO APRIL 15. 4. SOIL STOCKPILES SHALL BE MULCHED AND SEEDED IF THEY ARE TO REMAIN THREE MONTHS OR LONGER, PLACE HAY BALE DAM OR SILT FENCE AT TOE. DURING CONSTRUCTION, STOCKPILE SOILS IN FRINGES OF DISTURBED AREA (TYPIC.AL). DO NOT STOCKPILE IN DRAINAGE WAYS OR SWALES OR WITHIN 50' OF PROPERTY LINE. PLACE ON FLATTEST AREA POSSIBLE. 5. ALL EROSION CONTROL MEASURES IN PLACE DURING CONSTRUCTION ARE TO BE CLEANED WHEN THEY REACH HALF CAPACITY OR AFTER SIGNIFICANT STORM EVENTS. 6. THE STATE OF VERMONT OR ENGINEER MAY ADD OTHER STORM EROSION CONTROL MEASURES AS NECESSARY. EROSION CONTROL N.J7E& 1. THE EROSION CONTROL PROCEDURES SHALL CONFORM TO THE VAOT 'STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" - SECTION 105.23 (CONTROL OF EROSION AND SILTATION). 2. PRIOR TO PERFORMING ANY EARTHWORK AND DURING CONSTRUCTION, EROSION CONTROL MEASURES ARE TO BE IMPLEMENTED. THE SMALLEST PRACTICAL AREA OF LAND SHALL BE DISTURBED AT ANY ONE TIME DURING DEVELOPMENT. WHEN LAND IS DISTURBED DURING DEVELOPMENT, THE DISTURBANCE SHALL BE KEPT TO THE SHORTEST PRACTICAL DURATION AS APPROVED BY THE ENGINEER. LAND SHALL NOT BE LEFT DISTURBED DURING THE WINTER MONTHS, NOVEMBER THROUGH APRIL. 3. SILT FENCE SHALL BE INSTALLED AS SHOWN PRIOR TO ANY ON - SITE GRADING OR DISTURBANCE OF EXISTING SURFACE MATERLAL. IT SHALL BE MAINTAINED DURING AND AFTER CONSTRUCTION TO REMOVE SEDIMENT FROM SURFACE RUNOFF. WHERE POSSIBLE NATURAL DRAINAGE -WAYS SHOULD BE UTILIZED AND LEFT OPEN TO REMOVE EXCESS SURFACE WATER. THE SILT FENCE IS TO BE MAINTAINED AND CLEANED UNTIL ALL SLOPES ARE PERMANENTLY STABILIZED. HAYBALES SHALL BE INSTALLED IN EXISTING AND NEW DRAINAGE SWALES, AROUND DRAIN INLETS AND ALONG LIMITS OF WORK AS SHOWN OR DIRECTED BY THE ENGINEER. HAYBALES WILL BE STAKED AND MAINTAINED PRIOR TO AND DURING CONSTRUCTION UNTIL DISTURBED AREAS ARE PERMANENTLY STABILIZED. 5. ALL DISTURBED AREAS AND SIDE SLOPES WHICH ARE FINISH GRADED WITH NO FURTHER CONSTRUCTION TO TAKE PLACE SHALL BE LOAMED AND SEEDED. A MINIMUM OF 4' OF LOAM SHALL BE PLACED. SEED, LIME AND FERTILIZER SHALL CONFORM TO ALL APPLICABLE SECTIONS OF THE VAOT 'STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.' 6. ANY DISTURBED AREAS WHICH ARE TO BE LEFT TEMPORARILY, AND WHICH WILL BE REGRADED LATER DURING CONSTRUCTION SHALL BE MULCHED AND SEEDED WITH RYE GRASS TO PREVENT EROSION. HAY OR STRAW MULCH SHALL BE APPLIED TO ALL FRESHLY SEEDED AREAS AT THE RATE OF 2 TONS PER ACRE. BALES SHALL BE UNSPOILED, AIR DRIED, AND FREE FROM WEED, SEEDS AND ANY COARSE MATERIAL. TEMPORARY EROSION CONTROL MEASURES SHALL BE UTILIZED BY THE CONTRACTOR AS REQUIRED TO PREVENT ANY SEDIMENTATION FROM OCCURRING WITHIN ADJACENT WETLANDS AREAS TO BE PROTECTED. 8. AFTER ALL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED, THE TEMPORARY EROSION CONTROL MEASURES ARE TO BE REMOVED AND ACCUMULATED SEDIMENT PROPERLY DISPOSED OF. MIRAFI 140N FILTER FABRIC 61 10•-0' MAX. ED 18' MIN. L-L--L SECTION A -A NIS 6'X6' WOVEN MIRE FL (14 CA MIN) •� �, �. !., i. � . - is MIRAFI 14ON I FIL TER FABRIC OR EQUAL FENCE POST L '1 I . I GRADE Su 1 FENCE NOTES: 1. SILT FENCE SHALL BE PRE —FABRICATED EROSION CONTROL FENCE BY MIRAFI OR EOUAL, OR CONSTRUCTED IN PLACE AS SPECIFIED HEREIN. 