HomeMy WebLinkAboutSD-93-0000 - Decision - 0271 Meadowland DriveFINDINGS OF FACT & DECISION STATE OF VERMONT S 5" O a a D COUNTY OF CHITTENDEN /7 l CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Green Acres, Inc. for subdivision of 116.7 acres of land into 13 lots ranging in size from 3.06 to 49.5 acres, Hinesburg Road. On the llth of May, 1993 the South Burlington Planning Commission approved the request of Green Acres, Inc. for preliminary plat approval under Section 203 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of the subdivision of a 116.7 acre lot into 13 lots. The sketch plan for this project was reviewed on 12/29/92. At that time a 250,000 square foot office complex was proposed for lot #1. It is no longer part of this application and may be submitted at a later date under a separate application. 2. This property located on the east side of Hinesburg Road lies within the Industrial and Open Space District. The property is bounded on the north by Dynapower, to the east by a large undeveloped parcel owned by the applicant, on the south by residences in the Ledgeknoll development and on the west by Hinesburg Road and several single family residences. 3. The site slopes downward from Hinesburg Road. Most of the site is open with fields with a wooded portion located in the southeast corner on lot #4. A stream (beginnings of Potash Brook) runs north -south in the center of the property. Two small tributaries lead into this stream. 4. Minimum lot size/frontage: The zoning ordinance requires a three (3) acre minimum lot size, however, the average size of all the lots must equal a minimum of 8 acres. The plans show 13 lots ranging between 3.06 acres and 49.5 acres. The average lot size is 8.44 acres (based on a total of 116.73 acres in the I-0 zone). All lots meet the minimum frontage requirement of 200 feet. 5. Access: The plan shows an 80 foot wide r.o.w. with 32 foot wide paved road extending south-easterly from the Lane Press/Dynapower Road over the western portion of the Dynapower property onto Green Acres property and then extending eastward through the middle of the property and ending in a cul-de-sac at the easterly boundary. A 735 foot long road with a 60 foot r.o.w. (Vosburgh Lane) branches off to the north ending in a cul-de-sac at the north boundary. This road would serve lots 5-10 and could eventually be used to serve the parcel to the north. Another road 710 feet long (Green Acres Lane) also branches off to the north and will serve lots 11 and 12. 1 6. Wetlands: The wetlands report submitted by the applicant was provided to the Planning Commission at the 12/29/92 sketch plan meeting. Plans do not show the entire delineated boundary of the forested wetland on lots 2 and 3. A portion is shown on sheet P3 and another portion is shown on sheet SP11. Also, sheet P7 shows only a portion of a wetland protection area. Plans should show all wetland protection areas. Sheet SP2 under the Legend has a designation for "Wetlands (NWI)" but no symbol is provided for this designation. 7. Staff recommended that a plan be submitted that shows delineation of all wetlands and wetland protection areas. 8. _Conservation Zone: will these The western portions be unusable because of the Potash Brook lots should reflect this restriction. of lots 8, 9 and 10 CO zone. Deeds for 9. Staff requested that applicant show the 50 foot CO zone on either side of the stream flowing north on lots 4-7. Applicant indicated that he has no intention of showing this CO zone because the stream will be discontinued. 10. The center of the relocated stream on lot 2 will be less than 50 feet from the adjoining Dubois property resulting in a CO zone extending onto the Dubois property. Unless the property owner agrees to the encroachment, the stream should be moved farther to the north to avoid extending a CO zone onto their property. 11. Recreation path: The Recreation Path Committee reviewed these plans at their 5/3/93 meeting and submitted a memo dated 5/4/93. The applicant has indicated that he will not design or construct any recreation path. Staff recommended that the recreation path which runs along the relocated stream along the southern boundary be constructed by the applicant at the same time that the "natural" stream is constructed. Applicant should provide information on how the recreation path will connect and cross Hinesburg Road. 12. Applicant should provide a 20 foot easement between the 60 foot r.o.w. off Knoll Circle and proposed recreation path. 13. Traffic: The applicant proposed to "build" from the traffic study which was originally conducted in 1991 for the