HomeMy WebLinkAboutBATCH - Supplemental - 0078 Bartlett Bay Roadsouthburfington
PLANNING & ZONING
May 2, 2018
Re: #CU-18-05 — 78 Bartlett Bay Rd
Dear Applicant:
Enclosed, please find a copy of the Findings of Fact and Decision rendered by the
Development Review Board concerning your recent applications. Please note the
conditions of approval including that a zoning permit must be obtained within six (6)
months.
If you have any questions, please contact me.
Sincerely,
Marla Keene
Development Review Planner
Encl.
CERTIFIED MAIL -Return Receipt Requested # 7018 0040 0000 0165 3024
575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101
www.sburi.com
theOther Paper • otherpapervt.com • March 29, 2018 • 19
day Concerns for Pets
fusing them to choke or
. blockage in their intes-
ict. Fake grass may look
:hew on and play with to
s, but it can cause them
.e or obstruct their intes-
ingested. Cats especially
chew on (and swallow)
ingy things like fake grass
:an cause severe damage
m death if it gets caught
intestines.
cies of Easter lilies are
toxic to cats. Even simply
the pollen or eating one
:ertain species can cause
�atening kidney failure in
his is even more heart-
ig as often it is younger
who are affected as they
ie tendency to get into
everything. If your cat chews
on or eats any part of an Easter
lily, call your veterinarian im-
mediately.
There is no doubt bunnies and
chicks are impossibly cute when
they're little. The reality is that
they grow up to be adult rabbits
and chickens who have housing,
feeding, and handling require-
ments that most people do not
know about. While chickens can
make excellent pets, Vermont
State lawrequires that a minimum
of six chicks be purchased at a .
time. This is to prevent neglect
of individual chickens purchased
on impulse during the holiday for
pets or gifts. Further, chickens are
flock animals, and do not do well
individually. Shelters are often
inundated with rabbits after Eas-
ter, and most are not equipped to
take in a large number of rabbits..
A serious misconception is that
they can simply be released into
the wild, which is not true as they
often starve to death or become
easy prey for predators. If you .
are not prepared to take care of
your bunny or a small flock of
chickens in the long run, stick to
chocolate rabbits and peeps; they
are easy to care for and don t stay
around long.
)VMfor the VermontVeterinaryMedicalAssociataon. TheVVMA,
?n of370 veterinarians dedicated to compassionate animal care
e from $5 to $20 each. 802-
5. (03/22)
[AMPOOER: Sears Kenmore
.mpooer-Floor Polisher, like
,d only afew times. $60.914-
0. (3/29)
4 virtually new all -season
)odyear Eagle LS-2 245-18,
iven on for approximately
es, purchased new car and
ig to winter/summer tires.
all four, cash only. 802-578-
115v/60hz, 90-amp output (25-135
amps), like new, used once, with
tank, gas, wire, auto -light helmet,
gloves, cart, manuals (operators,
repair, parts list, instruction), $700.
MITER SAW, Delta, compound, 10
inch, new -in box, $150. PRESSURE
WASHER: Craftsman, never -used,
2,400 PSI, 2.2 GPM, 6.5 HP, extra 25-
foot hose for gutters, $300. RADIAL
ARM SAW. Craftsman,10 inch, with
stand, perfect condition, $150.802-
863-2135.(03/22)
3/22) WINE RACKS: Two free-standing
black metal wine racks. Each rack
3 EQUIPMENT: CHAIN- holds sixbottles. $10 each or $15 for
hnt}i Rn7_dQ7_11dR ROM
PUBLIC HEARING
SOUTH BURU NGTON DEVELOPMENT REVIEW BOARD
The South Burlington Development Review Board will hold a pub-
lic hearing in the South Burlington City Hall Conference Room,
575 Dorset Street, South Burlington, Vermont on TuesdayApril 17,
2018 at 7:00 P.M. to consider the following:
Conditional use application #CU-18-05 of Seventy Eight Bartlett
Bay Road, LLC to replace an existing deck and make minor modi-
fications thereto, 78 Bartlett Bay Road.
Bill Miller, Chair
South Burlington Development Review Board
A copy of the application is available for public inspection at the
South Burlington City Hall. Participation in the local proceeding
is a prerequisite to the right to take any subsequent appeal.
March 29, 2018
After 30 years Greg vernet has decided to retire
from the Thomas Hirchak Company
and we are looking to fill his critical role.
Auction Manager — THCo Auto Auction
Primary responsibilities include working closely with sellers,
intake of vehicles, auction setup on -site and within our auction
software, managing documentation and coordinating routine
responsibilities of the yard crew.
Requirements:
• Excellent customer service in a busy, on -your -feet job
• Computer knowledge
• Auto industry experience
• Experience with titles and transfer paperwork involved in
the sale of vehicles
• Basic accounting and business management
We offer a competitive salary, great benefits including 401K
and health insurance.
Hours Monday -Friday, 8-5 and Saturdays until the auction is
closed.
Email your resume to Terry@THCAuction.com
CITY OF SOUTH BURLINGTON CERTIFICATE OF SERVICE
I hereby certify that on this 28th day of March , 2018 , a copy of the foregoing public
notice for Conditional Use [type of application] # CU-18-05 [application number], was
sent by U.S. mail, postage prepaid to the owners of all properties adjoining the subject property
to development, without regard to any public right-of-way, and including the description of the
property and accompanying information provided by the City of South Burlington. I further
certify that this notification was provided to the following parties in accordance with 24 V.S.A.
§4464(a) and Section 17.06(B) of the South Burlington Land Development Regulations:
List of recipients:
(full names and addresses)
Rosalee A. Sproute, Trust 76 Bartlett Bay Rd., South Burlington, VT 05403
Michael D. Sirotkin 80 Bartlett Bay Rd., South Burlington, VT 05403
Dated at So. Burling[town/city], Vermont, this 28th day of March , 2018
Printed Name: Amy T. Marks
Phone number and email: 80-864-232, 3 1 aM@cea-vt.com
Signature: f'iZC
Date:
i f
Remit to: City of South Burlington
Department of Planning & Zoning
575 Dorset Street
South Burlington, VT 05403
South Burlington Sample Certificate of Service Form. Rev. 1-2012
Richard Reed
Seventy Eight Bartlett Bay Road, LLC
Adjoiner List
78 Bartlett Bay Road — Tax Map Parcel 0130-00078
March 8, 2018
Parcel ID #
0130-00076
Property Location:
76 Bartlett Bay Road
Parcel ID #
0130-00080
Property Location:
80 Bartlett Bay Road
Owner of Record
Rosalee A. Sprout, Trustee
76 Bartlett Bay Rd
South Burlington, VT 05403
Owner of Record
Michael D. Sirotkin
80 Bartlett Bay Rd
South Burlington, VT 05403
1/1
TO: South Burlington property owners
SUBJECT: Application before the Development Review Board for an abutting property
The enclosed Development Review Board public notice or agenda is being sent to you
because you have been identified as an abutting landowner to a proposed land
development listed on the attachment. The distribution of this information to the abutting
landowners is required by state law. You are encouraged to attend and participate in the
public hearing as participation in the local proceeding is a prerequisite to the right to
take any subsequent appeal.
