HomeMy WebLinkAboutSD-93-0000 - Supplemental - 0173 Patchen RoadCity of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658-7955
January 16, 1990
Ms. Joanne Brill
RD 1, Box 890
Woods Hollow Road
Westford, Vermont 05494
Re: 2-lot subdivision, Patchen Road
Dear Ms. Brill:
ZONING ADMINISTRATOR
658-7958
Enclosed are the 10/17/89 Planning Commission meeting minutes.
Please call if you have any questions.
S' c .rely
oe Weith,
City Planner
1 Encl
cc: Mr. Chip Hart
JW/mcp
PLANNING COMMISSION 7 MARCH 1989
The South Burlington Planning Commission held a meeting on
Tuesday, 7 March 1989, at 7:30-pm, in the Conference Room, City
Hall, 575 Dorset St.
Members Present
Peter Jacob, Chairman; William Burgess, Catherine Peacock, Mary -
Barbara Maher, Ann Pugh, William Craig
Also Present
Joe Weith, City Planner; Sid Poger, The Other Paper; Chip Burr,
Susan Hilton, John Osgood, Richard Spokes, William Shearer Robert
Krebs, Paul Savas, Brad Martell, John Larkin, G. Rabideau, Sally
Gunn, Alex Blais, John Jewett, Gerry Milot, Bill Whalen, Frank
Naef
PUBLIC HEARING: C
woods Association
to the east resul
15.11 acre parcel
construction of a
14.79 acre parcel
ontinue proposed Final Plat amendment of Summer -
for 1)land swap with adjoining property owner
ting in a 15.11 acre parcel, 2)subdivision of the
into 2 lots of 14.79 acres and .32 acres, and 3)
38 unit planned residential development on the
Patchen Road
Mr. Weith advised the cul de sac has been redesigned to provide 30
ft. of pavement and 5 ft. for snow storage. A note has been added
for extension of the road for future development of the Munson
property. There is also a note for the future curb cut for the
driveway to the Brill property. The plan has been revised to show
the road crown slope of 1/3" per foot, the sidewalk cross slope of
1/4" per foot to the top of the curb, and concrete curbs on all
streets. Wording has been added to the Condo Association rules
giving the city the right to enforce the "no conversion of garage
space to living space" stipulation and to reimburse the city for
legal fees to enforce this. A denser, taller hedge has been pro-
vided along the Brill property. Street trees have been moved from
road pavement around the cul de sac. 89 parking spaces are shown
with 86 required.
A discussion on lighting followed. Members were concerned that
Act 250 has required lights.that cost the city too much to
operate. Messrs. Burgess and Craig felt the applicant should
return to the Commission if this happens; Mr. Jacob didn't grant
the developer "in the middle" of a contention between the city and
Act 250.
Members did not feel 2 exit lanes were needed now. They did feel
private loops should be signed as fire lanes to give police the
right to tow cars parked there.
PLANNING COMMISSION
7 MARCH 1989
page 2
Ms. Peacock moved the Planning Commission approve the Final Plat
amendment for subdivision of a 15.11 acre parcel into two parcels
of 14.79 acres and 0.32 acres, and construction of a 38 unit
planned residential development on the 14.79 acre parcel as de-
picted on the 7 page set of plans titled "Summer Woods, Patchen
Road, South Burlington, Vermont," prepared by Krebs & Lansing Con-
sulting Engineers, Inc, dated January, 1989, last revised 2/28/89
(page 2), with the following stipulations:
1. A $38,400, 3-year landscaping bond shall be posted prior to
permit. This includes $30,300 for site landscaping and $8100 for
street trees.
2. An intersection improvement fee of $893 shall be paid to the
City prior to permit based on the 17 peak hour trip ends from this
development that will use the White Street/Patchen Road
intersection and Williston Rd. corridor.
3. The developer shall furnish to the City in writing the name of
the contractors and/or builders that will be doing the work. This
shall be done at least 7 days prior to any construction. In
writing, the developer shall submit the name of the architect and/
or engineer who will stake out and supervise the construction and
upon completion of the work, the architect and/or engineer shall
certify that the work is in conformance with the approved plans,
stipulations and any other requirements and/or changes that the
City requests.
Concrete curbs shall be continuous across entrances where they
shall be depressed with a 1-1/2 inch reveal.
5. A utility plan showing all underground utilities (electric,
gas, cable, telephone) and street lighting shall be submitted to
l the City for review and approval prior to recording. The
underground lines shall be in an easement along and outside the
road rights of way. Street lights shall be in place and operating
before any units are occupied. A downcast luminere which costs no
more to operate than the Town and Country light shall be
installed.
6. The sewage pumping station shall be privately maintained and
owned.
7. The recorded plat shall show a 60 foot wide right of way where
the road is proposed for future extention. The current plan shows
a 50 foot wide right of way in this location.
