HomeMy WebLinkAboutMS-06-11 - Decision - 0080 Bartlett Bay Road#MS-06-11
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
MICHAEL D. SIROTKIN - 80 BARTLETT BAY ROAD
MISCELLANEOUS APPLICATION #MS-06-11
FINDINGS OF FACT AND DECISION
Michael Sirtokin, hereinafter referred to as the applicant, is seeking miscellaneous
approval for a 504 sq. ft. footprint expansion to a single family dwelling, 80 Bartlett Bay
Road. The Development Review Board held a public meeting on November 21, 2006.
The applicant was present at the meeting.
Based on testimony provided at the above mentioned meeting and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking miscellaneous approval for a 504 sq. ft. footprint
expansion to a single family dwelling, 80 Bartlett Bay Road.
2. The owner of record of the subject property is Michael D. Sirotkin.
3. The subject property is located in the Lakeshore Neighborhood (LN) Zoning
District & the Residential 1-Lakeview District.
4. The plans submitted consist of a three (3) page set of plans, page one (1)
entitled, "Proposed Building Addition 80 Bartletts Bay Road South Burlington
Vermont", prepared by Civil Engineering Associates, Inc, dated Nov 7, 2006.
-1-
#MS-06-11
DIMENSIONAL REQUIREMENTS
Table 1. Dimensional Reauirements
LN Zoning District
Required
Proposed
Min. Lot Size
12,000 SF
132,000 SF
Max. Building Coverage
20%
2.5%
Max. Overall Coverage
40%
4.6%
Min. Front Setback
20 ft.
20 ft
Min. Side Setback
10 ft.
10 ft.
Min. Rear Setback
30 ft.
>30 ft.
q zoning compliance
CONDITIONAL USE CRITERIA
Pursuant to Section 12.01(D) of the South Burlinqton Land Development Regulations,
the proposed structure shall be reviewed as a conditional use and shall meet the
following standards:
The proposed use, in its location and operation, shall be consistent with the
planned character of the area as defined by the City of South Burlington
Comprehensive Plan.
The proposed project is consistent with the planned character of the area, as defined by
the Comprehensive Plan.
The proposed use shall conform to the stated purpose of the district in which the
proposed use is located.
The proposed project is consistent with the stated purpose of the Lakeshore
Neighborhood District, which is "to encourage residential use at densities and setbacks
that are compatible with the existing character of the lake shore neighborhoods located
in the vicinity of Bartlett Bay Road and Homes Road."
The Development Review Board must find that the proposed uses will not
adversely affect the following:
(a) The capacity of existing or planned municipal or educational facilities.
The proposed project will not adversely affect municipal services. This addition will have
no impact on educational facilities.
(b) The essential character of the neighborhood or district in which the
property is located, nor ability to develop adjacent property for appropriate
uses.
The proposed project will not have an adverse affect on the character of the
-2-
{
#MS-06-11
neighborhood or zoning district that this property falls within.
(c) Traffic on roads and highways in the vicinity.
It is extremely unlikely that this proposed addition will generate any additional traffic.
Any traffic that is generated by this addition will be negligible in its effect on the
neighborhood.
(d) Bylaws in effect.
The proposed project meets all of the dimensional standards of the zoning district.
(e) Utilization of renewable energy resources.
The proposed project will not likely affect renewable energy resources.
(0 General public health and welfare.
The proposed project will not likely have an adverse affect on general public welfare.
SITE PLAN REVIEW STANDARDS
Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations the
proposed conditional use shall meet the following standards:
(a) The site shall be planned to accomplish a desirable transition from structure
to site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
The proposed project has been planned to accomplish a desirable transition from structure
to site, from structure to structure, and to provide for adequate planting, safe pedestrian
movement.
(b) Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
Parking is to the front and side of the building. However, given that the nature of the project
as a single-family residential use, this layout acceptable and in harmony with the rest of the
neighborhood.
(c) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and
existing or adjoining buildings.
-3-
l
t �
#MS-06-11
The applicant has stated that the proposed structure will be approximately 24' in height,
which is in compliance with Section 4.07(E) and 4.08(F) of the Land Development
Regulations.
(d) Newly installed utility services and service modifications necessitated by
exterior alterations or building expansions shall, to the extent feasible, be
underground.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(e) The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual
interruptions to create attractive transitions between buildings of different
architectural styles.
