Loading...
HomeMy WebLinkAboutSD-18-28 - Supplemental - 1580 Dorset Street (69)SOUTH BURLINGTON WATER DEPARTMENT 403 Queen City Park Road South Burlington, VT 05403 Phone: (802) 864-4361 Fax: (802) 864-0435 www.sburl.com March 28, 2018 Mr. Bryan Currier, P.E. O’Leary-Burke Civil Associates, PLC 13 Corporate Drive Essex Junction, VT 05452 RE: Cider Mill Phase II, SD-17-29, Revised Water Allocation, 1580 Dorset St., South Burlington, VT 05403 Dear Mr. Currier, In response to your email request as to the capability of the South Burlington water distribution system (WSID 5091) to supply water to the above referenced project we submit the following Preliminary Allocation Determination: 1. Sufficient water storage and capacity is located at the South Burlington East Tank located off Dorset Street in South Burlington. 2. Based upon your final allocation request, water service connection and allocation fees shall be applied to this project according to the City Water Ordinance Rate and Fee Schedule. It must be recognized by all developers that the Rate and Fee Schedule established by the South Burlington City Council may be modified at any time by resolution at an open meeting of the City Council. 3. Your water supply requirement for this proposed project of 66,420 gpd can be furnished by this Department without restricting or encumbering present South Burlington water customers. 4. You are also required to contact the Champlain Water District (CWD) in order that they verify supply, treatment, and transmission capability as the wholesale water supplier for the South Burlington Water Department. Please contact Joe Duncan directly at joe.duncan@champlainwater.org or, call 864-7454 X- 126. 5. Any significant increase in current demand or any change in use will require water allocation re-approval from the South Burlington Water Department. 6. Water is supplied to the referenced area through 12” and 8” distribution mains. 7. Preliminary Allocation Determination shall not constitute a binding commitment of capacity to the applicant and may be revoked by the Superintendent before a final allocation of capacity is granted if uncommitted reserve capacity ceases to be available. A preliminary determination may be used by the applicant that a proposed development has sufficient water capacity available to proceed through the development process. 8. This preliminary allocation approval supersedes the preliminary allocation letter previously issued for this project. If you have any questions or I can be of further assistance, please do not hesitate to call me. Sincerely, South Burlington Water Department John Tymecki Superintendent Cc. (via email) J. Fay J. Duncan J. Rabidoux R. Belair D. Lutz APPLICATION FOR WATER ALLOCATION * Items marked with an asterisk must be filled in by ALL applicants * Applicant Information Applicant: Contact Person: Mailing Address: Telephone & Fax for Contact Property Owner Name (if not applicant): Property Owner Mailing Address: JJJ South Burlington, LLC _ Bryan Currier 21 Carmichael St, Suite 201, Essex (802) 878-9990 JJJ South Burlington, LLC - _. --- ................. - 21 Carmichael St, Suite 201, Essex !t* of project: 1580 Dorset St & 1699 Hinesburg Rd * Signature of Applicant * Project Information If the project is a single-family home, please check one: New Existing (For existing homes, no Application is required if revised demand is less than 1,000 gpd.) If not single-family home, project name: Ledgewood Estates / Cider Mill II * Application or Permit Numbers: (from Department of Planning & Zoning) # SD _ 17 _29 Engineer's Information for flows over 1,000 gpd Name of Engineer: Bryan Currier Firm: O'Leary -Burke Civil Assoc. Mailing Address: 13 Corporate Drive, Essex Phone & Fax: 878-9990 PE License #: 0114132 * Flow Calculations (You may substitute an engineer's calculation or letter containing the information requested below) For additional bedrooms in single-family homes: Number of existing bedrooms: Number of additional bedrooms requested: Page 1 APPLICATION FOR WATER ALLOCATION For other residential oroiects. list number of bedrooms and units renuested: Number of bedrooms x Number of units x Gallons per day per unit Total flows 1 150 2 300 3 76 450 34,200 gpd 4 66 600 39,600 gpd 5 750 6+ (specify) TOTAL 142 73,900 gpd i-or commercial and industrial projects, list existinq and proposed tenants, uses and flows: Tenant / I I Number of I I Other Business Type of use seats, SF, etc. x I Flow per unit Adiustments I Total flow AL Total development water flow requested: 66,420 gallons per day "'10% reduction for low flow fixtures 73,800 gpd x 0.90 low flow reduction = 66,420 gpd Please do not write below this line Approved !by Water Department S perintendent of Water Preliminary Allocation approved: Final Allocation approved: -F— Dat 3 as �l g Date Date Final Allocation Expires: with permit # - (Date) For Extensions of Final Allocation Only EXTENSION GRANTED (Date) G :W ord:S BForms: W ateralloc at ion Form to (Date of Expiration) Page 2