Loading...
HomeMy WebLinkAboutSP-99-78 - Decision - 0500 Patchen Road#SP-99-78 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of the City of South Burlington to: 1) raze bus and public works storage and maintenance buildings, 2) construct a 13,200 square foot storage, maintenance and office building, 3) construct a 12,000 square foot vehicle storage building, 4) construct a 960 square foot bus driver facility, and 5) construct three (3) bus storage pole barns totaling 15,120 square feet, 500 Patchen Road. On the 16`E' of November, 1999 the South Burlington Development Review Board approved the site plan application of the City of South Burlington under Section 26.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of. 1) razing bus and public works storage and maintenance buildings, 2) construct a 16,300 square foot storage, maintenance and office building, 3) construct a 25,500 square foot vehicle storage building, 4) construct a 960 square foot bus driver facility, and 5) construct three (3) bus storage pole barns totaling 15,120 square feet. This property is also developed with: 1) a solid waste/recycling transfer station, 2) a wastewater treatment facility and 3) a biosolids processing facility. 2. This property located at 500 Patchen Road lies within the Municipal District. It is bounded on the north by Berard Drive, on the west by I-89, on the south by residences, and on the east by Airport Parkway. 3. Access/circulation: Access is provided by a 26 foot curb cut on Patchen Road. No changes proposed. Circulation on the site is adequate. 4. Coverage/setbacks: Building coverage is 2.1% (maximum allowed is 30%). Overall coverage is 18% (maximum allowed is 70%). Front yard coverage is 8.1 % (maximum allowed is 30%). Setback requirements are met. 5. Landscaping: The minimum landscaping requirement, based on building costs, is unknown. The estimated cost of the buildings has not been determined. A detailed landscape plan has not been prepared. Staff recommended that the applicant work with staff to develop an acceptable landscape plan. Section 25.108 of the zoning regulations requires a 15 foot buffer strip adjacent to the residential district which is suitably landscaped with dense evergreen or other suitable plantings for a screen. The plan should be revised to incorporate this requirement. 6. Parking: A total of 34 parking spaces are required and 74 spaces including five (5) handicapped spaces and a bike rack will be provided. 7. Sewer: No additional sewer allocation needed. 8. Lighting: The lighting plan has yet to be developed. Staff recommended that all light fixtures be downcasting shielded fixtures which must be approved by the Director of Planning & Zoning prior to permit issuance. 9. Traffic: No additional traffic is anticipated. 10. Dumpster: The dumpster storage area will be placed behind a building. DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approves the site plan application of City of South Burlington to: 1) raze bus and public works storage and maintenance buildings, 2) construct a 13,200 square foot storage, maintenance and office building, 3) construct a 12,000 square foot vehicle storage building, 4) construct a 960 square foot bus driver facility, and 5) construct three (3) bus storage pole barns totaling 15,120 square feet, 500 Patchen Road, as depicted on a plan entitled "City of South Burlington South Burlington Vermont Proposed Site Plan", prepared by Llewellyn - Howley, Inc., dated I l/15/99, with the following stipulations: 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Development Review Board estimates that the bus and public works buildings will generate zero (0) additional vehicle trip ends during the P.M. peak hour. 3. All exterior lighting shall consists of downcasting shielded fixtures. Any change to approved lights shall require approval of the Director of Planning & Zoning prior to installation. Prior to permit issuance, the applicant shall submit details (cut -sheets) of the exterior light fixtures to the Director of Planning & Zoning for approval. 4. Pursuant to Section 26.105(a) of the zoning regulations, the Development Review Board grants the applicant a $ 21,500 credit for existing trees on the site. The applicant shall work with staff to develop a landscaping plan to add trees along Patchen Road and along the residential district boundary. 5. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 6. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to the use of the new buildings. 7. Any change to the site plan shall require approval by the South Burlington Development Review Board. Chair or Clerk South Burlington vent Review $qrd e