Loading...
HomeMy WebLinkAboutSD-18-26 - Supplemental - 1398 Hinesburg Road (3)04kO'Leary -Burke Civil Associates, PLC CIVIL ENGINEERING I REGULATORY AND PERMIT PREPARATION I LAND SURVEYING I CONSTRUCTION SERVICES I LAND USE PLANNING July 17, 2018 Mr. Ray Belair Zoning Administrator 575 Dorset Street So. Burlington, VT 05403 RE: Gardner Parcel A 7 Lot, 23 Unit PRD 1398 Hinesburg Road, South Burlington, VT Dear Ray: We are writing on behalf of Gardner Construction, Inc. (c/o Brad Gardner) to request Development Review Board scheduling and review of the attached Sketch Plan for a 7 Lot, 23 Unit PRD located at 1398 Hinesburg Road. A Sketch Plan was previously submitted to the City on 1/15/2016 and was presented to the DRB on 4/5/2016. As it has been more than 6 months since the DRB Sketch Plan hearing, we are resubmitting the attached application for Sketch Plan review. The attached plans have been revised to incorporate feedback from the 4/5/2016 Sketch Plan hearing. The project involves two parcels owned by Brad Gardner (Parcel ID #0860-01398) totaling 5.84 acres. The parcels are located within the Southeast Quadrant - Neighborhood Residential zoning district. The proposal is to dissolve the lot line between the existing parcels and subdivide the parcel into 7 lots. A total of 23 units are proposed. Of the 23 units, one (1) unit is the existing single family home to remain, four (4) are proposed single family lots, twelve (12) are proposed carriage homes and three (3) are duplexes. Units 1-4 are currently proposed as 1 story units as to minimize the developments visual impact from Hinesburg Road. As part of this subdivision Wildflower Drive is to be extended from the "Summerfield" subdivision to the south and connect back into Hinesburg Road at the existing driveway location for 1398 Hinesburg Road directly opposite Butler Drive. Per a 1/20/16 meeting with City Staff, Wildflower Drive is proposed at 24' wide, to minimize impervious surface and match the existing pavement width within the Summerfield subdivision. All units will be served by municipal water and sewer. There is an existing Class II Wetland in the north-west corner of the property and Class III wetlands located along the eastern property line and western property line. The connection of Wildflower Drive directly across from Butler Drive will have marginal impact to the Class II wetland and buffer. Detailed information regarding the proposed wetland impacts will be provided with our preliminary submittal. 13 CORPORATE DRIVE ESSEX JUNCTION VERMONT 05452 TEL 802 878 9990 1 FAX 802 878 9989 1 obca@olearyburke.com Ray Belair 7/17/2018 Page 2 Please see below for a summary of the plan changes as a result of the former Staff Report, Sketch Hearing and meeting with Staff: 1) The duplex units along the southerly property line (adjacent to the Summerfield development) have been replaced with carriage homes to fit the character of the surrounding neighborhood. This results in three (3) units vs. the four (4) units previously at this location. 2) The common amenity area has been revised to remove a carriage unit (Unit 7 in the previous 1/15/2016 submittal) to increase the Common Land area and make the area more accessible to the surrounding neighborhood. The plans have been forwarded to a Landscape Architect who will provide additional detail regarding the common amenity area with the preliminary submission. 3) Per a conversation between Brad Gardner and Kevin Dorn, the six (6) carriage homes located in the north-west corner of the property are sized based on the existing homes located on Kirby Road. These six (6) units replace the previous three (3) units at the north- west corner and result in one (1) additional unit, despite the reduction of one (1) unit along the southerly boundary and one (1) unit abutting the Common Land. 4) The private drives serving units 6-11 & 17-22 have been reduced to 200' in length. Please find the following information for Staff and Development Review Board review and approval: 