8. Legal documents including the Declaration of Condominium and
bffers of dedication and deeds for streets, sewer and water lines,
and provisions for non -conversion of garages per R. Spokes'
PLANNING COMMISSION
MARCH 7 1989
page 3
letter of 2/23/89, and the pedestrian easement shall be submitted
to and approved by the City Attorney prior to recording. Prior to
permit, the City shall be granted enforcement rights to enforce
the garage covenants and the revision to covenant #1 per Dick
Spokes' 2/23/89 letter.
9. A sewer allocation of 18,000 gpd is granted. The $2.50 per
gallon fee shall be paid for 7,500 gpd and shall be paid prior to
permit.
10. City standard street name signs and stop signs shall be
installed at the Patchen Road intersection of the 2 new streets.
The locations of these signs shall be shown on the plans. Street
names shall be submitted to the City Planner for approval prior to
recording. "No Parking" signs shall be installed around both cul
de sacs. All traffic signage shall be in place prior to occupancy
of units.
11. A snow fence shall be erected along the top of the bank along
the CO Zone and no trees shall be cut in the CO Zone.
12. A bond shall be posted for streets, water, sewer lines and
sidewalks in an amount determined by the City Engineer prior to
permit.
13. The recorded plan shall show the dead -ended water main near
units 24-32 extended to the north property line and capped for
future loop connection when property to the north is developed.
14. The private loop drives serving the units shall be posted as
Fire Lanes and no parking signs shall be erected.
15. A recreation fee of $200 per unit shall be paid prior to
permit.
16. A formal letter from Ms. Brill approving the planting of the
hedge on her property shall be submitted to the City Planner prior
to recording.
17. It is the applicant's responsibility to record the final plat
with the City Clerk within 90 days or this approval is null and
void. It must be approved by the Planner and signed by the
Chairman or Clerk prior to recording. '
Mrs. Maher seconded. Motion passed unanimously.
2. Sketech plan application of Gerald Milot and John Larkin for a
7 lbt subdivision of a 30.5 acre parcel and construction of a 140
unit planned residential development on 1 of the lots (22.6
acres), Shelburne Rd.
Notes
L Reference is mode to the'b Boundary Survey and Final Plot _Me/no Concrete
of Summer Woods, Job B5/48./ prepared by Krebs
and Lansing Consulting Engineers, lost revised 5-25-89 Volume /// Page 183
and 7-19-89 respectively. May 31, 1973
2. Reference is specificolly mode to survey notes /, 2 and 3
on the boundary survey sheet
E+na,np 6aroe+
8
5� f
- 110.00'
_ • • �•. o. `o.e b
Ib
m• _Lot *2— m m
r" Arm = 12, 063sf yjh
�n a �' ti O .Men .°•
N H �
1 00
Summer '�
_9Qds „1�.--'aau_- c
Assoc. I 31 W • °°`
volume 2B/
Page 510 - 513 !o' a.v r•,° h
July 20, 1989 w.ex. io ip
1 87.45' .n12
o-°- -- --
. n •a .•„vn, pce
ate --
z.w Arbor
ce
Legend Summer Woods Associates
--- Property line /ROW volume 281 Page 510�-513
o Iran pipe to be sal July 20, 1989
O 20 40 60 80 /00
® /ton pips found or set
o Concrete monument to be set
- - Traverse point
❑ce Catch basin Bar Scale
Qsun Sanitary manhole /" = 20'
_Lot_#/
Area = 28, 550 sJ.
_ 20*4.40'
N 76°39'07"W 1
ia.
sa» Rood
cerufmotion
/ certify that this survey is
bosed upon information
abstracted from pertinent deeds
and mops and on evidence
found in the field.
1 Lo_ca_tion Map _
1 " = 2000'
i
I 1
66'
s,ana.o.�.o• I
I�
�I
n
o �\\
Ps,_
Richard
N
Terrace
alp
C.
-)ce
QLC.
I
CB I
� I i
E
PLANNING COMMISSION
17 OCTOBER 1989
page 2
3. Final Plat application of Joanne Brill for subdivision of a
40,600 sq. ft. lot on Patchen Road into two lots of 28,600 and
12,000 sq. ft., Patchen Road
Ms. Brill indicated that the curb cut on Arbor will be farther
than 80 feet from Patchen Road. Both lots meet the minimum lot
sizes for either single or 2-family homes. Frontage requirements
are met. All issues raised at the sketch plan hearing have been
addressed.
Ms. Peacock moved the Planning Commission approve the final Play
application of Joanne Brill for subdivision of a 40,600 sq. ft.
lot ^n Patchen Road into two lots of 28,550 and 12,063 sq. ft. as
depicted on a plan entitled "Subdivision Plat, Jo Anne Brill,
Patchen Road, South Burlington, Vermont," prepared by Krebs &
Lansing Consulting Engineers, Inc, and dated September, 1989 with
the followinq stipulations:
1. The curb cut on Arbor Road for lot #1 shall be at least 80 feet
from Patchen Rd. The existing driveway on Patchen road shall be
closed.
2. A $200 per unit recreation fee shall be paid prior to permit
for lot #2.
3. A $2.50 per gall sewer fee shall be paid prior to building
permit for lot #2.
4. The final plat must be recorded within 90 days or this approval
is null and void.
