Muddy Brook Industrial Park
Area zoned Industrial District
Section 11.15 multiple use- no more than one use or structure
per lot.
Proposed uses:
1- plastic bottle manufacture,B (4,000 Square feet.)
2T Wholesales gases ( 02-CM 2 etc.) distributor- (2, 100
square feet.)
3- Ski service center- shop and storage (5,480 square feet.)
Uses are permitted.
Q
LEGAL NOTICES 1
SOUTH BURLINGTON
ZONING NOTICE
In occordonce with the South Bur-
lington Zoning Regulations and
Chapter 117, Title 26 V.S.A. the South
Burlington Zoning Board of Adlust.
ment will hold a public hearing at
the South Burlington City Offices,
Conference Room, 117S Williston
Road, South Burlington, Vermont on
Monday, November 13, 1979, at 5:0g
p.m. to consider the following:
(1) Appeal of Rheol and Helen
Gagnon seeking a variance, from
Section 13.00, Non -conforming struc-
tures of the South Burlington Zoning
Resviations. Request is for per-(
mission to construct on addition con-!
foining 1950 sovore feet with at.,
toched 24' X 36' paroge to on existing
single family dwelling which is to-)
toted to within twenty-five (25) feet;
of the northerly side vord, at 1520
,;:.ear Si eet.
(2) Arceol of Kenneth A. Daley seek.
ing a vq•Ionce, from Section 11.00 ,
Dimensional, area, density require.
ments 6 Section 11.15 multiple use of
the South Burlington Zoning Rego- ,
lotions. Reovest is for permission to
locate a 10' X 50' mobile home on a
lot presently occupied by a single
family dwelling, lot contains 14,7501
square feet, at 1227 Airport Drive.
(3) Appeal of Wilfred and Bonnie,
Kirby seeking a variance, from Sec-
tion 11.00, Dimensional requirement I
of the South Burlington Zoning Regu-
lotions. Request Is for permission to
construct o single family dwelling
(24' X 601 with attached (20' X 201 1
goroge to within twenty-three (23)
feet of the required front Yard, at 15
Sherry Road. ,
(4) Appeal of Alan D. Palmer seek-
ing o variance, from Section 11.15,
Multiple Uses of the South Burling. i
ton Zoning Regulations. Request is .
for Permission to establish three]
businesses (plastic bottle manufoc- f
Curer. wholesale gases distributor 1
and a ski service center) from a
building containing I1,S80 square
feet, located at lot no. 2, Muddy
Brook Industrial Park.
(3) Appeal of Merllin Corporation,
d.b.o. Howard Johnson's seeking a
variance, from Sectton 13.00, non.
conforming structures & Section
11.00 Dimensional requirements of
the South Burlington Zoning Regu-
lations. Request Is for Permission to
.construct an addition containing S50
square feet (to the restaurant areal
to within flfty (50) feet of the re-
oulred front yard, at 1 Dorset Street.
(6) Appeal of Modlyn M. Walsh seek-
ing a variance, from Section 11.00,
Dimensional requirements of the
South Burlington Zoning Regu.
lations. Request Is for Permission to
construct a 12' X 16' utility storage
building to within two (2) feet of the
westerly rear yard line, at 21 Maple
Maplewood Drive.
(7) Appeal of Gerold C. Jourdan Jr.
seeking a vorlance, from Section
13.00, Non -conforming uses and
structures of the south Burlington
Zoning Regulations. Request is for
Permission to construct one-half of a
second story and remodel the in-
terior of on existing building which I
Is non -conforming to area &
dimensional requirements, of 86
Hadley Roth.
Robert M. Martineau
Chairman
Zoning Dogrd of Adjustment
October 31, 1978
It is the intention of this ad to car•
reel the ad which oppeored Satur-
dav, October 26, 1978. i
•n,•cn �,ecu cum c 0 arnc
1
NOTICE OF APPEAL
SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT
I hereby appeal to the Zoning Board of Adjustment for the following:
conditional use, variance, decision of administrative officer.
Property Owner /J I C4 r, lJ - 1 L^ t. C- .
