Loading...
HomeMy WebLinkAboutBATCH - Supplemental - 0085 Meadowland Drivesouthburlirzoll PLANNING & ZONING March 25, 2015 Re: #SP-15-11 Dear Applicant: Enclosed, please find a copy of the Findings of Fact and Decision rendered by the Administrative Officer concerning the above referenced application. Please note the conditions of approval including that a zoning permit must be obtained within six (61 months. If you have any questions, please contact me. Sinc ly Raymond J. Belair Administrative Officer Encl. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com r 1� C�. southurlington PLANNING & ZONING I\ \Wl Permit Number SP-- (office use only, APPLICATION FOR SITE PLAN REVIEW M� dministrative ❑ Development Review Board All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. 1. OWNER(S) OF RECORD (Name(s) as shown on deed, mailing address, phone and fax #): Burlington Properties Limited Partnership, 85 Meadowland Drive, South Burlington, VT 05403, 802-860-7200 2. LOCATION OF LAST RECORDED DEED(S) (Book and page #): Bk. 273, pg. 265 3. APPLICANT (Name, mailing address, phone and fax #): Burlington Properties Limited Partnership, 85 Meadowland Drive, South Burlington, VT 05403, 802-860-7200 4. CONTACT PERSON (person who will receive all correspondence from Staff. Include name, address, phone & fax #): Peter Mead, Civil Engineering Associates, Inc. 10 Mansfield View Lane, South Burlington, VT 05403, 802-864-2323 ext. 319 fax: 802-864-2271 4a. CONTACT EMAIL ADDRESS:: pmead@cea-vt.com 5. PROJECT STREET ADDRESS: 85 Meadowland Drive 6. TAX PARCEL ID # (can be obtained at Assessor's Office): 0860-0120C 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com 7. PROJECT DESCRIPTION a. General project description (explain what you want approval for): Relocation/screening of dumpster area. Approval of existing temporary storage buildings & outside storage area. After the fact approval of +/- 12ft x 10 ft smoking area lean-to. (see Site Plan) b. Existing Uses on Property (including description and size of each separate use): Dynapower Corporation (light manufacturing) in 123,300 s.f. building on a 27.8 acre lot. c. Proposed Uses on property (include description and size of each new use and existing uses to remain): No change in use proposed. d. Total building square footage on property (proposed buildings and existing buildings to remain): 123,200 s.f. light manufacturing, +/- 1,750 s.f. temporary storage buildings, +/- 120 s.f. smoking area lean-to. No proposed buildings. Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine): _ Existing light manufacturing buildi +/- 30' (2 floors f. Number of residential units (if applicable, new units and existing units to remain): No residential units. g. Number of employees (existing and proposed, note office versus non -office employees): 216 existing employees on largest shift, no proposed changes. All non -office (light manufacturing) h. Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable): Property is in the Industrial & Open Space District and the Airport Approach Corridor & Hinesburg Road - North View Protection Zone Overlay Districts. There are Class II wetlands on the property (no disturbance). Site Plan Application Form. Rev. 12-2011 8. LOT COVERAGE a. Building: Total Parcel Size: 1,210,303 Sq. Ft. Existing 10.3 % / Proposed 10.3 % / 124,870 124,870 sq. ft. sq. ft. b. Overall impervious coverage (building, parking, outside storage, etc) Existing 25.3 % / 306,416 sq. ft. Proposed 25.3 % / 306,416 sq. ft. c. Front yard (along each street) Existing 0.1 % / 1,586 sq. ft. Proposed 0.1 % / 1,586 sq. ft. d. Total area to be disturbed during construction (sq. ft.) 0 * Projects disturbing more than one-half acre of land must follow the City's specifications for erosion control in Article 16 of the Land Development Regulations. Projects disturbing more than one acre require a permit from the Vermont Department of Environmental Conservation. 9. COST ESTIMATES a. Building (including interior renovations): b. Landscaping: c. Other site improvements (please list with cost): Dumpster enclosure - $2,500 +/- 10. ESTIMATED TRAFFIC $ N/A $ N/A a. P.M. Peak hour for entire property (In and out): 97 11. PEAK HOURS OF OPERATION: 8 am - 3:30 pm 12. PEAK DAYS OF OPERATION: Monday - Frid 13. ESTIMATED PROJECT COMPLETION DATE: August 2015 14. SITE PLAN AND FEE A site plan shall be submitted which shows the information required by the City's Land Development Regulations. Five (5)1 regular size copies, one reduced copy (I V x 17"), and one digital (PDF-format) copy of the site plan must be submitted A site plan application fee shall be paid to the City at the time of submitting the site plan application in accordance with the city's fee ms, schedule. A'--- � ' '(/�'t `r 4Awv 64W 47 �IXVIF 9 A� ' /� -1v' Administrative site plan applications require three (3) regular size copies, one reduced copy (11" x 17"), and one digital (PDF-format) copy. 3 Site Plan Application Form. Rev. 12-2011 I NOTE: NOTIFICATION of ADJOINING PROPERTY OWNERS: Notification of adjoining property owners, in accordance with 24 V.S.A. §4464(a) and Section 17.06(B) of the South Burlington Land Development Regulations, is the responsibility of the applicant. After deeming an application complete, the Administrative Officer will provide the applicant with a draft meeting agendas or public hearing notice and sample certificate of service. The sworn certificate of service shall be returned to the City prior to the start of any public hearing. I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. .r ATURE OF APPLICANT OF PROPERTY OWNER PRINT NAME Do not write below this line DATE OF SUBMISSION: 3 REVIEW AUTHORITY: Development Review Board E Administrative Officer I have reviewed this site plan application and find it to be: Complete I tie Administrative 6fficer Date The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802) 879-5676 to speak with the regional Permit Specialist. Site Plan Application Form Rev. 12-2011 u U I CHAIN LINK FENCE WITH GREEN SLAT SCREENING OR APPROVED EQUAL EXISTING PAVEMENT STEEL POST CONCRETE FILL AROUND �6" CRUSHED POST BOTTOM OF POST 7'-0" O.C. OR LESS NOTES: � i T r- . ) I 7'-0" O.C. OR LESS 1. COORDINATE SIZE OF ENCLOSURE AND GATE LOCATIONS WITH SITE CONDITIONS. 2. PATCH PAVEMENT AS REQUIRED AFTER ENCLOSURE CONSTRUCTION DUMPSTER ENCLOSURE N. T. S. CIVIL AsSoCia7_s. "'C. BURLINGTON PROPERTIES Project 10 MANSFIELD VIEW LN., SO. BURLINGTON, VT 05403 F 802-864-2323 FAX: 802-864-2271 LIMITED PARTNERSHIP DRAWING Scale: N.T.S. Drawn by PJM SITE DETAILS D1 Date 311712015 Checked by SAV SO. BURLINTON VERMONT I I N/F WGM ASSOCIATES 11 Ir ---( \ N/F LANDRUM II I I N/F BURUNGTON PROPERTIES UMMED PARTNERSHIP LOT 1 , r• I j rl — J //y / / I TEMPOIIARYSTORAOE I {/'/� � BURDNNfi9 EwsnNo GRAVEL STORAGE AREA N (STHL CONTARIEFM FOR TEMPORARY STORAGE OFMATEALALS AS — �I I MANUFACT R NEEDED FOR I I - TYPICALLY ON PALLETS OR I _ IN CONTAINERS HAULED TO AND FROM MAIN BUILDING TUR91N� _ ! I TEMPORARY STORAGEt BUILDINGS v — J '' L — — — — — . _ — .1� / / �i B6�RLI GTON PROP ES '�Y,•' EXISTING DUMPSTERS �. (SEMITRAILERS)j I / �� v + I •` -f/y/ IMIT D ARTNERSH LOT 3 TO BE RELOCATED \ t TEMPoaar> ` / �` • + f 7 lip/ DUMPSTER LOCATION \ \\ �,\ V - - - - \ � � �2i I / Si TO BE ENCLOSED \ \\\ BUILDING YSTORAGE / ^ ��- } + �� W IW + . _ _ __ _ __ _ / -�C� \ (STEEL CONTAINER) / . y ` + G,. ••F ,� 4 CL / �, \ RELOCATED DUSTING \ �\ `~ \ \\ / ! \ . I . +C . • 1v I �I . 9 ¢ = I I ,i/ EXISf1T1g DUMPSTERS DUMPSTER 1 \ . 1 a / 11 I %r// / •'�`t� \ I Building LorrAnoN % \ ; \ 1�j/j1 . • - - - - - i i" // \\ �` -� \ DUSTING RACK \ \ ` Wp10NDn i l l \jUR§INE47 I ,I I ,I II I ,I LEGEND EXISTING CONTOUR PROPOSED CONTOUR APPROXIMATE PROPERTY LINE SETBACK LINE ---------------------- EASEMENT UNE -- —SS— — GRAVITY SEWER LINE — G — — GAS LINE — W — — WATER LINE —LIE&T UNDERGROUND ELEC. & TEL -- - --ST — STORM DRAINAGE UNE SEWER MANHOLE ® SHUT-OFF ( HYDRANT WETLAND DIMENSIONAL SUMMARY J. If N/F BURUNGTON PROPERTIES Ij LIMITED PARTNERSHIP LOT 2 y J �� \ / �. i/- W . /. w + . + W f W ` ( •) / J - ` + W . - - - - - - - ----Y- - --a— _ _q---------------- w v ` W • ,,. \ \ DESIGNATED STORAGE CONTAINER TO BE I L \ L J SMOKING AREA MOVED TO TEMPORARY (LEAN-TO) STORAGE AREA , �j\• I ( I I I I l N/F MUNSON EARTHMOVING CORP. \ t EXISTING PROPOSED REQ'D. CONDITIONS CONDITIONS LOT AREA 3 AC 27.78 AC 27.78 AC FRONT SETBACK 50 135' 135' SIDE SETBACK 35' 357 357 REAR SETBACK 50 82 82' BUILDING COVERAGE 30% 10.3% 10.3% LOT COVERAGE 50% 25.3% 25.3% FRONT YARD COVERAGE 30% 0A% 0.1 % 7nAIlAIR nLCTRInT- INDUSTRIAL - OPEN SPACE OWNER OF RECORD & APPLICANT BURLINGTON PROPERTIES LIMITED PARTNERSHIP 85 MEADOWLAND DRIVE SO. BURLINGTON, VT 05403 GRAPHIC SCALE e a. - ( IN FEET ) I inch - 00 fL PARKING CALCULATION LIGHT MANUFACTURING 0.511000 SF GFA + 1/EMPLOYEE= 0.5 x (123,2001100) + 216 (EMP. ON LARGEST SHIFT) = 278 SPACES REQUIRED (7 HC REQUIRED 241 SPACES PROVIDED (7 HC PROVIDED) WAIVER REQUEST FOR 37 SPACES (13.3%) (N/F GRANDVIEW FARM, INC. GENERAL NOTES: 1. UTIU77ES SHOWN DO NOT PURPORT TO CONSTITUTE OR REPRESENTALL UTILITIES LOCATED UPON OR ADJACENT TO THE SURVEYED PREMISES. EXISTING UTILITY LOCATIONS ARE APPROXIMATE ONLY THE CONTRACTOR SHALL FIELD VERIFYALL. UnLFTY CONFLICTS. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. THE CONTRACTOR SHALL CONTACT DIG SAFE (BeBJ4a 7233) PRIOR TO ANY CONSTRUCTION. 2. THE CONTRACTOR SHALL REPAIRIRESTORE ALL DISTURBED AREAS (ON OR OFF THE SITE) AS A DIRECT OR INDIRECT RESULT OF THE CONSTRUCTION. 3. ALL GRASSED AREAS SHALL BE MAINTAINED UNTIL FULL VEGETATION IS ESTABLISHED. 4. MAINTAIN ALL TREES OUTSIDE OF CONSTRUCTION LIMITS. N/F THE ROCK OF GREATER BURUNGTON, INC. 5. IN ADDITION TO THE REQUIREMENTS SET IN THESE PLANS AND SPECIFICATIONS. THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL PERMIT CONDITIONS AND THE CRY OF SOUTH BURLINGTON PUBLIC WORKS STANDARDS. B. THE TOLERANCE FOR FINISH GRADES FOR ALL PAVEMENT, WALKWAYS AND LAWN AREAS SHALL BE 0.1 FEET. 7. THIS IS NOTA BOUNDARY SURVEY AND IS NOT INTENDED TO BE USED AS ONE. B. IF THERE ARE ANY CONFLICTS OR INCONSISTENCIES WITH THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR VERIFICATION BEFORE WORK CONTINUES ON THE ITEM IN QUESTION. SITE ENGINEER: r F CIVIL ENGINEERING ASSOCIATES. INC. 1094WELDWEWUhE, SOUTHBIWICTOH, VI DW BO16N-4929 FAk' BO]dltTS)1 xeA w.w.wN. OIU11N PJ M CJG �PPA01[0 SAV OWNER: BURLINGTON PROPERTIES LIMITED PARTNERSHIP 85 MEADOWLAND DRIVE SO. BURLINGTON, VT 05403 PROJECT. PROPOSED SITE IMPROVEMENTS 85 MEADOWLAND DRIVE SO. BURLINGTON, VT 05403 I LOCATION MAP I r � sDaEr OVERALL SITE PLAN u�1s I ux.nnc nulmxx 3/17/2015 =80 C1.0 PROJ. t10. 