HomeMy WebLinkAboutSP-98-0000 - Decision - 0014 Berard DriveFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON -, 0 , �6,00 C-V Re: Findings of Fact, application of Goldfield Construction Management to amend a previously approved plan for a 23,600 square foot building for equipment rental/light manufacturing use. The amendment consists of: 1) increasing the size of the internal office space from 2605 square feet to 4605 square feet, 2) reducing the width of a curb cut, 3) adding green area at building entrance, and 4) constructing a 20 space parking lot, 14 Berard Drive. On the 16th day of December, 1997, the South Burlington Planning Commission approved the request of Goldfield Construction Management for site plan review under Section 26.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consist of amending a plan previously approved on 1/10/95 for a 23,600 square foot building for equipment rental/light manufacturing use. The amendment consists of: 1) increasing the size of the internal office space from 2605 square feet to 4605 square feet, 2) reducing the width of a curb cut, 3) adding green area at building entrance, and 4) constructing a 20 space parking lot. 2. This property located at 14 Berard Drive lies within the IC District. It is bounded on the east by a fuel storage and distribution business, on the north and west by undeveloped land, and on the north and west by undeveloped land, and on the south by Berard Drive. 3. Access/circulation: The property is currently served by six (6) curb cuts on Berard Drive ranging in width from 60 feet to 12 feet. The 1/10/95 approval required that the 60 foot curb cut be reduced in width to 36 feet. This was never done. This proposal would reduce the 60 foot curb cut to 24 feet. A seventh curb cut is proposed at the northerly end of the property to access a new 20 space parking lot. Section 26.103(a) of the zoning regulations states that "unless specifically approved by the Planning Commission there shall be a maximum of one driveway per lot accessing a public street." Circulation on the site is adequate. 4. Coverage/ setbacks: Building coverage is 16.6% (maximum allowed is 30%) . Overall coverage is 37.3% (maximum allowed is 70%). Front yard coverage is 22.7% (maximum allowed is 30%). Setback requirements are met. 1 5, Parking: A total of twenty four (24) spaces are required and 29 spaces will be provided including two (2) handicapped spaces and a bike rack. 6, Landscaping- The minimum landscaping requirement, based on building costs, is $4050 which is being met. Proposed plantings include Boxwood, Arborvitae, Pine and Pear. 7. Sewer: No additional allocation needed. 8. Traffic: No additional traffic is expected. 9. Lighting: Exterior lighting consists of seven (7) building mounted 100 watt high pressure sodium lights with downcasting shielded fixtures. 10. Lot mercrer: The new parking area is to be constructed on an adjoining lot acquired by the property owner. A lot merger agreement should be recorded merging the new lot with the existing lot prior to permit issuance. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Goldfield Construction Management to amend a previously approved plan for a 23,600 square foot building for equipment rental/light manufacturing use. The amendment consists of: 1) increasing the size of the internal office space from 2605 square feet to 4605 square feet, 2) reducing the width of a curb cut, 3) adding green area at building entrance, and 4) constructing a 20 space parking lot, 14 Berard Drive, as depicted on a three (3) page set of plans, page one (1) entitled, "Vermont Tent Co. South Burlington, Vermont," prepared by Michael Lawrence Associates, dated December 8, 1997, with the following stipulations: 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2) For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the additional office space will generate zero (0) additional vehicle trip ends during the P.M. peak hour. 3) Any new exterior lighting shall consist of downcasting shielded fixtures. Any change to approved lights shall require approval of the City Planner prior to installation. 4) Prior to issuance of a zoning permit, the applicant shall post a $4050 landscape bond. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has 2 a good chance of surviving. 5) Pursuant to Section 26.103(a) of the zoning regulations, the Planning Commission approves a seventh curb cut to serve the new parking area. 6) Prior to permit issuance, the applicant shall record in the land records a lot merger agreement that merges the newly acquired lot with the existing lot. The agreement shall require approval of the City Attorney prior to recording. 7) At the new curb opening, the existing barrier curb shall be removed and a new depressed curb shall be installed.. 8) The new parking lot shall be graded so as to drain towards the gully to the east. 9) The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 10) The applicant shall obtain a Certificate of occupancy/Compliance from the Administrative Officer prior to the use of the additional office space and the new parking lot.. 11) Any change to the site plan shall require approval by the South Burlington Planning Commission. Chaien-fan or' CAi�k---v South Burlington Planning Commission -Z 3