Loading...
HomeMy WebLinkAboutCU-95-0000 - Decision - 0008 Berard DriveFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON C (f /, 'Oee) Re: Findings of Fact, application of Alfred Senecal, Jr., to construct a 2 story 6,400 square foot addition to an existing 7,200 square foot building used for office/warehouse use (electrical contracting business), 8 Berard Drive. On the 8th day of August, 1995, the South Burlington Planning Commission approved the request of Alfred Senecal, Jr. for site plan review under Section 26.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of the construction of a 2-story 6,400 square foot addition to an existing 7200 square foot building used for office/warehouse use (electrical contracting business). 2. This property located at 8 Berard Drive lies within the IC District. It is bounded on the north and west by a fuel distributor, on the east by a mixed use commercial building, and on the south by Berard Drive. 3. Access/circulation: Access is provided by a 20 foot curb cut on Berard Drive. No change proposed. Circulation is adequate. 4. Coverage/setback: Building coverage is 25.7% (maximum allowed is 30%). overall coverage is 61% (maximum allowed is 70%). Front yard coverage is 29% (maximum allowed is 30%). Setback requirements will be met. 5. Parking: A total of 25 parking spaces are required and 29 spaces are being provided including one (1) handicapped space. A bike rack is being provided as required under Section 26.253(b) of the zoning regulations. The parking space closest to Berard Drive should be eliminated to provide a minimum 15 foot green strip along the street as required under Section 25.107 of the zoning regulations. 6. Landscaping: The minimum landscaping requirement, based on building costs, is $1200 which is being met. Plantings will include White Pine, Spruce and Yew. 7. Traffic: ITE estimates that the current facility generates 7.1 vehicle trip ends and with the addition and two (2) tractor storage units to generate 14.1 vte's for a 7.0 vte increase. The applicant should be aware that the road impact fee for this project is approximately $1000. B. Sewer: No sewer allocation needed due to on -site septic. 9. Dumpster: The dumpster is located at the rear of the existing building so it will not be visible from the street. 10. Lighting: Exterior lighting will consist of the following: --- one (1) 175 watt high pressure sodium lamp with a downcasting and shielded fixture mounted on a 12 foot pole. f ive (5) 35 watt high pressure sodium lamps mounted on the building with shielded fixtures. An existing pole mounted flood light will be removed. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Alfred Senecal, Jr. to construct a 2-story 6,400 square foot addition to an existing 7,200 square foot building used for office/warehouse use (electrical contracting business), 8 Berard Drive, as depicted a plan entitled "Proposed Addition for Omega Electric Construction, 8 Berard Drive, South Burlington, Vermont", dated 6/19/95, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plan shall be revised prior to issuance of a zoning permit to show the changes listed below and shall require approval by the City Planner. Three (3) copies of the approved revised site plan shall be submitted to the City Planner prior to permit issuance. a) The site plan shall be revised to eliminate the parking space closest to Berard Drive to provide a minimum 15 foot green strip along the street r.o.w. 3. For the purpose of calculating required road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the addition will generate 7.0 additional vehicle trip ends during the P.M. peak hour. 4. Any new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. 5. The applicant shall post a $1200 landscaping bond prior to issuance of a zoning permit. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. �A 6. The applicant shall obtain a zoning permit for the addition within six (6) months or this approval is null and void. 7. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative officer prior to occupancy of the addition. 8. Any change to the site plan shall require approval by the South Burlington Planning Commission. 9. As expressly represented by the applicant, there shall be a maximum of two trailers parked on the site at any time. ChAirman or;==kr South Burlington Planning Commission Date 3