Loading...
HomeMy WebLinkAboutSD-95-0000 - Decision - 0201 Patchen RoadFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of South Burlington Realty Company for construction of a planned residential development consisting of 100 multi -family units on 27.76 acres of land, 201 Patchen Road. On the 12th day of December, 1995, the South Burlington Planning Commission approved the request of South Burlington Realty Company for preliminay plat approval under Section 203 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of the construction of 100 multi -family residential units in 25 buildings on 27.76 acres. The sketch plan was reviewed on 5 / 9 / 95 . 2. This property located at 201 Patchen Road lies within the R4 and C . O. Districts. It is bounded on the south by a single family residence and the Summer Woods residential development, on the north by the Patchen Place residential development and a cemetery, on the west by undeveloped property and on the east by single family residences and Patchen Road. 3. Access: Access will be via a new 30 foot paved street off Patchen Road and a connection to Arbor Road. The portion of the street from Patchen Road to and including the Arbor Road connection will be constructed to City standards and will become a City street. The portion of the road which lies westerly of the intersection with Arbor Road is a "loop road" cul-de-sac and will remain a private street. The cul-de-sac portion provides access to 88 units which is 38 units more than permitted under Section 401.1(g) of the subdivision regulations. The applicant is proposing a median for the first 100 feet of the private street as a safety measure since this is the only portion of the street that will have only one (1) access. This concept was approved by the Commission for the residential portion of the L&M Park project on Shelburne Road. 4. Coverage/setbacks: Building coverage is 9.8 % (maximum allowed is 20%) . Overall coverage is 18.3 % (maximum allowed is 40%) . Buildings #1,2 and 3 do not meet the 30 foot front yard setback from the proposed street r.o.w. 5. Density: Staff determined that 76 units is the base maximum density as calculated under Section 26.152(a) of the zoning regulations. The proposal is for 100 units which is 24 units or 31.6% more than the base maximum. Section 26.152(b) of the zoning regulations allows the Planning Commission to permit density increases up to the normal maximum per district according to the degree to which the development satisfies the general standards listed in Section 26.151 and the specific standards for a PUD or PRD in a given district. The normal maximum for this project is 111 units (i.e., 27.76 acres x 4 units/acre = 111 units) . The applicant has submitted a report addressing the criteria in 26.151. It was staffs opinion that the project as designed promotes the P.U.D. criteria to a high degree. 1 6. Wetlands: A significant portion of the site is wetland and wetland buffer area. These areas constitute the C. 0. District on the property. Since sketch plan review, plans have been revised to relocate all of the buildings which were encroaching into the C . 0. zone outside of the C . 0. zone. The Natural Resources Committee reviewed these plans and submitted comments. The only encroachment proposed is some filling at the rear of building #5. This encroachment is permitted by the Planning Commission if the encroachment will not significantly adversely affect the attributes provided in Section 3.503 (a) - (e) of the zoning regulations. 7. Sewer: The sewer allocation requested is 38,225 gpd. The applicant should be aware that the policy of the Commission has been to grant allocation for a 10 year period. Any portion of the project not developed within this time period would require reapproval for sewer allocation. 8. Traffic: The applicant submitted a traffic impact analysis which concludes that this project will have a negligible impact at the study intersections except for the White Street/Patchen Road intersection. The study recommends that the LOS be checked at the White Street/Patchen Road intersection. Staff concured that a LOS analysis be conducted for this intersection. 9. Pedestrian path: A pedestrian path is proposed which would connect this property with the Summer Woods project on the south and with the Patchen Place project to the north. The Recreation Path Committee reviewed these plans and submitted comments. The final plat should show the pedestrian trail within a 20 foot wide easement. A note should be added that the final location of the easement will be determined in the future when the trail is constructed. This trail should connect with the existing trail on the Summer Woods property. Applicant should show a pedestrian trail connection to the Lamplough property. 10. Parking: This project requires 225 parking spaces and 226 spaces and two (2) bike racks are being provided. Section 26.253(c) of the zoning regulations requires that parking or storage of recreational vehicles be provided. The applicant has indicated that the Homeowners Association documents will prohibit the on -site storage and parking of these vehicles. As has been done in the past, the Homeowners Association documents should include a provision that prohibits garages from being converted to living space. 11. Landscaping: The minimum landscaping requirement, based on building costs, is $47,500 which is not being met. Landscaping proposed is $7500 short of the requirement. Plantings will include Sugar Maple, Serviceberry, Burning Bush, Crabapple, Mugo Pine, Yew, Arborvitae and Viburnum. Staff suggested that a $7,500 credit be granted since a number of trees will be left untouched. The street trees have an estimated value of $17,415. The combined landscaping value for site and street trees is $64, 915 . 12. Building height: The applicant submitted a typical building elevation for the "worst case" situation which indicates that the maximum building height will be 31.5' above average pre -construction grade. The maximum height allowed is 40 feet. 13. Sidewalk: Sidewalks will be provided along the proposed streets (public and private) and along the property's frontage with Patchen Road. The sidewalk along K the proposed City street should be placed one (1) foot from the r.o.w. line as required under Exhibit A-1 of the subdivision regulations. The Public Works Superintendent recommended that in lieu of the applicant constructing 283 feet of sidewalk along the property's frontage with Patchen Road (between #223 Patchen Road and the cemetery) that 283 feet of sidewalk be constructed along the front of #209, 211, 215 and 219 Patchen Road. The area north of #223 Patchen Road has steep banks making it difficult to construct a sidewalk along this portion of the road. Staff concured with this recommendation. 14. Lighting: Exterior lighting will consist of the following: --- one (1) 60 watt incandescent lamp with lantern style fixture located on each porch. --- three (3) street lights ( two (2) in the City street and one (1) in the private street). 