Should you have any questions about the proposal, or wish to view the submittals,
please contact the South Burlington Department of Planning & Zoning. They can be
reached at (802) 846-4106 or at City of South Burlington, Department of Planning &
Zoning, 575 Dorset Street, South Burlington, VT 05403.
Approved for Distribution by South Burlington Department of Planning & Zoning
r
southbnrlinoon
PLANNING & ZONING
PUBLIC HEARING
SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD
The South Burlington Development Review Board will hold a public hearing in the South Burlington City
Hall Conference Room, 575 Dorset Street, South Burlington, Vermont on Tuesday April 17, 2018 at 7:00
P.M. to consider the following:
Conditional use application #CU-18-05 of Seventy Eight Bartlett Bay Road, LLC to replace an
existing deck and make minor modifications thereto, 78 Bartlett Bay Road.
Bill Miller, Chair
South Burlington Development Review Board
A copy of the application is available for public inspection at the South Burlington City Hall. Participation
in the local proceeding is a prerequisite to the right to take any subsequent appeal.
March 29, 2018
575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com
Cl8/1! E1*'� Irll IEEAll Ir r���JC1,XtES, lHC.
10 Mansfield View Lane
South Burlington, VT 05403
March 13, 2018
Raymond Belair
Administrative Officer
City of South Burlington
Department of Planning & Zoning
575 Dorset Street
South Burlington, VT 05403
Re: 78 Bartlett Bay Road — Deck Replacement
Conditional Use Application
Dear Ray,
Phone: 802-864-2323
Fax: 802-864-2271
E-Mail: mail@cea-vtxom
RECEIVED
MAR 13 2018
City of So. Burlington
Please find enclosed Conditional Use Application, site plans, adjoiner list, and $178.00 application fee for
the proposed replacement of an existing deck at 78 Bartlett Bay Road in the Lakeshore Neighborhood (LN)
Zoning District.
The applicant and land owner, Seventy Eight Bartlett Bay Road, LLC c/o Dick Reed, is proposing the
replacement of an existing deck. The existing deck footings may need replacement (to be verified by
contractor). If the footings require replacement, silt fence will be installed and any necessary equipment
will access the rear yard along the north side of the house. Please see attached site plans, including erosion
details and specifications, for details.
The applicant would like to please be added to the April 17, 2018 Development Review Board Agenda.
Should you have any questions or wish to discuss the project in greater detail, please feel free to contact me.
Respectfully,
Michael Koch
Staff Engineer
Enclosures: Application, plan set, adjoiner list, and $178.00 application fee
cc: Dick Reed, CEA File 17195
P:\AutoCADD Projects\2017\17195\3-Pennitting\l-Local Applications\Conditional Use - Deck Replacement\Cover Letter.docx
l
10
southburlington
PLANNING A ZONING
Application # "-/8 - 05
(office use only)
CONDITIONAL USE / VARIANCE / MISCELLANEOUS
APPLICATION FOR THE DEVELOPMENT REVIEW BOARD
All information requested on this application must be completed in full. Failure to provide the requested
information either on this application form or on the site plan will result in your application being rejected and a
delay in the review before the Development Review Board.
Type of application (check one):
Miscellaneous Application
Request for a conditional use
Request for a variance
1) OWNER(S) OF RECORD (Name(s) as shown on deed, mailing address, phone & fax #):
Seventy Eight Bartlett Bay Road, LLC c/o Richard R. Reed, 78 Bartlett Bay Road, South Burlington, VT 05403, (802) 238-6363,
smilesofvt.reed@aol.com
2) LOCATION OF LAST RECORDED DEED (book & page #) Book: 395 & Page: 1-2
3) APPLICANT (name, mailing address, phone, fax #)
Seventy Eight Bartlett Bay Road, LLC, c/o Richard R. Reed, 78 Bartlett Bay Road, South Burlington, VT 05403, (802) 238-6363,
smilesofvt.reed@aol.com
4) CONTACT PERSON (person who will receive staff correspondence. Include name, mailing address, phone &
fax #, if different from above):
Civil Engineering Associates, c/o Michael Koch, 10 Mansfield View Lane, South Burlington, VT 05403, (802) 864-2323 ext. 309
a. Contact e-mail address: mkoch@cea-vt.com
5) PROJECT STREET ADDRESS: 78 Bartlett Bay Road
6) TAX PARCEL ID #: 0130-00078
575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburi.com
7) PROJECT DESCRIPTION
a. General Project Description (describe what you are proposing): This application proposes the replacement of
an existing deck. Existing footings to be replaced as needed (to be verified by contractor). If the footings require replacement, silt fence
will be installed and any necessary equipment will access the rear yard along the north side of the house. Please refer to attached site
plan set for details.
b. Existing Uses on Property (including description and size of each separate use):
Single-family residence
c. Proposed Uses on Property (include description and size of each new use and existing uses to remain):
No change in use is proposed as part of this application.
d. Total building square footage on property (proposed buildings & existing building to remain):
Existing: 3,165 SF, Proposed: 3,165 SF
e. Height of building & number of floors (proposed buildings and existing buildings to remain, specify if
basement & mezzanine): No changes to the existing single-family residence building are proposed.
f. Number of residential Units (if applicable, new units & existing units to remain):
Existing: 1, Proposed: 1
g. Number of employees & company vehicles (existing & proposed, note office vs. non -office employees):
Not applicable.
h. Other (list any other information pertinent to this application not specifically requested above, please note
if overlay districts are applicable): Flood Plain Overlay District
8) LOT COVERAGE
a. Total parcel size: 13,380
b. Buildings: Existing 24
Proposed 24
Ft.
3,165 Sq. Ft
3,165 Sq. Ft.
2 Conditional Use / Variance / Miscellaneous Application Form. Rev. 2-2018
l
c. Overall impervious coverage (building, parking, outside storage, etc)
Existing 32 % / 4,245 Sq. Ft.
Proposed 32 % / 4,300 Sq. Ft.
Front yard impervious coverage (building, parking, outside storage, etc)
Existing 32 % / 620 Sq. Ft.
Proposed 32 % / 620 Sq. Ft.
e. Total area to be disturbed during construction: 700 Sq. Ft.
* Projects disturbing more than one-half acre of land must follow the City's specifications for erosion control in
Article 16 of the Land Development Regulations. Projects disturbing more than one acre require a permit from
the Vermont Department of Environmental Conservation.
9) COST ESTIMATES
a. Building (including interior renovations)
b. Landscaping
15,000 - $17,000
$ No landscaping is proposed.
c. Other site improvements (please list with cost):
No other site improvements are proposed as part of this application.
10) ESTIMATED TRAFFIC:
a. P.M. Peak hour for entire property (in and out): No change in traffic is proposed.
