Loading...
HomeMy WebLinkAboutSD-18-28 - Supplemental - 1580 Dorset Street (67)4 0 Firs 0 3 Queen Telep st In The N n City Pa hone: (8 w CHAM Ded ation ~ Exce a rk Road 8 02)864- ww.cham MPLAIN dicated to Qu ellence In W ~ South 7454 ~F plainwat WATER Quality Wate Water Treat h Burlin ax: (802 t er.org R DISTRI er & Service tment, Partn gton, VT 2 )864-04 ICT e nership For T 05403 35 Safe Waterr April 19, 2018  Mr. Bryan Currier, PE  O’Leary‐Burke Civil Associates  13 Corporate Drive  Essex Junction, VT 05452  RE:  Ability to Serve Cider Mill Phase II, South Burlington, VT  Dear Bryan:  In response to your request dated March 28, 2018 for information regarding the capability of Champlain  Water District (CWD) to supply water to the referenced proposed project, we submit the following:  1.The water supply requirement of 66,420 gpd for this proposed project can be furnished by CWD without restricting or encumbering its present users on the CWD supply system. 2.Water is supplied to the referenced area via locally‐owned distribution mains within the City of South Burlington.  Capability of the local water distribution system must be verified by the local water system official. 3.Existing water storage is provided by the 2.1 MG South Burlington East Tank (SBET) off of Dorset Street in the City of South Burlington.  CWD’s Water Storage Ta nk Policy stipulates that the served system is responsible for providing the required local volumes of water storage.  Therefore, adequacy of local water storage volume must be verified by the local water system official. 4.It is our understanding that the highest finished floor elevation (FFE) is 437’+/‐ with a maximum of two stories.  The SBET low operating level is 515’ (430’+85’).  Assuming 20’ for a two‐story structure the pressure at the very top of the second story would be 25 psi [(515‐437‐20)/2.31]. Per the Vermont Department of Public Safety Division of Fire Safety, the current adopted code is the International Plumbing Code (IPC), 2015 Edition.  The 2015 IPC requires 20 psi minimum for toilets  (“water  closet,  tank,  close  coupled  or  one  piece),  which  is  the  controlling  factor  for establishing the minimum required pressure for internal plumbing (assuming the toilets do not have flushometer valves).  Given that the pressure at the top of the second story is estimated at 25 psi there would be adequate pressure to accommodate the proposed development. 5.This letter of availability is only for the source of water supply requirement based upon the condition that the structures have a maximum FFE of 437’ with a maximum of two stories per structure. 6.This letter of availability is valid for a three‐year period commencing on today’s date and ending on April 19, 2021. Please don’t hesitate to contact us with any questions.    Sincerely,  CHAMPLAIN WATER DISTRICT        Joseph J. Duncan, PE, F.NSPE  Director of Projects & Programs / Chief Engineer    cc:  Jim Fay, CWD    Justin Rabidoux, City of South Burlington    John Tymecki, CWD    Dennis Lutz, CWD Board of Commissioners South Burlington Rep