2. CONSTRUCTED IN PLACE SILT FENCE A WOVEN MIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. B. FILTER FABRIC TO BE FASTENED SECURELY TO WOVEN WIRE FENCE TIES SPACED EVERY 24' AT TOP OF MIO SECTION. C. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED BY 6, FOLDED AND STAPLED. 3. INSPECTION SHALL BE FREOUENT (MINIMUM ONCE A WEEK AND AFTER EVERY RAINFALL). MAINTENANCE SHALL BE PERFORMED AS NEEDED, AND SEDIMENT REMOVED WHEN 'BULGES' DEVELOP IN SILT FENCE. SLFENCEDETAL C SCALE: NONE City of South Burlington 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 FAX 658-4748 PLANNER 658-7955 June 1, 1993 Mr. Ron Stankevich Rice Memorial High School 99 Proctor Avenue South Burlington, Vermont 05403 Re: Zoning appeal Dear Mr. Stankevich: ZONING ADMINISTRATOR 658-7958 Be advised that the South Burlington Zoning Board of Adjustment will hold a public hearing at the City Offices, Conference Room, 575 Dorset Street on Monday, June 14, 1993 at 7:00 P.M. to consider your request for a conditional use expansion. Please plan to attend this meeting. Very truly, Richard Ward, Zoning Administrative Officer 1 Encl RW/mcp City of South Burlington Application to Board of Adjustment Official Use APPLICATION # HEARING DATE Date �� V �� . �q{ 3 L C Applicant j�jiftz mCSL1R'�X- Owner, leasee, agent FILING DATE FEE AMOUNT i �-o 1416 Address 'Aq FAAe rie Telephone # 1 Landowner 1�41 Address 3SI ��� 1qm Location and description of property Q9 A&RU-k, L5 is I�b1�►1 sC w)( &C'J ( �',gLasa \i,.,X k rxek� 1Gl lMQ2C� _P� �}�r�,,^ c 14�h�4( V, I 1>xrnti5� Type of application check one ( ) appeal from decision of Administrative Officer( ')request for a conditional use ( ) request for a variance. I understand the presentation procedures required by State Law (Section 4468 of the Planning & Development Act). Also that hearings are held twice a month (second and fourth Mondays). That a legal advertisement must appeal a minimum of fifteen (15) days prior to the hearing. I agree to pay a hearing fee which is to off -set the cost of the hearing. Provisions of zoning ordinance in question rJJ- QWJC�_- Reason for appeal A, r ' The owner or applicant should submit along with this application (8 copies) plans, elevations, landscaping diagrams (drawn to scale) traffic data and any other additional information which will serve as support evidence to the Board. Hearing Date Signature of Appellant Do not write below this line ----------------------------------------------------------------------------- SOUTH BURLINGTON ZONING NOTICE In accordance with the South Burlington Zoning Regulations and Chapter 117, Title 24, V.S.A. the South Burlington Zoning Board of Adjustment will hold a public hearing at the South Burlington Municipal Offices Conference Room, 575 Dorset Street, South Burlington, Vermont on Day o Week J..a4_'- - i /��3 at U'� � � to consider the following: Month and Date T irde Appeal of seeking :Zr' from Section �`ZD G/Y► .C./1�►�c� -Gd of the South Burlington Regulations. Request is for permission to If �2�Los�» So CCU F/� U .4.e1c/�v6- �snN6— lag:v oseD� p20 100 b*D f r-1 r'-,� 1,415;r /. 