11) PEAK HOURS OF OPERATION No change in traffic is proposed.
12) PEAK DAYS OF OPERATION No change in traffic is proposed
13) ESTIMATED PROJECT COMPLETION DATE Summer, 2018
14) PLANS AND FEE
Plans shall be submitted which shows the information required by the City's Land Development Regulations.
Three (3) regular size copies, one reduced copy (11" x 17"), and one digital (PDF-format) copy of the plans must
be submitted. A subdivision application fee shall be paid to the City at the time of submitting the application.
See the City fee schedule for details.
NOTE: NOTIFICATION of ADJOINING PROPERTY OWNERS: Notification of adjoining property owners, in
accordance with 24 V.S.A. §4464(a) and Section 17.06(B) of the South Burlington Land Development
Regulations, is the responsibility of the applicant. After deeming an application complete, the Administrative
Officer will provide the applicant with a draft meeting agendas or public hearing notice and sample certificate of
service. The sworn certificate of service shall be returned to the City prior to the start of any public hearing.
Conditional Use / Variance / Miscellaneous Application Form. Rev. 2-2018
Mar.12. 2018 2:1?PM
( No, 2570 P. 1
1 hereby certify that all the information requested as part of this application has been submitted and is accurate
to the best of my knowledge.
4
Ae " Leo&
SIGNATURE OF APPLICANT
�I
SIGNATURE OF PROP RTY OWNER PRINT NAME
Do not write below this line
DATE OF SUBMISSION: 3113
I have 3:PLETE
this application and find it to be:
Incomplete
c,3
Admin
�V (8
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits forthis
project. Call (802) 879-5676 to speak with the regional Permit Specialist-
4 Cnnditim7al Use / Variance 1 Mixoftneous Application Fotn►. Rev, 2 2018
I
Richard Reed
Seventy Eight Bartlett Bay Road, LLC
Adjoiner List
78 Bartlett Bay Road — Tax Map Parcel 0130-00078
March 8, 2018
Parcel ID #
0130-00076
Property Location:
76 Bartlett Bay Road
Parcel ID #
0130-00080
Property Location:
80 Bartlett Bay Road
Owner of Record
Rosalee A. Sprout, Trustee
76 Bartlett Bay Rd
South Burlington, VT 05403
Owner of Record
Michael D. Sirotkin
80 Bartlett Bay Rd
South Burlington, VT 05403
1/1
�N
c
KOuSE
�E„r�R ace
� k1R 1 �'� s♦
OLO 5TV-P5
RND OP,CI�
2
i 95'
NOTES
RNV 5-Ml< uNIT5
r�RE Q OTH FO R I IAOLC AN V U SU4 i b� E
LOWER STAY? UNIT To et:
R E IMOVEP "K WI NfEK
1 ATFORK15 I D r ra v! 12E STo'z IN6
OI< 74GK,5 NN r2 L.t r'T
�izope r-ry L.+►� E
K, nuv
Ygovoev STAiQS ANq PJA'rroRRI
i" - Id 5 c a L.E
Introduction
Maintenance.
Mulching Rates
• Remove accumulated sediment before it is halfway up the fence
April 15 - Sept 15 -- Hay or Straw 1 inch deep (1-2 bales/1000 s f )
This project is subject to the terms and conditions of the authorization
• Ensure that silt fence is trenched in ground and there are no gaps
Sept 15 - April 15 -- Hay or Straw 2 in deep (2-4 bales/1000 s I)
from the State of Vermont to discharge construction related storm water
runoff
5 Divert Upland Runoff
Erosion Control Matting
As per manufacturer's instructions
Coverage under the State Construction General Permit 3-9020 is
Purpose:
required for any construction activity that disturbs 1 or more acres of
Diversion berms intercept runoff from above the construction site and
Hydroseed
land, or is part of a larger development plan that will disturb 1 or more
direct it around the disturbed area. This prevents clean water from
As per manufacturer's instructions
acres
becoming muddied with sod from the construction site
9 Winter Stabilization
This project has been deemed to quality as a Low Risk Site which is
Requirements:
subject to the erosion prevention and sediment control (EPSC)
If storm water runs onto your site from upslope areas and your site
Purpose:
standards set for in the State of Vermonfs
meets the following two conditions, you must install a diversion berm
Managing construction sites to minimize erosion and prevent sediment
Low Risk Site Handbook for Erosion Prevention and Sediment
before disturbing any soil
loading of waters is a year-round challenge In Vermont, this challenge
1 You plan to have one or more acres of soil exposed at any one time
becomes even greater during the late fall, winter, and early spring
_Control
(excluding roads)
months
The following narrative and implementation requirements represent the
2 Average slope of the disturbed area is 20% or steeper
'Winter construction' as discussed here, describes the period between
minimum standard for which this Site is required to be maintained as
October 15 and April 15, when erosion prevention and sediment control
regulated by the State of Vermont
How to install:
is significantly more difficult
1 Compact the berm with a shovel or earth -moving equipment
Rains in late fall, thaws throughout the winter, and spring melt and rains
Any best management practices (BMPs) depicted on the project's EPSC
2 Seed and mulch berm or cover with erosion control matting
can produce significant flows over frozen and saturated ground, greatly
Site plan which go beyond the Handbook requirements are considered
immediately after installation
increasing the potential for erosion
to be integral to the management of the site and represent components
3 Stabilize the flow channel with seed and straw mulch or erosion
of the municipal EPSC approval for the project which shall be
control matting Line the channel with 4 inch stone if the channel
Requirements for Winter Shutdown:
Implemented
slope is greater than 20%
For those projects that will complete earth disturbance activities poor to
4 Ensure the berm drains to an outlet stabilized with oprap Ensure that
the winter period (October 15), the following requirements must be
The EPSC plan depicts one snap shot in time of the site All
there is no woslon at the outlet
adhered to
construction sites we fluid in their day to day exposures and nsks as it
5 The diversion berm shall remain in place until the disturbed areas are
1 For areas to be stabilized by vegetation, seeding shall be completed
relates to minimizing sediment loss from the site It Is the
completely stabilized
no later than September 15 to ensure adequate growth and cover
responsibility of the Contractor to Implement the necessary Sli
2 If seeding is not completed by September 15, additional
to comply with the Low Risk Handbook standards outlined on this
6 Slow Down Channelized Runoff
non -vegetative protection must be used to stabilize the site for the
sheet based on the Interim site disturbance conditions which may or
winter period This includes use of Erosion Control Matting or netting
may not be shown on the EPSC Site Plan
Purpose:
of a heavy mulch layer Seeding with winter rye is recommended to
Stone check dams reduce erosion in drainage channels by slowing
allow for early germination during wet spring conditions
Specific BMPs which are critical to allowing the project to be considered
down the storm water flow
3 Where mulch is specified, apply roughly 2 inches with an 80-90%
a Low nsk site include the items checked below
cover Mulch should be tracked In or stabilized wdh netting in open
Requirements:
areas vulnerable to wind
• Limit the amount of disturbed earth to two acres or less at any one
If there is a concentrated How (a g in a ditch or channel) of storm water
time
on your site, then you must install stone check dams Hay bales must
Requirements for Winter Construction
• There shall be a maximum of 7 consecutive days of disturbed earth
not be used as check dams
If construction activities involving earth disturbance continue past
exposure in any location before temporary or final stabilization is
October 15 or begin before April 15, the following requirements must be
implemented
How to Install:
adhered to
Height: No greater than 2 feet Center of dam should be 9 inches lower
1 Enlarged access points, stabilized to provide for snow stockpiling
1 Mark Site Boundaries
than the side elevation
2 Limits of disturbance moved or replaced to reflect boundary of winter
Slde slop.*: 2 1 or flatter
work.