proposed 11 lot industrial subdivision. The preliminary plat for the 11-lot subdivision was approved by the Planning Commission on 10/8/93. The original traffic study estimated that the future development would generate 777 A.M. peak hour trips and 743 P.M. peak hour trips. The results of the analysis were as follows: 2 1997 build 1997 1992 1997 without build with Intersection Base No build improvements improvements Kennedy/Rte. 116 F F F C Williston/Rte. 116 F F F C Williston/Dorset F F F Kennedy/Dorset F F F The traffic impact analysis submitted by the applicant indicated that critical intersections are currently operating at an unacceptable LOS and are expected to continue operating at unacceptable LOS in 1997 under both build and no -build conditions. Substantial improvements (additional approach lanes) are needed at the Route 116/Kennedy Drive and Route 116/Williston Road intersections in order to improve the LOS to "C". Improvements which have been identified as beneficial for the Dorset Street intersection, but not incorporated into this analysis, include signal optimization, adding a northbound on -ramp at Exit 13 and connecting Corporate Way through to Route 116. Prior to the preliminary plat hearing for the original 11 lot industrial subdivision, staff and the applicant met and agreed to propose to the Commission the following traffic impact mitigation package: o Applicant install, prior to occupancy of first building, the necessary lane and taper improvements at the Route 116/Swift Street Extension intersection (shown on Sheet SP15). VAOT shall approve design prior to issuance of zoning/building permit. o Prior to site plan approval for each lot, the signal warrant analysis shall be updated. When the signal is shown to be warranted at Route 116/Swift Street Extension, applicant shall install signal at specifications approved by the City. o Each building shall be required to contribute to the Hinesburg Road/Kennedy Drive impact fee based on P.M. peak hour trip ends to be generated by each use. Assuming an average building size of 72,000 square feet, each lot would be required to contribute approximately $13,000 to the fund based on the current contribution formula. o Additionally, since a significant amount of project traffic will be going through the Williston Road/Route 116 intersection (43%), each new building should be required to contribute to the Williston Road Area 1 impact fee based on 43% of the P.M. peak hour trip ends. Under current formula, each lot would be required to contribute approximately $4,000. At the preliminary plat hearing held on October 8, 1991, the Commission expressed concern over the timing of development and intersection improvements. The Commission subsequently approved the preliminary plat application but with the following stipulation 3 regarding traffic: "The traffic issue and appropriate mitigation is unresolved at this time. This issue shall be finalized at final plat. Prior to final plat, staff shall obtain an indication from Council on timing and funding of necessary intersection improvements at Route 116/Kennedy Drive and Route 116/Williston Road. In addition, staff and applicant shall consider a phasing plan tied to specific intersection improvements and/or level of service and present recommendations(s) to Planning Commission at Final Plat". Provided below is an update of what has occurred since the 10/8/91 Preliminary Plat hearing: Kennedy Drive/Hinesburg Road: The VAOT improved this intersection last year which included restriping to provide left -turn only lanes on each approach, and installing a new controller. The City and State feel that further improvements are needed at this intersection. The City is planning to add this summer, a third right -turn only lane to each approach. These improvements will be funded by developer fees and the general fund. The applicant submitted an updated traffic impact analysis dated 2/16/93 which analyzes the impact of the project on this recently improved intersection. The results of the analysis indicate that the intersection will operate at LOS "C" with the project. These results seem to differ from earlier analyses which estimated LOS "E" for current conditions. The results also seem to contradict existing conditions where traffic is significantly backed -up during peak periods. Williston Road/Hinesburg Road: The improvement of this intersection is planned to be done as part of the Williston Road improvement project currently being designed by the VAOT. The City's matching funds will be partially funded through developer impact fees (i.e., Williston Road Area 1 Improvement