Mr. Belter seconded. Moation passed unanimously.
4. Site Plan Application of Airport Realty Associates for erection
of a 420 sq. ft. building to be used as a pilot's lounge, 3060
Williston Road.
Mr. Kellogg indicated the building will be a modular type and will
be used only for a pilot's lounge for private, corporate pilots
waiting for their return flights. Overnight pilots will still be
referred to motels. The building will be immediately southwest
of the existing Valley Air Hangar. Access is over the private
road at 3060 Associates property across from Shunpike Rd.
Five new spreading yews and one pine tree and a Norway Maple will
be put in. An existing Norway maple will be relocated.
No additional traffic will result from the building.
Planning File Data for Computer Input
I Original Property Owner__
2. Developer's Name
3. Name of Development,
4 Address of Development or Project
------------
5. Type of Project
/.�✓e
Minor Subdivision
Major Subdivision (MS)
Site Plan (SP)
6. Zoning District 1 rz
7. Zoning District 2
8. Zoning Board Approval date if Required
9. Date of Planning Commission Hearings/Meetings
Site Plan Date
0 11
Sketch Plan Date
10. Preliminary Plat date
11. Final Plat Date / o/.J.
12. Revised Final Plat Date 'I (it' applicable)
13. Revised Final Plat Date 2 (if applicable)
14. Acreage of Total Project
ID -. Use of Lind I &S I
If; . Use ot' Land 2
Ust ()t* Land J
(it' [..and zI
]'A. Number of Lots
N: I I m 1) 1- of SinglyI- r i m i I} U i i i t
21. N i i m h r of Mu I t i - t', t m i I y Un i t N/A_
[, "L, . 1.11(,t i ()11 ( )f, M) i I d i �// A
2:3 Size of Building (Square footage)
24. Streets —
City Street CS
Private Street PS
25. Date of Acceptance of streets by City
26.
27.
28.
29.
30.
Bond -Landscaping
Bond -Streets
Bond -Sewer
Bond -Water
Bond -Other
31. Date Mylar Due (90 days after approval) 1)
32. Date Recorded -
33. Expiration date of Approval /a ?�L9Z
34. Date of First Building Permit
34 . Tax Map Number �.- 3 _ .3
36. Map File Location 1
37. Map File Location 2
38. Map File Location 3
Other fees ('Type and amount) ri (��u. A�.�•� Z.So /2C.t
Preparers Name:— J• -----
Date:
Posted in Computer (Name, Date):
N
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658-7955
October 13, 1989
Ms. Joanne Brill
RD 1, Box 890
Woods Hollow Road
Westford, Vermont 05494
Re: 2-lot subdivision, Patchen Road
Dear Ms. Brill:
ZONING ADMINISTRATOR
658-7958
Enclosed is the agenda for next Tuesti.xy' Pia.-: ing (�ununission
meeting and my comments to the Planning Commission. Also en-
closed are Bill Szymanski's and Chief Goddette's comments.
Please be sure someone is present on Tuesday, October 17, 1989 at
7:30 P.M. to represent your request.
Sincerely,
tip 74--
Joe Weith,
City Planner
Encls
cc: Chip Hart
JW/mcp
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658-7955
October 16, 1989
Ms. Joanne Brill
RD 1, Box 890
Woods Hollow Road
Westford, Vermont 05494
Re: 2-lot. subdivision, Patchen Road
Dear Ms. Brill:
ZONING ADMINISTRATOR
658-7958
Enclosed are the 8/29/89 Planning Commission meeting minutes.
Please call if you have any questions.
gWenely,
ith,
City Planner
1 Encl.
cc: Chip Hart
JW/mcp
10/17/89
JW
MOTION OF APPROVAL
I move the South Burlington Planning Commission approve the Final
Plat application of Joanne Brill for subdivision of a 4.0,600
square foot lot on Patchen Road into two lots of 28,600 and
12,000 square feet as depicted on a plan entitled "Subdivision
Plat, Jo Anne Brill, Patchen Road, South Burlington, Vermont,"
prepared by Krebs & Lansing Consulting Engineers, Inc. and dated
September, 1989 with the following stipulations:
1. The curb cut on Arbor Road for lot #1 shall be at least 80
feet from Patchen Road. The existing driveway on Patchen Road
shall be closed.
2. A $200 per unit recreation fee shall be paid prior to permit
for lot #2.
/2/ The final
proval is null
plat must be recorded within 90 days or this ap-
and void.
M E M O R A N D U M
To: South Burlington Planning Commission
From: Joe Weith, City Planner
Re: October 17, 1989 agenda items
Date: October 13, 1989
2) COMMUNITY BIBLE CHURCH, WILLISTON ROAD
Community Bible Church proposes to construct a 1,344 square foot
building to be used for storage and activity space for children.
Enclosed are: 1) the 8/29/89 minutes when the Sketch Plan was
reviewed, and 2) my comments for that meeting.
At the last meeting, the Commission requested one pine tree be
planted. This has been shown on the plan.