1) Application for Sketch Plan Review; 2) Sketch Plan Review Application with $1,450.50 application fee (($350 base + $13 recording fee + ($25 / 1st two units x 2 units) + ($50 / units 3-9 x 7 units) + ($25 / units 10-22 x 13 units) + (50% x $725(per unit/lot fee in SEQ)) = $1,450.50); 3) Three (3) full size and one (1) reduced, 11" x 17" copies of Sheet 1, Sketch Plan; 4) CD with Digital PDF of Sheet 1, Sketch Plan; 5) Abutters List; Please call if you have any questions. Sincerely, Daniel J. Heil, PE Enclosures cc: Brad Gardner Z:\2012\2012-84\CITY OF SOUTH BURLINGTON\SKETCH PLAN 2018\2012-84 - SKETCH COVER.DOC 4► southburtingt®n PLANNING & ZONING Permit Number SD - (office use only) APPLICATION FOR SUBDIVISION SKETCH PLAN REVIEW SOUTHEAST QUADRANT All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. For amendments, please provide pertinent information only. 1) OWNER(S) OF RECORD (Name(s) as shown on deed, mailing address, phone and fax Bradley C. Gardner P.O. Box 21, Colchester, VT 05446 email:brad@Iivingvermont.com; phone:373-8661 2) LOCATION OF LAST RECORDED DEED(S) (Book and page #) Book 692 Page 353, Book 1359 Page 238 3) APPLICANT (Name, mailing address, phone and fax #) Gardner Construction, Inc. (c/o Bradley Gardner), P.O. Box 21, Colchester, VT 05446 email:brad@livingvermont.com; phone:373-8661 4) APPLICANT'S LEGAL INTEREST IN THE PROPERTY (fee simple, option, etc.) Fee Simple 5) CONTACT PERSON (Name, mailing address, phone and fax #) David W. Burke or Daniel Heil 13 Corporate Drive, Essex Jct. VT 05452 phone: 878-9990 5a) CONTACT EMAIL ADDRESS dwburke@olearyburke.com 6) PROJECT STREET ADDRESS: 1398 Hinesburg Road, South Burlington, VT 05403 7) TAX PARCEL ID # (can be obtained at Assessor's Office) 0860-01398 8) PROJECT DESCRIPTION a) General project description (explain what you want approval for): A 7 Lot, 23 Unit PRD, comprised of 1 existing single family home, 4 proposed single family lots 12 carriage homes and 3 duplexes. All lots served by municipal water and sewer. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com b) Existing Uses on Property (including description and size of each separate use Existing 2,900 SF Single Family Home on property to remain c) Proposed Uses on property (include description and size of each new use and existing uses to remain) 1 existing single family home, 4 proposed single family lots, 12 carriage homes and 3 duplexes. d) Total building square footage on property (proposed buildings and existing buildings to remain) Proposed 34,100 SF and Existing 2,900 SF to remain. e) Proposed height of building (if applicable) 128 f) Total parcel size(s) 5.84 Acres g) Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable) N/A 9) 9a: SEQ SUBDISTRICT (identify in each) Acreage Units Existing Units proposed NRP N RT NR / NRN 5.84 1 23 VR VC 9b: Are Transfer of Development Rights (TDRs) being utilized? Yes If yes, please identify how many and from which parcel (street address) The property has Seven (7) inherent TDRs (5.84 acres x 1.2 units /acre = 7.01) 10 TDRs are necessary as we understand units 6-11 do not require TDRs per a conversation between Brad Gardner and Kevin Dorn. 10) TYPE OF EXISTING OR PROPOSED ENCUMBRANCES ON PROPERTY (easements, covenants, leases, rights of way, etc.) Proposed Wildflower Drive ROW, Sidewalk Easement on Lots 12-16 & 25. Ingress/Egress Easement across Unit 17-22 private road. Sanitary Sewer easement on Lots 24 & 25, Stormwater easement on Lots 12,13 & 25. 2 Southeast Quadrant Sketch Plan Application Form. Rev. 2-2018 11) LOT COVERAGE a) Building: Existing 2.5 % Proposed 14.5 % b) Overall (building, parking, outside storage, etc) Existing 7.3 % Proposed 34.2 % c) Front yard (along each street) Existing 5.5 % Proposed 37.2 12) PROPOSED EXTENSION, RELOCATION, OR MODIFICATION OF MUNICIPAL FACILITIES (sanitary sewer, water supply, streets, storm drainage, etc.) Proposed sanitary sewer and watermain extension, proposed Wildflower Drive extension. 