HomeMy WebLinkAboutSD-18-28 - Supplemental - 1580 Dorset Street (43)O'Leary -Burke Civil Associates, PLC CIVIL ENGINEERING I REGULATORY AND PERMIT PREPARATION I LAND SURVEYING I CONSTRUCTION SERVICES I LAND USE PLANNING July 31, 2018 Marla Keene Development Review Planner City of South Burlington 575 Dorset Street South Burlington, VT 05403 Re: JJJ South Burlington, LLC— Ledgewood Estates (aka Cider Mill Phase II) Final Plat Application — SEQ 1580 Dorset Street, South Burlington, VT Dear Marla: We are writing on behalf of JJJ South Burlington, LLC c/o Brad Dousevicz, to request final plat review for a revised layout of the Planned Unit Development called Ledgewood Estates (aka Cider Mill Phase II), previously approved under #SD-16-01. The preliminary plan was approved by the Development Review Board on March 215t, 2018. The proposed layout consists of 142 units including; single family lots, carriage homes and duplex units on the 65.5 acre parcel. All of the units will be served by municipal facilities including; roads, sidewalks, recreation paths, water supply, wastewater collection, and stormwater collection and treatment systems. LEGAL: The preliminary plat approval was appealed by one of the neighbors within the Cider Mill Phase I Development. A motion was filed to stay the appeal in Environmental Court in the interest of judicial economy and to conserve the resources of both parties until the final approvals are issued. The court has decided to dismiss the appeal without prejudice, meaning the case is dismissed, but the neighbor is free to refile an appeal if there is still opposition following a final plat or Act 250 approval. A copy of court docket #44-4-18 verifying the court's dismissal has been included in the application materials. A letter from the applicant's attorney, regarding the right to construct the previously approved 109 unit development (SD#- 16-01) regardless of the outcome of any future appeals or decisions, has also been included in the application materials. 13 CORPORATE DRIVE ESSEX JUNCTION VERMONT 05452 TEL 802 878 9990 1 FAX 802 878 9989 1 obca@olearyburke.com TRArrir- Following the preliminary plat approval, technical review was invoked by the development review board regarding the construction of the Cider Mill Drive extension. A subsequent letter from BFJ Planning dated April 9th 2018 was distributed to the applicant. The applicant does not agree with BFJ Planning recommendation to construct the Cider Mill Drive extension as part of the Cider Mill II project. The recommendation is strictly based on a planning perspective, as the letter reinforces the applicant's position that the 142 unit development will not create any unsafe or unreasonable traffic conditions within the Cider Mill Phase I development. It is unknown whether BFJ Planning has considered the historical purpose of the Cider Mill Drive extension as part of their review. The right of way was created in order to develop an east -west connector through the neighboring Marceau Parcel from Dorset St to Hinesburg Road as part of the Cider Mill Phase I approval, not as a means to alleviate traffic impacts from the Cider Mill Phase II development. The City did not require the Cider Mill Phase I developer to build the roadway through to the property line because it was not the Cities policy at the time. Also, a known wildlife corridor and class II wetland would need to be impacted. The City has targeted the Marceau Parcel in the Comprehensive Plan as a high density residential area (101- 443 Units). When the Marceau Parcel is developed the east -west connector will be completed, along with the missing portion of Cider Mill Drive currently being discussed as part of the Cider Mill Phase II application. The question is not if the connection will be completed, it is by whom and when. Cider Mill Phase II is doing more than its fair share to alleviate any potential traffic issues including; paying a $1,000+/- per unit traffic impact fee ($142,000+/-), building a south bound left turn lane on Dorset Street at the Cider Mill Drive intersection, committing to a scoping study of the Hinesburg Rd/ Cheesefactory Rd and a 'fair share' impact fee not to exceed 21.3%, committing to a traffic impact study for a northbound left turn lane at the Nadeaucrest / VT 116 intersection after the construction of the 515Y unit that may or may not need to be constructed, and the applicant has proposed to pay an additional $1,000 per unit ($142,000) as a 'fair share' impact fee to build the Cider Mill Drive extension. The Cities Planning Staff has agreed with the applicant's proposal to pay an additional $1,000 per unit ($142,000) as a 'fair share' impact fee and to not construct the roadway as part of the