09202 _ I CO P�' '� SITE ENGINEER: BE NSIii ED`_ ) C / /,/ / / \ / (;' ' • \ _ I T — — — CIVIL ENGINEERING ASSOCIATES, INC. Y / / 61 EXISTING GRAVEL STORAGEAREA I — — — -- _ _ -� \ IOMNISFIBDNEWLWE• SO KALINGTON, VTOW ` \ QpV / QI,V\Ip �L;\ FOR TEMPoRARYSTORAOE OF v aozaeasszv rueosfzn weo:ww.c..Kc°m W1 ING \ \ �qFY ® MATERIALS AS NEEDED FOR ///"' `-�• -(fy _ MANUFACTURING W _/ corraz - / / WI D 5� ��"lN (/�5�1/� TYPICALLY ON PALLETS OR • / / � TUfiBINE \ �\ IN CONTAINERS HAULED TO AND FROM MAIN BUILDING PJM TEMPORGRYSroRAGE AS CABINET / �.(STTEELCCOOWAINERS) O , \ \ \ -/ +� /• ! CJG FREIGHT PICKU / O O I ,`> , ` ` \ ` • \ / _ �eenovsn 4 \ \ / SAV / \' — / OWNER: TEMPORARY STORAGE \ MTING DUMPSTERS BURLINGTON / 4, \ BUILDINGS < / 1 1 'fp (SEMI -TRAILERS) I� TO BE RELOCATED TEMPORARY BUILD ' ♦ \ / PROPERTIES �pP \ I, '', / \ `♦ TEMPDORARY STORAGE / J'\\l.-. DUMPSTER LOCATION / / \ LIMITED / } EXISTING \ �� (STEEL CONTAINER) \ \ `� ^ 7 PARTNERSHIP TO BE ENCLOSED OUMPSTER ♦ �� / LOCATION \ ♦ ` \�I. y / r — 85 MEADOWLAND DRIVE _W5 \ �` SO. BURLINGTON, VT O5403 RELOCATE \ ' / DU PSTERS \ \ \ \ \ \ / ` _ f PROTECT: Existing � t \ Building /) \ • \ \ / \ EXISTING % \ \ BIKE RACK i/4 y ♦� l I � PROPOSED EXISTING SITE WINO 1 TURBINE 1 I IMPROVEMENTS 85 MEADOWLAND DRIVE 1X \ �. o • , �• I� I SO. BURLINGTON VT 05403 \` 4 ✓ 1..89 LAO �•� ♦ \ \ .GRAVEL- 1 ♦ \� ♦ \\ ( \ \STEEL CABINET♦ \ PARKING AREA of 0 \ ♦ \ Y RETAI ALL ` � � Q �� \ _ / / - ' \ ♦/Ord \ 04X2 CONC.G BLDCI( �i / /• I - 4 TER HIOU, • I / �i'� LOCATION MAP LEGEND EXISTING CONTOUR ♦ \\\\ \/ ♦�\\ \ \ �Y�{f �; / \. j ,� / I �n �. ar0a. 356 PROPOSED CONTOUR APPROXIMATE PROPERTY LINE ` SETBACK LINE \ `♦\\\ \ 1 \ I i / / _�w►� ' ``` ICJ ---------------------- EASEMENT LINE — _SS— — GRAVITY SEWER LINE\ ♦\``\ J`\\ ♦; I \ 1/�/�/� ; �� -- — G — — GAS LINE / \\\ \ // _ �v _ _ _' / I ` • ` — — — — — W — — WATER UNE \ i' —UEhT— — UNDERGROUND ELEC. dt TEL \\\\' / ♦\\ J \/ �i \ STORAGE CONTAINER TO BE ' �Y — —ST— — STORM DRAINAGE LINE \ I \ y r♦\\\ T \• \ \ �� / MOVED TO TEMPORARY v1 J W �' v- 4 ,� SITE PLAN \ DESIGNATED STORAGEAREA ® SEWER MANHOLE r \ �`\ \;\\ ( \'\� \ \ \ —ObID- —. J ��/ (EANINOG)AREA� W W W /'W WIOW ® SHUT-OFF \ 1 \ 1 ♦\\ \ 1 \ _ `1i V' ! NI, \ / l �( HYDRANT \ s \) (\ \ \ l . \ \ \ 1 JE/ / / . 14, .✓ y `/ v, w / W H' �l. V, �\ WETLAND (\ \ ♦� `\\ \\\ ��'''_ —��"=j r �' Vi \, �' v. .l V' v. ;\ \ \ .—WC�W �I • — . (. 3/1712015GRAPHIC SCALE W—v---------- --IN FEET I e_ 1 i—h- 40 K _ _ • __ • __ _ J -- • eno . no. 09202 C I V I L EA IGINEERIIN G A�*SSOClArEIPSO. I HC, 10 Mansfield View Lane Phone: 802-864-2323 South Burlington, VT 05403 Fax: 802-864-2271 E-Mail: mail@cea-vt.com September 17, 2013 City of South Burlington c/o Ray Belair-Zoning Administrator 575 Dorset St. South Burlington, VT 05403 Re: Dynapower Dear Ray, As you are aware Dynapower has withdrawn their Application for Certificate of Occupancy for their property at 85 Meadowland Drive in South Burlington. We will be evaluating the site discrepancies in greater detail and then apply for an amended site plan. Stephen A Vock, P.E. QAAmy\Doc\SA V\Dynapower.doc �A south PLANNING & ZONING August 7, 2013 Burlington Properties Limited Partnership c/o Peter Pollak, Registered Agent 85 Meadowland Drive So. Burlington, VT 05403 Re: Zoning Violation — Using New Parking Lot without C.O. Dear Mr. Pollak: It has come to my attention that you are using the new parking lot at 85 Meadowland Drive without having obtained a Certificate of Occupancy (C.O.). This violates condition #6 of your site plan approval issued on 9/10/13 which requires the issuance of a C.O. prior to the use of the new parking lot. Therefore, please complete and return to me the enclosed Application for Certificate of Occupancy together with the $153 application fee. Should you have any questions, please feel free to contact me. Sincerely, Raymond J. Belair Administrative Officer 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburi.com Vermont Secretary of State Page I of 1 NA �a ARC HI4ES COitFOi%ATIONS OTHER PROFESSIOhIA ELECTIONS PROGRALIS REGULATIONI Limited Partnership Information Name BURLINGTON PROPERTIES LIMITED PARTNERSHIP Status ACTIVE Date Formed 07/25/2011 File Number 0000925 Type Foreign State MI Office Address 85 MEADLOWLAND DRIVE City State Zip S BURLINGTON VT 05403 Registered Agent PETER POLLAK Address 85 MEADLOWLAND DRIVE City State Zip S BURLINGTON VT 05403 Partner(s) Listed BPLP, L.L.C. (GP) Partner(s) Listed Partner(s) Listed Partner(s) Listed Partner(s) Listed Record Last Updated 07/26/2011 Inlbnnalion Contact Home I Site Search I Help Vermont State Page I Disclaimer This Web Page isY' &1 , http://cgi3.sec.state.vt.us/cgi-shl/nhayer.exe 8/7/2013 AAgenda #2 0lo 10 south udington. PLANNING & ZONING MEMORANDUM TO: South Burlington Development Review Board FROM: Raymond J. Belair, Administrative Officer DATE: August 31, 2012 Re: Agenda Item # 5 #SP-12-33 Burlington Properties Limited Partnership 85 Meadowland Drive At its August 7th consideration of the site plan, the Board asked to obtain further information from Public Works Department staff regarding the project's potential impacts on stormwater and wetlands as well as conditions for removal of the temporary construction access drive. In an August 27th email, the Deputy Director provided the following comments: • The DRB should include a condition requiring the applicant to regularly maintain all stormwater treatment and conveyance structures on -site. • The State of Vermont plans to issue permit 6853-INDS for this project. The DRB should require that a copy of this approved permit be submitted prior to approval of this project. The Director also reviewed the plan and indicated he had no additional comments. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com A Agenda #7 southburlington PLANNING & ZONING MEMORANDUM TO: South Burlington Development Review Board FROM; Dan Albrecht, Contractor, Chittenden County RPC Raymond J. Belair, Administrative Officer MEETING DATE; August 7, 2012 0 CC Burlington Properties Limited Partnership, Applicant Re; #SP-12-33, 85 Meadowland Drive Site Plan Application #SP-12-33 85 Meadowland Drive Burlington Properties Limited Partnership is seeking to amend a previously approved plan for a 123,200 sq. ft. light manufacturing facility. The amendment consists of :1) after -the -fact approval for a 24 space gravel parking area, 2) after -the -fact gravel storage area, 3) a 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburi.com temporary construction access to Meadowland Drive, and 4) constructing a 60 space paved parking area, 85 Meadowland Drive. Administrative Officer Ray Belair and Dan Albrecht, Chittenden County RPC Contractor, referred to herein as Staff, have reviewed the plans submitted on June 15, 2012 and have the following comments. Zoning District & Dimensional Requirements Table 1, Dimensional Requirements Industrial & Open Space Zoning District Required Proposed �l Min. Lot Size 3 acres 27.78 acres �l Max. Building Coverage 30 % 10.2 % �l Max. Overall Coverage 50 % 25.3 % Max. Front Yard Coverage 30 % 0.1 % Min. Front Setback 50 ft. 135 ft. �l Min. Side Setback 35 ft. 357 ft. �l Min. Rear Setback 50 ft. 82 ft. � Zoning compliance Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the following review standards shall apply to site plan applications: (a) The relationship of the proposed development to goals and objectives set forth in the City of South Burlington Comprehensive Plan. This criterion will continue to be met. (b) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas This criterion will continue to be met. (c) Parking shall be located to the rear or sides of buildings All proposed parking will be located to the rear or side of the building. Section 13.01 of the Land Development Regulations requires that bicycle parking or storage facilities be provided for employees, residents, and visitors to the site. A bike rack is shown on the plans. (d) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings No changes are proposed. This criterion will continue to be met. (e) Newly installed utility service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground SP 12_33_85MeadowlandUrive_parking page 2 of 4 No changes are proposed. This criterion will continue to be met. (f) The combination of common materials and architectural characteristics, landscaping, buffers, screens, and visual interruptions to create attractive transitions between buildings or different architectural styles shag be encouraged. No changes are proposed. This criterion will continue to be met. (g) Proposed structures shag be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures No new structures are proposed. This criterion will continue to be met. In addition to the above general review standards, site plan applications shall meet the following specific standards set forth in Section 14.07 of the Land Development Regulations: (a) The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. Staff feels that the reservation of land is not necessary; not adjacent lots require connections at this time. This criterion will continue to be met. (b) Electric, telephone, and other wire -served utility lines and service connections shag be underground. Any utility installations remaining above ground shag be located so as to have a harmonious relation to neighboring properties and to the site. No new utility lines are proposed. This criterion will continue to be met. (c) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shag be accessible, secure, and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). This criterion will be met. (d) Landscaping and screening requirements In a memo dated 6/20/12, the City Arborist provided comments on the proposed landscape plan. The Arborist stated that neither Green Ash nor Red Maple would be acceptable or recommended for the site. The Arborist provided a list of various potential substitutes and the plan was revised to comply with these recommendations. The proposed, 60-space paved parking lot and 24 space gravel parking lot will bring the total number of spaces on site to 241. Section 13.06(B) of the Land Development Regulations sets forth various requirements for landscaping of parking areas. The proposed project is consistent with the regulations. The perimeter of the lot is landscaped, the interior of the parking lot is adequately landscaped, the planting is protected by curbing and other requirements concerning landscaping variety, the use of deciduous shade trees, minimum tree width and adequate species mix are met. SP 12_33_8SMeadowlandDrive_parking page 3 of 4 Pursuant to Section 13.06(B) of the Land Development Regulations, snow storage areas must be specified and located in an area that will minimize the potential for run-off. The plans depict adequate snow storage areas. Lighting Pursuant to Section 13.07(A) of the Land Development Regulations, all exterior lighting shall be shielded and downcasting to prevent light from spilling onto adjacent properties and rights -of - way. Cut sheets for new proposed lighting are provided. This criterion will be met. Access/Circulation A temporary construction access is proposed from Meadowland Drive to the building's parking area. Prior to obtaining a Certificate of Occupancy, the access shall be covered with topsoil, seeded and mulched. Traffic No changes are proposed that will result in an increase in traffic volumes. SP_I Z_33 85MeadowlandDi•ive_parking page 4 of 4 South Burlington Planning Zoning New Non -Residential Construction Impact Fees Project Completed by April 1, 2011 ? 