Property location & description L I
-1, chi , p,i vA NOLA,
Variance of Section ,
(number) (title of section)
Basis of appea
I understand the regular meetings are held twice a month on Monday
at 5:00 p.m. at the City Hall, Conference Room. The legal advertise-
ment must appear in the Burlington Free Press a minimum of fifteen
(15) days before the hearing, I agree to pay a fee of $30.00 which
fee is to off -set the costs of advertising and the hearing.
Hearing DatI6 Si ature or Appel nt
------------------------------
SOUTH BURLINGTON ZONING NOTICE
In accordance with the South Burlington Zoning Regulations and Chapter
117, Title 24 V.S.A. the South Burlington Zoning Board of Adjustment
will hold a public hearing at the South Burlington City Offices,
Conference Room, 1175 Williston Road, South Burlington, Vermont on
J. , at to consider the
(day of week) (nionth and date) (time)
following:
f / Appeal of J ,2„ ) a -
t seeking a from Section , %�'���' /c•A t.d
of the South Burlington
Zoning Regulations. Request is for permission to _444j_4 ;1 t44 -'
�'�d.L�e,. � �"i-•-fit ' �,�,--*��-*�"-�e�, i W �-:�.� .a a-Q.�,� �, �e ,a.e
f t rz� t�%�t.... ,►7 cJ • .=Q % ,"'�,.s apt-�^� /�'�.� �V`'�--�" �e.lt-+� �t. � c�,,,. �.t �.c.�-✓!!
October 31, 1978
Alan D. Palmer
Palmer Circle
Muddy Brook Industrial mark
South Burlington, Vermont 05401
Dear Mr. Palmer:
Be advised that the South Burlington Zoning Board ok.,4dj tment
will hold a public hearing at the South 3urlington Come nce
Room, 1175 Williston Road on Monday, November 13, 1978 at 5:00 p.m.
to consider your request for a zoning variance.
Please plan to attend this hearing.
Very truly,
Richard Ward
Zoning Administrative Officer
RW/mcg
A
r
LL
I:_ -lj
C")
A.
'RELOLATED OAW-
2-' 40 -31
13.
Flowerp-ioic--. CRAMAPPLE
C.
�E LO CA -r&D V\1 I
D.
1 IEW6-ATtFIC-) SC-UTCIA
IKE
12-
11
MVPFE On
III I
BLuF MAT '\U N l PE R
13
i
To
i f
4-25-73
6
•
I
CITY OF SOUTH BURLINGTON
APPLICATION FOR SITE PLAN REVIEW
DATE
NAME OF OWNER �v 6 ►2 TE L . #
ADDRESS
NAME OF
DEVELOPER ��Q �� �h �T� TEL. 616/
c
ADDRESS 022
LOCATION OF PROPOSED SITE
ADJOINING PROPERTY OWNERS
NAME
ADDRESS
SITE IMPROVEMENTS MUST BE DETAILED ON PLAN, BEL0W LIST ESTINLyTED COST
OF:
STOEM DRAINAGE WORK
ENTRANCE & EXIT Iil:PROVEMENTS
LANDSCAPING COST
UTILITIES (SEWER — WATER) —
TOTAL COST OF SITE IlMPROVEMENTS $ 6 cQA
ESTIMATED CONSTRUCTION COSTy. c
COMPLETION DATE OF SITE IMPROVE?,:ENTS
T i /J"r
M
DAY
YEAR
SOILS CONDITIONS, MINIMUM DEPTh OF 4 FEET ,ADDITIONAL INFORMATION MAY
BE ?EQULSTED BY ADMINISTRATIVE OFFICERV-4/'1 ''
NOTE: APPLICATION AND SITE PLAz `UST EE SUBMITTED TC ADMINISTRATIVE
OFFICER SEVEN (7) DAYS PRIOR TO MEETING DATE.
