Loading...
HomeMy WebLinkAboutSD-18-28 - Supplemental - 1580 Dorset Street (34)The Stormwater Section has reviewed the “Cider Mill - Phase II” site plan prepared by O’Leary-Burke Civil Associates, dated 10/5/13 and last updated on 8/17/2018. We would like to offer the following comments: The project has an operation permit (3144-9015.2A), as well as a construction permit (3144-9020.2), which was issued for the previously approved project. The applicant shouldconfirm if the 9020 permit needs to be revised to the current layout. The City staff previously provided a recommendation to include fences around the stormwater ponds. It was the decision of the applicant to keep the ponds unfenced based on discussions with the DRB, Natural Resources Committee, and neighbors from Cider Mill Phase I. The applicant should confirm that the stormwater drainage structures are designed, at a minimum, to safely pass the twenty-five year, twenty-four hour (4.0 inch) rain event, in accordance with §12.03.E(2). The DRB should include a condition requiring the applicant to regularly maintain all stormwater treatment and conveyance infrastructure.