1 Project Name & Address Property Owner Effective Date TOTAL IMPACT FEE Value of New Construction: TviDe of Construction Type of Use Fireproofed Steel Skeleton or Reinforced Concrete Masonry or Concrete SF Bearing SF Wall Structure Wood Frame Structure SF Pre -Fab Steel Structure SF Industrial/Manufacturing S66 S69 S65 S64 68,000 Engineering & Research S88 S96 S93 S88 General Office S123 S113 silo S104 Medical Office S133 S71 S69 S67 General Retail S84 S54 S51 S41 Auto Service Facility 84 S81 S78 Elder Care Facility 102 S74 S72 S72 Motel Sprinkler credit? (Enter 1 if yes) Total Value of New Structure: Total Value of New Structure & Contents: Current grand list value of property: Past payments credit: Post construction value of structure & land Future payments credit: Base fee: NET FIRE PROTECTION IMPACT FEE: PM Peak Hour VTEs Past payments credit: Future payments credit: OTHER CREDITS: ROAD IMPACT FEE: $8,119.64 $S,8A,i.8o 1 $115,968.36� 1 $4,352,00 $10,880,000.0 $5,988,00 $4,431.12 $10,340,000.00 $103.40 $6,56o.64 $2,026.12 05/18/2012 Cis, of South Burlington Grand L:--c Page 1 of 1 10:06 am Parcel Report ray For Parcel: 0860-01020. BURLINGTON PROPERTIES LTD Name BURLINGTON PROPERTIES LTD 85 MEADOWLAND DR S BURLINGTON VT 05403 Location (A) LOT 3 911 85 MEADOWLAND DR Tax Map 0860-01020 C Desc. 27.78A, BLDG Codes: (1) (Category)C (Equipment) (Owner)C Wood Crop Pasture Other Site Total Acres: 0.00 0.00 0.00 0.00 0.00 27.78 Real Land Building Equipment Inventory Values: 5,988,000 560,000 5,428,000 0 0 Homestead Veterans Farm Stab. L.U. Acres Land Use 0 0.00 0.00 0.00 0.00 Contract Lease Prev. Eqpm Land Use Amt Prev. Real 0 0.00 0 0.00 6,041,100 Housesite Special Exmp Grand List 0.00 0.00 59,880.00 Misc: Status: T Updated: 11/18/2011 Last sale was: Invalid on 08/01/2001 for $0 recorded on 514/272 Grievance Info: Flag: Y Remarks: (1) SUBDIVISION OF PROPERTY. (2) THIS IS FOR LOT 3 AND BUILDINGS ONLY. Misc Fields: (0) : 150233000 (9) : 06/23/00 SPAN: 600-188-10932 (' oO ` YERMONT Vermont Department of Environmental Conservation Watershed Management Division RECEIVED 103 South Main Street, Building io North Waterbury, V F o5671-04o8 Burlington Properties, LP Attn: Aaron Pollak 85 Meadowland Drive South Burlington, vT 0403 Re: Discharge Permit #6853-INDS Dynapower Facility Dear Mr. Pollak: Agency of Natural Resources (phonel 802-338-4835 [mil 802-338-4890 September 6, 2012 Enclosed is your copy of Discharge Permit #6853-INDS. The permit authorizes the discharge of treated stormwater runoff from impervious surfaces associated with your project. Please read this permit carefully and note the inspection, maintenance, and reporting requirements, and other operating conditions including operating fees. In addition, per the authorization, the permittee shall record a one page -page notice of issuance of this discharge permit in the local Iand records within fourteen (14) days of issuance of this permit on the form provided. The permittee shall then provide a copy of the recording to the Secretary within fourteen (14) days of the permittee's receipt of the copy of the recording from the local land records. Since we did not receive any public comments during the notice period, the final permit is unchanged from the draft that was placed on public notice. If you have any questions pertaining to this permit, please contact the Stormwater Management Program's Environmental Analyst assigned to your district, or by email at stormwater Dastate.vt.us. Additional Stormwater Management Program contact information and stormwater permitting information is available at www.vtwaterqualit�org. Sincerely, Stormwater Management Program Enclosures cc: Peter Smiar, P.E., Civil Engineering Associates, Inc. Act 250 District Coordinator 7b preserve, enhance, restore, and conserve Vel•rnont's natural Pvsources, and protect human health, for the benefit of t1d.5 and f azire generations. '.:"t.,, Permit No. 6853-INDS Project ID No. EJ96-0217.02 STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION STORMWATER DISCHARGE PERMIT STORMWATER RUNOFF TO WATERS OF THE STATE In compliance with provisions of 10 V.S.A. §1264 and the Stor►nwater Management Rule and in accordance with "Terms and Conditions" hereinafter specified, Burlington Properties, LP 85 Meadowland Drive South Burlington, VT 0403 (Impervious Area: 0.54 acres) the permittee, is hereby granted permission to discharge stormwater runoff from the Dynapower Parking Expansion located on Meadowland Drive in the 'Town of South Burlington, Vermont to Potash Brook. Expiration Date: Five years from issuance date of final permit. Note: This permit, unless revoked, modified or suspended, shall be valid until the designated expiration date not withstanding any intervening change in water quality, effluent, or treatment standards, or classification of the receiving waters including groundwater. However, any such changed standard or classification, and any applicable requirement in a total maximum daily load (TMDL) for Potash Brook, shall be applied in determining whether or not to renew this permit, and in determining the conditions of a renewed permit. The permittee shall reapply for a renewed discharge permit ninety days prior to the expiration date of this permit. 2. Revocation: 10 V.S.A. §1267 provides as follows: The Secretary may, after notice and opportunity for a public hearing, revoke, modify or suspend this permit if it is found that the permittee submitted false or inaccurate information in its application or has violated any requirement, restrictions, or condition of this permit, or if there is any change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge. The Secretary shall impose conditions as the Secretary deems necessary for regulating the discharges of a permittee whose permit has been revoked, modified or suspended. Revocation shall be effective upon actual notice thereof to the permittee. Operating Fees: This discharge is subject to operating fees under 3 V.S.A. §2822. The permittee shall submit the operating fees to the Agency in accordance with procedures provided by the Secretary. Permit #: 6853-INDS Page 2 of 5 4. Recording in Land Use Records: The permittee shall record a one -page notice of issuance of this discharge permit in the local land records within fourteen (14) days of issuance of this permit on the form provided by the Secretary, per § 18-312 of Stormwater Management Rule. The permittee shall provide a copy of the recording to the Secretary within fourteen (14) days of the permittee's receipt of the copy of the recording from the local land records. 5. Transfer of Permit: This permit is not transferable without prior written approval of the Secretary. Provided all applicable fees under 3 V.S.A. §2822 have been paid, a permittee may submit a notice of transfer to the Secretary. The notice shall be submitted at least five (5) days prior to the proposed date of transfer. The notice shall state that the prospective permittee has adequate funding to comply with this permit. The permittee shall provide a copy of this permit to the new owner or tenant and inform him of the responsibility to make application for a permit which shall be issued in his name. Any failure to do so shall be considered a violation of this permit. 6. Riaht of Entry: The permittee shall allow the Secretary, or his or her authorized representatives, at reasonable times, upon presentation of credentials, to enter upon and inspect the permitted premises, and the stormwater collection, treatment and control system; and to sample any discharge to determine compliance with this permit; and to have access to and inspect and copy any records required to be kept pursuant to this permit. 7. Receivin waters: Potash Brook Manner of Discharge: S/N 001: Stormwater runoff from an expanded parking area and gravel pad receive treatment in two grass treatment channels prior to discharge to an existing storm water treatment pond which outlets via a 12" RCP pipe to Potash Brook. 9. Wastes Permitted: Stormwater runoff from S/N 001 of the Dynapower Parking Expansion project after treatment from grass channels. 10. Volumes Permitted and Frequency of Discharge: Such volumes and frequency as required by the discharge specified in #8 above. 11. Approved Project Design: This project shall be constructed and operated in accordance with the following site plans and details prepared by Civil Engineering Associates, Inc. (Sheets: Sheet SWI, "Proposed Stormwater Treatment Plan, Phase I," dated 6/2012; and all supporting information). By reference, the above noted plans are made a part of this permit. 12. Maintenance and Maintenance Reporting Requirements: a. The basins, grass channels, and related stormwater collection, treatment and control system, and the Potash Brook offset projects shall be maintained in good operating Permit #: 6853-INDS Page 3 of 5 condition at all times and shall be inspected annually and cleaned as necessary to maintain design specifications. The inspections shall be conducted between the conclusion of spring snow melt and June 15t" of each year. b. Any sediment removed from the basins, grass channels, and related stormwater collection, treatment and control system shall be disposed of properly in accordance with state and federal statutes and regulations. C. By July 15 of each year the permittee shall submit a written report to: Department of Environmental Conservation Watershed Management Division Building 10 North 103 South Main Street Waterbury, Vermont 05671-0408. This report shall include, at a minimum: i. for the first report, an inspection and verification that the project was built in compliance with the Approved Project Design per #1.1 above; ii. the dates and details of any cleaning and maintenance operations carried out in the preceding year; iii. a narrative summarizing the results of any inspections conducted in the preceding year and highlighting any stormwater related problems encountered, and all remedial steps taken in response. Should any erosion problems occur, the permittee is required to immediately correct any such problems. e. Any basins, grass channels, or related stormwater devices used during construction for erosion control shall be inspected and cleaned to design specifications immediately after construction has been completed. 