HomeMy WebLinkAboutSD-04-42 - Decision - 0200 Old Farm RoadCITY of SOUTH BURLINGTON
DEPARTMENT of PLANNING & ZONING
HOMESTEAD DESIGN - PLANNED UNIT DEVELOPMENT
FINAL PLAT APPLICATION #SD-04-42
FINDINGS of FACT AND DECISION
Homestead Design, Inc., hereafter referred to as the applicant, is requesting final plat approval
to amend a planned unit development consisting of 117 multi -family residential units in 16
buildings. The amendment consists of: 1) a request for the "as -built" relocation of Building G;
2) a request for handicapped -accessible sidewalks to Buildings E, F, G, H, J, and M; and 3) a
request for the "as -built" location of clustered mailboxes, Stonington Circle. The South
Burlington Development Review Board held a public hearing on July 6, 2004. Michael Burke
represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
1. The applicant is requesting final plat approval to amend a planned unit development
consisting of 117 multi -family residential units in 16 buildings. The amendment consists
of: 1) a request for the "as -built" relocation of Building G; 2) a request for handicapped -
accessible sidewalks to Buildings E, F, G, H, J, and M; and 3) a request for the "as -
built" location of clustered mailboxes, Stonington Circle.
2. The owner of record is Homestead Design, Inc.
3. The subject property is Residential 7 Zoning District.
4. The plans consist of one (1) sheet entitled, "Utility Plan — Eldredge Street & Stonington Circle
O'Brien Home Farm Old Farm Road South Burlington, Vermont", prepared by Krebs & Lansing
Consulting Engineers, Inc., dated May 1, 2001, last revised on 5/19/04.
- 1 -
�f DECISION
Motion byM &0�C�/� , seconded by 1691V
to approve Final Plat Application #SD-04-42 of Homestead Design, Inc., subject to the following
conditions:
1. All previous approvals and stipulations shall remain in effect, except as amended herein.
2. This project shall be completed as shown on the plans submitted by the applicant, as
amended by this decision, and on file in the South Burlington Department of Planning
and Zoning.
3. If the coverage on the subject property is being altered through the proposed project,
the new coverage calculations shall be submitted to the Administrative Officer, prior to
recording of the final plat plans.
4. Any changes to the final plat plan shall require approval of the South Burlington
Development Review Board.
5. The final plat plan shall be recorded in the land records within 90 days or this approval is
null and void. The plan shall be signed by the Board Chair or Clerk prior to recording.
Chuck Boltoniyeynay/abstain/not present
Mark Boucheray/abstain/not present
John Dinklageay/abstain/not present
Roger Farley -6//abostain/not present
Michele Kupersmith -nay/abstain/not present
Larry Kupferman - ee nay/abstain/not present
Gayle Quimby - yea/nay/abstain of present
Motion Carried by a vote of 6- O- C>
Signed this (/ day of July, 2004 by
ohn Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental Court,
pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is
issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this
decision at some future time may be lost because you waited too long. You will be bound by
the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality).
-2-