15. Size of Dwelling Units: The size of the dwelling units will be 1090 square feet, 1140 square feet and 1300 square feet. This is in compliance with Section 25.114 of the zoning regulations which requires a minimum of 425 square feet per unit for a multi -family structure. 16. Mailbox cluster: The mailbox cluster is proposed to be located within the r.o.w. for the proposed public street. It is City policy to locate the mailbox cluster outside of the City r . o . w . for liability reasons. Applicant should find another suitable location for the mailbox cluster which is located outside the City r . o . w . 17. Legal documents: The applicant should submit for review and approval by the City Attorney all appropriate legal documents including easements (e . g. , irrevocable offer of dedication and warranty deed for proposed public road, and pedestrian trail easement) . 18. Other: --- no dumpsters will be used --- applicant should submit proposed street name --- the final plat should include the metes and bounds information for the proposed City street. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the preliminary plat application of South Burlington Realty Company for construction of a planned residential development consisting of 100 multi -family units on 27.76 acres of land, 201 Patchen Road, as depicted on a 13 page set of plans, page 1 entitled "Randall G. Munson, Patchen Rd., So. Burlington, VT, Boundary Plat", prepared by Trudell Consulting Engineers, dated November 18, 1994, subject to the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 3 2. Prior to issuance of a zoning permit for the first building or start of utility or road construction, all appropriate legal documents including easements (e.g., irrevocable offer of dedication and warranty deed for the proposed public road, and utility, sewer, drainage, water and pedestrian path, etc.) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 3. Prior to start of construction of the improvements described in condition #2 above, the applicant shall post a bond which covers the cost of said improvements. 4. In accordance with Section 301.5 of the subdivision regulations, within 14 days of completion of required improvements (e. g. , roads, water mains, sanitary sewers, storm drains, etc.) the developer shall submit to the City Engineer, "as -built" construction drawings certified by a registered engineer. 5. The plans shall be revised prior to final plat submittal as follows: a) The final plat shall show the pedestrian trail located within a 20 foot wide easement. A note shall be added that the final location of the easement will be determined in the future when the trail is constructed. b) The final plat shall show a pedestrian trail connection to the Lamplough property and shall show the pedestrian trail connecting with the existing trail in the Summer Woods property. c) Sheets SP1, SP2 and SP3 shall be revised to show the sidewalk along the proposed City street located one (1) foot from the r . o . w. line as required under Exhibit A-1 of the subdivision regulations. d) Sheets SP1, SP2 and SP3 shall be revised to show 283 feet of sidewalk along the front of #209, 211, 215 and 219 Patchen Road in lieu of constructing a sidewalk along the project frontage between #223 Patchen Road and the cemetery. e) Sheets SP1, SP2 and SP3 shall show the mailbox cluster located outside of the City r . o . w . f) The plan shall show a street name for the proposed new street. g) The boundary plat shall show metes and bounds information for the proposed City street. h) Sheet SP3 shall be revised to relocate the fire hydrant located at building #14 to the front of building #17 and add one (1) additional hydrant in front of building #10. i) Sheet SP3 shall be revised to show the water main located within the grass strip (between the curb and sidewalk) and the water shutoff's located between the sidewalk and the r . o . w . line. This applies only to the proposed City street. 6. The Planning Commission approves a sewer allocation of 38,225 g. p . d. The sewer 4 allocation approval shall remain in effect for ten (10) years from the date of final plat approval. Any buildings which have not been constructed within 10 years shall lose their allocation unless reapproved by the Planning Commission. The applicant shall be required to pay the per gallon fee prior to permit issuance. 7. Pursuant to Section 9.404 of the zoning regulations, the Planning Commission modifies the front yard setback requirement for buildings #1, 2 and 3 as shown on the approved plans. 8. Pursuant to Section 26.152(b) of the zoning regulations, the Planning Commission approves a residential density of 100 units which is 24 units or 31.6 o more than the base maximum of 76 units. It is the Planning Commission's opinion that this development satisfies the general standards listed in Section 26.151 of the zoning regulations and the specific standards for a PRD in the R4 District. 9. The Planning Commission approves the encroachment of fill into the C . 0. District behind building #5 as provided under Section 3.50 of the zoning regulations. It is the Planning Commission's opinion that this encroachment will not significantly affect adversely the attributes provided in Section 3.503()a) - (e) of the zoning regulations. 10. The applicant shall construct the concrete retaining walls along the C.O. District boundary lines in such a manner that there is no disturbance of soil or vegetation within the C.O. District. 11. The final plat submittal shall include an LOS analysis of the White Street/Patchen Road intersection. 12. As expressly represented by the applicant, the Homeowners Association documents shall prohibit the on -site storage and parking of recreational vehicles. In addition, the Homeowners Association documents shall prohibit garages from being converted to living space. The wording of these provisions shall be approved by the City Planner prior to issuance of the first zoning permit. 13. The applicant shall post a landscape bond in the amount of $64,915 ($47,500 for site landscaping and $17,415 for street trees) . This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 14. The Planning Commission grants a landscaping credit of $7500 for the site trees which will remain undisturbed. 15. Snow removal and maintenance of the mailbox cluster shall be the responsibility of the Homeowners Association. This requirement shall also be reflected in the Homeowners Association documents. 16. Prior to final plat submittal, a flow test of the water main on Patchen Road shall be taken to determine whether the water supply is adequate for fire protection. The determination as to whether adequate water supply is available shall be made by the City Engineer. 17. The sewage pumping station and force main shall remain private. 5 18 . The final plat application shall be submitted within 12 months or this preliminary plat approval is null and void. Chairman o C er South Burlington Planning Commission / z3 Date 2