13. Description of Required Offset and Offset Projects: In order to meet the statutory standard for new discharges set forth in 10 V.S.A. §1264a, the permittee is required to offset 54 pounds of sediment per year associated with permittee's proposed stormwater discharge. The Secretary hereby assigns the permittee an offset charge of 54 pounds of sediment per year from Offset Project Permit No. 5080-INDO which was issued to the City of South Burlington for the Carrell Street Potash Brook stormwater improvement project, which discharges to Potash Brook . 14. Margin of Safety: The Secretary has determined that an appropriate margin of safety was applied in evaluating and approving the Potash Brook offset project. 1.5. Secretary's Determination: The Secretary has determined that this project meets the Permit #: 6853-INDS Page 4 of 5 requirements of the Agency's 2002 Stormwater Management Manual and does not increase the sediment or hydrologic load of the receiving stormwater-impaired waters. The Secretary has determined that the proposed discharge will not reduce the quality of the receiving waters below the classification established for them. 16. Implementation of Offset: Offset Project Permit No. 5080-INDO shall be completed prior to the discharge of regulated stormwater runoff from the Dynapower parking expansion as permitted herein. 17. Personnel and Training Requirements: Such personnel and training as necessary to fulfill the requirements of #12 above. 18. Monitoring and Reporting Requirement: No monitoring required; reporting requirement as specified in # 12 above. 1.9. Other Requirements: a. Treated stormwater runoff is the only waste authorized for disposal under the terms and conditions of this permit. The discharge of any hazardous materials or hazardous waste into the stormwater management system is prohibited. b. The issuance of this permit does not relieve the permittee from the responsibility to obtain any other local, state or federal permits required by law. 20. Compliance with Anti -degradation and Water Quality Standards: The Secretary has determined that the permitted discharges satisfy Vermont's Anti -Degradation Policy described in the Department of Environmental Conservation's Interim Anti -Degradation Implementation Procedure, because the procedure allows a presumption of compliance for discharges that are in compliance with the Vermont Stormwater Management Manual and any additional best management practices that will be used to control the stormwater discharge as described in Section IX.D.1.d of the Department's Interim Anti -Degradation Implementation Procedure. The Secretary has also determined that for such discharges that qualify for the presumption under IX.D.1.d, all existing uses of surface waters, and the level of water quality necessary to protect those existing uses will be maintained and protected. The Secretary has determined that if the permittee is in full compliance with all permit conditions, including approved plans, monitoring, reporting and recordkeeping conditions, and is frilly implementing stormwater BMPs required by this permit, the permitted discharges will meet the requirements of the Vermont Stormwater Management Manual and qualify for the presumption described in Section IX.D.1.d of the Department's Interim Anti -Degradation Implementation Procedure and will be presumed to comply with the Vermont Water Quality Standards, including but not limited to §l -03 (Anti - degradation Policy). 21. Renewable Energy Projects — Right to Appeal to Public Service Board: If this decision relates to a renewable energy plant for which a certificate of public good is required under 30 V.S.A. §248, any appeal of this decision must be filed with the Vermont Public Service Board pursuant to 10 V.S.A. §8506. This section does not apply to a facility that is subject to 10 V.S.A. §1004 (dams before the Federal Energy Regulatory Commission), 10 Permit #: 6853-INDS ?age 5 of 5 V.S.A. §1006 (certification of hydroelectric projects) or 10 V.S.A. Chapter 43 (dams). Any appeal under this section must be filed with the clerk of the Public Service Board within 30 days of the date of this decision. For further information, see the Public Service Board website at httpJ/psb.vermont.gov or call (802) 828-2358. The address for the Public Service Board is 112 State Street Montpelier, Vermont 05620-2701. All Other Projects — Right to Appeal to Environmental Court: Pursuant to 10 V.S.A. Chapter 220, any appeal of this decision must be filed with the clerk of the Environmental Court within 30 days of the date of the decision. The Notice of Appeal must specify the parties taking the appeal and the statutory provision under which each party claims party status; must designate the act or decision appealed from; must name the Environmental Court; and must be signed by the appellant or their attorney. In addition, the appeal must give the address or location and description of the property, project or facility with which the appeal is concerned and the name of the applicant or any permit involved in the appeal. The appellant must also serve a copy of the Notice of Appeal in accordance with Rule 5(b)(4)(B) of the Vermont Rules for Environmental Court Proceedings. For further information, see the Vermont Rules for Environmental Court Proceedings, available online at www.verniontjudiciary.org or call (802) 828-1660. The address for the Environmental Court is 2418 Airport Road, Suite 1, Barre, Vermont 05641. 22. Dated this 6`1' day of September , 2012 David K. Mears, Commissioner Department of Environmental Conservation B_ Y Padraic Monks, Program Manager Stormwater Management Program 1 Page 1 of 1 ray From: Tom Dipietro Sent: Tuesday, September 04, 2012 11:21 AM To: ray Subject: Change to Dynapower Comment Ray, Please change my previous comment on the Dynapower project from "The State of Vermont plans to issue permit 6853-INDS for this project. The DRB should require that a copy of this approved permit be submitted prior to approval of this project" to "The State of Vermont plans to issue permit 6853-INDS for this project. The DRB should require that a copy of this approved permit be submitted prior to the issuance of a zoning permit." Thank you. -Tom Thomas J. DiPietro Jr. Deputy Director Department of Public Works City of South Burlington Phone: (802) 658-7961 x108 Email: Tdipietro(cDsburl.com Web Site: www.sburl.com Twitter: @SBPubWorks 9/4/2012 Agenda #2 southburiffligton PLANNING & ZONING MEMORANDUM TO: South Burlington Development Review Board FROM: Raymond J. Belair, Administrative Officer DATE: August 31, 2012 Re: Agenda Item # 5 #SP-12-33 Burlington Properties Limited Partnership 85 Meadowland Drive At its August 7th consideration of the site plan, the Board asked to obtain further information from Public Works Department staff regarding the project's potential impacts on stormwater and wetlands as well as conditions for removal of the temporary construction access drive. In an August 27th email, the Deputy Director provided the following comments: • The DRB should include a condition requiring the applicant to regularly maintain all stormwater treatment and conveyance structures on -site. • The State of Vermont plans to issue permit 6853-INDS for this project. The DRB should require that a copy of this approved permit be submitted prior to approval of this project. The Director also reviewed the plan and indicated he had no additional comments. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburi.com Page 1 of 3 ray From: Tom Dipietro Sent: Monday, August 27, 2012 11:29 AM To: ray Subject: RE: Burlington Properties Limited Partnership Lot 2 (Dynapower) You can send them the following instead: . The DRB should include a condition requiring the applicant to regularly maintain all stormwater treatment and conveyance structures on -site. • The State of Vermont plans to issue permit 6853-INDS for this project. The DRB should require that a copy of this approved permit be submitted prior to approval of this project. -Tom Thomas J. DiPietro Jr. Deputy Director Department of Public Works City of South Burlington From: ray Sent: Monday, August 27, 2012 11:22 AM To: Tom Dipietro Subject: RE: Burlington Properties Limited Partnership Lot 2 (Dynapower) Hi Tom, In light of the responses from Matt, do you wish to change any of your comments to the DRB? Ray Belair Administrative Officer City of So. Burlington 802-846-4106 From: Tom Dipietro Sent: Monday, August 27, 2012 11:08 AM To: matt@cea-vt.com Cc: ray Subject: RE: Burlington Properties Limited Partnership Lot 2 (Dynapower) That all looks fine. Thank you Matt. -Tom Thomas J. DiPietro Jr. Deputy Director Department of Public Works City of South Burlington From: Matthew 1. Wamsganz [mailto:matt@cea-vt.com] Sent: Monday, August 27, 2012 10:52 AM To: Tom Dipietro Subject: FW: Burlington Properties Limited Partnership Lot 2 (Dynapower) 8/27/2012 Page 2 of 3 Hi Tom, Ray forwarded me your comments and I have provided responses in BLUE below. Please let me know if you need anything else and I will provide ASAP. We have our next hearing on 9/4/12 and are trying to get through this as we have been delayed a month already and will have another month appeal period when we get approval. Thanks! Matt Matthew J. Wamsganz Project Manager Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 P: 802-864-2323 x303 F: 802-864-2271 matt cea-vt.com Justin, Below are my comments on the Burlington Properties Limited Partnership Lot 2 (Dynapower) plans prepared by Civil Engineering Associates, dated June 2012, with no revisions. I reviewed sheets C2.0 and C2.1. • This property is subject to a State of Vermont Stormwater Permit (1-0618). Has the applicant reviewed the proposed site changes (i.e. increase of -0.5 acres of impervious surface and modifications to the stormwater treatment system) with the Vermont DEC stormwater section? Are changes to the State permit required? We have submitted an application to the State of Vermont Stormwater Section. The application was reviewed and determined to be technically complete and the review and appeal periods have passed, the permit number is 6853-INDS. We are just waiting for the client to pay the sediment offset fee for the new impervious area and the permit will be in hand. • Confirm that the wetland delineations shown on the plans are current. We have hired wetland ecologist Jeff Severson to delineate wetlands and he performed this work in the spring of 2012. If you need anything further he will gladly provide a letter. • Have some of the "proposed improvements" already been constructed? As noted on the application (but not on the plan) the proposed gravel storage area and proposed gravel parking area have been built and we are requesting after the fact approval. These areas were noted in the State Stormwater application and approved. • Many of the proposed improvements are adjacent to