HomeMy WebLinkAboutSP-13-29 - Decision - 0025 Bay Crest Drive#SP-13-29 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING BAY COURT CONDOMINIUM ASSOCIATION 25 BAY CREST DRIVE SITE PLAN APPLICATION #SP-13-29 FINDINGS OF FACT AND DECISION Bay Court Condominium Association is seeking site plan approval to amend a previously approved plan for a 56 unit condominium complex. The amendment consists of making improvements to the stormwater system, 25 Bay Crest Drive. The Development Review Board held a public hearing on July 2 and September 17, 2013. Jason Burt represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. Bay Court Condominium Association, hereinafter referred to as the applicant, is seeking site approval to amend a previously approved plan for a 56 unit condominium complex. The amendment consists of making improvements to the stormwater system, 25 Bay Crest Drive. 2. The owner of record of the subject property is Bay Court Condominium Association. 3. The application was received on May 24, 2013. 4. The subject property is located in the Residential 2 Zoning District. 5. The plans submitted consist of a three (3) page set of plans, page one (1) entitled "Bay Court Condominium Association 25 Bay Crest Drive South Burlington Vermont 05403 Proposed Stormwater Improvements Existing Conditions Hydrology Plan", prepared by Queen City Engineering, dated August 2011 and last revised on 9-10-13. SITE PLAN REVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the Land Development Regulations, any PUD shall require site plan approval. Section 14.06 establishes the following general review standards for all site plan applications: The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. S P_13_29_25 BayCrest Drive_BayCou rtCon d oAssoc_sto rmwater_ffd.d oc I #SP-13-29 Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. The DRB shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. No changes to the existing buildings or site are being proposed as part of this application and therefore the aforementioned criteria are not applicable. Site plan applications shall meet the following specific standards as set forth in Section 14.07 of the South Burlington Land Development Regulations: (a) The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. The Board finds that the additional reservation of land is not necessary. (b) Electric, telephone and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. The Board finds that pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. (c) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). There are no changes proposed to the existing trash facilities. (d) Landscaping and Screening Requirements As there is no building construction proposed for this site, there are no minimum landscaping requirements. As the application includes the alteration of more than twenty cubic yards of fill, this application shall also be reviewed under Section 3.12 of the Land Development Regulations. The removal from land or the placing on land of fill, gravel, sand, loam, topsoil, or other similar material in an amount equal to or greater than twenty (20) cubic yards, except when incidental to or SP_13_29_25BayCrestDrive_BayCourtCondoAssoc_stormwater_ffd.doc 2 #SP-13-29 in connection with the construction of a structure on the same lot, shall require the approval of the Development Review Board. The Development Review Board may grant such approval where such modification is requested in connection with the approval of a site plan, planned unit development or subdivision plat. This section does not apply to the removal of earth products in connection with a resource extraction operation. Standards and Conditions for Approval: (1) The Development Review Board shall review a request under this Section for compliance with the standards contained in this sub -Section 3.12(B). An application under Section 3.12(A) above shall include the submittal of a site plan, planned unit development or subdivision plat application showing the area to be filled or removed, and the existing grade and proposed grade created by removal or addition of material. The applicant submitted a plan showing the proposed improvements. The Board finds that this plan is sufficient to satisfy this requirement. (2) The Development Review Board, in granting approval may impose any conditions it deems necessary, including, but not limited to, the following: (a) Duration or phasing of the permit for any length of time. The Board finds this requirement is applicable to the subject application. (b) Submission of an acceptable plan for the rehabilitation of the site at the conclusion of the operations, including grading, seeding and planting, fencing drainage, and other appropriate measures. The applicant is proposing an upgrade to an existing stormwater system. The applicant proposes to install an underground stormwater storage/infiltration structure, pond outlet structure and to increase the pond capacity. (c) Provision of a suitable bond or other security adequate to assure compliance with the provisions of this Section. The Board finds that this requirement will be necessary for the subject application. (d) Determination of what shall constitute pre -construction grade under Section 3.07, Height of Structures. The Board finds that the pre -construction height for future development will be the existing grade. Other: 1. The applicant must comply with all requests of the South Burlington Storm water Superintendent and the project shall meet with his approval prior to the issuance of a zoning permit. SP_13_29_25BayCrestDrive_BayCourtCondoAssoc_stormwater_ffd.doc 3 #SP-13-29 The South Burlington Stormwater Superintendent who oversees the City's Stormwater Utility (SWU) provided comments to staff on June 26, 2013 which were relayed to the applicant in the staff comments for the July 2"d DRB meeting. These comments stated in part as follows: It should therefore not be assumed by the applicant that once this project is granted approval by DRB that the SWU will accept maintenance responsibility for the project. Review through the site plan process does not include evaluation of things like easements and maintenance access for SWU staff that would be required if the City is going to accept responsibility for the system. 