13) ESTIMATED PROJECT COMPLETION DATE 2019 Site Infrastructure; Est. 2019 - 2021 for Units 14) PLANS AND FEE Plat plans shall be submitted which shows the information required by the City's Land Development Regulations. Three (3) regular size copies, one reduced copy (11" x 17"), and one digital (PDF-format) copy of the plans must be submitted. The application fee shall be paid to the City at the time of submitting the application. See the City fee schedule for details. NOTE: NOTIFICATION of ADJOINING PROPERTY OWNERS: Notification of adjoining property owners, in accordance with 24 V.S.A. §4464(a) and Section 17.06(B) of the South Burlington Land Development Regulations, is the responsibility of the applicant. After deeming an application complete, the Administrative Officer will provide the applicant with a draft meeting agendas or public hearing notice and sample certificate of service. The sworn certificate of service shall be returned to the City prior to the start of any public hearing. I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNA RE OF APPLICANT SIGNATURE F PROPERTY OWNER Do not write below this line DATE OF SUBMISSION: I have reviewed this sketch plan application and find it to be: Domplete ❑ ncomplete Administrative Officer Date The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802) 879-5676 to speak with the regional Permit Specialist. Southeast Quadrant Sketch Plan Application Form. Rev. 2-2018 2012‐84 – Gardner ‐ Hinesburg Road  Abutters List  7/17/18    Parcel ID#: 1805‐00055  Shu Teng Zhao & Xiu Hua Hu  55 Wildflower Drive  South Burlington, VT 05403    Parcel ID#: 1805‐00079  Esther Abrams Trust  79 Wildflower Drive  South Burlington, VT 05403    Parcel ID#: 1805‐00082  Amie & Anthony Carpenter  82 Wildflower Drive  South Burlington, VT 05403    Parcel ID#: 1002‐00012  Faith McDonald Trust  12 Knoll Circle  South Burlington, VT 05403    Parcel ID#: 1002‐00014  Lon Finklestein   14 Knoll Circle  South Burlington, VT 05403    Parcel ID#: 1002‐00016  Gary & Nancy Lines  16 Knoll Circle  South Burlington, VT 05403    Parcel ID#: 1002‐00018  Christopher & Theri Davis  18 Knoll Circle  South Burlington, VT 05403    Parcel ID#: 1155‐00284  SBRC Properties, LLC.  85 Shunkpike Road  Williston, VT 05495    Parcel ID#: 0860‐01400  Jackson Applebaum   1400 Hinesburg Road  South Burlington, VT 05403    Parcel ID#: 0860‐01402  Brian Armstrong & Lora Wilson  50 Old Farm Road  South Burlington, VT 05403    Parcel ID#: 0860‐01175  City of South Burlington  575 Dorset St  South Burlington, VT 05403                        CITY OF SOUTH BURLINGTON CERTIFICATE OF SERVICE I hereby certify that on this 27 day of July , 2018 , a copy of the foregoing public notice for Sketch Plan [type of application] # SD-18-26 [application number], was sent by U.S. mail, postage prepaid to the owners of all properties adjoining the subject property to development, without regard to any public right-of-way, and including the description of the property and accompanying information provided by the City of South Burlington. I further certify that this notification was provided to the following parties in accordance with 24 V.S.A. §4464(a) and Section 17.06(B) of the South Burlington Land Development Regulations: List of recipients: (full names and addresses) See attached abutters list Dated at Essex [town/city], Vermont, this 27 day of July , 2018 Printed Name: Daniel Heil, P.E. Phone number and email: (842 78-999 ; d ii lea burke.com Signature: Date: Remit to: City of South Burlington Department of Planning & Zoning 575 Dorset Street South Burlington, VT 05403 South Burlington Sample Certificate of Service Form. Rev. /-2012 2012-84 — Gardner - Hinesburg Road Abutters List 7/17/18 Parcel I D#: 1805-00055 Parcel I D#: 1002-00016 Shu Teng Zhao & Xiu Hua Hu Gary & Nancy Lines 55 Wildflower Drive 16 Knoll Circle South Burlington, VT 05403 South Burlington, VT 05403 Parcel I D#: 1805-00079 Parcel I D#: 1002-00018 Esther Abrams Trust Christopher & Theri Davis 79 Wildflower Drive 18 Knoll Circle South