3) 2-LOT SUBDIVISION. PATCHEN ROAD
Joanne Brill proposes to subdivide a 40,600 square foot lot into
two lots of 28,600 and 12,000 square feet. Enclosed are the
8/29/89 minutes of the meeting at which the Sketch Plan was
reviewed. Also enclosed are my comments for the meeting.
The plan has been revised to meet all of the concerns raised at
the Sketch Plan meeting. A $200 per unit recreation fee shall be
paid at time of application for a building permit.
4) T0WN & COUNTRY. SHELBURNE ROAD
Nathaniel and Millicient Lash have submitted a Site Plan showing
the "as built" structure, the block retaining wall and proposed
landscaping. It is my understanding that the applicants are
requesting approval for a 9,344 square foot addition (5,061
square foot footprint) which consists of 5061 square foot first
floor and a 4,283 square foot basement.
A proposal to build a 5064 square foot addition was denied on
August 5, 1986 (minutes enclosed). A proposal to construct. a
5,061 square foot addition was later submitted and approved on
10/28/89 (minutes enclosed). As you are aware, the site con-
struction did not follow the approved site plan.
M E M O R A N D U M
To: South Burlington Planning Commission
From: William J. Szymanski, City Engineer
Re: October 17, 1989 agenda items
Date October 13, 1989
2) COMMUNITY BIBLE CHURCH, WILLISTON ROAD
Site plan dated 9/7/89 prepared by Trudell Consulting Engineers
is acceptable.
3) JO ANNE BRILL. PATCHEN ROAD
Curb cut for lot #1 shall be at least 80 feet from Patchen Road.
Existing curb cut on Patchen Road shall be closed.
4) TOWN AND COUNTRY FURNITURE. SHELBURNE ROAD
A massive concrete block wall was placed within the water line
easement very close and portions on top of the water main. Fill
was also placed on top of the water main making it very deep and
impossible to get to in an emergency. The water main serves Goss
Dodge and Grossmans. If the wall remains, the water serving
other businesses should be relocated. That would mean Goss Dodge
to be served from Shelburne Road and Grossmans from Bartlett's
Bay Road. The water main now under the wall and in the deep fill
would become a service and Town & Country be responsible if it
fails.
5) VALLEY AIR SERVICE. BURLINGTON INTERNATIONAL AIRPORT
Site plan dated 10/5/89 prepared by Richard Kellogg Architect is
acceptable.
�uutlt +.6 urliugtovu ifirr D ep artuYeut
575 Barnet �§treet
Nauth _413nrlingtan, Vermont 11540
(802) 658-7960
TO: SO. BURLINGTON PLANNING COMMISSION
FROM: CHIEF GODDETTE
RE: TUESDAY OCTOBER 17,1989 AGENDA ITEMS
DATE: WEDNESDAY OCTOBER 1111989
Plans have been reviewed by this office on
Town&Country landscaping project, 2-lot sub -division
for Joanne Brill -and the trailer addition to the Valley
Air property at the airport. I am pleased to inform
you that at this time I do not see any problem for our
department in given emergency protection if it would
be needed .
PLANNING COMMISSION
29 AUGUST 1989
page 6
4. The applicant has said that he will put in $2,500 worth of
landscaping to improve the appearance of the property and dock A
revised plan shall be submitted to the Planner for approval prior
to permit. A 3-year bond in this amount shall be posted prior to
permit.
5. The plan shall be revised to show a single bay dock not to
exceed 10 feet in width.
6. The building permit shall be obtained within 6 months or this
approval is null and void.
Mrs. Maher seconded. Motion passed unanimously.
6. Sketch plan application of Joanne Brill for subdivision of a
40,500 sq. ft, parcel into two lots of 12,375 sq ft and 28,125
sq. ft., Patchen Road
Ms. Brill said she will subdivide off a section of the back lot,
the exact footage to be determined when surveyed. This lot will
be for either a single family home or a duplex. The existing curb
cut on Patchen Rd. will be closed when Summer Woods road is built
and opened for use. Mr. Weith said he would need to see the
garage and house plotted on the plat. Mr. Weith said that the garage
currently exceeds the minimum setback from Larch Road.
Members had no objections to the subdivision plans.
7. Sketch Plan application of Community Bible Church for
construction of a 1,344 sq. ft. building for uses in conjunction
with Sunday School services and storage, 2025 Williston Road
The applicant proposes a 3-bay garage to house vans in 2 bays and
for 9se in building props for plays and other craft projects.
there will also be a small bathroom.
Mr. Jacob asked whether the applicant should be required to pay a
sidewalk fee. The concensus of the Commission was they should
not.
Mr. Weith noted that $650 in landscaping is required. Members
agreed that one nice evergreen would be satisfactory.
7. Continue Public HEaring: Revised Final Plat application of
Heathcote Associates for: 1) change the parking layout, and 2)
request an amendment to stipulation #5 of the approval dated 10/
14/89 regarding intersection improvements, Factory Outlet Mall,
Shelburne Road
Memorandum
August 29,
August 25,
Page 6
- Planning
1989 agenda items
1989
6) 2-LOT SUBDIVISION. PATCHEN ROAD
Joanne Brill proposes to subdivide a 40,500 square foot lot
located on Patchen Road into two lots of approximately 12,375 and
28,125 square feet. There is an existing house and garage on the
parcel both of which would be retained on the 28,125 square foot
lot.