Cider Mill II project. As part of the preliminary staff report dated 1-2-18 the Cities Director of Public works commented the proposed traffic improvements should alleviate any traffic concerns caused by the development, "The above mentioned micro -improvements will ensure the project does not cause undue, adverse conditions on existing and proposed roadways." Page 12 As an additional mitigation measure the applicant will agree to phase the project so the Aurora Rd / Sommerfield Ave connection will only be made available to emergency vehicles until the 50th unit is constructed within the Cider Mill Phase II development. In the time it takes to construct 50 units with associated infrastructure (3-10 years) the plans for finishing the Cider Mill Drive east -west connector may be made more clear as neighboring parcels get developed. The Cider Mill Phase II development is currently approved with 109 units with a designated "Future Development" area within the northern Village Residential portion of the parcel. This approval does not include finishing the construction of Cider Mill Drive. The DRB will have to conclude the addition of only 33 units (not a total of 142 units), added as part of the current proposal, create enough traffic impacts to the surrounding community to make the construction of Cider Mill Drive a condition of approval. PRELIMINARY CONDITIONS: The preliminary plat approval dated March 21, 2018 contains specific approval conditions to be incorporated into the final plat application. The applicable approval conditions have been included, along with responses below: 5. The plans must be revised to show the change below prior to final plat submission. a. Adjust the mid -block pedestrian crossings to be 20 feet wide except at the Senator Street at Nadeaucrest Drive pedestrian crossing. Please see SH 3 — Site Plan (North) and SH 4 — Site Plan (South) for the 20 foot wide pedestrian crossings. b. Include E911 addresses for structures in the proposed project, in conformance with local ordinances and Vermont E911 addressing standards. Please see SH 5 — Site Plan 'A', SH 6 — Site Plan '13% SH 7 — Site Plan 'C', SH 8 — Site Plan 'D', SH 9 — Site Plan 'E', SH 10 — Site Plan 'F' and SH 11 — Site Plan V for the E911 addresses for all 142 units throughout the development. c. The applicant's Final Plat application must include a southbound left -turn lane at the intersection of Dorset Street and Cider Mill Drive. Please see SH 20 — Dorset St Left Turn Lane 0+00-15+54.94 and SH 21 — Dorset St Left Turn Lane Overall Plan for the southbound left turn lane design at the intersection of Dorset Street and Cider Mill Drive. Page13 d. The applicant must adjust the proposed grading to the rear of homes on Lindamac Street and on the south side of Liberty Lane to result in fewer homes needing approval for adjustment of pre -construction grade prior to final plat approval. Please see SH 7 — Site Plan 'C', SH S — Site Plan 'D', SH 9 — Site Plan 'E' and SH S1— Overall Stormwater Management Plan for the revised typical grading of the homes on Lindamac Street and the south side of Liberty Lane. The back yards have mostly been graded with a 1 on 10 slope based on the assumption all of the homes will be garden style units. The slopes in the rear of the lots will be even more gradual if the homes are constructed as walk -out units. e. Incorporate the following recommendations of the Natural Resources Committee pertaining to the wetland crossing of Aurora Road connecting to Sommerfield Road, provided by memorandum to the Development Review Board on November 12, 2017. i. The height and grade of the embankment of the road should ensure the safe passage of wildlife. Please see SH 5 — Site Plan 'A', the wetland crossing is a maximum of 4' high and the roadside maximum slope is 2 feet horizontal on 1 foot vertical. The wetland crossing also includes two 24" diameter culverts under the roadway. This should allow for the safe passage of wildlife. ii. The structure should be free of guardrails to allow wildlife to cross. The wetland crossing does not include guardrails. iii. Signage depicting "wildlife crossing" should be placed at both ends of the connector. Please see SH 3 — Site Plan (North) showing the proposed location of the "wildlife crossing" signs at both ends of the wetland crossing. 