Purpose.
Stone size: Use a mixture of 2 to 9 inch stone
3 A snow management plan prepared with adequate storage and
Mark the site boundaries to identify the limits of construction Delineating
Width: Dams should span the width of the channel and extend up the
control of meltwater, requiring cleared snow to be stored down slope
your site will help to limit the area of disturbance, preserve existing
sides of the banks
of all areas of disturbance and out of storm water treatment structures
vegetation and limit erosion potential on the site
Spacing: Space the dams so that the bottom (toe) of the upstream dam
4 A minimum 25 foot buffer shall be maintained from perimeter controls
is at the elevation of the top (crest) of the downstream dam This
such as silt fence
How to comply:
spacing is equal to the height of the check dam divided by the channel
5 In areas of disturbance that drain to a water body Within 100 feet, two
Before beginning construction, walk the site boundaries and flag trees,
slope
rows of silt fence must be installed along the contour
post signs, or install orange safety fence Fence is required on any
Spacing (in feet) = Height of check dam (in feet)/Slope in channel (iVft)
6 Drainage structures must be kept open and free of snow and ice
boundary within 50 feet of a stream, lake, pond or wetland, unless the
dams
area is already developed (existing roads, buildings, etc.)
Maintenance:
7 Stilt fence and other practices requiring earth disturbance must be
Remove sediment accumulated behind the dam as needed to allow
installed ahead of frozen ground
2 Limit Disturbance Area
channel to drain through the stone check dam and prevent large flows
8 Mulch used for temporary stabilization must be applied at double the
from carrying sediment Over the dam, If significant erosion occurs
standard rate, or a minimum of 3 inches with an 80-90% cover
Purpose.
between check dams, a Inver of stone should be installed
9 To ensure cover of disturbed sod in advance of a melt event, areas of
Limit the amount of sod exposed at one time to reduce the potential
disturbed sod must be stabilized at the and of each work day, with the
erosion on site
7 Construct Permanent Controls
following exceptions
• If no precipitation within 24 hours is forecast and work will resume
Requirements:
Purpose:
in the same disturbed area within 24 hours, daily stabilization Is not
The permitted disturbance area is specified on the site's written
Permanent storm water treatment practices are constructed to maintain
necessary
authonzabon to discharge Only the acreage listed on the authonzation
water quality, ensure groundwater flows, and prevent downstream
. Disturbed areas that collect and retain runoff, such as house
form may be exposed at any given time
flooding Practices include detention ponds and wetlands, infiltration
foundations or open utility trenches
basins, and storm water fitters
10 Prior to stabilization, snow or ice must be removed to less than 1
How to comply:
inch thickness.
Plan ahead and phase the construction activities to ensure that no more
Requirements:
11 Use Slone to stabilize areas such as the perimeter of buildings
than the permitted acreage is disturbed at one time Be sure to property
If the total Impervious- area on your site, or within the common plan of
under construction or where construction vehicle traffic is anticipated
stabilize exposed soil with seed and mulch or erosion control mamng
development, will be 1 or more acres, you must apply for a State Storm
Stone paths should be 10 to 20 feet wide to accommodate vehicular
before beginning work in a new section of the site
water Discharge Permit and construct permanent storm water treatment
traffic
practices on your site These practices must be installed before the
3 Stabilize Construction Entrance
construction of any impervious surfaces
10 Stabilize Soil at Final Grade
Purpose.
How to comply:
Purpose:
A stabilized construction entrance helps remove mud from vehicle
Contact the Vermont Storm water Program and follow the requirements
Stabilizing the site with seed and mulch or erosion control matting when
wheels to prevent tracking onto streets
in the Vermont Storm water Management Manual The Storm water
It reaches final grade Is the best way to prevent erosion while
Management Manual is available at
construction continues
Requirements:
www vtwaterquality org/stormwater htm
If there will be any vehicle traffic off of the construction site, you must
-An Impervious surface is a manmade surface, including, but
Requirements:
install a stabilized construction entrance before construction begins
not limited to, paved and unpaved roads, parking areas, roofs,
Within 48 hours of final grading, the exposed soil must be seeded and
driveways, and walkways, from which precipitation runs off rather
mulched or covered with erosion control matting
How to Install
than infiltrates
Rock Size: Use a mix of 1 to 4 inch stone
How to comply:
Depth: a inches minimum
8 Stabilize Exposed Soil
Bring the site or sections of the site to final grade as soon as possible
Width: 12 feet minimum
after construction is completed This will reduce me need for additional
Length: 40 feet minimum (or length of driveway, hf shorter)
Purpose:
sediment and erosion control measures and will reduce the total
Gaotextlle: Place filter cloth under entire gravel bad
Seeding and mulching, applying erosion control matting, and
disturbed area
hydroseedhng are all methods to stabilize exposed soil. Mulches and
For Seeding and mulching rates, follow the spacrficalions under Rule 8,
Maintenance:
matting protect the soil surface while grass is establishing
Stabilizing Exposed Soil
Redress with clean stone as required to keep sediment from tracking
onto the street
Requirements:
11 Dewatenng Activities
All areas of disturbance must have temporary or permanent stabilization
4 Install Silt Fence
within 7.14. or 21 days of indhal disturbance, as stated in the project
Purpose:
authorization After this time, any disturbance in the was must be
Treat water pumped from dewatenng actwthes so that it is clear when
Purpose:
stabilized at the end of each work day
leaving the construction site
Silt fences intercept runoff and allow suspended sediment to settle out
The following exceptions apply,
Requirements:
Requirements:
Water from dewaterhng activities that flows off of the construction ace
Silt fence must be installed.