1 spoke to the project engineers and made this clear in March 2013. * * * 0 Provide final hydrologic modeling so that information regarding the project can be included in watershed models maintained by the City. 0 Consider modification of the outlet structure. As proposed there is an 8" pipe leading into the concrete outlet structure. Inside the concrete structure is a 1.75" diameter hole. If this small hole becomes plugged it would require confined space entry to unclog. Also, the cap should be removable to allow the 12" pipe leading out of the structure to be cleaned/inspected as necessary. 0 Confirm that the system is capable of safely passing large storm events. During large storm events, it appears as if the system is designed to fill and flow out of a 12" pipe in an upstream drainage structure. Where would water flow if this 12" pipe fails or is overwhelmed by water from upstream drainage areas? 0 What State permits has this project applied for/received? The applicant responded to the Superintendent's comments on September 10, 2013 which stated in part as follows: ...............Please see below responses to comments in bold: -Provide final hydrologic modeling so that information regarding the project can be included in watershed models maintained by the City. See attached hydroCAD results for Q-1, Q-10, Q-100 events -Consider modification of the outlet structure. As proposed there is an 8" pipe leading into the concrete outlet structure. Inside the concrete structure is a 1.75" diameter hole. If this small hole becomes plugged it would require confined space entry to unclog. Also, the cap should be removable to allow the 12" pipe leading out of the structure to be cleaned/inspected as necessary. The outlet structure has been modified so that the orifice is on the outside of the structure, protected by a trash rack. See details sheet C3. This redesign results in a change to how the structure manages large storms. See next bullet. -Confirm that the system is capable of safely passing large storm events. During large storm events, it appears as if the system is designed to fill and flow out of a 12" pipe in an upstream drainage structure. Where would water flow if this 12" pipe fails or is overwhelmed by water from upstream drainage areas? Existing conditions hydrologic modeling shows that this system may be overwhelmed during larger events under existing conditions. Please note that the revised outlet structure includes a new 18" pipe that will replace the existing 12" outfall pipe. The revised outlet structure has been designed to maintain 12" of freeboard in the pond during the 100-year event. -What State permits has this project applied for/received? The project has coverage under DEC stormwater permit 6294-9030.1. SP_13_29_25BayCrestDrive_BayCourtCondoAssoc_stormwater_ffd.doc 4 #SP-13-29 On September 11, 2013 the Superintendent indicated that he was satisfied with the proposed changes and response to comments/questions. DECISION Motion by Tim Barritt, seconded by Jennifer Smith, to approve the site plan application #SP-13-29 of Bay Court Condominium Association, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plat submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. The applicant shall adhere to the comments of the South Burlington Stormwater Superintendent and to the applicant's responses as noted above and the project shall meet with his approval prior to the issuance of a zoning permit. 4. The applicant shall regularly maintain all stormwater treatment and conveyance structures on -site and shall comply with all requirements noted in VTDEC stormwater permit 6294-9030.1. 5. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 6. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 7. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to use of the proposed stormwater system improvements. 8. Any changes to the site plan shall require approval of the South Burlington Development Review Board. Tim Barritt— yea nay abstain not present Mark Behr— yea nay abstain not present Art Klugo — yea nay abstain not present Bill Miller— yea nay abstain not present David Parsons yea nay abstain not present Michael Sirotkin — yea nay abstain not present Jennifer Smith — yea nay abstain not present The application was approved by a vote of 4 — 0 — 0 Signed this V1111- day of A1ltihw 2013, by SP_13_29_25 BayCrestDrive_BayCou rtCondoAssoc_stormwater_ffd.doc 5 C� #SP-13-29 Art Klugo, Vice Chair Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this decision, a notice of appeal and the required fee by certified mail to the Superior Court, Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to the City of South Burlington Planning and Zoning Department at 575 Dorset Street, South Burlington, VT 05403. See V.R.E.C.P. 5(b)(4)(A). Please contact the Environmental Division at 802-828-1660 or http://vermont*udiciary.org/GTC/environmental/default.aspx for more information on filing requirements, deadlines, fees and mailing address. The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.879.5676 to speak with to speak with the regional Permit Specialist. 5P_13_29_25BayCrestDrive_BayCourtCondoAssoc_stormwater_ffd.doc 6