6. The final plat submission must include the following information. a. The applicant must demonstrate that they have obtained preliminary water supply and wastewater allocations prior to final plat approval. Please see the attached preliminary water and wastewater allocation letters from the City of South Burlington and the Champlain Water District. b. The applicant must submit legal documents confirming options to purchase the required 26 additional TDRs for review by the City Attorney prior to final plat approval. Page 14 Please see the attached options to purchase the additional 26 TDRs for the development. c. The applicant must submit an open space management plan prior to final plat approval. Please see the attached SH 22 — Open Space Management Plan. d. The applicant must incorporate the approved open space management plan as part of the Home Owners Association documents, which must be reviewed and approved by the City Attorney, prior to recording mylars. The open space management plan will be incorporated in the Home Owners Association documents prior to recording mylars. e. The applicant must describe the agricultural nature of the adjacent lands and Vermont's Right to Farm statues in the development's HOA documents. The HOA documents will be reviewed and approved by the City attorney prior to recording mylars. f. The applicant must submit documentation that open spaces will be maintained by the homeowners' association prior to recording mylars. The HOA documents will state the HOA will be responsible for maintaining the open space. The HOA documents will be reviewed and approved by the City attorney prior to recording mylars. g. The applicant must submit documentation of any required off -site easements prior to final plat approval. Where the easement will be conveyed to the City, the easement must be included in the irrevocable offer of dedication for the street. The irrevocable offer of dedication has been included in the application materials and will be approved by the City attorney prior to recording mylars. The IOD includes all off -site easements to be conveyed to the City. h. For each home which is proposed to have anew preconstruction grade for the purposes of compliance with the height standard, the applicant must submit a table of the new desired preconstruction grade. Please refer to the table on the following page. Page 15 Lot/Unit Elev. j Unit #73 409' j Unit #97 414' Unit #121 427' Lot #18 416' Unit #74 407' Unit #98 416' Unit #122 427' Lot #19 415' Unit #75 419' Unit #99 418' Unit #123 429' Lot #20 414' Unit #76 418' Unit #100 420' Unit #124 429' Lot #21 413' Unit #77 416' Unit #101 423' Unit #125 407' Lot #22 413' Unit #78 415' Unit #102 423' Unit #126 407' Lot #23 413' Unit #79 414' Unit #103 426' Unit #127 410' Lot #24 412' Unit #80 412' Unit #104 426' Unit #128 410' Lot #25 412' Unit #81 410' Unit #105 429' Unit #129 413' Lot #26 412' Unit #82 408' Unit #106 429' Unit #130 413' Lot #27 411' Unit #83 405' Unit #107 435' Unit #131 416' Lot #28 411' Unit #84 405' Unit #108 435' Unit #132 416' Lot #29 410' Unit #85 405' Unit #109 406' Unit #133 419' Lot #30 410' Unit #86 405' Unit #110 406' Unit #134 419' Lot #31 410' Unit #87 408' Unit #111 408' Unit #135 422' Lot #32 409' Unit #88 410' Unit #112 408' Unit #136 422' Lot #33 409' Unit #89 412' Unit #113 410' Unit #137 425' Lot #34 409' Unit #90 414' Unit #114 410' Unit #138 425' Unit #67 419' Unit #91 416' Unit #115 413' Unit #139 427' Unit #68 417' Unit #92 418' Unit #116 413' Unit #140 427' Unit #69 415' Unit #93 420' Unit #117 416' Unit #141 429' Unit #70 414' Unit #94 407' Unit #118 416' Unit #142 429' Unit #71 412' Unit #95 409' Unit #119 419' Unit #72 1 411' 1 Unit #96 411' Unit #120 419' i. The applicant must submit estimate project costs for public facilities and improvements and estimated project costs for all other types of bonds required by these Regulations. Proposed Roadway Linear Feet (LF) Cost Per LF* Total Cost* Aurora Road 1,276 $550 $701,800 Senator Street 2,045 $550 $1,124,750 Russett Road 10+00-18+00 800 $550 $440,000 Russett Road 18+00-23+00 500 $400 $200,000 Russett Road 23+00-28+23 523 $550 $287,650 Nadeaucrest Drive 1,426 $525 $748,650 Liberty Lane 512 $550 $281,600 Lindamac Street 1,372 $550 $754,600 Pippin Lane 287 $550 $157,850 TOTAL 8,741 $4,696,900 Page 16 *Estimates are based solely on historical cost per linear foot of completed public roadways with associated utilities and landscaping. The approved preliminary landscaping budget for the project is $122,560 or $1,613 per unit for the 76 condos (carriage homes and duplex units) applicable to the landscaping budget standards. The approved landscaping budget and typical plantings have been provided as part of the application materials. The project will comply with Section 15.15 A. in the Land Development Regulations. When a zoning permit is pulled for each phase of the project, a detailed estimate, done by a qualified contractor, for the construction of all public facilities will be part of the application materials. The bond required by the City of South Burlington will be based on these estimates. The