wetlands. The DRB should include a condition requiring the applicant to install appropriate erosion control measures during construction (see section 16 of the LDRs). As per Sheet C2.1 we have called for silt fence, stone check dams and catch basin inlet protection as part of the improvements. As per the answer to the above comment we haven't shown erosion control measures because the two gravel areas were already constructed. • The DRB should include a condition requiring the applicant to regularly maintain all stormwater treatment and conveyance structures on -site. We would gladly adhere to this. I'm not sure if you'll be back in the office prior to when P&Z needs this information so I am copying Paul on this email. -Tom Thomas J. DiPietro Jr. Deputy Director 8/27/2012 Page 3 of 3 Department of Public Works City of South Burlington Phone: (802) 658-7961 x108 Email: Tdipietro@sburl.com Web Site: www.sburl.com Twitter: @SBPubWorks 8/27/2012 Page 1 of 2 ray From: Paul Conner Sent: Monday, August 27, 2012 9:01 AM To: ray; Dan Albrecht Subject: FW: Burlington Properties Limited Partnership Lot 2 (Dynapower) Ray, Dan, See below. Paul Conner, AICP Director of Planning & Zoning City of South Burlington 575 Dorset Street South Burlington, VT 05403 (802)846-4106 pconner@sburl.com www.sburl.com/planning From: Tom Dipietro Sent: Monday, August 27, 2012 7:55 AM To: Justin Rabidoux Cc: Paul Conner Subject: Burlington Properties Limited Partnership Lot 2 (Dynapower) Justin, Below are my comments on the Burlington Properties Limited Partnership Lot 2 (Dynapower) plans prepared by Civil Engineering Associates, dated June 2012, with no revisions. I reviewed sheets C2.0 and C2.1. • This property is subject to a State of Vermont Stormwater Permit (1-0618). Has the applicant reviewed the proposed site changes (i.e. increase of —0.5 acres of impervious surface and modifications to the stormwater treatment system) with the Vermont DEC stormwater section? Are changes to the State permit required? • Confirm that the wetland delineations shown on the plans are current. • Have some of the "proposed improvements" already been constructed? • Many of the proposed improvements are adjacent to wetlands. The DRB should include a condition requiring the applicant to install appropriate erosion control measures during construction (see section 16 of the LDRs). • The DRB should include a condition requiring the applicant to regularly maintain all stormwater treatment and conveyance structures on -site. I'm not sure if you'll be back in the office prior to when P&Z needs this information so I am copying Paul on this email. -Tom Thomas J. DiPietro Jr. Deputy Director Department of Public Works 8/27/2012 - Easement Note( E 1. City of South Burlington plans to widen Hinesburg Road R.O.W. by 7 feet on each side. The PROPOSED resulting line is depicted and labeled "EV hereon. E 1.1. - 1.2 A 20-foot-wide easement for future recreation path is PROPOSED serving the City of South Burlington, bound westerly by the PROPOSED widened street. E2. 10-foot-wide easement for electric & communication lines conveyed to Green Mountain Power Corp. (GMP) and New England Telephone & Telegraph Co. (NETT) Vol. 176 Pg. 138). E3. 30-foot-wide easements for gas line serving Vermont Gas Systems, Inc. and for water line conveyed to City of South Budington as depicted on Reference Plat E. E4. 50-foot-wide easement for access, snow storage, electric & telephone line as depicted on Reference Plat C. E5. 2D-foot-wide sewer easement conveyed to City of South Burlington Q (Vol. 179 Pg.510). C)E6. 20-foot-wide power & communications easement serving Green Mountain C) o Power Corp. and New England Telephone & Telegraph Co. (Vol. 275 Pg. 464) E7. 10-foot-wide easement for gas serving Vermont Gas Systems, Inc.cc y (Vol. 274 Pg.587) : 2 E8. 2D-foot-wide waterline easement, 30-foot-wide sewer easement and ¢ I an 30-foot-wide combined water and sewer easements across Landrum to serve C0 Dynapower building. (Vol. 278 Pg. 120) Ly m Z E9. 20-foot-wide sewer easement running southerly and easterly from W cuF pump station conveyed to City of South Burlington (Vol. 651 Pg. 140) 2 I = Gs' BG Also sewer line easement (12 feet wide) conveyed to Summer Ice Joint n I - Ventures by Burlington Properties LP (Vol. 651 Pg. 140), apparently for - the same sewer line. E10. 30-foot-wide water and sewer and access easement to pump station conveyed to City of South Burlington (Vol. 176 Pg. 516). E11. 200' x 25' easement for electric & telephone conveyed by 6 Burlington Properties Limited Partnership to Green Mountain Power Corp. S y o and New England Telephone, dated 4/12/1989 (Vol. 281 Pg. 221-22). El 2. Sewer Pump Station (conveyed in fee) and 60' x 1 00'easement conveyed to City of South Burlington (Vol. 176 Pg. 516). II Eli. Sewer line easement (20 feet wide) for possible future use, II conveyed to City of South Burlington (Vol. 176 Pg. 518). E14. 15-foot-wide pedestrian trail easement conveyed to City of --- South Budington (Vol. 176 Pg. 514). E15. A 20' x 42' sewer easement conveyed by Burlington Properties MS(2) aysx<� Limited Partnership to CEA Properties, LLC, dated 1/7/2008 (Vol. 804 Pg. 519-20). 50a'6v 6� E16. Agreement for utilization of signage between Burlington I Properties LP and Lane Press, Inc. (Vol. 280 Pg. 398). N08°1325•W E17. 10-foot-wide easement for buried electric & telecom lines ALu tAe _ to serve Gm Mtn. Power Corp. and NET&T. (Vol. 572 Pg. 620). /H cuae� o.J' ns I - Highway or Street Notes - H.1. Meadowland Drive (f/k/a Swift Street Extension) an 80-foot- wide right-of-way is subject to an Irrevocable Offer of Dedication from Burlington Properties Limited Partnership to the City of South Budington, dated 9/12/1995 (Vol. 384 Pg. 104-108). This Irrevocable Offer of Dedication apparently supercedes a previous Irrevocable Offer of Dedication recorded (Vol. 176 Pg. 518). A third Irrevocable Offer of Dedication from Summer Ice Joint Venture to the City of South Burlington, dated 10/23/1996 was not recorded as of early March 2010. H.2. Hinesburg Road (VT Rte. 116) is a public highway or street with a right-of-way width of 4 rods (66 feet). H.3. Interstate Highway 89 is a public highway with a variable -width right-of-way. Reference Volume 48 Page 489 ,City Land Records, and Reference Plan I. No direct access to 1-89 from subdivision. HA Thompson and Bowdoin Streets are 60-foot-wide rights -of -way subject to Irrevocable Offers of Dedication from Burlington Properties L.P. to the City of South Burlington (Vol. 401 Pg. 350) and from Summer Ice Joint Venture to the City of South Burlington, dated 10/23/1996 (Unrecorded). - Zoning Data( "INDUSTRIAL -OPEN SPACE" DISTRICT LOT AREA 3 AC. FRONT SETBACK 50' SIDE SETBACK 35' REAR SETBACK 50, BUILDING COVERAGE 30% LOT COVERAGE 50% FRONT YARD COVERAGE 30% OWNER of RECORD: BURLINGTON PROPERTIES LIMITED PARTNERSHIP 85 MEADOWLAND DRIVE SOUTH BURLINGTON, VT 05403 I I WGM ASSOCIATES V. 655 P.16 I V. 675 P. 550 - Legend - SUBJECT PROPERTY LINE - - OTHER (APPROX) PROP. LINE -------------------- EASEMENT SIDELINE - -SS- - GRAVITY SEWER LINE - _G - - GAS LINE - - W - - WATER LINE - - UE - - UNDERGROUND ELECTRIC - - UT - - UNDERGROUND TELEPHONE cw.F N83'074PE 727.43 0.4' AG AM 4730 -------"---- -----w- 170.23 A27' / ]' Al j LOT 1 S08°00'18'E �, E1 n s S83°08'334&5.36' FLusH 'W FiusH , .� E1 A-/71.9 L-35a.6' ` •� d-4M I�a3°0717tr407.91'���A� CMF %JO'4wP4'9I•F I23.1ry W 0.5' AG SPANIEL PROPERTIES, LLC _ V. a95 P. 372 - G. ELTABBAM �I V. 804 A W5 LLJ-- -- Cr a I AG 0.1 AG LOT 2 4.93 Ac. IPF/CIPF O IRON PIPE / CAPPED IRON PIPE FOUND IRF/CIRF 0 IRON ROD / CAPPED IRON ROD FOUND GRID NORTH CMF E] SQUARE CONC. MARKER FOUND SEE NOTE _ CMS O CONIC. MARKER SET (NOTE 5) o AG / BG ABOVE / BELOW GRADE / E14 E3 CORRESPONDS W/ EASEMENT NOTE / O SEWER MANHOLE (NOT .ALL SHOWN) / 0M\ 20' AG aN o Dynapower Building 3( I G. ELTABBAKH III V. 806 R 24 t5 S r y I E15 cur ' WF N83"o374E 5W 77 518• CIRF N 43•E as'AG a5' AG a 'so MUNSON EAST MOUNTAIN VIEW, LLC I I EARTHMOV/NG CORP. V. 754 A 53 V. 651 A 152 M-d-1-d Lot 1 - Survey Notes - 1. Purpose of this surrey and plat was to: 5. Iron pipes found are typically described with inside diameters. Iron rods found are a.) Retrace, document, monument and perpetuate the perimeter boundaries of land typically described with outside diameters. Comer or line markers (monuments) set or conveyed to Burlington Properties Limited Partnership by deed of Orchard Lake Road proposed shall typically consist of 40" x 5/8" diameter steel reinforcing rods or 4" square Properties, dated 12/15/1998 and recorded in Volume 273 Page 265 of the South Burlington reinforced concrete markers with aluminum caps embossed "CIVIL ENGINEERING Land Records. ASSOCS. - VT LS 597", typically set flush with existing grade. New markers set in b.) Depict the proposed subdivision of the surveyed parcel into four (4) lots as shown. woodlands are typically set with 4" - 10" of reveal. a LANDRUM Lane Prws� E8 ra, '14I / LOT 3 II iT'' l /I 27.78Ac. Jeslaszr E14 )•orsaw CIRF -� N83°01'47E 589.69' CIRF IfN63°03FFE 39945/s• CIRF a4' AG I 0.5' AG y GRANDVIEW FARM, Inc. I TPe ROCK of GREATER I I 88Y5>Y I I l 4 10 V. 800 P.570 I BURLINGTON, Inc. I sp,gs / \�\ Mn,dowio„a I. of 12 I I V745 P. 464 BI Cn Z Meadowland lot 11 I Other neighboring property lines may be shown approximately and are for reference 6. The subject property MAY be subject to buried utilities, easements, rights -of -way, purposes only. restrictions, covenants, licenses, permits, regulations and/or set -back lines not readily apparent from normal inspection of the property or land records. No liability is assumed by 2. Field surveying was conducted during January 2010 and consisted of a dosed -loop Civil Engineering Associates, Inc., or the undersigned, for any loss associated with the traverse utilizing electronic total -station and GPS instruments unless otherwise noted. existence of any undiscovered easements, uses, or restrictions on use of the property which Bearings shown are from Grid North, Vermont Coordinate System of 1983, based upon our are not evident in the record or are not readily apparent from normal inspection of the GPS observations on or near the site. property or land records. 3. Some dimensional information shown hereon may differ significantly from existing land records, plats or deeds, due to differences in orientation or methods of measurement. 