This requirement is being met.
(fl Proposed structures shall be related harmoniously to themselves, the terrain,
and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures.
This requirement is being met.
(g) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial of collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation
in the area.
It is not necessary to require any additional access easements as part of the proposed
project.
(h) Electric, telephone and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall
be located so as to have a harmonious relation to neighboring properties and
to the site.
It has already been stated that any new utility lines, services, and service modifications
shall be underground.
(i) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not
escape the enclosure(s).
As this is a single-family residential lot, it is unlikely that this criterion would apply.
-4-
#MS-06-11
(j) Landscaping and Screening Requirements
The proposed project does not require additional landscaping or screening under the South
Burlington Land Development Regulations. Furthermore, no trees or shrubs are proposed
to be removed in order to accommodate the addition and so none are required to be
replaced.
Pre -Existing Structures along Lake Champlain and within Queen City Park
This proposed expansion shall be reviewed under Section 12.01(D) of the South
Burlington Land Development Regulations which includes all lands within one hundred
fifty feet horizontal distance of the high water elevation of Lake Champlain. The
expansion and reconstruction of pre-existing structures on these lands may be approved
by the Development Review Board as a conditional use provided the requirements of the
underlying zoning district and the following standards are met:
a) The structure to be expanded or reconstructed was originally constructed on or
before April 24, 200.
The existing structure meets this criterion.
b) The expanded or reconstructed structure does not extend any closer, measured
in terms of horizontal distance, to the applicable high water elevation or stream
centerline than the closest point of the existing structure.
The proposed expansion is no closer to the lake than the existing structure.
c) The total building footprint area of the expanded or reconstructed structure shall
not be more than fifty percent larger than the footprint of the structure lawfully
existing on April 24, 2000.
The proposed expansion meets this criterion: the expansion is 17.3% of the
existing structure.
d) An erosion control plan for construction is submitted by a licensed engineer
detailing controls that will be put in place during construction or expansion to
protect the associated surface water.
The applicant has submitted an erosion control plan which has in turn been
reviewed by the City's Stormwater Superintendent. He has stated the following:
"if they are going to be stockpiling material I'd like to see silt fence on the down
gradient side of the storage piles, as well as surrounding the work area as is
shown on the plan. This prevents the pile from moving and provides extra
protection. "
e) A landscaping plan showing plans to preserve maintain and supplement existing
trees and ground cover vegetation is submitted and the DRB finds that the
overall plan will provide a visual and vegetative buffer for the lake and/or stream.
-5-
#MS-06-11
The plan indicates that all trees will remain and meets this criterion.
OTHER
The plans should be revised to remove the property lines showing Bartlett Bay Road
crossing this property as this private road stops at the southerly boundary line.
DECISION
Motion by G W tl� ' 4 04 V seconded by KFla H L , to
approve Miscellaneous Application MS-06-11 of Michael D. Sirotkin, subje t to the
following conditions:
1) All previous approvals and stipulations, which are not superseded by this approval,
shall remain in full effect.
2) This project shall be completed as shown on the plans submitted by the applicant
and on file in the South Burlington Department of Planning and Zoning.
3) The plans shall be revised to show the changes below and shall require approval of
the Administrative Officer. Three (3) copies of the approved revised plans shall be
submitted prior to permit issuance.
a) The plans shall be revised to comply with the comments of the South Burlington
Stormwater Superintendent as per his comments regarding the silt fence on the
down gradient of the topsoil piles.
b) The plans shall be revised to remove the Bartlett Bay Road property lines which
cross this property. The plans shall show this property as one (1) lot.
4) Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility
lines, services, and service modifications shall be underground.
5) The applicant shall obtain a zoning permit within six (6) months pursuant to Section
17.04 of the Land Development Regulations or this approval is null and void.
6) Any change to the site plan shall require approval by the South Burlington
Development Review Board.
Mark Behr — yea/nay/abstain/not present
Matthew Birmingham — yea/nay/abstain/not present
John Dinklage — yea/nay/abstain/not present
Roger Farley — yea/nay/abstain/not present
Eric Knudsen — yea/nay/abstain/not present
Peter Plumeau — yea/nay/abstain/not present
Gayle Quimby — yea/nay/abstain/not present
Q
#MS-06-11
Motion carried by a vote of =
Signed this L_ day off Z z��, -n�% 2006, by
John Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).
-7-