estimates provided on the previous page should be taken as "ballpark" costs only and should not be utilized to calculate the performance bonds associated with the project. j. The final plat application shall be accompanied by a Certificate of Title showing the ownership of all property and easements to be dedicated or acquired by the City, and said Certificate of Title shall be approved by the City Attorney. All proposed legal documents purporting to convey property or easements to the City shall also accompany the final plat application for a minor subdivision or major subdivision, and be approved by the City Attorney. The Certificate of Title has been included in the application materials. The Certificate of Title will be reviewed and approved by the City attorney prior to recording mylars. k. The applicant must provide sufficient information about the proposed buildings to evaluate the percent of South facing translucence. The Residential Design criteria in the Cities Land Development Regulations have been included in the design guideline narratives for the single family homes, carriage homes, and duplex units. This includes, "a minimum of 35% of translucent windows and surfaces should be oriented to the south." This standard will be met on a case by case basis with each building permit application depending on the lot/unit orientation, unit style and future homeowners input. The design guideline narratives have been included in the final plat application materials and will be included in the final plat approval. 19. The Applicant must address the comments of the Assistant Stormwater Superintendent prior to final plat approval. Page 17 The only remaining comment to be addressed from the Assistant Stormwater Superintendent was in an email dated January 25, 2018 in regards to the rooftop disconnections previously proposed on Lindamac Street, Liberty Lane, Nadeaucrest Drive, Russett Road, and the cul-de-sac at the end of Aurora Rd. The City is requiring the previously disconnected rooftops to be routed to a stormwater treatment practice: "If you read LDR §12.03C.(3), it notes that site balancing may be utilized if required control of stormwater runoff cannot be achieved. Can you demonstrate that this is true? Additionally, in Definitions on page 2-33, Site Balancing is defined for use where Stormwater control of certain limited areas are not possible." Collection swales have been proposed along the rear of the previously disconnected units to route the rooftop runoff towards the existing detention ponds, please see SH 2 — Overall Stormwater Management Plan. In order to handle the increased runoff, the total impervious coverage representing the full buildout of the development has been reduced from 18.97 acres to 17.81 acres. This is mostly due to assuming each single family lot will have 20%-32% coverage with a safety factor built in to include potential sheds, driveway turnarounds, three car garages, etc. that are occasionally added to single family lots. The stormwater calculations were previously based on the very conservative assumption, that each building envelope would have 100% coverage within the single family lots. Each point of interest within the development will meet the Cities stormwater treatment standards without the use of rooftop disconnection. The revised HydroCAD modeling results have been included in the application materials. Page 18 Please find the following attachments enclosed for your review: 1) Application Materials a. Application for Final Plat review; b. Application fee of $4,630.50; c. Three (3) 24" x 36" copies of the Final Plat Set; d. One (1) 11" x 17" copy of the Final Plat Set; e. PDF's of the Final Plat Set; f. List of property abutters; 2) Architect Materials a. Single Family Home Design Guidelines, revised 7/24/17 by Rabideau Architects b. Carriage Home Design Guidelines, revised 7/24/17 by Rabideau Architects c. Duplex Units Design Guidelines, revised 7/24/17 by Rabideau Architects 3) Legal Materials a. Letter from Gravel and Shea regarding 109 unit approval b. Court Docket #44-4-18 c. Declaration of Planned Community for Ledgewood Estates d. Amended Irrevocable Offer of Dedication for the roads with Exhibit A Warranty Deed e. Amended Irrevocable Offer of Dedication for easements with Exhibit A Easement Deed f. Attorney's Report and Opinion on Title g. Transfer Development Rights Option Agreement 4) Engineering Materials a. HydroCAD Modeling Results — PO1 A, B, C b. Preliminary Water and Wastewater Allocation Letters 5) Landscaping Materials a. Duplex and Carriage Home Planting Plan b. Duplex and Carriage Home Planting Budget and Schedule If you have any questions or comments, please let us know. Sincerely, an Currier, PE Page 19