The parcel is zoned R-4. It is bounded on the east by Patchen
Road, on the north by Melna Concrete, on the south by the pro-
posed Larch Street (Summerwoods project) and on the west by an
undeveloped duplex lot (Summerwoods). It is my understanding
that Summerwoods Associates is interested in purchasing the new
12,375 square foot lot for either a single-family or two-family
building.
Since this in only a two -lot subdivision, it should be handled as
a minor subdivision which requires a sketch and Final Plat re-
view.
Lot size/frontage: Both lots meet the minimum lot sizes for
single-family (9,500 square feet) and two-family (12,000 square
feet). Lot frontage requirements are also met - 85 feet on Larch
Street and 100 feet on Patchen Road.
Setback/Coverage: Assuming the front yard for the 28,125 square
foot lot is Patchen Road, the required setbacks are 50 feet from
Patchen Road, 30 feet from Larch Street, 30 feet from the new
rear property line, and 10 feet from the Melna Concrete line.
Currently, all setbacks are met except for the garage setback
from Larch Street (only 21 feet). The proposed subdivision would
still meet all required setbacks with the exception of the garage
setback from Larch Street. Coverage requirements are met.
Access: Access for both lots will be from Larch Street.
Other: A $200 per unit recreation fee and $2.50 per gallon sewer
allocation fee will be required for the new lot only. I will
check with the Zoning Administrator, Dick Ward, to see when this
fee should be assessed (i.e., as a condition of subdivision
approval or building permit?) I suspect the most appropriate
time is at permit since this is when we know for sure whether a
one or two unit building will be constructed.
The Final Plat should show allowable building envelopes.
C.
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
PLANNER
658-7955
August 25, 1989
Ms. Joanne Brill
RD 1, Box 890
Woods Hollow Road
Westford, Vermont 05494
Re: 2 lot subdivision, Patchen Road
Dear Ms. Brill:
ZONING ADMINISTRATOR
658-7958
Enclosed is the agenda for next Tuesday's Planning Commission
meeting and my comments to the Planning Commission. Also en-
closed are Bill Szymanski's comments.
Please be sure someone is present on Tuesday, August 29, 1989 at
7:45 P.M. to represent your request.
Si rely,
A2
ZZ,Joe Weith,
City Planner
Encls
cc: Chip Hart
JW/mcp
SOUTH BURLINGTON PLANNING COMMISSION
The South Burlington Planning Commission will hold a public hear-
ing at the South Burlington City Hall, Conference Room,
Dorset Street, South Burlington, Vermont on Tuesday, October 17,
1989 at 7:30 P.M. to consider the following:
1. Final Plat application of Joanne Brill for subdivision of a
40,600 square foot lot on Patchen Road into two lots of 28,600
and 12,000 square feet. The property is bounded on the north by
Melna Concrete, on the west and south by Summer Woods Associates,
and on the east. by Patchen Road.
2. Revised Final Plat application of Community Bible Church for
construction of a 1,344 square foot building for uses in conjunc-
tion with storage and Sunday School/camp activities, 2025
Williston Road. The property is bounded on the north b,
Williston Road, on the east by L. Rozzi, on the south by A.
Pa L,i-r. and on the west by R. Ploof, D. Bordonero, V. Devlin, C.
Spinelli, C. Stearns, L. Bouchard and D. Mayo.
Copies of the applications are available for public inspection at
the South Burlington City Hall.
Peter L. Jacob
Chairman,
South Burlington Planning Commission
September 30, 1989
CITY OF SOUFH BURLINGTON
Subdivision Application - FINAL PLAT
1) Name of Applicant Joanne Brill
2) Name of Subdivision Joanne Brill
3) Indicate any changes to name, address, or phone number of owner of record,
applicant, contact person, engineer, surveyor, attorney or plat designer
since preliminary plat application: None
4) Indicate any changes to the subdivision, such as number of lots or units,
property lines, applicant's legal interest in the property, or developmental
timetable, since preliminary plat application: None
S) Submit f ire copies of a final set of plans consisting of a final plat plus
engineering drawings and containing all information required under section
202.1 of the subdivision regulations for a minor subdivision and under section
204.1(a) for a major subdivision.
6) Submit tfo draft copies of all legal documents required under section 202.1
(11) and (12) of the subdivision regulations for a minor subdivision and
under section 204.1(b) for a major subdivision.
i 9/26/89
(Signature) applicant or contact person Date
Melna Concrete
Volume l// Page /83
May 3/, 1973.
�P ErifNnq 6aigpf -
T�1`
g83°35'2�--110.00
30
�l 0
Eris/�nq N°use
s g3°35_26"E J� ie Joii;.
/79.
