Loading...
HomeMy WebLinkAboutVR-78-0000 - Supplemental - 0015 Palmer CourtPALMER Muddy Brook Industrial Park Area zoned Industrial District Section 11.15 multiple use- no more than one use or structure per lot. Proposed uses: 1- plastic bottle manufacture,B (4,000 Square feet.) 2T Wholesales gases ( 02-CM 2 etc.) distributor- (2, 100 square feet.) 3- Ski service center- shop and storage (5,480 square feet.) Uses are permitted. Q LEGAL NOTICES 1 SOUTH BURLINGTON ZONING NOTICE In occordonce with the South Bur- lington Zoning Regulations and Chapter 117, Title 26 V.S.A. the South Burlington Zoning Board of Adlust. ment will hold a public hearing at the South Burlington City Offices, Conference Room, 117S Williston Road, South Burlington, Vermont on Monday, November 13, 1979, at 5:0g p.m. to consider the following: (1) Appeal of Rheol and Helen Gagnon seeking a variance, from Section 13.00, Non -conforming struc- tures of the South Burlington Zoning Resviations. Request is for per-( mission to construct on addition con-! foining 1950 sovore feet with at., toched 24' X 36' paroge to on existing single family dwelling which is to-) toted to within twenty-five (25) feet; of the northerly side vord, at 1520 ,;:.ear Si eet. (2) Arceol of Kenneth A. Daley seek. ing a vq•Ionce, from Section 11.00 , Dimensional, area, density require. ments 6 Section 11.15 multiple use of the South Burlington Zoning Rego- , lotions. Reovest is for permission to locate a 10' X 50' mobile home on a lot presently occupied by a single family dwelling, lot contains 14,7501 square feet, at 1227 Airport Drive. (3) Appeal of Wilfred and Bonnie, Kirby seeking a variance, from Sec- tion 11.00, Dimensional requirement I of the South Burlington Zoning Regu- lotions. Request Is for permission to construct o single family dwelling (24' X 601 with attached (20' X 201 1 goroge to within twenty-three (23) feet of the required front Yard, at 15 Sherry Road. , (4) Appeal of Alan D. Palmer seek- ing o variance, from Section 11.15, Multiple Uses of the South Burling. i ton Zoning Regulations. Request is . for Permission to establish three] businesses (plastic bottle manufoc- f Curer. wholesale gases distributor 1 and a ski service center) from a building containing I1,S80 square feet, located at lot no. 2, Muddy Brook Industrial Park. (3) Appeal of Merllin Corporation, d.b.o. Howard Johnson's seeking a variance, from Sectton 13.00, non. conforming structures & Section 11.00 Dimensional requirements of the South Burlington Zoning Regu- lations. Request Is for Permission to .construct an addition containing S50 square feet (to the restaurant areal to within flfty (50) feet of the re- oulred front yard, at 1 Dorset Street. (6) Appeal of Modlyn M. Walsh seek- ing a variance, from Section 11.00, Dimensional requirements of the South Burlington Zoning Regu. lations. Request Is for Permission to construct a 12' X 16' utility storage building to within two (2) feet of the westerly rear yard line, at 21 Maple Maplewood Drive. (7) Appeal of Gerold C. Jourdan Jr. seeking a vorlance, from Section 13.00, Non -conforming uses and structures of the south Burlington Zoning Regulations. Request is for Permission to construct one-half of a second story and remodel the