Burlington, VT 05403 South Burlington, VT 05403 Parcel ID#: 1805-00082 Parcel ID#: 1155-00284 Arnie & Anthony Carpenter SBRC Properties, LLC. 82 Wildflower Drive 85 Shunkpike Road South Burlington, VT 05403 Williston, VT 05495 Parcel I D#: 1002-00012 Parcel I D#: 0860-01400 Faith McDonald Trust Jackson Applebaum 12 Knoll Circle 1400 Hinesburg Road South Burlington, VT 05403 South Burlington, VT 05403 Parcel I D#: 1002-00014 Parcel I D#: 0860-01402 Lon Finklestein Brian Armstrong & Lora Wilson 14 Knoll Circle 50 Old Farm Road South Burlington, VT 05403 South Burlington, VT 05403 Parcel I D#: 0860-01175 City of South Burlington 575 Dorset St South Burlington, VT 05403 Page is too large to OCR. 1 Marla Keene From:David Burke <dwburke@olearyburke.com> Sent:Tuesday, August 21, 2018 4:46 PM To:Paul Conner Cc:Marla Keene; Dan Heil; Charlotte Gardner (charlotte@livingvermont.com); brad@livingvermont.com Subject:Re: Link to 8/21/2018 DRB Packet Paul: While your recollection differs from ours, thank you for replying.     We remain hopeful due to being at the Sketch level the Sketch that the DRB will see some positives in the changes made  since  the 2016 Hearing.    We understand more work is necessary for the Common Amenity Area, but suggest it’s a bit premature at the Sketch  level.    David Burke  O'Leary‐Burke Civil Associates    Sent from my iPhone    On Aug 21, 2018, at 4:23 PM, Paul Conner <pconner@sburl.com> wrote:  Hi David –     Thank you for your note. It’s my understanding that Marla spoke with you last week regarding the  Hinesburg North View Protection District. It’s a restriction on the property that all parties must have  missed in April 2016, but certainly better to know now than at a later stage in the review. You note that  you may wish to seek a zoning amendment on this item. Should you wish to do so, the Planning  Commission has a policy in place for the consideration of zoning amendments. I’ve attached it for you.  The Commission’s next round of “initial reviews” will take place on October 9th; the deadline for  submission of requests is September 7th. The following round will be in March/April.     Regarding the rest of the design, as you know, the Board provided feedback in April of 2016 regarding  the overall design and intensity of the layout as presented. Staff’s notes at this sketch plan is, we  believe, consistent with the Board’s guidance and with our prior general feedback. We do appreciate the  modifications that were made to the Wildflower loop road dimensions.     With regards to the open space, from staff’s perspective we feel it is possible this area could if well  designed, and so that is why our comments focused on the need for a preliminary layout of this area.  With regards to the dead‐end roads and overall site layout, our notes indicate, as we have before, that  design as presented is problematic and we have encouraged your team to look into alternative  arrangements that better meet the purposes of the regulations.     We are happy to work with your team in any way that can be of help.     Marla will be our staff person at tonight’s DRB meeting.     Sincerely,     2 Paul                    <image003.jpg>     Paul Conner, AICP  Director of Planning & Zoning  City of South Burlington  575 Dorset Street  South Burlington, VT 05403  (802) 846‐4106  www.sbvt.gov     Notice ‐ Under Vermont’s Public Records Act, all e‐mail, e‐mail attachments as well as paper copies of documents received or  prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City  business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made  confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your  cooperation.         