Fund). The City's 5-year construction plan has this improvements scheduled for 1995/96. However, this is dependent on the State's construction plan. The State has not yet included this project in this 5-year plan. Other: The City will be upgrading the Williston Road/Kennedy Drive intersection this summer. Also, the Dorset Street project will be complete by fall, 1993. Staff Comments/Recommendations: o Any approval should include a condition that this development is approved for a maximum of 777 A.M. peak hour trip ends and 743 P.M. peak hour trip ends. Any subsequent development of a lot or lots which exceeds this limit shall require an 4 updated traffic impact analysis. o Any approval should include the mitigation package agreed to and proposed earlier by staff and the applicant. 14. Airport Approach Cone: Lots 2-12 are located within the Airport Approach Cone. Applicant will be subject to the limitations provided in Section 19.45 of the zoning regulations. 15. "Natural" Stream: The applicant will be constructing a "natural " stream with berms and landscaping along the southerly boundary to replace an adjacent drainage way illegally constructed a couple of years ago. The Natural Resources Committee reviewed the details of this stream and find it acceptable. The value of the landscaping along the stream including plant material and installation is estimated to be $14,660. Plantings will include Redstem Dogwood, Inkberry, White Pine and Weeping Willow. 16. Sewer: The sewer allocation being requested is 30,345 gpd. The applicant will be required to pay the per gallon fee prior to permit. Planning Commission should consider a time limit on the sewer allocation. 17. Street trees: The applicant is proposing approximately 170 street trees which will have a value, including installation, of $44,200. This property is located in the Hinesburg Road - North View Protection Zone and the trees proposed along the street between stations 14 + 00 and 20 + 00 will exceed the height limits. Street trees proposed between stations 14 + 00 and 20 + 00 should be changed to a species which will not exceed the height limit. Some acceptable species include:; Ruby Red Horsechestnut; European, Hop or American Hornbeam and Hedge Maple. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the Preliminary Plat application of Green Acres, Inc. for subdivision of 116.7 acres of land zoned Industrial and Open Space into thirteen (13) lots ranging in size from 3.06 to 49.5 acres as depicted on a 25 page set of plans, page one entitled "Green Acres Industrial Park, South Burlington, Vermont", prepared by Trudell Consulting Engineers and dated last revised 3/2/93 with the following stipulations: 1. Any previous approvals and stipulations affecting the subject property which are not superseded by this approval shall remain in effect. 2. Prior to start of construction, the applicant shall post a landscape bond to cover the installation cost and value of proposed street trees and berm landscaping, and the berm installation and 5 planting shall take place contemporaneously with the road construction. The bond shall remain in effect for three (3) years from the date of planting to assure that the planted landscaping has taken root and has a good chance of surviving. 3. In order for the Commission to find that the proposed development will not cause unreasonable highway congestion or unsafe conditions with respect to use of the highways, the applicant shall be responsible for the following: a) This project is approved for a maximum of 777 AM peak hour trip ends and 743 PM peak hour trip ends. Any subsequent development of a lot or lots which exceeds this limit shall require an updated traffic impact analysis. b) Applicant shall install, prior to occupancy of first building, the necessary lane and taper improvements at the Route 116/Swift Street Extension intersection (shown on Sheet SP15). VAOT shall approve design prior to issuance of zoning building permit. c) Prior to site plan approval for each lot, the signal warrant analysis shall be updated. When the signal is shown to be warranted at Route 116/Swift Street Extension, applicant shall install signal at specifications approved by the City. d) Each building shall be required to contribute to the Hinesburg Road/Kennedy Drive impact fee based on P.M. peak hour trip ends to be generated by each use. Assuming an average building size of 72,000 square feet, each lot would be required to contribute approximately $13,000 to the fund based on the current contribution formula. e) Additionally, since a significant amount of project traffic will be going through the Williston Road/Route 116 intersection (43%), each new building shall be required to contribute to the Williston Road Area 1 impact fee based on 43% of the P.M. peak hour trip ends. Under the current formula, each lot would be required to contribute approximately $4,000. 