4. Areas of proposed Lots 2 and 3 are calculated to the sidelines of Meadowland Drive, as shown. APPROVED BY RESOLUTION OF THE SOUTH BURLINGTON, VERMONT, DEVELOPMENT REVIEW BOARD, ON THE DAY OF 2 , SUBJECT TO THE REQUIREMENTS AND CONDITIONS OF SAID RESOLUTION. SIGNED THIS DAY OF ,2 , BY CHAIRPERSON. - Reference Plats or Maps - A. "Consolidation of Lot 8 & 9 Meadowland Business Park for Birchwood Burlington, LLC", last revised 9/16/2008, by Civil Engineering Associates, Inc. Recorded in Map Slide 534.3, South Burlington Land Records. B. "Boundary Plat Linus & Sue Wiles", dated March 11, 2003, by Trudell Consulting Engineers, Inc. Vol. 425 Pg. 3 South Burlington Land Records. C. "Meadowland Business Park - Subdivision Plat", last revised 8/27/1996, by Trudell Consulting Engineers, Inc. Recorded in Map Slide 300.3, South Burlington Land Records. D. "Landrum and Orchard Lake Road Properties", last revised 2/03/1988, by Trudell Consulting Engineers, Inc. Recorded in Map Slide 208.5, South Burlington Land Records. E. "Plat of Land of.Semicon Components, Inc.", last revised 8/29/1986, by Trudell Consulting Engineers, Inc. Recorded in Map Slide 193.1, South Burlington Land Records. F. "Plat of Land of Mitel, Inc.", last revised 5/21/1984, by Trudell Consulting Engineers, Inc. Recorded in Map $lide l70.4, South Burlington Land Records. G. "Mountain View Industrial Park", last revised12/03/1981, by Trudell Consulting Engineers, Inc. Recorded in Map Slide 153.4, South Burlington Land Records. H. "Property Survey - Wright Farm", dated February 7,1979, by Engineers Incorporated of Vermont. Recorded in Map Slide 150.1, South Burlington Land Records. I. "Interstate Project in the Towns of VVllliston & South Burlington - Project 1-89-3 (14)", Sheets 15-16 of 115, circa April 1961, by Boswell Engineering Co., VTrans District 5 Engineer's Office. /�F95'TAT�ch//GjyK, f \ 9 R=4683.75 _ d=4"OP'OB' SrATZo°f \ \ -- V \ \ \ l! ae p F976j0Nr \ \ \ \ x e \ 2.0' AG LOCATION MAP NOT to SCALE 77• CDF 1.5'AG E13'' 111 ! I / / I m ~ � Inn 2 �C) m *EIVE :fi LOT 4 38.W Ac. I AN 15 2012 Im I City of So. Burlington I I Sa3°04'02'W 59.9s E74 I ' _ 5A- CIRF FLUSH _ 1-3, 5/e• CIRF S"01'58'W $50.06- - I.J' AG -T$93°02'06�W 701.49' 0e' AG I ® SUPER -TEMP REALTY I l BIRCHWOOD 81 I COMPANY, Inc. J BURLINGTON, LLC I I V. 755 P. IW V. 822 P.87 2 Naodo"lord Lat 6 Meadowland Lots d-9 AI y GRAPHIC SCALE d W13 (IN FEET) --- 1 inch = 150 1t_ SOUTH BURLINGTON CITY CLERK'S OFFICE RECEIVED FOR RECORD This _ day of , 2010, at _ o'clock _ minutes _M and recorded in map slide _ page/number Attest City Clerk To the best of my knowledge & belief this plat properly depicts the results of a survey conducted under my direct supervision, based upon our analysis of record and physical evidence found. Existing boundaries shown are substantially consistent with the record unless otherwise shown. This plat is in substantial compliance with 27 VSA 1403, This statement valid only when accompanied by my original signature and seal. Timothy R. Cowan VT LS 597 SURVEYED BY: f E CIVIL ErIGlrllMUSIIG AyvOCIAHSO. INC. 10 MANSFIELD VIEW LANE SOUTH BURLINGTON, Vr 05403 PRONE SE4042M FAX 802-884-1271 :aPYWa-(ry72Dla -ALL RIam ses3av® DMW MJW/TRC JLM APPROYSO TRC CH'%'D IOiVLSIX4 >9.15.10 TRC REC. EASE. ON RTE. 116 )4.06.10 TRC ADD EASEMENT DATA PROPOSED 4-LOT SUBDIVISION BURLINGTON PROPERTIES LIMITED PARTNERSHIP 85 MEADOWLAND DRIVE SOUTH BURLINGTON, VERMONT Un �71NC xtM®eq MAR. 10, 2010 GIHGm� � P 1 1"=150' M M. 09202 SITE ENGINEER: EXISTING CB > —INV IN W-359.1' \INV OUT 9*-355.5' _%I; tL� _ S RIM-3 58.9' 11MANSFED VIEWLW SOMR)RUMSTOK Yr OW EXISTING ce♦ CIVIL ENGINEERING ASSOCIATES INC. 0.o S s INV IN 4 j1I`!ROP0&ED GRAVEL I� - Vi ` —�� I. f MJw ST0R,4GEARE4 A eafte 4#4- 1000 MJw SAV NI, OWNER: ILI 141 BURLINGTON PROPERTIES % % *it Q� \41 41 LIMITED % % aaaa 14, PARTNERSHIP 85 MEADOWLAND DRIVE 41 ExSO. BURLINGTON, VT05403 a.. isting CIS ea.. -a- , PROJECT: El`.Z'%G4.W N IN 8"-349.2' % WvV 1:�,N 8.::1.1151: Building 1. IT S" 349.1' PROPOSED EXISTING CB PARKING RIM:W'.V INV IN 4* 360.1' eafteAREA INV IN 4"-359.5' EXISTING CS 0 , INV OUT 8"-355.6' NRIV IN 51.9-3, .3. INV IN al'-3 .3! \� IN, OUT 12" 3. EXISTING 7/ ee 85 MEADOWLAND DRIVE Is -35 IAISTALL SO. BURLINGTON, VT05403 :NV I u 7�4 XISTING . . . . . . IM -,- : SPA -6 \ . V OUT , . AS ING CS Q INSTALL M-351 6, STONE CHECK \ • \ \ \ E ISTING C8 IN 1�5--345i' 24W 03 GA DAM (TYP.) 356.S INV a 112 4' OJT 24C 1 %TMSNICrH DRAIN INV IN a*:35i leti EXISTIN INV T W-3 V_ STORM'M 14 41 \,P,. RII PROPOSED 201 Ida PROPOSED Wft LIGHT POLE (TYP. FOR 4) EXISTING CS GRAVER- PARKING AREA EX�STING R M. . INV I a: IN ECE I INV CUT D.t 2.6'CAUPER a GREENASH MV. FOR 7) 2 W CAUPER JUN 15 2012 RED AdAPLE LOCATION MAP LEGEND EXISTING CB (ryp. FOR 5) RIM 360,v w INV OUT 1.:355:7' City of So. Buding EXISTING CONTOUR _K. REVISION 356 � PROPOSED CONTOUR EXISTING B'RIM-WO 12' INV IN 12*-343.540 ea ea m ea I fN-356 APPROXIMATE PROPERTY LINE IN V15: 359 • T 18" .01 1% EX TING CO SETBACK LINE CUT Ix A M �.s J` INV. z35&3 INV OUT EASEMENT UNE HIS -34... v S "ER INV T 1 -355.1' 4. STOAMWATER -55-- GRAVITY SEWER LINE TM 15* WIFES♦ TREATMENT AREA (TO EMA/N, INV. AREA (FO REMAIN) MIA \ G — GAS LINE TO Q 1 ve ea. W — WATER LINE ---UE&T— UNDERGROUND ELEC. & TEL. \�INV OUT 12'-342.0' _ST— STORM DRAINAGE LINE 12'HOPE.IFES aaaa aaaa aaaa LOT 3 A INV. 3*5 w SEWER MANHOLE #a- 4000 SEWER PROPOSED PHASE I SITE IMPROVEMENTS GRADING a SHUT-OFF HYDRANT MAKl WETLAND NOTE, PRIMOR TO DO CER IE OF ANCY TEMPORARYA SS BE COVERED WITH MIN. & MULCHED GRAPHIC SCALE I------------- ----------- ----------------- - ----- ---------- IN F= ) 1 inch = 40 fL sr INV IN \41 NI, Landscape Schedule S. CK - P .I 14, Abbreviation Botanical Name Common Name Plant Size City Coal Total & UTILITY —$T— ­T_/,V RCI Tre WSh.b. RM Acer rubwm Red Maple 2, S' 5 $ 450DO $ 2,250.00 PLAN 15' HOPE wIFES %41 GA Fwnua Pennsyl,anica Lanceolata Green Ash 2.5" 7 $ 4%00 $ 3,150.00 INV 352.0 NWALL SILT FENCE \-INV Out 15*-350.7' Proposed Total TreedShrubsCost 11, $ 5,400.00 AL7QE - — - — - — - DATE ..vm. NUMBER \11 \ N \L, Required Landscaping JUNE, 2012 e , 1111" — I-aaaa I- Nw ------------------------- # -------------- ----------------------- ----- ------------- - -------- *'--Conatructlon Cost, $175,000 RequireLandscaping Expenditum Z50,000 First of Building Cost 3% x $175,000 $5,250 1 11 = 40' C2.1 2nd $250,000 of Building Cost 2% x Additional Cwr $500,000 1% Additional $0 $o Total Landscaping $51250 MOU. NO. 09202 I I I I I I � I I �I I I I i - SITE ENGINEER: WGM OCIATES �_-_•—__--�--_- — — _ - LAND C ---+_, I t / / CIVIL ENGINEERING ASSOCIATES. INC / 18M4 WVEWIMK SUITHSIMUM M W M II / MJ oM /• / I / W cercTv:D MJW BURLING ON PRO ERTIES / PA VED_ " APRO°60 LIMITED ARTNERS (PLOT 1 / �� -�'� I / / SAV BURLINGTON PROPERTIES p / -;�' / / ,• • j I —'• —� "1 w y / LIMITED PARTNERSHIP BU E TIES / \ 7 �'Y \ ,Y w w \, v. � � w `I' w M PARTNERSHI LOT 3.� / ® I w� W w w w w w O 7 L—— — — — —.— Q 1 \ 1 \ NEiNGIL1VELw w w w w w/- I 1 w I 85 MEADOWLAND DRIVE 'l / � � \ �� i� � �E w w w w w w �� A w w w w w1 W I. SO. BURLINGTON, VrO5403 Lu m � •I � __ __ _ �I, w w ►u _ / a vTS = I Y / Existing \ \ w w w / w I_ w w w Iw w wl ? 05 PROJECT: ,1' w Building `1 w w� �.-PROPOSED PARKING o -- -- -- -- ', \\ ® �, � � �• � ' I � I ��%/;'� AREA cc I '� � \\ 1 w I I %/ 85 MEADOWLAND DRIVE SO. BURLINGTON, VT O5403 I I I I \ \\ , ,,�•, P Q CLASS Sl D I / " •r w w w ' PAR RA ? BUFFER CLASS 11amp LEGEND I \ \ ` \ ► / ; / w w w w w g I % „a BURLINGTON PROPERTIES I LIMITED PARTNERSHIP LOT EXISTING CONTOUR I APPROXIMATE PROPERTY LINE I • \ \ ��. \ ! / . / , / W +. +' W w ,Y w w w 'b w w w w w ,Y w w f '�. 1 / I' Q Hw�o o -- / • — ' — ' — SETBACK LINE ---------------------- EASEMENT UNE - I \ \ /\ � ,-.Z "_ w w w •Y y'� w _w w w� w w'. �• . w S v' —'�'. �Y . 1 w W v' _w• �' w O — —SS— — GRAVITY SEWER LINE L — . — . — . — . — . — . — — . — . — . — . \ w _ _ w__ __ __________ __ _ _____ +• _ __ _ ________a____r________ ________.Y_ ___________.________ ____ ________ ___ __ _ _ _______ W w�______ ___ w G — — GAS LINE -----?----------------------- _ ------ _ _ — — — — -- , — — Z — — — — LOCATION MAP-- — — w w � _ —A — -.- — — — - I i = 200P — W — WATER UNE —UE&T— -- UNDERGROUND ELEC. & TEL \ Nq I I DATe cRr. rrvismn —ST — -- STORM DRAINAGE LINE I \ I I I I ® SEWER MANHOLE \�I/; I Q ' ® Xb SHUT—OFF HYDRANT WETLANDBURLINGTON, I I MUNSONEARTHMOVINGCORP. / \ GRAPHIC SCALE I GRANDVIEWFARM/NC. I \ I I I I - 1.0 I I THE ROCK OF GREATER INC. ^ R E C E I� E o — --- LOT 3 IN FM> DIMENSIONAL SUMMARY JUN 15 2012 1 Inch = BD ft.i LOT AREA REDD. 3 AC EXISTING CONDITIONS 27.78 AC PROPOSED CONDITIONS 27.78 AC ZONING DISTRICT.' INDUSTRIAL - OPEN SPACE PARKING CALCULATION GENERAL NOTES. 1. UTILITIES SHOWN DO NOT PURPORT TO CONSTITUTE OR REPRESENT ALL UTILITIES LOCATED UPON OR ADJACENT TO THE SURVEYED PREMISES. EXISTING UTILTY CI�//}f W� o'.����y-- ,`, O So Bu I,K')wr� 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARY FOR COMPLETE AND OPERABLE FACILITIES AND UTILITIES OVERALL SITE FRONT SETBACK 50' SIDE SETBACK 35' REAR SETBACK 50' BUILDING COVERAGE 30% LOT COVERAGE 50% FRONT YARD COVERAGE 30% 135' 357 82' 10.1 % 23.7% 0.1% 135' 357 82' 10.1 % 25.3% 0.1% OWNER OF RECORD&APPLICANT BURLINGTON PROPERTIES LIMITED PARTNERSHIP 85 MEADOWLAND DRIVE SO. BURLINGTON, VT 05403 LIGHT MANUFACTURING 0.5/1000 SF GFA + 1/EMPLOYEE= 0.5x (123,200/100) + 216 (EMP. ON LARGEST SHIFT) 278 SPACES REQUIRED 7HCREQUIRED ( % 241 SPACES PROVIDED (7 HC PROVIDED) WAIVER REQUEST FOR 37 SPACES (13.3%) LOCATIONSAREAPPROMMATEONLY. THE CONTRACTOR SHALL FIELD VERIFYALL UTILITY CONFLICTS ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. THE CONTRACTOR SHALL CONTACT DIG SAFE(88&341-7233) PRIOR TO ANY CONSTRUCTION. 2. THE CONTRACTOR SHALL REPAIR/RESTOREALL DISTURBED AREAS (ON OR OFF THE SITE) AS A DIREC T OR INDIRECT RESUL T OF THE CONSTRUCTION. 3. ALL GRASSED AREAS SHALL BE MAINTAINED UNTIL FULL VEGETATION IS ESTABLISHED. 4. MAINTAIN ALL TREES OUTSIDE OF CONSTRUCTION LIMITS 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARY FOR COMPLETE AND OPERABLE FACILITIES & UTILITIES ALL PROPOSED UTILITIES SHALL BE UNDERGROUND. 5. IN ADDITION TO THE REQUIREMENTS SET IN THESE PLANSAND SPECIFICATION$ THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL PERMIT CONDITIONSANDTHECITYOFSOUTHBURLINGTONPUBLICWORKSSTANDARD& 7. THE TOLERANCE FOR FINISH GRADES FOR ALL PAVEMENT, WALKWAYS AND LAWN AREAS SHALL SE0.1 FEET. S. THIS IS NOTA BOUNDARY SURVEYAND IS NOT INTENDED TO BE USED AS ONE. S./FTHEREAREANYCONFLICTSORINCONSISTENCIESWITHTHEPLANSOR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR VERIFICATION BEFORE WORK CONTINUES ON THE ITEM IN QUESTION. PLAN DATE JUNE, 2012 ill " = SO' PRol. No. DM nurser ��.O 09202 0 Permit Number SP-�-� (office use only) APPLICATION FOR SITE PLAN REVIEW �,a ❑ Administrative development Review Board All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. 1. OWNER(S) OF RECORD (Name(s) as shown on deed, mailing address, phone and fax #): BurlinjZton Properties Limited Partnership, 85 Meadowland Drive, So. Burlington, VT 05403, 860-7200. 2. LOCATION OF LAST RECORDED DEED(S) (Book and page #): Book 273, Page 265. 3. APPLICANT (Name, mailing address, phone and fax #): Burlinl1ton Properties Limited Partnership, 85 Meadowland Drive, So. Burlington, VT 05403, 860-7200. 