From: David Burke <dwburke@olearyburke.com>   Sent: Monday, August 20, 2018 4:01 PM  To: Paul Conner <pconner@sburl.com>; Marla Keene <mkeene@sburl.com>  Cc: Dan Heil <dheil@olearyburke.com>; Charlotte Gardner (charlotte@livingvermont.com)  <charlotte@livingvermont.com>; brad@livingvermont.com  Subject: FW: Link to 8/21/2018 DRB Packet     Paul / Marla: I am writing to inquire as to whether Paul intends to be present at tomorrow’s DRB  Hearing. As you may be aware the Staff Notes for the Gardner’s Sketch Plan at 1398 Hinesburg Road are  not good, stating “several major issues of concern with the proposal” and recommending “continuing  the meeting to address issues with the application form, if any, and to potentially allow design technical  review”.     We feel that this submission did address the issues formally raised at the 4/5/2016 Sketch Hearing as  outlined in our July 17, 2018 cover letter. Namely, the two (2) duplex Units formerly proposed along the  southerly property line were reduced to three (3) single Units to better blend with the Wildflower loop  single family homes, former Unit 7 was eliminated in the interior circle to provide for an increased  Common Amenity Area and the Private Roads serving Units 6 – 11 and 17 – 22 were reduced in length to  not exceed the 200 lf requirement. While two (2) Units were removed at key locations the change to six  (6) small Units at the northeast corner of the parcel replace the former three (3) larger Units resulting in  a change from 22 to 23 Units.     Hopefully, Paul recalls that this proposal had an informal meeting with Staff including you prior to the  additional land at the northwest corner of the parcel purchased from South Burlington Realty Company  and more importantly had a “Design Technical review” meeting on 1/20/16 as referenced in our July 17,  2018 cover letter for this submission. While my notes nor recollection recall specific discussion of the  “Hinesburg North View Protection District”, the layout at the northwest corner of the project is the  same as reviewed at the 1/20/16 meeting at which we discussed these Units being 1 story to reduce the  visual impact from Hinesburg Road and were asked to include a porch and front façade appearance on  3 Unit 1 (done),  Justin Rabidoux requested a decrease in road width for consistency with Wildlife Loop  (done) and Paul discussed the need for a better Common Amenity Area. As stated above and in our July  17, 2018 cover letter, a Unit was eliminated in this area. In addition, the Gardner’s did hire Terry Krinski  Landscape Architect who did come up with a Concept which will be finalized and provided with  Preliminary Plan submission.      In addition to the above regarding the “Hinesburg North View Protection District” the Gardner’s moved  forward with the purchase of the approximate 1 acre parcel from South Burlington Realty Company  following the 1/20/16 meeting with Staff and the 4/5/2016 DRB Hearing as well as the subsequent Re‐ Zoning of the 1 acre to allow for the purchase and use with this project. In review of the Regulations  regarding Scenic View Protection Overlay District we are in hopes that the DRB will grant a waiver for  Units 1 – 5. If not, we will pursue a re‐designation of the District to be consistent with the re‐zoning as it  appears the 1 acre was merely a southwest appendage of the South Burlington Realty Company lands  and had little if anything else to do to “..encourage the preservation of spectacular views of the Green  Mountains”.     Paul, we are in hopes that you have planned on attending tomorrow’s DRB hearing and regardless,  request your input on the above. We look forward to hearing from you.        David W. Burke      From: Marla Keene [mailto:mkeene@sburl.com] Sent: Friday, August 17, 2018 4:01 PM To: Jennifer Desautels; Brandon Bless; David Burke; Peter Ewing; Joe Tanguay Subject: Link to 8/21/2018 DRB Packet     Applicants,     Below is the link to DRB packet for 8/21/2018. This is a general link that you can use for all packets going  forward. On the left side of the page, click on Development Review Board, then agendas, then the  appropriate meeting date. If the packet is not there when you go to the link, then it will be up by 4:30.     