in- terior of on existing building which I Is non -conforming to area & dimensional requirements, of 86 Hadley Roth. Robert M. Martineau Chairman Zoning Dogrd of Adjustment October 31, 1978 It is the intention of this ad to car• reel the ad which oppeored Satur- dav, October 26, 1978. i •n,•cn �,ecu cum c 0 arnc 1 NOTICE OF APPEAL SOUTH BURLINGTON ZONING BOARD OF ADJUSTMENT I hereby appeal to the Zoning Board of Adjustment for the following: conditional use, variance, decision of administrative officer. Property Owner /J I C4 r, lJ - 1 L^ t. C- . Property location & description L I -1, chi , p,i vA NOLA, Variance of Section , (number) (title of section) Basis of appea I understand the regular meetings are held twice a month on Monday at 5:00 p.m. at the City Hall, Conference Room. The legal advertise- ment must appear in the Burlington Free Press a minimum of fifteen (15) days before the hearing, I agree to pay a fee of $30.00 which fee is to off -set the costs of advertising and the hearing. Hearing DatI6 Si ature or Appel nt ------------------------------ SOUTH BURLINGTON ZONING NOTICE In accordance with the South Burlington Zoning Regulations and Chapter 117, Title 24 V.S.A. the South Burlington Zoning Board of Adjustment will hold a public hearing at the South Burlington City Offices, Conference Room, 1175 Williston Road, South Burlington, Vermont on J. , at to consider the (day of week) (nionth and date) (time) following: f / Appeal of J ,2„ ) a - t seeking a from Section , %�'���' /c•A t.d of the South Burlington Zoning Regulations. Request is for permission to _444j_4 ;1 t44 -' �'�d.L�e,. � �"i-•-fit ' �,�,--*��-*�"-�e�, i W �-:�.� .a a-Q.�,� �, �e ,a.e f t rz� t�%�t.... ,►7 cJ • .=Q % ,"'�,.s apt-�^� /�'�.� �V`'�--�" �e.lt-+� �t. � c�,,,. �.t �.c.�-✓!! October 31, 1978 Alan D. Palmer Palmer Circle Muddy Brook Industrial mark South Burlington, Vermont 05401 Dear Mr. Palmer: Be advised that the South Burlington Zoning Board ok.,4dj tment will hold a public hearing at the South 3urlington Come nce Room, 1175 Williston Road on Monday, November 13, 1978 at 5:00 p.m. to consider your request for a zoning variance. Please plan to attend this hearing. Very truly, Richard Ward Zoning Administrative Officer RW/mcg A r LL I:_ -lj C") A. 'RELOLATED OAW- 2-' 40 -31 13. Flowerp-ioic--. CRAMAPPLE C. �E LO CA -r&D V\1 I D. 1 IEW6-ATtFIC-) SC-UTCIA IKE 12- 11 MVPFE On III I BLuF MAT '\U N l PE R 13 i To i f 4-25-73 6 • I CITY OF SOUTH BURLINGTON APPLICATION FOR SITE PLAN REVIEW DATE NAME OF OWNER �v 6 ►2 TE L . # ADDRESS NAME OF DEVELOPER ��Q �� �h �T� TEL. 616/ c ADDRESS 022 LOCATION OF PROPOSED SITE ADJOINING PROPERTY OWNERS NAME ADDRESS SITE IMPROVEMENTS MUST BE DETAILED ON PLAN, BEL0W LIST ESTINLyTED COST OF: STOEM DRAINAGE WORK ENTRANCE & EXIT Iil:PROVEMENTS LANDSCAPING COST UTILITIES (SEWER — WATER) — TOTAL COST OF SITE IlMPROVEMENTS $ 6 cQA ESTIMATED CONSTRUCTION COSTy. c COMPLETION DATE OF SITE IMPROVE?,:ENTS T i /J"r M DAY YEAR SOILS CONDITIONS, MINIMUM DEPTh OF 4 FEET ,ADDITIONAL INFORMATION MAY BE ?EQULSTED BY ADMINISTRATIVE OFFICERV-4/'1 '' NOTE: APPLICATION AND SITE PLAz `UST EE SUBMITTED TC ADMINISTRATIVE OFFICER SEVEN (7) DAYS PRIOR TO MEETING DATE. 4 0 SIGNATU=tE OF APPLICANT 4/25/78 SSP SUGGESTED MOTION OF APPROVAL - SITE PLAN FOR LOT #1, MUDDY BROOK INDUSTRIAL PARK I move that the South Burlington Planning Commission approve the site plan application of Mr. Alan Palmer, fir a 2400 sq. ft. contractor's building, as depicted on a plan entitled, "Site Plan - Lot 1...", drawn by A.P., dated 3/23/78, subject to the following stipulations: 1. The required improvements to Williston Road shall be completed prior to occupancy. 