P
0 M
�
eui/Oinq .nrf/o>f i _ _ _. _ rn I u Irolro/ �' b
0
Lot #/ _30
-_
Arso = 28,550sf fwt IN'Poro _ r. ra 91lw f4f ti
Z ',a Lot #2
Area = /2, 063 sl.
b � ti ti �>f. of zo• II
_ � I
to sous/np m.agp. '
- bp,c./ I wrr..af l Erifliwp Ma.. N
V •' . z1 �_ � oo M�
Summer
Woods
69
N \
SVi
II
a
ra
0
rr
C3_
N Bat/1N - -
BURLIN67tM'
8 7,
-ation M
/" a 2000,
Richard
Terrace
Assoc.
Volume 281 M n 30:00 co
'C
'=
Page 510 - 513 30' troll raw iq - _
✓u/y 20, /989 QL
c rs-
-vef
87.4_5• 204. 40e /o .ef rnr> ,./ooc. i .;fitii
N 76° 39' 07" W 1Ot>" N 76 ° 39 07 W
OCB Er,rl,ap NWgs / w �>,r.f• i t
r, tf/aJ F_kJ.
UCB
Arbor sw Rood
Legend - Summer Woods Associates~�
-- Property line /R.0.W Volume 28/ Pope 510-5/3
-- o Iron pipe to be set ✓u/y 20, /9890 c'O 40 60 80 20
® Iron pipe found or set _
o Concrete monument to be set
-j>- Traverse point ❑ce Catch basin _ 8ar Scale
0sr. Sanitary montwe /" = 20'
ce
Design whn
Subdivision Plot -
Drawn pfm "d-
::hecMed
Scale Jo Anne Bt-i// --. ;..`
Date Sept. /989
Project B5/48./ Polchen Rood - south 8ur/inpfon, Vermont
KREBS & LANSING Consulting Engineers, Incorporated �+'Tn- "
10 Main Street, Colchester, Vermont 03446
1.
Mena _Concrete
volume /// Page /83
- May 3/, /973
' - Er,srinp Woos, 11
- Errrnnq Geroge -
83' 35 ' 26 n E
S ,d• ra,a
179.62 j ro'
3v 35' 261E
se r a"
-k //0.0
en,rd�nq • eroo• hit o
s' •' Ii is us/oa d n'. Rr O
30' nor yar 1b,
f wwa 0
_Lot #/ _'°-,
mxa
1 a" Area = 2B, 550 st
,yo
Lot !!2 m I y, tar Area = 12,063sf yjh
toN ti ry w,•rnil o°.•
L t b enu,Iv •,w•ron
°v o nvvet I 1, E,nr,nq NIa„
z ac,aua. N
t 1 t 40 O O a
'Summer i I 0'
LlO O E.,rrmp
��OO� —I - GIr•v,
;-Volume 281
%Poge 510-513 ijo,f 11-0 h sere E,anl -
-'✓u/y 20 1989 u to - ---- - L-- v b it
I
N k
k3>
�Od _
1 bc,
66'
R,vi,-It-.ar
'1
_rj
0
0
`v
M
Ih
OHYa
1
1�
O
vt t-"t
r o
'' - -- 87.45' to 2 204. 40' ,one• rlyd
::: si.',„.,,•, N 76139'07' W av,rn N 76139 07 W --
' i a1 isr il�s/�aa _ GCB Ei,a/,aq H2Oq, r n I• rl ,�./�aa
_--. UCH
La1+2 LIJ 1`/
Arbor sw. Road
17
Legend - Summer Woods Associates
-- Property fine /RO.W. volume 281 Page ✓u/y 20, 1989 5/0-5-5/3
o Iron pipe to be set 0 20 40 60 80 /00
® Iron p,pe found or set
a Concrete monument to be set
11
.ri- Traverse point '.Oce Catch basin BOr SCGle
-� .Osre sanitary manhole /" = 20' --
eVRC/NG7aN
IVi'1
Won. Mop ',:
/" = 2000,
Richard
Terrace
is
r
;e
t
—o
I
Srgn whn
Subdivision Plot
awn Pfm aa.F-
ecked -
ate f 20, Jo Anne Brill
to Sept. 1989
oject 85/4B./ Po/then Rood ,Soufh Burlington, Vermont'
KREBS & LA14SI14G Consulting Engineers, Incorporated
10 Main Street, Colchester, Vermont 05446v;;
W
qj- 3526'
7.9
13
C�
so,
CO
Q0
Lot #
AX Are, = 28,550sf.
30'
' 'o.
Lot #2.
Arco • 12, 063 sl
0 zo.,
1� ....................
�..ts mer Q (Z�
P-11:1 IlWl — C; 6
I&L&O —dS L
I s -5 o c *j%U
lkliv:O/Ume 281
3000
ypage 510-513 so,
'•Zilkirly '2 0, 1989 %0 ip
N 76*39'07'W
L.1 OZ 4.t or
Arbor e Road
Ofi—qy
I N v
Legend - Summer Woods Associates
Property line / R 0 W Volume 281 Page 510-513
Iron pipe 10 be so, July 20, 1989
0 20 40 60 80 /00
Iron olpe found or set
o Concrete monument to too set
Traverse point
07tC11 basin —.Sar Sccle—
Qs/re soniforry triorinofe
Q)
Richard
Osam Terrace _:,j
QL
'A
Design whn Subdivision P/Cf
Drawn p/m
ZheCked
Scale / "a 20, do Anne Brill
Date Sept 1989
Project 85148.1 I Polchen Road South Burfington,'21ferhionf.