http://clerkshq.com/default.ashx?clientsite=SouthBurlington‐vt     Sincerely,  <image004.jpg>  Marla Keene, PE   Development Review Planner   City of South Burlington   575 Dorset Street   South Burlington, VT 05403   (802) 846‐4106   www.southburlingtonvt.gov     Notice - Under Vermont’s Public Records Act, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your cooperation.      4 <Amendment Review Policy Adopted 7‐10‐2018.pdf>  1 Marla Keene From:Dan Heil <dheil@olearyburke.com> Sent:Monday, October 29, 2018 3:30 PM To:Paul Conner; Marla Keene Cc:brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com); rich@livingvermont.com; David Burke; Cathyann LaRose Subject:RE: 2012-84 - 1398 Hinesburg Road View Protection Rezoning Hi Paul/Marla,     Following up from the 8/21/2108 DRB Meeting and 10/9/2018 Planning Commission Meeting, it appears the Planning  Commission will be moving forward with looking into amending the View Protection Corridor at 1398 Hinesburg Road,  although the timeframe is not exactly clear when this will occur.     The continuation of the 1398 Hinesburg Road Sketch Plan (SD‐18‐26) is scheduled for the DRB on 11/6/2018. The intent  of continuing SD‐18‐26 was to allow for the 6 month approval window to align with Planning Commission  recommendation to remove the view protection corridor, and as we are unsure when the Planning Commission will be  taking this item up, we are requesting that the DRB continue SD‐18‐26 to the maximum date that they’re  conformfortable with.    We were not planning on attending the DRB meeting next week so please pass this request along to the DRB. If you  need a formal letter please let me know.     Thanks,   Dan      Daniel Heil, PE | O'Leary‐Burke Civil Associates, PLC      From: Dan Heil   Sent: Tuesday, October 09, 2018 4:40 PM  To: 'Paul Conner' <pconner@sburl.com>  Cc: brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com) <charlotte@livingvermont.com>;  rich@livingvermont.com; Marla Keene <mkeene@sburl.com>; David Burke <dwburke@olearyburke.com>; Cathyann  LaRose <clarose@sburl.com>  Subject: RE: 2012‐84 ‐ 1398 Hinesburg Road View Protection Rezoning    Thank you Paul!     Daniel Heil, PE | O'Leary‐Burke Civil Associates, PLC      From: Paul Conner [mailto:pconner@sburl.com]   Sent: Tuesday, October 09, 2018 4:22 PM  To: Dan Heil <dheil@olearyburke.com>  Cc: brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com) <charlotte@livingvermont.com>;  rich@livingvermont.com; Marla Keene <mkeene@sburl.com>; David Burke <dwburke@olearyburke.com>; Cathyann  LaRose <clarose@sburl.com>  Subject: RE: 2012‐84 ‐ 1398 Hinesburg Road View Protection Rezoning  2   Hi Dan –    In case you didn’t get  chance to look for the packet on the website, here is the Planning Commission packet for this  evening.        Paul Conner, AICP  Director of Planning & Zoning  City of South Burlington  575 Dorset Street  South Burlington, VT 05403  (802) 846‐4106  www.sbvt.gov    Notice ‐ Under Vermont’s Public Records Act, all e‐mail, e‐mail attachments as well as paper copies of documents received or prepared for use in  matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as  public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in  error, please notify us immediately by return email. Thank you for your cooperation.       From: Dan Heil <dheil@olearyburke.com>   Sent: Friday, October 5, 2018 9:08 AM  To: Paul Conner <pconner@sburl.com>  Cc: brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com) <charlotte@livingvermont.com>;  rich@livingvermont.com; Marla Keene <mkeene@sburl.com>; David Burke <dwburke@olearyburke.com>; Cathyann  LaRose <clarose@sburl.com>  Subject: RE: 2012‐84 ‐ 1398 Hinesburg Road View Protection Rezoning    Thank you Paul. Will Staff notes be issued for the request? If not, does Staff support the proposal to remove the portion  of the Hinesburg Road North View Protection Zone located on the northern portion of the 1398 Hinesburg Road parcel.     