2. A landscaping bond of $1,000 shall be posted. 3. This approval expires 6 months from this date. { TYpp-- (;�-- i"*--- DPa�--r, S�\04 boor--- ---uI&P',( _. s -5 z L,p ( +-1 lei x e7WA4-- Sk-cV-- Fio A.A t • t= TRUDELL R 0 U T E-- 2 A CONSULTING PrIx Z' JS ENGINEERS, Inc. VALLISTON, VT. 05405 879-6331 October 25-Y 1977 Mr. .1aan Palmer Palmer Company, Ltd. 2071 'W'illiston Road South Burlington., 'Ven,,iont- 05401 Re: Muddy Brook Industrial Park South Burlington, Vermont Dear I-fr. Palmer: Percolation tests were conducted at the referenced site on October 18, 1977. The following results were obtainefl: Test Pit #1 * Test Pit #7 P 1 15 min/in. P 7 51 min/in. P 1.) 32 miri/in. P 8 41 min/in. Test Pit #2 P 3 2 min/in. 2, 4 2 itin/in. Teat Pit i _1!6 P 5 2 nLin/in. P 6 2 min/in. Test Pit #5 P 9 Water in hole P 10 Water in hole icated one topographic plan, th ,Test pit numb-rs correspond wi-t;h those ind-L- .dated August 12, '3977- V. Mr. Alan Palmer October 25, 1977 Page 2 These results indicate that Lots 1., ', 3 and 4 have a suitable per(,olation rate. Lot, 5 however has an unacceptable percolation rate and slioudd not be developed. At this time with subsurface sewage disposal. A De-ferral lbrnit should be requested tha,L would allow you to construct a warchouse .;-a similarstructure that does not require disposal facilities. 11' -there are any questions,, plume: contact me at P,-9-6331. "' - Very truly yours, TRUDELL CONSULTING ENGINE-E&9, INC. Frank R. O'Brien FIR01sp f 77. TRUDELL CONSULTING ENGINEERS, Inc. August 31, 1977 Mr. Alan D. Palmer, President Palmer Company, Ltd. 2071 Williston Road South Burlington, Vermont 05401 Re: Muddy Brook Industrial Park South Burlington, Vermont Dear Mr. Palmer: ROUTE 2A BOX 308 WILLISTON, VT. 05495 879.6331 Soils testing was conducted at the referenced site on June 22 and 30, 1977• The following results were obtained: Test Pit #1 * Test Pit #5 0 - 12" Topsoil 0 - 6" Topsoil 12" - 96" Silty sand 6" - 30" Fine sand No groundwater 30" - 54" Clay Test Pit #2 0 - 6" Topsoil 6" - 110" Medium sand No groundwater Test Pit #33 0 - 10" Topsoil 10" - 84" Silty sand No groundwater Test Pit #4 No groundwater Test Pit #6 0 - 6" Topsoil 6" - 60" Medium sand 60" Hard pan No groundwater Test Pit #7 0 - 24" Fine sand 24" - 66" Fine sandy silt, trace clay No groundwater 0 - 6" Topsoil 6" - 60" Fine sand 60" - 84" Dense clay No groundwater # Test pit numbers correspond with those indicated on the topographic plan, dated August 12, 1977• f � � Mr. Alan D. Palmer, President August 31, 1977 Page 2 Test Pit #$ 0 - 1211 Fine sand 12" - 4811 Silty clay No groundwater Test Pit #9 0 3611 Fine sand 36" - 90" Medium sand No groundwater Should you have any questions, please contact this office. Very truly yours, CSULT ENGI NEE , INC. P.E.ad P. Trudell, President RPT/slp