• Stabilization is not required If earthwork is to continue in the area
must be clear Water must not be pumped into storm sewers, lakes, or
• on the downhill side or the construction activities
within the next 24 hours and there is no precipitation forecast for
wetlands unless the water is clear
• between any ditch, Swale, storm sewer inlet, or waters of the Stale
the next 24 hours
and the disturbed sod
Stabilization is not required it the work is occurring in a
How to comply:
• Hay bales must not be used as sediment barriers due to their
self-contained excavation (I a no outlet) with a depth of 2 feet or
Using sock filters or sediment filter bags on dewatering discharge hoses
tendency to degrade and fall apart
greater (e g house foundation excavation, utility trenches)
or pipes, discharge water into silt fence enclosures installed in vegetated
areas away from waterways Remove accumulated sediment attar the
are to place:
All areas of disturbance must have permanent stabilization within 48
water has dispersed and stabilize the area with seed and mulch
r• Place sift fence on the downhill edge of bare soil At the bottom of
hours of reaching final grade
slopes, place Iona 10 feet downhill from the and of the slope (it
12 Inspect Your Site
space is available)
How to comply:
• Ensure the sit fence catches all runoff from bare soil
Prepare bare soil for seeding by grading the top 3 to 6 inches of soil and
Purpose:
• Maximum drainage area is Y. acre for 100 feet of silt fence
removing any large rocks or debris
Perform site inspections to ensure that all sediment and erosion control
• Install silt fence across the slope (not up and down hillsl)
practices are functioning properly Regular inspections and maintenance
• Install multiple rows of sit fence on long hills to break up flow
Seeding Rates for Temporary Stabilization
of practices will help to reduce costs and protect water quality
• Do not install silt fence across ditches, channels. or streams or in
April 15 - Sept 15 --- Ryegress (annual or perennial. 20lbs/acre)
stream buffers
Sept 15 - April 15 — Winter rye, 120lbs/acre
Requirements:
Inspect the site at least once every 7 days and after every rainfall or
How to Install sift fence.
Seeding Rates for Final Stabilization Choose
snow melt that results in a discharge from the site Perform maintenance
• Dig a trench 6 inches deep across the slope
to ensure that practices are functioning according to the specifications
• Unroll silt fence along the trench
�> a+rFtiV sraua tw
outlined in this handbook
• Ensure stakes are on the downhill side of the fence
moo>e Rom. bs ,acre b: 1000s a
2F usm0 hlda 31 0l
• Join fencing by rolling the and stakes together
In the event of a noticeable sediment discharge from the construction
• Drive stakes in against downhill side of trench
C.— white cloow Cb®on
site, you must take immediate action to inspect and maintain existing
• Drive stakes until 16 inches of fabric is In trench
4a
erosion prevention and sediment control practices. Any visibly
• Push fabnc into trench, spread along bottom
0 E'ncee KY-3 VRebel I tol
discolored storm water runoff to waters of the State must be reported
• Fill trench with soil and pack down
W+
Forms for reporting discharges are available at
Red10 canon.*21
vtwaterquality org/stormwater him
I4iln Siul�v51 el
w
1-hLx25 uch ofELpae arM hdee CMSSOts ofRYtl>Ibot
.,
and216s whttcloverperacrt
WOVEN WIRE FENCE (MIN.
14 GAUGE w/MAX. 8' MESH
SPACING)
FILTER FABRIC TO BE
POST MIRAFI 10OX OR APPROVED
EQUAL
? POST SPACING
zY, wooD z.r
POST 10'
4x4 WOOD 10'
Z
7
Tr FILTER FABRIC TO BE
CLIPPED, BACKFILLED AND
TAMPED W BELOW GRADE
STEEL OR WOOD STAKES
NOTES. (SEE CHART AT RIGHT)
1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES.
WIRE FENCE REINFORCEMENT REQUIRED WITHIN 100 FT UPSLOPE OF RECEIVING
WATERS.
2. INSTALL MIRAFI ENVIROFENCE, OR APPROVED EQUAL OR AS DETAILED HEREIN.
3. INSTALL SILT FENCES AT TOES OF ALL UNPROTECTED SLOPES AND AS PARALLEL TO
CONTOURS AS POSSIBLE. THIS INCLUDES ALL FILLED OR UNPROTECTED SLOPES
CREATED DURING CONSTRUCTION, NOT NECESSARILY REFLECTED ON THE FINAL
PUNS. CURVE THE ENDS OF THE FENCE UP INTO THE SLOPE. REMOVE SEDIMENT
WHEN ACCUMULATED TO HALF THE HEIGHT OF THE FENCE. SILT FENCES ARE TO BE
MAINTAINED UNTIL SLOPES ARE STABILIZED.
4. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER, THEY SHALL BE
OVERLAPPED BY S", FOLDED AND STAPLED.
SILT FENCE DETAIL
N.T.S.
EaU, REVISED 09/24/2014
i
PLASTIC ORANGE
CONSTRUCTION FENCE
f �
WOOD POST
f
>� 1
EXISTING GRADE
NATIVE MATERIAL
CONSTRUCTION FENCE DETAIL
N.T.S.
U,
iu E-002 REMBED 09/01/2014
SANDBAGS OR
CONTINUOUS BERM OF
SPILLWAY
Atli,NOTE:
EQUIVALENT HEIGHT
T USE SANDBAGS OR OTHER
APPROVED METHODS TO
SUPPLY WATER TO WASH
WHEELS IF NECESSARY
\ i
\ CHANNELIZE RUNOFF TO
BASIN AS REQUIRED
— — TEMPORARY SEEDING IL MULCH
OR NETTING
\ SILT FENCE OR HAY
�\ BALESINSTALLED ON
\ DOWN GRADIENT SIDE
TEMPORARY STOCKPILE DETAIL
NTS
ps�
yi E.1 REVISEDOa/O1/2014
POSTS 1. SET POSTS AND 2. ATTACH SILT FENCE
ANGLE 10- EXCAVATE A 4"XE" AND EXTEND IT TO
AN
AN L 1 FOR TRENCH, SET POST SILT THE TRENCH.
DOWNSLOPE. FENCE
STABILITY AND
SELF CLEANING
1I l I
3. STAPLE THE SILT
COMPACTED —, FENCING TO THE
BACKFILL END POSTS.
BACKFILL TRENCH.
III
SILT FENCE CONSTRUCTION DETAIL
N.T.S.
E4)07 REVISED OU01/2014
DIVERSION RIDGE HEATER
WHERE GRADE EXCEEDS 2% 2��
ROADWAY
FILTER FABRIC
SECTION A -A
f
NOTES:
rA
3 A
D
,• -F-:
2"-3" (50-75mm) COURSE �� �,- - _
d �:
M INTAINED IN A CONDITION THAT WILL PREVENT
1. THE ENTRANCE SHALL BE A
L
a�L'
� AGGREGATE MIN. E" °= ti V
TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY
_�
(150mm) THICK y, �.,-tip,
REQUIRE TOP DRESSING, REPAIR AND/OR CLEAN OUT OF ANY MEASURES USED TO
o
TRAP SEDIMENT.
�
SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC
2. WHEN NECESSARY WHEELS S L
,
RIGHT-OF-WAY.
3. WHEN WASHING IS REQUIRED. IT SHALL BE DONE ON AN AREA STABILIZED WITH
DIVERSION RIDGE
CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT
50' MIN.
BASIN.