Daniel Heil, PE | O'Leary‐Burke Civil Associates, PLC      From: Paul Conner [mailto:pconner@sburl.com]   Sent: Friday, October 05, 2018 9:02 AM  To: Dan Heil <dheil@olearyburke.com>  Cc: brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com) <charlotte@livingvermont.com>;  rich@livingvermont.com; Marla Keene <mkeene@sburl.com>; David Burke <dwburke@olearyburke.com>; Cathyann  LaRose <clarose@sburl.com>  Subject: RE: 2012‐84 ‐ 1398 Hinesburg Road View Protection Rezoning    Hi Dan –    Yes, towards the end of the day today. Confirming that the request will be on the agenda, though, and likely in the 7 pm  to 8 pm timeframe.  3       Paul Conner, AICP  Director of Planning & Zoning  City of South Burlington  575 Dorset Street  South Burlington, VT 05403  (802) 846‐4106  www.sbvt.gov    Notice ‐ Under Vermont’s Public Records Act, all e‐mail, e‐mail attachments as well as paper copies of documents received or prepared for use in  matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as  public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in  error, please notify us immediately by return email. Thank you for your cooperation.       From: Dan Heil <dheil@olearyburke.com>   Sent: Friday, October 5, 2018 8:29 AM  To: Paul Conner <pconner@sburl.com>  Cc: brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com) <charlotte@livingvermont.com>;  rich@livingvermont.com; Marla Keene <mkeene@sburl.com>; David Burke <dwburke@olearyburke.com>; Cathyann  LaRose <clarose@sburl.com>  Subject: RE: 2012‐84 ‐ 1398 Hinesburg Road View Protection Rezoning    Hi Paul,     I noticed that the Agenda and Staff notes have not been posted online for next Tuesday’s Planning Commission meeting.  Do you know when these items will be available?    Thanks,   Dan     Daniel Heil, PE | O'Leary‐Burke Civil Associates, PLC      From: Dan Heil   Sent: Monday, October 01, 2018 1:40 PM  To: 'Paul Conner' <pconner@sburl.com>  Cc: brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com) <charlotte@livingvermont.com>;  rich@livingvermont.com; Marla Keene <mkeene@sburl.com>; David Burke <dwburke@olearyburke.com>  Subject: RE: 2012‐84 ‐ 1398 Hinesburg Road View Protection Rezoning    Hi Paul,     Following up on the below, is there an agenda for the October 9th Planning Commission meeting? I’m assuming the 1398  Hinesburg Road View Protection Corridor topic is to be heard at this meeting.     4 Will Staff be preparing notes for the Planning Commission on this item? If so will you please forward once available?    Thanks,   Dan     Daniel Heil, PE | O'Leary‐Burke Civil Associates, PLC      From: Paul Conner [mailto:pconner@sburl.com]   Sent: Monday, August 27, 2018 5:15 PM  To: Dan Heil <dheil@olearyburke.com>  Cc: brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com) <charlotte@livingvermont.com>;  rich@livingvermont.com; Marla Keene <mkeene@sburl.com>; David Burke <dwburke@olearyburke.com>  Subject: RE: 2012‐84 ‐ 1398 Hinesburg Road View Protection Rezoning    Hi Dan –    Received. Thank you.        Paul Conner, AICP  Director of Planning & Zoning  City of South Burlington  575 Dorset Street  South Burlington, VT 05403  (802) 846‐4106  www.sbvt.gov    Notice ‐ Under Vermont’s Public Records Act, all e‐mail, e‐mail attachments as well as paper copies of documents received or prepared for use in  matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as  public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in  error, please notify us immediately by return email. Thank you for your cooperation.       From: Dan Heil <dheil@olearyburke.com>   Sent: Monday, August 27, 2018 12:47 PM  To: Paul Conner <pconner@sburl.com>  Cc: brad@livingvermont.com; Charlotte Gardner (charlotte@livingvermont.com) <charlotte@livingvermont.com>;  rich@livingvermont.com; Marla Keene <mkeene@sburl.com>; David Burke <dwburke@olearyburke.com>  Subject: 2012‐84 ‐ 1398 Hinesburg Road View Protection Rezoning    Paul,     Following up from your 8/21/2018 email correspondence with David Burke, please see attached letter requesting the  Planning Commission initiate an amend to the City’s LDR’s to remove the portion of the Hinesburg Road North View  Protection Zone located on the 1.29 acre parcel to the north of 1398 Hinesburg Road.     5 As stated at the 8/21/2018 DRB meeting, we would like to schedule a meeting with Staff to review the overall design for  the PRD located at 1398 Hinesburg Road, but we feel it would be more productive to schedule this meeting after the  October PC meeting  once we receive initial feedback on the view corridor.     