6- 0/UD/M Cj- Ift6A '`l/�O S4.S)Do 0 sK (y, U ozJ S� �y, s%) -j- _ 8 97o- -� Ji 7 91(oo sr norl�lr �, 3 °��` '` � 636 y 7y c-,c (7 Y 0.6) 1, �5�?, � (I�/�A (&. ? d J067�Z1U iJ f- SpAe.,�p5 /� �5"�, V 70 s a ZVCW D/N6- 9'7X)P nOSO/6 AIU� S73-01604Z (2;VC4a.P1A6- p6- 7�3 z& 72 95-u4cw— iIi cs rr<TM 9 91, 47� 4k6 ern) AJ AS A/I BALED HAY OR STRAW / i'x 1 "x3' HARDWOOD STAKES (2 PER BALE) 18' MIN. \ IUI U -- TEMPORARY DIVERSION OR EXISTING SWALE HAYBALE DAM DETAL B SCALE: NONE MAYBALE DAYIDIKE NOTES_ 1. BALES SHALL BE PLACED IN A ROW WITH THE ENDS TIGHTLY ABUTTING ADJACENT BALES. TWO ROWS IF REQUIRED BY ENGINEER- 2- EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES. 3_ BALES SHALL BE SECURELY ANCHORED IN PLACE BY STAKES OR PINS DRIVEN THROUGH THE BALES. THE FIRST STAKE IN EACH BALE SHALL BE ANGLED TOWARD THE PREVIOUSLY LAID BALE, TO FORCE BALES TOGETHER. 4. INSPECTION SHALL BE FREQUENT (MINIMUM ONCE A WEEK AND AFTER EVERY RAINFALL) AND REPAIR AND REPLACEMENT SHALL BE MADE PROMPTLY (WITHIN THE SAME DAY) AS NEEDED. 5. UPON STABILIZATION OF THE AREA UPSTREAM FROM THE BALES, THE BALES SHALL BE REMOVED WITH THE APPROVAL OF THE ENGINEER. AFTER CATCH BASIN IS IN PLACE, LIFT THE GRATE AND INSTALL FILTER FABRIC (MIRAFI 140) OVER THE FRAME, AND THEN SET GRATE BACK IN PLACE. 2_ HAY BALES SHALL BE PLACED AROUND ALL INLETS. 3_ INSPECTION SHALL BE FREQUENT (MINIMUM ONCE A WEEK AND AFTER EVERY RAINFALL) AND REPAIR AND REPLACEMENT OF INLET PROTECTION SHALL BE MADE PROMPTLY (WITHIN THE SAME DAY) AS NEEDED. UPON STABILIZATION OF THE AREA UPSTREAM FROM THE INLET, THE PROTECTION SHALL BE REMOVED WITH THE APPROVAL OF THE ENGINEER. HAY BALES CATCH BASIN GRATE 2 STAKES/BALE 1'X1'X3' WOOD STAKES SCALE: NONE q SCALE .0 . �,. VARIES DEPENDING ON HEIGHT OF SLOPE AND STEEPNESS OF 0 RESULTING GRADE AT TOE OF SLOPE -EXISTING GROUND 3 INTERSECTION 0 ai PLAN /')) I % 1 % T' STAKE. VT SLOPE OVERLAP EDGES SECTION HAYBALE DKE DUAL E SCALE NONE 1. SEQUENCE OF CONSTRUCTION (TO BE COMPLETED BEFORE PROJECT SITE WORK IS COMPLETED) A. ERECT SILT FENCE AT THE PROPERTY LINE, MAINTAIN ON A CONTINUAL BASIS B. CONSTRUCT OUTLET WORKS FOR STORMWATER POND WHILE MAINTAINING ADEQUATE FLOW PATTERN FOR DRAINAGE. C. CONSTRUCT EMBANKMENT FOR STORMWATER POND, ROUTE DRAINAGE THROUGH NEW OUTLET WORKS, PROTECT WITH HAY BALE DAMS. D. EXCAVATE REMAINDER OF STORMWATER POND. E. PROCEED WITH PROJECT CONSTRUCTION, MAINTAINING SEDIMENT COLLECTION IN POND. 2. VEGETATION SHALL BE APPLIED BETWEEN MAY 1st AND OCTOBER 1st, ON EACH AREA AS SOON AS FINAL GRADES ARE REACHED. J. ALL DISTURBED AREAS NOT WORKED FOR THREE DAYS OR MORE SHALL BE MULCHED. ALL DISTURBED AREAS SHALL BE MULCHED UNTIL FINAL VEGETATIVE COVER IS ESTABLISHED FROM OCTOBER 1, TO APRIL 15. 4. SOIL STOCKPILES SHALL BE MULCHED AND SEEDED IF THEY ARE TO REMAIN THREE MONTHS OR LONGER, PLACE HAY BALE DAM OR SILT FENCE AT TOE. DURING CONSTRUCTION, STOCKPILE SOILS IN FRINGES OF DISTURBED AREA (TYPICAL). 00 NOT STOCKPILE IN DRAINAGE WAYS OR SWALES OR WITHIN 50' OF PROPERTY LINE. PLACE ON FLATTEST AREA POSSIBLE. 5. ALL EROSION CONTROL MEASURES IN PLACE DURING CONSTRUCTION ARE TO BE CLEANED WHEN THEY REACH HALF CAPACITY OR AFTER SIGNIFICANT STORM EVENTS. 