PLAN VIEW
STABILIZED CONSTRUCTION ENTRANCE
N.T.S.
E-0 REVISED 0e/01/2014
CIVIL ENGINEERING ASSOCIArES. INC.
10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 0540
P L02-064-2022 web wwwcea-Ncw
DRAWN
GAC
CHECKED
MCK
0PR0IED
XX
CLIENT:
78 BARTLETT BAY
ROAD, LLC
C/O RICHARD REEL
78 BARTLETT BAY ROAD
SOUTH BURLINGTON
VERMONT 05403
PROJECT:
REED DECK
78 BARTLETT BAY ROAD
SOUTH BURLINGTON, VT
LOCATION MAP
=2
REVISION
EROSION CONTR(
DETAILS &
SPECIFICATIONS
DATE ORA1UNO NUMBER
0310612018
SCALE
11. = 10. I %�1
_2. i
PH NO
17195
SITE ENGINEER
LEGEND
APPROXIMATE PROPERTY LINE
Do
EXISTING CONTOUR
EXISTING PAVEMENT
_..
LAKE
EXISTING DECIDUOUS TREE
EXISTING CONIFEROUS TREE
EDGE OF BRUSH/WOODS
GENERAL NOTES
1. UTILITIES SHOWN DO NOT PURPORT TO CONSTITUTE OR REPRESENT
ALL UTILITIES LOCATED UPON OR ADJACENT TO THE SURVEYED
PREMISES. EXISTING UTILITY LOCATIONS ARE APPROXIMATE ONLY THE
CONTRACTOR SHALL FIELD VERIFYALL UTILITY CONFLICTS. ALL
DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. THE
CONTRACTOR SHALL CONTACT DIG SAFE (888-344-7233) PRIOR TO ANY
CONSTRUCTION.
2, THE CONTRACTOR SHALL REPAIRIRESTORE ALL DISTURBED AREAS (ON
OR OFF THE SITE) AS A DIRECTOR INDIRECT RESULT OF THE
CONSTRUCTION.
3. ALL GRASSED AREAS SHALL BE MAINTAINED UNTIL FULL VEGETATION IS
ESTABLISHED
4. MAINTAIN ALL TREES OUTSIDE OF CONSTRUCTION LIMITS.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARY
FOR COMPLETE AND OPERABLE FACILITIES AND UTILITIES.
6. IN ADDITION TO THE REQUIREMENTS SET IN THESE PLANS AND
SPECIFICATIONS, THE CONTRACTOR SHALL COMPLETE THE WORK IN
ACCORDANCE WITH ALL PERMIT CONDITIONS AND ANY LOCAL PUBLIC
WORKS STANDARDS.
7, THE TOLERANCE FOR FINISH GRADES FOR ALL PAVEMENT, WALKWAYS
AND LAWN AREAS SHALL BE 0.1 FEET.
8. IF THERE ARE ANY CONFLICTS OR INCONSISTENCIES WITH THE PLANS
OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE
ENGINEER FOR VERIFICATION BEFORE WORK CONTINUES ON THE ITEM
IN QUESTION.
9. PROPERTY LINE INFORMATION IS APPROXIMATE AND BASED ON
EXISTING TAX MAP INFORMATION. THIS PLAN IS NOT A BOUNDARY
SURVEY AND IS NOT INTENDED TO BE USED AS ONE.
10, THE CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT AND FIELD
ENGINEERING REQUIRED FOR COMPLETION OF THE PROJECT. CIVIL
ENGINEERING ASSOCIATES WILL PROVIDE AN AUTOCAD FILE WHERE
APPLICABLE,
11. THE OWNER SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ANY
AND ALL SAFETY FENCES OR RAILS ABOVE EXISTING AND PROPOSED
WALLS. THE OWNER SHALL VERIFY LOCAL, STATEAND INSURANCE
REQUIREMENT GUIDELINES FOR THE INSTALLATION AND VERIFYANY
AND ALL PERMITTING REQUIREMENTS.
_ � YY-1'YVVYy'yyYyyl.1,,,V.WYYVY�'
h
_ �- � .10'SIDEVARD SETBACK
PROPOSED STEPS I
PROPOSED DECK EXPANSION I
±40 SF TO FILL VOID BETWEEN I
EXISTING DECK & HOUSE I
I I
t I
EX. DECK FOOTING(S) TO BE REPLACED
EX STEPS AS NEEDED, CONTRACTOR TO VERIFY &
1 INSTALL SILT FENCE IF DISTURBANCEIIS
1 CONTRACTOR TO INSTALL SILT ) PROPOSED
SHEL B U R N E BAY FENCE DOWN HILL OF ALL AREAS I I
ITO BE DISTURBED, SEE DETAIL, 4 78 BARTLETT BAY ROAD, LLC °
SHEET C2.0 Z EXISTING CIO RICHARD REED I '
LAKE CHAMPLAIN (TYP•)
I
DECK EXISTING
HOUSE
i
EXISTING DECK, STEPS
& RAILING TO BE
REPLACED WITH NEW
I
I
%
DECK, STEPS & RAILING
I
I
I
EX STEPS
I
NEW RAILING AROUND
o
OUTER EDGE OF DECK
I
PINE �
&SIDES STAIRS
_
/
— —
EXISTING LAKE ACCESS
— —
l0'
SI(EYARD SETBACK
a
/--
f0
4
a9 N > tl�
N a
l'WVYY-v r Y v• v v v. v r v r,
--
16'P tiA-MWE
& RAILING TO BEV V
REPLACED WITH NEW
DECK, STEPS & RAILING
GRAPHIC SCALE
IN FEET )
l inch = 20 0
r-Piumla) Iv
BE REPLACED AS NEEDED,
CONTRACTOR TO VERIFY
& INSTALL SILT FENCE IF
DISTURBANCE IS
PROPOSED
PROPOSED DECK EXPANSION
TO FILL EXISTING VOID
BETWEEN HOUSE & DECK
r / �
C1HIL EPI,INEERING A; OCIAfEi. II
10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, 1
P W2-664-2323 web- www.ce
DRAWN
GAC
CHECKED
MCK
APPROVED
CJG
CLIENT:
78 BARTLETT BA
ROAD, LLC
C/O RICHARD RE
78 BARTLETT BAY ROAD
SOUTH BURLINGTON
VERMONT 05403
PROJECT:
REED DECK
78 BARTLETT BAY ROAD
SOUTH BURLINGTON, VT
ti u, v
3
IPROJECT
¢ LOCATION
'Sep` L BURLINGT
LOCATION MAP
DATE CHECKED REVIBION
PROPOSED
CONDITIONS SI TI
PLAN
PROPOSED LOCATION I DATE
FOR ADDITIONAL STEPS 0310612018
SCALE
1" = 10'
DRAWING NUMBER
C1.
PROI. NO.
