HomeMy WebLinkAboutSP-91-0000 - Decision - 1200 Airport DriveFINDINGS OF FACT & DECISION
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of Hertz Corporation for
construction of a new 644 square foot office/storage building and
370 square foot addition to an existing building used for car
rental business, Burlington International Airport.
On the 19th of November, 1991 the South Burlington Planning
Commission approved the request of Hertz Corporation for site
plan review under Section 19.10 of the South Burlington Zoning
Regulations based on the following findings:
1. This project consists of the construction of a 644 square
foot office/storage building and a 370 square foot addition for
storage and entry to the service building. The new office/stor-
age building will replace a 288 square foot office trailer which
has been used for several years.
2. The project site is located within the Airport zone just
north of the FAA control tower. It is bounded on the north and
east by a taxi runway, an the south by the FAA control tower and
on the west, by Park. & Fly. This site is shared with National Car
Rental. Both agencies use this site -to store and service rental
Vehicles.
3. Access Circulation: Access to the site is via a two (2) way
service road connected to the one --way main terminal access drive.
The site is not accessible to the general public. A chain link
fence completely surrounds the site and the access gate is locked
at night. Circulation pattern is acceptable.
4. Parking: No additional park.ing needed since the new building
is to replace art existing office building and the general public
will not. use the site.
5. Landscaping: The landscaping requirement for this project is
$1260. This site is hidden, from view and not accessible to the
general publd.c. Therefore, this additional landscaping would be
of greater benefit to the public if it were place elsewhere on
airport property.
6. Lighting- No new lighting proposed.
7. SewerR The sewer allocation for this project is 60 gpd.
This is based on four (4) additional employees. The $2.50 per
gallon fee would have to be paid prior to permit.
8. Other: Two (2) existing dumpsters will be screened with a
six (6) foot. cedar screen.
DECISION & CONDITIONS
Based (.:in the above Findings of Fact, the South Burlington Plan-
ning Commission approves the site plan application of Hertz
Corporation for construction of a new 644 square foot
office/storage building and 370 square foot addition to an
existing building used for a car rental business as depicted on
a four (4) page set of plans, page one entitled "Hertz Burlington
International Airport, South Burlington, Vermont, Site Plan,"
prepared by Michael Dugan and dated 10/8/91, last revised
11/11/91, with the following stipulations:
1. The applicant shall post a $1,260, 3-year landscaping bond
prior to issuance of a zoning/building permit. Prior to permit,
applicant shall submit to the planner a letter from BIA which
indicates the type, size and number of landscaping species to be
planted on Airport property and an indication of the general
location where landscaping will be installed.
2. The Planning Commission grants an additional sewer allocation
of 60 gpd. The applicant shall pay the $2.50 per gallon sewer
fee prior to permit.
3. A zoning/building permit shall be obtained within 6 months or
this approval is null and void.
Chair an'-0-r (:!I—er—k
South Burlington Planning Commission
kk 2—
I -6a-t, _e