4. Prior to issuance of a zoning/building permit or start of roadway or utility construction, all appropriate legal documents including easements (e.g., utility, sewer, drainage, water, recreation path, etc) and roadway r.o.w.'s (irrevocable offer of dedication) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 5. The plans shall be revised prior to final plat to clearly indicate that a 20 foot wide recreation path easement only will be provided and that recreation paths will not be constructed by applicant (except the recreation path along swift Street Extension. N. 6. Prior to final plat submittal, the plans shall be revised to show the following: a) Limits of all wetlands and CO Zones on the property. b) 20' recreation path easement connecting to the 60' r.o.w. serving Ledge Knoll. c) The species of street trees between stations 14+00 and 20+00 changed to a species that will not exceed 40 feet at maturity. d) Easement for shared driveway between lots 3 and 4 on survey plat. e) Width of Green Acres Lane r.o.w. on survey plat. f) New zoning designation "Industrial and Open Space". g) Different name for street currently proposed to be called "Green Acres Lane". h) Sidewalk located one foot away from r.o.w. line. i) Proposed street lighting. j) Relocated stream at least 50' from the southern property line unless adjoining property owners agree to less than 50 foot distance. k) 8 foot wide asphalt bike path on north side of Swift Street Extension from Route 116 to Vosburg Lane instead of a concrete sidewalk. 7. Prior to final plat, the applicant shall evaluate the capacity and emergency storage of the existing pumping station and provide evaluation results to the City Engineer. 8. Prior to final plat, the applicant shall submit a report addressing each of the criteria contained in Section 417 of the subdivision regulations. 9. The applicant shall contribute $26,738 to the Hinesburg Road sidewalk fund based on 1,260 feet of frontage along Hinesburg Road. The contribution shall be made prior to issuance of a zoning/building permit for any lot. 10. Prior to issuance of a zoning/building permit or start of roadway or utility construction, bonds to cover the costs of roadway, utility, and sidewalk construction shall be posted. The amount of the bond shall be approved by the City Engineer. 7 11. The applicant shall be responsible for maintaining the new street until such time as the street and r.o.w. is accepted and taken over by the City. 12. The Commission approves a sewer allocation of 30,345 gpd. The applicant shall pay the required sewer allocation fee prior to issuance of a zoning/building permit. The length of time that this sewer allocation approval shall remain in effect shall be tied to roadway construction. The roadways serving this development shall be completed within 10 years of final plat approval. The sewer allocation for any lots served by a roadway or portion of roadway which is not completed within this ten year time limit shall be lost unless reapproved by the Planning Commission. 13. The developer shall furnish to the City, at least 7 days prior to beginning of road construction, the name of the contractors doing the street and utility work and the architect and/or engineer who will stake out and supervise the work . 14. In accordance with section 301.5 of the subdivision regulations, within 14 days of completion of required improvements (e.g., streets, water mains, sanitary sewers, storm drains, etc) the developer shall submit to the City Engineer "as -built" construction drawings certified by a registered engineer. 15. As expressly represented by the applicant, the applicant will dedicate to the city a recreation path easement and 80 foot floating right of way over the 146.6 acre parcel adjoining to the east as shown on sheet SP2. These legal documents shall be recorded prior to issuance of a zoning/building permit for any lot. 16. Prior to final plat, the applicant shall conduct the appropriate studies to determine whether or not there is a wetland on lot #4. 17. As expressly represented by the applicant, there will be no quarry generated traffic travelling through this subdivision. 18. The final plat plans, including survey plat, shall be submitted within 12 months or this approval is null and void. hairm n- r Clerk South Burlington Planning Commission l ate 0