17195
3
"1
City of South Burlington
Application to Board of Adjustment
Date
Applicant
Owner, leasee, agent
Official Use
APPLICATION #
HEARING DATE
FILING DATE
FEE AMOUNT
Address ���,j��,. Via/, Telephone #
Landowner a,���� Address
Location and description of property -ems
Type of application check one: ( ) appeal from decision of Administrative
Officer ( ) request for a conditional use (,) request for a variance.
I understand the presentation procedures required by State Law (Section
4468 of the Planning & Development Act). Also that hearings are held twice
a month (second and fourth Mondays). That a legal advertisement must
appear a minimum of fifteen (15) days prior to the hearing. I agree to pay
a hearing fee which is to off -set the cost of the hearing.
Provisions of zoning ordinance in question/ J
Reason for appeal
AiIJ� 4 i"!1`-7_' � �./�J��.c' /_+u s4"�L�i��r'-L�. //�:'/> ,.�:^�iC-'l�ri"?/� /�r.� � ,✓,•.r a �%.tr'i±� ,�Z '/Jlf/.'.Cf
The following documents are submitted in support of the application -
Hearing/Date
3 �
?` i;W t,- i fit:
SIgnaturer of -Appellant
Do not write below this line
---------------------------------------------------------------------------
SOUTH BURLINGTON ZONING NOTICE
In accordance with the South Burlington Zoning Regulations and Chapter 117,
Title 24, V.S.A. the South Burlington Zoning Board of Adjustment will hold
a public hearing at the South Burlington Municipal Offices, Conference
Room, 575 Dorset Street, South Burlington, Vermont on
. Day of Week
at to consider the following:
Month and Date Time
Appeal of
seeking a
from Section-
,mot
-art`_. G-�
- � *' �. a_-- •�"Q--'^�v 4' t`' _-.[ �y�. ,
� � ; il. �• '
4-
! I 'f � t`. .
a�
7
of the South
Burlington Zoning Regulations. Request is
for permission to
E
DECK F>LA'7-FC) PNI AN Z) SrN t R,=
L F- C-5 AM ES Wrn
18,
-Top C) P= B NN N
xw-
410
4F
--7
vS A LE LE
REf'-10VNBLE RklLe
ROLLED or SK,09 TO
RE FACE RPlLr, FbR
U43C*0C At4 0 LIFT Remcv4L
IR -1-0 HIMEE
OR MoVE
41--+
LNKIE
F-POPOSED DECK
I
Akt R115
No Text
No Text
4) RICHARD AND BARBARA REED, 78 BARTLETT BAY ROAD
Area is zoned R-1 and Conservation/Open Space District.
Section 3.10 sub -section 3.102 requires a setback of 150 feet
from elevation 102.5 feet above mean sea level.
Application is proposing to construct a 16'x 18' storage dock at
elevation 110 feet.
Any alterations or construction lower than 102.5 feet requires
approval by Army Corp of Engineers.
3
i
City of South Burlington
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
FAX 658-4748
PLANNER
658-7955
September 30, 1997
Mr. Richard Reed
78 Bartlett Bay Road
South Burlington, Vermont 05403
Re: Zoning Board of Adjustment
Dear Mr. Reed:
ZONING ADMINISTRATOR
658-7958
Be advised that the South Burlington Zoning Board of Adjustment
will hold a public hearing at the City Offices, Conference Room,
575 Dorset Street, South Burlington, Vermont on Monday, October 13,
1997 at 7:00 P.M. to consider your request for a variance.
Please plan to attend this meeting and be prepared.to address the
enclosed variance criteria. If you have any questions, please
don't hesitate to call me.
Very truly,
Richard Ward,
Zoning Administrative Officer
RW/mcp
1 Encl
^'1pJ1SiG6/ lf�A
p
:t, piOb wAla
s GA6GTaeA%y e(pG
a.!A!!
b,0, ;
sBpp
a oql^oT lA
wA
°J1s
S
ay66 sGo vo Gob 's s,�J 1j Y°o 0
`°As/a do�'oi6GGOl,, a ,'J1
vo aOp pos apl s�py9 4�6A °v
G0-p�
ob�GQJ@ As� j
os+ p A�GO.�O,.GT@a�
�(sssl/ GO�!�ev 'O 4o T rA
v GA sTGA �p'JT s,Ov Ai6lyM
o'0 4a{i�b4T �o°o °eQJns
A/e a you !PoG
� n,Ts aaG a M o ioQ °tea
s, Ts°o oA�os �,tGAs pas
T91 v/O/ABd�V
roJ r°//OAoJpd 010 a f
A4,
.G-dTV-� yew/j� �bp' d•�/
e l0°,o�os y°Gbo, 6 a,Ts
%, tni TSG0ra�4i!ya���4T 0�0�
a si+ ,GFi86/
',B o1'Goo `Op,1ST
T+,%. oA�� sl ��i���
q as O �GAb/
aaG9Z ov. eo 00k'a.,41 °
�AGo'Ga^°�l� sasai� s2 ' �bs S
elipG/AP��I/SSGa/&T�sG�J
A. 1, aaov /A JOTS .
vo ST
p! TA 41,,A ad, bG S
G00g941G°TGE'[ °ofMo!!
6 .)Lb
p 6G Gol6 oO`r ; Avlj� %
AG� 1Ga Aa4!/•�O !B ao Sla°l
6 a as bS 16 pb �aIOOSGOW/s
Ayf'Go� J p� y2%�7 'o o!o 41 ,
4{�� Gols sG aiTe 41�eOg4
OioJ y1 d
S
;7�f e?/� )'�
May 2, 1978
Mr. Richard Reed
4 Green Dolphin Drive
South Burlington, Vermont 05401
Dear Mr, Reed:
Be advised that the South Burlington zoning Hoard of Adjustment
has granted your request for a zoning variance.
The Board will issue their formal findings at a later date. This
office will issue a zoning permit upon your request.
This variance expires six (6) months from the date granted. If
you have any questions, please don't hesitate to contact me.
Very truly,
Richard Ward
Zoning Administrative Officer
RW/mcg
1st. Copy CODE OFFICER
2nd. Copy CITY ENGINEER
3rd. Copy CITY ASSESSOR
4th Copy APPLICANT
CITY OF SOUTH BURLINGTON
APPLICATION FOR ZONING PERMIT
PERMIT NO ...........
y Zone............
Date .....,. ...:......... (:................ 19 ...:�.. .
The undersigned hereby applies for permission to make certain building improvements as described below. (Plans to be submitted If required by Building Inspector.)
All construction to be completed in accordance with the Zoning Laws and Building Regulations of the City of South Burlington and the State of Vermont, and con-
form to the Regulations of the National Board of Fire Underwriters and any and all Federal Regulations now in effect.
CONSTRUCTION
OCCUPANCY
LOT SIZE: Frontage Depth Lot No.