4 0
SIGNATU=tE OF APPLICANT
4/25/78
SSP
SUGGESTED MOTION OF APPROVAL - SITE PLAN
FOR LOT #1, MUDDY BROOK INDUSTRIAL PARK
I move that the South Burlington Planning Commission approve
the site plan application of Mr. Alan Palmer, fir a 2400 sq. ft.
contractor's building, as depicted on a plan entitled, "Site
Plan - Lot 1...", drawn by A.P., dated 3/23/78, subject to the
following stipulations:
1. The required improvements to Williston Road shall be
completed prior to occupancy.
2. A landscaping bond of $1,000 shall be posted.
3. This approval expires 6 months from this date.
{
TYpp-- (;�-- i"*--- DPa�--r, S�\04 boor--- ---uI&P',( _. s -5 z
L,p ( +-1 lei x e7WA4-- Sk-cV-- Fio A.A t
• t=
TRUDELL R 0 U T E-- 2 A
CONSULTING PrIx Z' JS
ENGINEERS, Inc. VALLISTON, VT. 05405
879-6331
October 25-Y 1977
Mr. .1aan Palmer
Palmer Company, Ltd.
2071 'W'illiston Road
South Burlington., 'Ven,,iont- 05401
Re: Muddy Brook Industrial Park
South Burlington, Vermont
Dear I-fr. Palmer:
Percolation tests were conducted at the referenced site on October 18, 1977.
The following results were obtainefl:
Test Pit #1 * Test Pit #7
P 1 15 min/in. P 7 51 min/in.
P 1.)
32 miri/in. P 8 41 min/in.
Test Pit #2
P 3 2 min/in.
2, 4 2 itin/in.
Teat Pit i _1!6
P 5 2 nLin/in.
P 6 2 min/in.
Test Pit #5
P 9 Water in hole
P 10 Water in hole
icated one topographic plan,
th ,Test pit numb-rs correspond wi-t;h those ind-L-
.dated August 12, '3977-
V.
Mr. Alan Palmer
October 25, 1977
Page 2
These results indicate that Lots 1., ', 3 and 4 have a suitable per(,olation
rate. Lot, 5 however has an unacceptable percolation rate and slioudd not be
developed. At this time with subsurface sewage disposal. A De-ferral lbrnit
should be requested tha,L would allow you to construct a warchouse .;-a
similarstructure that does not require disposal facilities.
11' -there are any questions,, plume: contact me at P,-9-6331. "' -
Very truly yours,
TRUDELL CONSULTING ENGINE-E&9, INC.
Frank R. O'Brien
FIR01sp
f
77.
TRUDELL
CONSULTING
ENGINEERS, Inc.
August 31, 1977
Mr. Alan D. Palmer, President
Palmer Company, Ltd.
2071 Williston Road
South Burlington, Vermont 05401
Re: Muddy Brook Industrial Park
South Burlington, Vermont
Dear Mr. Palmer:
ROUTE 2A
BOX 308
WILLISTON, VT. 05495
879.6331
Soils testing was conducted at the referenced site on June 22 and 30, 1977•
The following results were obtained:
Test Pit #1 * Test Pit #5
0 - 12" Topsoil 0 - 6" Topsoil
12" - 96" Silty sand 6" - 30" Fine sand
No groundwater 30" - 54" Clay
Test Pit #2
0 - 6" Topsoil
6" - 110" Medium sand
No groundwater
Test Pit #33
0 - 10" Topsoil
10" - 84" Silty sand
No groundwater
Test Pit #4
No groundwater
Test Pit #6
0 - 6" Topsoil
6" - 60" Medium sand
60" Hard pan
No groundwater
Test Pit #7
0 - 24" Fine sand
24" - 66" Fine sandy silt,
trace clay
No groundwater
0 - 6" Topsoil
6" - 60" Fine sand
60" - 84" Dense clay
No groundwater
# Test pit numbers correspond with those indicated on the topographic plan,
dated August 12, 1977•
f � �
Mr. Alan D. Palmer, President
August 31, 1977
Page 2
Test Pit #$
0 - 1211 Fine sand
12" - 4811 Silty clay
No groundwater
Test Pit #9
0 3611 Fine sand
36" - 90" Medium sand
No groundwater
Should you have any questions, please contact this office.
Very truly yours,
CSULT ENGI NEE , INC.
P.E.ad P. Trudell, President
RPT/slp