6. THE STATE OF VERMONT OR ENGINEER MAY ADD OTHER STORM EROSION CONTROL MEASURES AS NECESSARY. VO / ROL. 1MES- 1. THE EROSION CONTROL PROCEDURES SHALL CONFORM TO THE VAOT 'STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" - SECTION 105.23 (CONTROL OF EROSION AND SILTATION). 2. PRIOR TO PERFORMING ANY EARTHWORK AND DURING CONSTRUCTION, EROSION CONTROL MEASURES ARE TO BE IMPLEMENTED. THE SMALLEST PRACTICAL AREA OF LAND SHALL BE DISTURBED AT ANY ONE TIME DURING DEVELOPMENT WHEN LAND IS DISTURBED DURING DEVELOPMENT, THE DISTURBANCE SHALL BE KEPT TO THE SHORTEST PRACTICAL DURATION AS APPROVED BY THE ENGINEER. LAND SHALL NOT BE LEFT DISTURBED DURING THE WINTER MONTHS, NOVEMBER THROUGH APRIL. 3. SILT FENCE SHALL BE INSTALLED AS SHOWN PRIOR TO ANY ON - SITE GRADING OR DISTURBANCE OF EXISTING SURFACE MATERIAL. IT SHALL BE MAINTAINED DURING AND AFTER CONSTRUCTION TO REMOVE SEDIMENT FROM SURFACE RUNOFF. WHERE POSSIBLE NATURAL DRAINAGE -WAYS SHOULD BE UTILIZED AND LEFT OPEN TO REMOVE EXCESS SURFACE WATER. THE SILT FENCE IS TO BE MAINTAINED AND CLEANED UNTIL ALL SLOPES ARE PERMANENTLY STABILIZED. 4. HAYBALES SHALL BE INSTALLED IN EXISTING AND NEW DRAINAGE SWALES, AROUND DRAIN INLETS AND ALONG LIA ITS OF WORK AS SHOWN OR DIRECTED BY THE ENGINEER. HAY64LES WILL BE STAKED AND MAINTAINED PRIOR TO AND DURING CONSTRUCTION UNTIL DISTURBED AREAS ARE PERMANENTLY STABILIZED. 5. ALL DISTURBED AREAS AND SIDE SLOPES WHICH ARE FINISH GRADED WITH NO FURTHER CONSTRUCTION TO TAKE PLACE SHALL BE LOAMED AND SEEDED. A MINIMUM OF 4' OF LOAM SHALL BE PLACED. SEED, LIME AND FERTILIZER SHALL CONFORM TO ALL APPLICABLE SECTIONS OF THE VAOT 'STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.' 6. ANY DISTURBED AREAS WHICH ARE TO BE LEFT TEMPORARILY, AND WHICH WILL BE REGRADED LATER DURING CONSTRUCTION SHALL BE MULCHED AND SEEDED WITH RYE GRASS TO PREVENT EROSION, HAY OR STRAW MULCH SHALL BE APPLIED TO ALL FRESHLY SEEDED AREAS AT THE RATE OF 2 TONS PER ACRE. BALES SHALL BE UNSPOILED, AIR DRIED, AND FREE FROM WEED, SEEDS AND ANY COARSE MATERIAL. TEMPORARY EROSION CONTROL MEASURES SHALL BE UTILIZED BY THE CONTRACTOR AS REQUIRED TO PREVENT ANY SEDIMENTATION FROM OCCURRING WITHIN ADJACENT WETLANDS AREAS TO BE PROTECTED. & AFTER ALL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED, THE TEMPORARY EROSION CONTROL MEASURES ARE TO BE REMOVED AND ACCUMULATED SEDIMENT PROPERLY DISPOSED OF. t, MIRAFI 140N - - - FILTER FABRIC B4CKFILL FLOW _ - \ - POST GRADE 1 1 EMBED 18' MIN. SECTION A —A A NTS -- 6'X6" WOVEN WIRE F( (14 GA MIN) 10'-0' MAX. SILT FENCE NOTES. T. SILT FENCE SHALL BE PRE -FABRICATED EROSION CONTROL FENCE BY MIRAFI OR EOUAL, OR CONSTRUCTED IN PUCE AS SPECIFIED HEREIN. 2. CONSTRUCTED IN PUCE SILT FENCE- A WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. B. FILTER FABRIC TO BE FASTENED SECURELY TO WOVEN WIRE FENCE TIES SPACED EVERY 24' AT TOP OF MID SECTION. C. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED BY 6�, FOLDED AND STAPLED. 3. INSPECTION SHALL BE FREOUENI (MINIMUM ONCE A WEEK AND AFTER EVERY RAINFALL) - MAINTENANCE SHALL BE PERFORMED AS NEEDED. AND SEDIMENT REMOVED WHEN 'BULGES' DEVELOP IN SILT FENCE. AT RNCE DiETAL C SCALE: NONE MIRAFI 14ON I'll TER FABRIC OR Louu FENCE POST - GRADE fy� i�5 + 77 0 R3- t-4 A -t,11 i OL kW- 10 A