■■■■■
-7—
OWNER BUILDER
WATER SU PPLY: Public Private
Store
Offices
■■■■■SEWAGE
DISPOSAL: Pus N!-1' Septic Tank ■ Permit *
ROAD OPENING: (Show layout) Permit *
Res. Garage
ELEC. WIRING: Underground 0 Overhead El Permit *
No. Cars Det.LJ Att.0
ON
Gas Station-
•
Plot to scale Lot and Building improvements, showing width of Front, Side and Rear yards.
Mark N at Compass point Indicating North.
Concrete
Concrete Block
■�■■■■■■■■■■■■■■■■■
■■■Itn■■I■■■■■■■■■■■■■■V.
v■■
Brick or Stone■
■■■■Piers
■
-��■■■■■■■■■■■■■■ur�r�i»Infr■■■■■■■■■■■■■■■■■■■
■■■■■Collar
■■■■■i�!!1■■II�tiI■
wR�■■■■I�■i■■r■■■■■■■■■■■■■■■■■■■
Area Full
M0
Recreat. Room
Finished Attic
■■■■■■��e>t■■■■�..■���:ate■■■■■■■■■■■■■■■■■�■�r�f���
_ _
EXTERIORWide
■
■■■■■■■■■■■■■■■■■■■■11■■■■II�IF�■i■■■■■■■■■■■■■■■
Clapboards
■■■■■■■■■■
■■■■■■■■■■11■■■��■�
1.7/■■■■■■■■■■■■■■■■■
Siding
....................C1�■DIY■II■■■■■■'l"AAtPJIeJ■■■■■■
Drop Siding
No Sheathing
■Forced
Air Furn.Wood
■
■■■■■■■■■■■■■■■■■■■■11■■■■\■■■■■■■■■■■■■■■■■■■■
Shingles
ITI..
Asbes. Shingles
Hot Wat. or Vapor
ANN
■■■■■■■�■■■■■■■■■■■■�1■■■t•■■■■■��■■■■■■■�■■■■n■
■■■■■■■l'i'■■■■■■A■■■■■11■■■'�■■■■■\a
■■■■11P■.■■■■
LINN
■■■■■■■r!!■■■■■...•�■n■■■L�■■■■■■■�■■■tea.■■■..lL�■
Stucco on Tile
! Electric
Brick Veneer
■■■
Brick on Tile
■Solar
■
■■■■■■■■■■■■irl�.■r1■■11■■\�■■■■■■■■■■■■■■■■■■■■■
Solid Brick
PanelsStone
■■■■■■■■■■■��.:�
:..e■�i■■■1■■■■.�■■■■■�■■■■■■le�■r■1�■■n
Veneer
PLUMBING
Conc. or Cind. Bl.
Bathroom
■■■■■■■■■■
\���■■■L'�l■■I■■■■\�!�■L'■■l1■■■■■■■■■■■■
■+�i■■■■■■■■■�r■■■■�■■■■■■■■■■■■■■■■■�:�•�■■■■■
Terra Cotta
■
Plate Glass
■
Heat
'
■��■■����TiiI1J11'�
•'��■■li=i�■■■'��1w■■■■■■■■■■■■■■■■■■■■■
■■■■■■■■■■■■■■■■■�I■■■�■■■■■■■■■■■■■■■■■■■■■■■■
Insulation
Auto.
Weatherstrip
MrIl?"MMIMMENSE
■ Demolition ■ Utilities closed ■
Cost/
■
■PROPERTY
Asbes. Shingles■
■Remarks
Slate■ToiletRoll
MQUO
Composition
■
Roofing
..
■®�Estimated
FEE COMPUTATION $ Plans received` Yes ❑ No ❑
SIGNATURE of OW ER or -BUILDER ADDRESS of IDWNER
APPLICATION: REJECTED ❑ APPROVED ❑
SIGNATURE OF CODE OFFICER
ISSUED TO
•, rti'
Z7,
19
PERMIT VALID FOR SIX MONTHS
No Text
f City of South Burlington
1175 WILLISTON ROAD
SOUTH BURLINGTON, VERMONT 05401
TEL.863-2891
April 18, 1978
Mr. Richard Reed
4 Green Dolphin Drive
South Burlington, Vermont 05401
Dear Mr. Reed:
Be advised that your request for a zoning variance before the
Zoning Board of Adjustment has been tabled to the next hearing
scheduled for Monday, May 11, 1978 at 5:00 p.m. The Board
requests that you attend this hearing.
Very truly,
Richard Ward
Zoning Administrative Officer
RW/mcg
NOTICE OF APPEAL
SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT
I hereby appeal to the Zoning Board of Adjustment for the following:
/conditional use, variance, decision of administrative officer.
/Property Owner Richard Reed
`'Property location & description Residence, 78 Bartletts Bay Road
South Burlington, Vermont 05401
Variance of Section ,
(number) (title of section
Basis of appeal
I understand the regular meetings are held twice a month on Monday
at 5:00 p.m. at the City Hall, Conference Room. The legal advertise-
ment must appear in the Burlington Free Press a minimum of fifteen
(15) days before the hearing, I agree to pay a fee of $30.00 which
fee is to off -set the costs of advertising and the hearing.
Hear g Date Signature -of Appellant
SOUTH BURLINGTON ZONING NOTICE
In accordance with the South Burlington Zoning Regulations and Chapter
117, Title 24 V.S.A. the South Burlington Zoning Board of Adjustment
will hold a public hearing at the South Burlington City Offices,
Conference Room, 1175 Williston Road, South Burlington, Vermont on
at •00 4m, to consider the
(day ofek) Month and date) (time)
following:
-b,�, Appeal of
seeking a .!/ �,� ,,.w �, from Section /. �a , ,,' �j� - e,..,,�, ,.,�,-,. �,-:�fi .a�J r"t
tL,o.o' -) of the South Burlington
Zoning Regulations. Request is for permission to a, /0��f'd0'
e�.� o e'".*..: r,'�-t.,l < ,! Gc ,►T �Gr1 �i-c�.G Ga.� .-°��►.,.t. ,r�i � C.Ga"'�._. ✓
-- -- ------
�--
�
� � ,
i
-- _.'
-
�
� '
'
I
'
II
-I _ �
'
, _ �'
/ �/
� �
i ,
• . -
- - � -�
� �; .
- -- � i - - - - - - - � -.. .,.�
- - - - 4� - --
I-
1
-- ��-' -
_ _ i
_ _ - � - -
-- -
���
.1 +ui� �1�
' t<'4y S 1 � �` � �, ����
�}� ?'
- - - --
-
� .
`M i _
-- - - - - -
- - - - -- - -
�. _ _ _._ _ _ _
April 3, 1979
Mr. Richard Reed
4 Green Dolphin Drive
South Burlington, Vermont 05401
Dear Mr. Rees.
Be advised that t Guth Burlington Zoning Board of Adjustment will
hold a public hea_ t the South Burlington City Hall, Conference
Room, 1175 Williatoi. ad o�onday, April 17, 1978 at 5:00 p.m.
to consider your requ, t for A zoning variance.
Please plan to attend.
Very truly,
Richard Ward
Zoning Administrative Officer
RW/meg