KREBS&LANSING Consulting Engineers, lacorpo led
10 Main Street, Colchester, Vermont 05446 -`., -', : n I �
E islinq Garage -
-01
00' a°Iroieq enwlopei --
a s uaiu.+rvry O
Bp'r•ar y°td
eeI°ocr 0 1 b y
10 �
--.30_ Lod #/ ,, rero B,
RiG°I'
-® 1 moo' Area = 28,550s1.
30,
$k.z
, ,eoc,
Io' I Lot
#2 11 m
Area = 12, 063 sJ.
O p ' • s
O an vne 3
�+ b N ,� Bvi/e,nq wwlovs -� ! tn•sr i f+islnp Noute 'll N
i O rv.col R
�• Summer d o E„t am ,
'
����0O�S
"{� f-- orege
y
kv A$$OC. T W G
!
�._�_-___- �R
tvolume 281 I n 30.00
Page 510 - 513 Jo' Iron, reedro•d
July 20, 1989 io b
87.45' y 2 _ 204. 40' Ia' : e. pro t./eoc•
;; �r• •,,..,.,. N 76 ° 39' 07' W tt:r N 76 ° 39 07 W _
w ass re pis/,et Oce
"ice 7
-.. . __ -� CB
a - _ Arbort Road
CB con
orireYey orrve.ar ori••.°�
Legend Summer Woods Associates
-- - — Properly fine / R.O.W. Volume 281 Page 510 - 5- 513
o lean pipe to be set July 20, 1989
® 0 2O 40 60 BO /00
/ion pipe found or set
o Concrete monument to beset
-jt- 7roverse paint [+
O ce Catch basin J Bar Scale
Os" Sanitary manhole /" = 2o'
£ �ry
s/I
t
sourN
BVRLIAVG N
� � t
Location Map
1" = 2000,
I
t3 -
O
Richard
OSN°
Terrace
whn Subdivision P/at
awn pfm
eckeo
Me l e Jo Anne Brill
to SPto L. 1989 _ - 4
,iect 8514B./ I Potchen Rood - :South Burlington; Vermont
KREBS W LANSING Consulting Engineers, Incorporated �`
10 Main Street, Colchester, Vermont 05446 `4 -
E-4
_Concrete
Volume /f/ Page 183
May J), 1973
3-,e 6' E
-179.62jo' Od.
�
1/0.00,
d
030'
1','
COI b
I Qu
Lot --#I
17-�
/01
Area = 28,550s1
JO'
0,
Lot -#2
Area 12,063sl
r ... ..
zo,
• 04
8-d", .... I.—
SUMME
E111-1 H.... ZD
Assoc.
Volume 281 -'a 00.
age 510-513 '."1 .,d
20,1989
tn
204.40'
IV 76 39 07 W N 76*39 07 W
OCB
-c-0
Arbor Road
Legend Summer Woods Associates
---- Properly 11ne I R O. W Volume 281 Page 510 - 513
* Iron pipe 10 be set duly 20, /969
0 20 40 60 80 /00
* Iron pipe found or set
* Concrete monument to be set
Traverse point
.0ce catch basin Bar Scale
OSMA Sanitary manhole /.. 20,
I
mh
all.
'0
sit
so(MI
BURLING
Location
Peg
2000,
13
40
Rlchcrd
cls-
Terrace
O
Des,q. whn Subdivision Plat
Drawn pfm
Checked
Scale• do Anne Brill
Date Sept 1989
Project ES148 Palchen Road South Burlington; Vermont
KREBS & LANSING Consulting Engineers, Incorporated
LIA10 Main Street, Colchester, Vermont 05446
Mena Concrete
Volume /// Page 183
May 31, 1973
E--q House
S
179 6j 0',,dl Y ... ...
S 8�2° 35� 2�
E - ------
/ 00
of
10
0-
30
JK�
Lot
f 11,
0 i
10 Area 28,55051
4
Lot #2
'a
to
Area > 12,063sl yjh
Iz.
(M
t
Q C,
Woods
I ku a.-V.
r
"Volume 281 I M In 50.00'
:Page 510-513 ijo" all
duty 20,1989
87.45'_ 204.40
.'76*J9'07'W ll 776-3.9-07-W
L5 5-
-1111.5 oca
UCB
f- Le/e2
Arbor G' Road
y N y V
Legend - Summer Woods Associates
Properly line IROW Volume 281 Page 510-513
o Ironolpe to be set July 20, 989
0 flo 40 60 80 /00
Iron P/Pe found or set
o Concrete monument to be set
7" Traverse point
"OCR catch bo$h? Bar Scale—
..Osmh sanitary manhole /., 20,
C .....
