HomeMy WebLinkAboutSP-88-0000 - Decision - 0030 Airport RoadFINDINGS OF FACT
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of Peter Judge of JDS for
construction of an 8800 square foot mixed use (retail/office)
building at 30 Airport Road.
On the 29th of March 1988, the South Burlington Planning
Commission approved the request of Peter Judge represented by
Boehm Associates for site plan approval under Section 19.10 of
the South Burlington Zoning Regulations based on the following
findings:
1. TRAFFIC ACCESS: Access is proposed from a 22 foot wide
driveway.
2. CIRCULATION AND PARKING: Circulation is shown on 2 sides of
the proposed building with a 22 foot wide aisle on the eastern
side and a 24 foot wide aisle in the back parking lot. The 6400
square feet of office requires 26 spaces and the 2400 square feet
of retail requires 16 spaces for 42 total spaces. The plans show
40; the Commission required the six spaces in front to be seeded
and grassed and not used unless determined by the Planner to be
needed for parking. The first five spaces on the east shall be
moved to the 5 foot set back line, increasing the aisle width.
3. LANDSCAPING & SCREENING: An $8600 landscaping bond shall be
posted prior to permit with a 2 year bond term. The parking lot
at the rear shall be graded and sloped to drain to the building.
Dumpster location shall be shown on the plan, screened and
approved by the Planner prior to permit. Nothing shall be placed
in the area reserved as a turn -around area on the west side of
the lot.
4. OTHER: Plans shall be revised to show manhole and inlet
details and submitted to the City Engineer for approval prior to
permit. Retail space is limited to 2400 square feet. Any
increase must be approved by the South Burlington Planning
Commission The building permit shall be obtained within 6 months
or this approval is_p-�yll 4nd void. ,, „
Chairman
South Burlington,
Clerk,
anning Commission