Please let me know if you would like hard copies (and how many) of the attached.     Thanks,   Dan     Daniel Heil, PE | Project Engineer  O'Leary‐Burke Civil Associates, PLC  13 Corporate Drive  Essex Junction, VT  05452  email: dheil@olearyburke.com  phone: (802) 878‐9990  |  fax: (802) 878‐9989    Gilman & Briggs Environmental, Inc. 1 Conti Circle, Suite 5 Barre, Vermont 05641 Tel: (802) 479-7480; FAX: (802) 476-7018 team@gbevt.com  31 July 2018 David Burke O’Leary-Burke Civil Associates 13 Corporate Drive Essex Junction, VT 05452 Subject: Wetlands at Gardner Parcel at 1398 Hinesburg Road Dear David, I have reviewed the Gardner Parcel sketch plan and the proposed impacts to wetlands on the site with regard to South Burlington Wetland Protection Standards and Review Procedures. Under these standards, encroachment into wetlands and wetland buffers may be permitted if three criteria are met. The first two of these – that the encroachments will not adversely affect the ability of the property to carry or store flood waters adequately, and the encroachments will not adversely affect the ability of the proposed stormwater treatment system to reduce sedimentation according to state standards – are not applicable to this site as there is no floodwater storage on the site and stormwater treatment proposed for the site (construction of a gravel wetland) will actually enhance the value of two small Class III wetlands. The third wetland protection standard allows encroachments if impacts to wetland values and functions are minimized and/or offset by appropriate landscaping, stormwater treatment, stream buffering or other mitigation measures Five wetland areas were identified and delineated on this parcel: 1. The only Class II wetland is at the northwest corner of the parcel. This wetland and its 50-foot buffer are protected with the exception of the proposed roadway and sidewalk which will aligned directly across from Butler Drive. This is a wet meadow that, because it receives runoff from nearby roadways, is valuable for surface and groundwater protection. Because it will be largely protected, the wetland’s capacity to perform this function will not be affected. 2. The small Class III west of proposed Unit 23 that will be filled has very low values and functions and apparently exists only because natural flows have been disrupted by the existing driveway. This is a seasonal wetland characterized by hydrology at the drier end of the scale which does not support wetland dependent species. It performs no protected function at a significant level. 3. The small Class III depressional wetland (formerly a pond, now choked with persistent emergent vegetation) in the southeastern corner of the parcel near proposed Lot 15 will be preserved and have a protected 10-foot buffer that should be adequate to preserve its values which are already compromised by surrounding land use. 4. The two small Class III wetlands in the northeastern corner of the parcel will be impacted by construction of a gravel wetland stormwater management area, but this will offset impacts by duplicating and enhancing the values and functions found in the existing wetlands. In summary, with the exception of the open water habitat found at the small pond in the northeastern corner of the parcel, all wetlands on at the Project site are wet meadows, and as such have limited functions and values. One small wet meadow area with minimal functions and values will be filled, and impacts to all other wetlands have either been minimized or will be offset by stormwater treatment facilities. Sincerely, Errol C. Briggs ECB/s