I.M1
Location -
2000,
CC
Richard.
CS"
Terrace
QL
hn w
on Subdivision Plot
rn Pfm
*ed
e /"z 20,
Jo Anne Brill
Seat 1989
DO 85148 Folchen Road —50.1h 8urfinoon, Vermont-
KREBS& LANSING Consulting Engineers, Incorporated
10 Main Street, Colchester, Vermont 05446
Z
Melva Concrete
Volume /// Page/83
May J/, 1973
--7110.00'
-4
ear card
WIWA
l(b
so' Lot #2 r lb
Area - 12.063sl
179. 2—
.1d- 0"
vrmca
0.11di.0
Lot — f /
Area - 28,550s.t
G mrr an.
Z
ummer c:i
lr Lj
;„Assoc.
�VOlume 281 M M 30.0
0
!fog* '510 - 513 30, 1 1.11
wc.
Yju/y zo, /989 iO 10
Ci
87.45' in _7204. 40 6� �4 0.". w
6*39 o; N 76*39'07'W
Ocs f--, Neees
Uce
`Coe tt'Ier
� - Le/ •P Lor
- Arbor sw Rood
V N V N orne.or y
Legend Summer Woods Associates
Property line R 0 W Volume 281 Page 510 - 513
0 Iron pipe to be set July 20, /989
0 20 40 60 80 /00
8 Iron pipe found or set
O Concrete monument to be set
.7'. traverse point
,Ocfi Catch basin Ecr Sccle
Osmh Sanitary manhole I" z 20,
30
roar raid
'.1
.7,
OURUNGrON
4-1
1"-2000,
Richard
cls— Terrace
(b
lZ3
` IV$
sign whnSubdivision Plot
awn pfm
ecked
Ale .10 Anne Brill
to Sept. 1989
elect Potchen Road.:South 8,,finitVermont.`, Vermont.`
KREBS & LANSING Consulting Engineers, Incorporated
-A 10 Main Street, Colchester, Vermont 03446 t�
CITY OF SCX TH PMPLINIMON
Subdivision Application - SKE C,H PLAN
1) Name, address, and phone number of:
a. Owner of record Joanne Brill 878-
RD 1, Box 890 Woods Hollow Road _
Westford, VT 05494
b. Applicant
c. Contact person same
2) Purpose, location, and nature of subdivision or development, including
number of lots, units, or parcels and proposed use(s).
Create two (2) residential lots from the property at
173 Patchen Rd. One lot with existing house and garage, the
second lot will front on Larch Road.
3) Applicant's legal interest in the property (fee simple, option, etc)
fee simple
4) Names of owners of record of all contiguous properties
Melna Concrete, Summer Woods Assoc.
5) Type of existing or proposed encumbrances on property such as easements,
covenants, leases, rights of way, etc.
N/A
6) Proposed extension, relocation, or modification of municipal.
facilities such as sanitary sewer,
storm drainage, etc.
N/A
water supply, streets,
7) Describe any previous actions taken by the 'Zoning Board of
Adjustment or by the South Burlington Planning Commission
which affect the proposed subdivision, and include the dates
of such actions:
none
8) Submit five copies and one reduced copy (8 1/2 x 11 or 8 1/2
x 14) of a sketch plan showing the following information:
1) Name of owners of record of contiguous properties.
2) Boundaries and area of: (a) all contiguous land
belonging to owner of record and (b) proposed
subdivision.
3) Existing and proposed layout of property lines; type and
location of existing and proposed restrictions on land,
such as easements and covenants.
4) Type of, location, and approximate size of existing and
proposed streets, utilities, and open space.
5) Date, true north arrow and scale (numerical and graphic).
6) Location map, showing relation of proposed subdivision to
adjacent property and surrounding area.
1C
(Signature) applicant or contact person —� date
-2-
M E M O R A N D U M
To: South Burlington Planning Commission
From: William J. Szymanski, City Engineer
Re: August 29, 1989 agenda items
Date August 25, 1989
3) L & M PARK, SHELBURNE ROAD
Streets should be public built to City standards. They shall be
looped together or terminate with a cul-de-sac, also no parking
turnoffs as plan shows. Intersecting streets shall line up and
not offset.
4) DEGRAFF PROPERTY, PATCHEN ROAD = KIRBY ROAD
1. There should be a pedestrian easement to the City Park to
serve this neighborhood. The land was acquired to serve as a
neighborhood park. The only other access to the park is from
Clover Street.
2. Another set of inlets should be placed at approximately sta.
12 + 25 and tied into the inlet at 10 + 25. The pipe may follow
the street curve.
3. A construction easement will be required from lot 17 for the
reconstruction of Patchen Road. That easement shall be granted
before any sale of that lot.
6) BRILL PROPERTY, PATCHEN ROAD
Two lot subdivision plan dated August 17, 1989 is acceptable.
7) COMMUNITY BIBLE CHURCH, WILLISTON ROAD
Plan dated 8/14/89, titled Community Bible Church prepared by
Trudell Consulting Engineers is acceptable.