4. CONTACT PERSON (person who will receive all correspondence from Staff. Include name, address, phone & fax #): Matthew J. Wamsganz, Civil Engineering Associates, Inc., 10 Mansfield View Lane, So. Burlington, VT 05403, 864-2323 x 303, 864-2271. 4a. CONTACT EMAIL ADDRESS:: matt(d)cea-vt.com 5. PROJECT STREET ADDRESS: 85 Meadowland Drive. 6. TAX PARCEL ID # (can be obtained at Assessor's Office): 0860-01020C 7. PROJECT DESCRIPTION a. General project description (explain what you want approval for): New 60 space paved parking lot, after the fact 24 space gravel parking lot, after the fact gravel storage area and temporary construction access off Meadowland Drive. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com b. Existing Uses on Property (including description and size of each separate use): Dynapower Corporation (light manufacturing) in 123,200 sf building on a 27.8 acre lot. c. Proposed Uses on property (include description and size of each new use and existing uses to remain): Same d. Total building square footage on property (proposed buildings and existing buildings to remain): 123,200 sf e. Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine): Existing Building +/-30' (2 floors) f. Number of residential units (if applicable, new units and existing units to remain): N/A g. Number of employees (existing and proposed, note office versus non -office employees): 216 existing on largest shift, 0 proposed, all non -office (light manufacturing) h. Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable): Interstate Highway Overlay District, Hinesburg Road - North View Protection Zone, Airport Approach Cone, Surface Water Buffer Standards, Class II Wetlands. 8. LOT COVERAGE Total Parcel Size: 1,210,303 Sq. Ft. a. Building: Existing 10.2 % / 123,200 sq. ft. Proposed 10.2 % / 123,200 sq. ft. b. Overall impervious coverage (building, parking, outside storage, etc) Existing 23.7 % / 287,038 sq. ft. Proposed 25.3 % / 306,416 sq. ft. c. Front yard (along each street) Existing 0_1 % / 1,586 sq. ft. Proposed 0_1 % / 1,586 sq. ft. d. Total area to be disturbed during construction (sq. ft.) 53,598 * * Projects disturbing more than one-half acre of land must follow the City's specifications for erosion control in Article 16 of the Land Development Regulations. Projects disturbing more than one acre require a permit from the Vermont Department of Environmental Conservation. Site Plan Application Form Rev. 12-2011 9. COST ESTIMATES a. Building (including interior renovations): $ N/A b. Landscaping: $5,250 c. Other site improvements (please list with cost): Construction of new parking lot and temporary entrance $175,000 10. ESTIMATED TRAFFIC a. P.M. Peak hour for entire property (In and out): 97 11. PEAK HOURS OF OPERATION: 8 am — 3:30 pm 12. PEAK DAYS OF OPERATION: Monday -Friday 13. ESTIMATED PROJECT COMPLETION DATE: September 15, 2012 14. SITE PLAN AND FEE A site plan shall be submitted which shows the information required by the City's Land Development Regulations. Five (5)1 regular size copies, one reduced copy (11" x 17"), and one digital (PDF-format) copy of the site plan must be submitted A site plan application fee shall be paid to the City at the time of submitting the site plan application in accordance with the city's fee schedule. Administrative site plan applications require three (3) regular size copies, one reduced copy (11° x 17"), and one digital (PDF-format) copy. 3 Site Plan Application Form. Rev. 12-2011 NOTE: NOTIFICATION of ADJOINING PROPERTY OWNERS: Notification of adjoining property owners, in accordance with 24 V.S.A. §4464(a) and Section 17.06(B) of the South Burlington Land Development Regulations, is the responsibility of the applicant. After deeming an application complete, the Administrative Officer will provide the applicant with a draft meeting agendas or public hearing notice and sample certificate of service. The sworn certificate of service shall be returned to the City prior to the start of any public hearing. I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATURE OF APPLICANT Do not write below this line I' : 1►� � : ul'r DATE OF SUBMISSION: REVIEW AUTHORITY: D Development Review Board ❑ Administrative Officer I have reviewed this site plan application and find it to be: Complete nc 1 /e Administrative Officer The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802) 879-5676 to speak with the regional Permit Specialist. Site Plan Application Form. Rev. 12-2011 Landscape Plan 85 Meadowland Dr Civil Engineering Assoc. 6/20/ 12 Species: 1. Green Ash is not an acceptable species due to over planting in South Burlington as well as the inevitability of Emerald Ash Borer reaching Vermont in the near future 2. Red Maple requires acidic soil and is not recommended on this site as the soils are neutral to mildly alkaline. Red Maples planted on the adjacent site are exhibiting symptoms of Manganese deficiency. Potential substitutes include but are not limited to: • Swamp White Oak • Shingle Oak • Honeylocust • Accolade Elm • Silver Linden • Freeman Maple `Celebration' or `Sienna Glen' Planting Details and Specifications need to be included in the plans ALED3T78 Specification Grade Area lights available in IES Type II, III and IV distributlons. For use In parking lots, roadways, pathways and general area lighting. Mounts to 4' square steel poles at 15-25'. Designed to replace 25OW Metal Halide Area Lights, Patent Pending thermal management system. 5 Year Warranty. LED Info Watts: 78 Color Temp: 6100K (Cool) Color Accuracy: 68 L70 Llfespan: 0 LM79 Lumens: 4,959 Efficacy: 54 LPW Technical Specifications Driver Info Type: Constant Current 120V: 0.78 A 208V: 0.50 A 240V: 0.44 A 277V: 0.38 A Input Watts: 91W Efficiency: 86% IES Classification: The Type III distribution is ideal for roadway, general parking and other area lighting applications where a larger pool of lighting Is required. It is Intended to be located near the side of the area, allowing the light to project outward and fill the area. LEDs: Six (6) multi -chip, 13W, high -output, long -life LEDs Drivers: Three drivers, constant current, Class 2, 100 - 277V, 50 - 60 Hz, 100 - 277VAC .04 Amps. Fixture Efficacy: 55 Lumens per Watt Ambient Temperature: Suitable for use in 40C ambient temperatures. Surge Protection: 6 KV Cold Weather Starting: The minimum starting temperature is-40F/-40C Thermal Management: Superior heat sinking with external Air -Flow fins. Effective Projected Area EPA = 0.75 Housing: Die cast aluminum housing, tens frame and mounting arm. Color Stability: RAB LEDs exceed industry standards for chromatic stability. L I G H T I N G Tech Help Line: 888 RAB•1000 CopyNNG2012 RAB Uohling, Inc, A9 Rlphls Reserved Color: Bronze Color Accuracy: 68 CRI Created: 05e2%2012 Weight: 30.4 Ibs Color Temperature (Nominal CCT): 5100K Color Uniformity: RAB's range of CCT (Correlated color temperature) follows the guldellnes of the American National Standard for Specifications for the Chromaticity of Solid State Lighting (SSL) Products, ANSI C78.377-2008. Reflector: Specufar aluminum. Gaskets: High temperature silicone gaskets. Finish. - Chip and fade resistant polyester powder coat finish. Green Technology: Mercury and UV free. IESNA LM-79 & IESNA LM-80 Testing: RAB LED luminaires have been tested by an independent laboratory In accordance with IESNA LM-79 and 80, and have received the Department of Energy "Lighting Facts" label Replacement: The ALED78 replaces 25OW Metal Halide Area Lights. California Title 24: ALED78 complies with California Title 24 building and electrical codes. Email: sates@tabweb.com On the web at: www.rabweb.com Rote: epeWjoatlons are sub*t to charge without notice _ Page 1 or 2 PS4-07-20D2 Square steel poles drilled for 2 Area Lights at 180 deg. Designed for ground mounting. Poles are stocked nationwide for quick shipment. Protective packaging ensures poles arrive at the job site good as new. Lamp Info Ballast Into Type: - Type: 0 Watts: 0 120V: NIA Shape/Size: WA 208V: WA Base: WA 240V: NIA ANSI: N/A 277V: N/A Hours: 0 Input Watts: NIA Lamp Lumens: 0 Efficiency: NIA Efficacy: NIA Technical Specifications Shaft: 46,000 p.s.i. minimum yield Hand Holes: Reinforced with grounding lug and removable cover Base Plates: 36,000 p.s.l. minimum yield Shipping Protection: All poles are shipped in Individual corrugated cartons to prevent finish damage. Color: Bronze powder coating Terms of Sale: Pole Terms of Sale is available Height: 20 FT Weight: 195 Ibs Gauge: 7 Wall Thickness: 3/16" Shaft Size: 4" Hand Hole Dimensions: 3" x 6" Bolt Circle. 9,l RAM L 1 G H 'T' I N G Tech Help Line: 888 RAB-1000 Copydgh[CI M12 RAB Lighting. [no. At Rights Reserved Geier: Bronze Base Dimension: 10" i i' Created: 05fMOI2 Weight: 195.0 Ibs Anchor Bolt: Galvanized anchor bolts and galvanized hardware and anchor bolt template. All bolts have a 3" hook Anchor Bolt Templates: WARNING Template must be printed on I x 17" sheet for actual size. CHECK SCALE BEFORE USING. Templates shipped with anchor bolts and available Pre -Shipped Anchor Bolts: Bolts can be pre -shipped upon request for additional freight charge MaxEPA's/Max Weights: 70MPH 16.2 ft /390 lb 80MPH 11.8 ft /285 lb 90MPH 8.7 ft_/205 lb 10OMPH 6.3 ft /150 lb 110MPH 4.5 ft_/110 lb 120MPH 3.1 ft /75 lb 13OMPH 2.0 It /50 lb 140MPH 1.1 ft_/30 lb 150MPH 0.4 ft /10 lb Email: sales@rabweb.com On the web at: www.rabwab.com Note: Spectf=Uons are subfod to change wtdwut notke Page 1 of 1 ALED3T78 - continued Warranty: LED fixtures give you peace of mind because both the fixture and light engine components are backed by RAB's 5 Year Warranty. For more information, Patents: The ALED design Is protected by patents pending to the U.S., Canada, China, Taiwan and Mexico. For use on LEED Buildings : IDA Dark Sky Approval means that this fixture can be used to achieve LEED Credits for Light Pollution Reduction Dark Sky Approved : The International Dark Sky Association has approved this product as a full cutoff, fully shielded luminaire. UL Llsting: Suitable for wet locations as a downlight. L I G H T I N G Tech Help Una: 888 RAS-1000 Copydght6M f2 RAH Llghtlng. Inc. All RIghla Reserved (mall: sales@rabveb.com On the web at: www.rabweb.com Now Speciriea8ons are subloa to charge wigwut notice Created: 05/29=12 Page 2 of 2 CITY OF SOUTH BURLINGTON CERTIFICATE OF SERVICE I hereby certify that on this 23`d day of July, 2012, a copy of the foregoing public notice for Burlington Properties Limited Partnership #SP-12-33, was sent by U.S. mail, postage prepaid to the owners of all properties adjoining the subject property to development, without regard to any public right-of-way, and including the description of the property and accompanying information provided by the City of South Burlington. I further certify that this notification was provided to the following parties in accordance with 24 V.S.A. §4464(a) and Section 17.06(B) of the South Burlington Land Development Regulations: List of recipients: (see attached list) Dated at So Burlington, Vermont, this 23`d day of July, 2012. Printed Name: Amy Marks Phone number and email: 8 2-864-2323 @cea-vt.com Signature: .,�.