Loading...
HomeMy WebLinkAboutSD-04-04 - Decision - 0014 Berard DriveCITY of SOUTH BURLINGTON DEPARTMENT of PLANNING & ZONING MOVEABLE PEAKS INC. & PIDGEON— BERARD DRIVE FINAL PLAT APPLICATION #SD-04-04 FINDINGS of FACT AND DECISION Moveable Peaks, Inc., hereafter referred to as the applicant, is requesting final plat approval for adjustments to the boundary lines between two adjacent parcels on Berard Drive described as Tax Parcel 0200-00014-C and 0200-00024-C. The subject properties contain approximately 13.3 acres and are located in the Mixed Industrial and Commercial (IC) District. Portions of the subject property fall within the Floodplain Overlay (FO) and Airport Approach Overlay (AO) Districts. The South Burlington Development Review Board held a public hearing on March 2, 2004. Bill Nedde represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is requesting final plat approval for adjustments to the boundary lines between two adjacent parcels on Berard Drive described as Tax Parcel 0200-00014-C and 0200-00024-C. 2. The owners of record are Movable Peaks, Inc. and Alan & Maureen Pidgeon. 3. The subject properties contain approximately 13.3 acres and are located in the Mixed Industrial and Commercial (IC) District. Portions of the subject property fall within the Floodplain Overlay (FO) and Airport Approach Overlay (AO) Districts. 4. The plans consist of one (1) plan entitled, "Boundary Line Adjustment for Alan and Maureen Pidgeon -Berard Drive -South Burlington, Vermont' dated January 28, 2004, prepared by Krebs & Lansing Consulting Engineers, Inc. 5. The South Burlington Development Review Board reviewed the sketch plan of the proposed project on May 6, 2003. 6. Pursuant to Section 15.06(A) of the Land Development Regulations, an applicant can bypass the preliminary approval stage of subdivision review if the final plat application is submitted within six (6) months of the sketch plan review. Although the applicant did not submit the final plat application within six (6) months of the sketch plan review, the Development Review Board granted the applicant a three (3) month extension on November 4, 2003. ZONING DISTRICT & DIMENSIONAL REQUIREMENTS As indicated above, portions of the subject properties fall within the Airport Approach Overlay District. However, the proposed boundary line adjustment will have no effect on the AO District. Small portions of the subject property may occur in the FO District, however, the proposed boundary line adjustment will not affect the FO District. As indicated in Tables 1 and 2 below, the proposal complies with the dimensional requirements of the IC District. Table 1. Moveable Peaks, Inc. Parcel IC Zoning District Required Existing Proposed Min. Lot Size 40,000 ft.2 142,400 ft.2 142,400 ft. Max. Building Coverage 40% 16.6% 16.6% Max. Total Coverage 70% 38.5% 37.9% Max. Total Front Yard Coverage 30% 30% 30% Min. Front Setback 30 ft. ±31 ft. ±31 ft. �l Min. Side Setback 10 ft. 21 ft. 21 ft. Min. Rear Setback 30 ft. ±75 ft. ±120 ft. Table 2. Alan & Maureen Pidgeon Parcel IC Zoning District Required Existing Proposed J Min. Lot Size 40,000 ft. 435,600 ft.z 435,600 ft. 4 Max. Building Coverage 40% 0% 0% 4 Max. Total Coverage 70% 0% 0% 4 Max. Total Front Yard Cover -age 30% 0% 0% 4 Min. Front Setback 30 ft. n/a n/a 4 Min. Side Setback 10 ft. n/a n/a � Min. Rear Setback 30 ft. n/a n/a The proposed boundary line adjustment will have a negligible change on both of the subject properties. The Moveable Peaks property will replace a 0.7 acre parcel with a 0.8 acre parcel, for an increase on 0.1 acres. The overall coverage on this property will decrease from 38.5% to 37.9%, while the building coverage will remain at 16.6%. The Pidgeon property will replace a 0.8 acre parcel with a 0.7 acre parcel, for a decrease of 0.1 acres. Currently, there are no buildings or development on this property, so overall and building coverages will remain at 0%. The lot sizes of both properties will remain well above the minimum lot size requirements of 40,000 square feet The applicant submitted a boundary line adjustment plan prepared by Krebs and Lansing Consulting Engineers, Inc. dated January 28, 2004, which is in compliance with Section 15.06(B) of the Land Development Regulations. 2 DECISION Motion by Gayle Quimby, seconded by Chuck Bolton, to approve Final Plat Application #SD-04-04 of Moveable Peaks, Inc., subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect, except as amended herein. 2. This project shall be completed as shown on the plans submitted by the applicant, as amended by this decision, and on file in the South Burlington Department of Planning & Zoning. 3. Any changes to the final plat plans shall require approval of the South Burlington Development Review Board. 4. The final plat plan shall be recorded in the land records within 90 days or this approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy of the survey plat in digital format. The format of the digital information shall require approval of the Director of Planning and Zoning. Chuck Bolton - yea/nay/abstain/not present Mark Boucher - yea/nay/abstain/not present John Dinklage - yea/nay/abstain/not present Roger Farley - yea/nay/abstain/not present Michele Kupersmith - yea/nay/abstain/not present Larry Kupferman - yga/nay/abstain/not present Gayle Quimby - yea/nay/abstain/not present Motion Carried by a vote of 6-0-0 Signed this -3 day of March, 2004 by John Dinklage,Chair 3