� 2' Date: July 23, 1012 Remit to: City of South Burlington Department of Planning & Zoning 575 Dorset Street South Burlington, VT 05403 South Burlington Sample Certificate of Service Form. Rev. 1-2012 Burlington Properties Limited Partnership Adjoiner Information June 2012 PARCEL ID OWNER OF RECORD 0860-00896 WGM Associates c/o Nancy McGovern PO Box 9477 South Burlington, VT 05407 0860-00087 Landrum Phillip Drumheller PO Box 130 Burlington, VT 05407 0860-01061 Arthur Rye & Bernice Brisson Trust 63 Sam Web Rd. Fairfax, VT 05454 1155-00284 Munson Earthmoving Corp. 85 Shunpike Rd. Williston, VT 05495 1155-00317 Grandview Farm Inc. PO Box 1304 Burlington, VT 05402-1304 1715-00073 The Rock of Greater Burlington, Inc. PO Box 464 Milton, VT 05468 i 0001 1620 V a 974 PG n � CITY C:t_ERK "S OFFICE Received Nov 23 r 2010 10:22A Recorded in VOL: 974 FG: 1 ~ 4 OF So. Burlington Lund Records Attiastm Gonna K.inville City Glen: RECREATION PATH EASEMENT DEED KNOW ALL PEOPLE BY THESE PRESENTS, that BURLINGTON PROPERTIES LIMITED PARTNERSHIP, a Michigan limited partnership with a place of business in South Burlington, Vermont (the "Grantor"), in consideration of Ten or More Dollars, and other valuable consideration, paid to the Grantor's full satisfaction by the CITY OF SOUTH BURLINGTON, a Vermont municipality located in the County of Chittenden and State of Vermont, (the "Grantee"), by these presents do freely GIVE, GRANT, SELL, CONVEY, AND CONFIRM unto the said Grantee, CITY OF SOUTH BURLINGTON, its successors and assigns forever, a certain recreation path easement in the City of South Burlington, in the County of Chittenden and State of Vermont, on, under and through the following Property (the "Property"): Being a portion of the lands and premises conveyed to Burlington Properties Limited Partnership by Warranty Deed of Orchard Lake Road Properties dated December 15, 1998 and recorded in Volume 273 at Page 265 of the City of South Burlington Land Records. Description and Terms and Conditions of Recreation Path Easement The recreation path easement granted herein is described as follows (the "Easement"): The easement is depicted on a plat of survey titled "Proposed 4-Lot Subdivision — Burlington Properties Limited Partnership", last revised 9/15/2010, prepared by Civil Engineering Associates, Inc. (the "Plat"). The Easement crosses portions of Lot #1 and Lot #2 and crosses an approximately 50' wide portion of Lot #3, as Lot #3 abuts Route 116 (Hinesburg Road). The 4-Lot Subdivision was approved by Findings of Fact and Decision of the South Burlington Development Review Board (DRB) dated April 12, 2010 (#SD-10-09). The within Recreation Easement is provided by Grantor agreeably to and in conformance with paragraph #5 of the DRB Decision. The Plat is about to be filed in the City of South Burlington Land Records in Map Slide SY 7 . A. Recreation Path Easement crossing portions of Lot #1 & Lot 93 Beginning at a point 7.0 feet easterly of a concrete monument marking the northwest corner of Lot 1 of Grantor; thence S06000' 19"E 513.05 feet; thence N83006'33"E 20.0 feet; thence N06000' 19"W 513.05 feet; thence S83007'40"W 20.00 feet to the point of beginning. Containing an area of 10,260 square feet, more or less. Said Easement is depicted on the Plat as Easement " B 1. L" See also Easement Notes E 1.1 on the Plat. Page 1 of 4 B. Recreation Path Easement crossing portions of Lot #2 A 20' wide easement beginning at a point 7.0 feet easterly of an aluminum cap in the curb marking the northwest corner of Lot 2 of Grantor; thence S06° 13'25"E 39.92 feet; thence N83°03'24"E 20.0 feet; thence N06° 13'25"W 39.89 feet; thence S83°07' 12"W 20.0 feet to the point of beginning. Containing an area of 798 square feet, more or less. Said Easement is depicted on the Plat as Easement "E 1.2." See also Easement Notes E 1.2 on the Plat. Within the Easement, Grantee and its successors and assigns shall have the right to locate, construct, improve, repair, maintain and replace a recreation path, together with the right to install, construct, maintain, repair, and replace all necessary culverts and bridges. The Easement shall be used solely for recreation purposes including walking, biking, hiking, cross country skiing, snowshoeing and similar activities. No vehicles, whether motorized or non - motorized, other than bicycles, which are permitted, shall be permitted in the Easement. Snowmobiles, ATVs, and other similar vehicles are specifically prohibited. Domesticated animals are permitted within the Easement, provided they are at all times appropriately controlled and supervised. Notwithstanding the foregoing, motorized vehicles may be used by the City of South Burlington or its contractors in connection with the construction, maintenance and repair of any improvements within the Easement. Grantee, its successors and assigns shall have no obligation to construct or repair any improvements permitted hereunder within the Easement. In the event such improvements are constructed by Grantee, they shall be designed and constructed in a manner so as to reasonably provide for the safety of users of the Easement. For purposes of construction, a temporary easement and right-of-way seven feet on each side of the Easement is hereby granted, together with the right to enter onto the other lands of Grantor proximate to the Easement area. Said temporary easement and right-of-way shall expire without the need for any further documentation or instrument once construction of the recreation path is completed and the same is open and available to the public. In the event any premises of Grantor lying outside the scope of the Easement described herein are in any way disturbed or affected by Grantee's exercise of the rights granted to it hereunder, the same shall be restored to their condition prior to such entry as soon as reasonably practical at Grantee's cost and expense. The construction and maintenance of the Easement and recreation path within the Easement shall be the sole responsibility of the City of South Burlington. Grantor and its successors and assigns shall have the right to make such use of the Easement as shall not be inconsistent with the Grantee's rights as set forth herein. Grantor shall place no structures, landscaping or other improvements within the Easement which shall unreasonably prevent or interfere with the Grantee's ability to use said Easement for its intended purposes as stated herein. Page 2 of 4 1 00011620 V: 974 PG= 3 In consideration of the grant of this Easement, the City of South Burlington agrees to indemnify and hold Grantor and its successors and assigns harmless to the fullest limits of liability insurance that it customarily maintains as a municipality from and against any and all claims, liabilities, suits, actions, demands or losses, including all costs and attorney's fees arising from the Grantee, its successors and assigns, or any member of the public utilizing the Easement granted herein, provided, however, that such indemnity and hold harmless obligation shall not extend to any claim made against Grantor based upon intentional, willful or wanton acts of the Grantor within the Easement. Grantee acknowledges that the Easement herein has been given and granted by Grantor for no consideration and for recreational use, all as defined in 12 V.S.A. §5792. Grantor provides this Easement and Grantee accepts the same with the mutual understanding and agreement that Grantor shall at all times be entitled to the fullest protection available to Grantor under 12 V.S.A. §5793(a) and that Grantor is entitled to the fullest protection available to Grantor as a landowner under 12 V.S.A. §5794. Without in any way limiting the generality of the foregoing, agreeably to 12 V.S.A. §5794(a) and (b), in granting the Easement described herein, Grantor extends no assurance and provides no representation or warranty of any nature that the Easement herein granted is safe or suitable for recreational uses. Further, Grantor expressly disclaims any duty, undertaking or obligation to inspect the Property upon which the Easement is located for any purpose whatsoever. Nothing in this deed, or otherwise, relieves any person making recreational use of the Easement from all obligations of such person or persons to exercise reasonable precautions and due care for such person's own safety or the safety and protection of such person's property, including domestic animals. Reference is hereby made to the above -mentioned instruments, the records thereof, the references therein made, and their respective records and references, in further aid of this description. TO HAVE AND TO HOLD the Easement, with all of the privileges and appurtenances thereof, to the Grantee, and the Grantee's successors and assigns, to the Grantee's own use and behoof forever. The Grantor, for the Grantor and the Grantor's successors and assigns do covenant with the Grantee, and the Grantee's successors, and assigns, that until the ensealing of these presents, the Grantor is the sole owner of the Easement and has good right and title to convey the same in the manner set forth in this Recreation Path Easement Deed, and that the Easement are FREE FROM EVERY ENCUMBRANCE, except as stated in this Easement Deed; and the Grantor hereby engage to WARRANT AND DEFEND the same against all lawful claims whatever, except as stated in this Recreation Path Easement Deed. Page 3 of 4 Burlington Properties Limited Partnership hereunto sets its hand and seal this S� day of October 2010. BURLINGTON PROPERTIES LIMITED PARTNERSHIP By: Pete.713qkak, Partner and duly authorized agent STATE OF VERMONT COUNTY OF CHITTENDEN, SS. At South Burlington in said County, this _I_g— day of October 2010, Peter Pollak, Partner and as duly authorized agent of Burlington Properties Limited Partnership, personally appeared and he acknowledged this instrument, by him subscribed, to, be his.£ree act and deed and the free act and deed of Burlington Properties Limited Partnership. Before 110 Notary Publ c' My Commission Expires: Vermmk Prvaertq Transfer, Tax _ 32 V-S-A_ Chap 231 —AC:YNOWLEDGEMENT— RETURK RECID-TAX PAID BOARD OF HEALTH $:ERT_ REM. ''? LAND USE & DEVELOPMENT PLANS Aff. CERT. RE'D RetEirn No. P-agc-4-of_4_-_.---------- Donn,a ;n{r e i I.i� Clerk i � '3 I r k DLit-_ Nov 23F2 10 EN® OF ®OC ENT ,�,"'' w►�.VERM NTH 000:� s BVE C V : 974 RG : � 0 State of Vermont C ,rw' Inc. Agency of Natural Resources Department of Environmental Conservation i WASTEWATER SYSTEM AND POTABLE WATER SUPPLY PERMIT LAWS/REGULATIONS INVOLVED 10 V.S.A. Chapter 64, Potable Water Supply and Wastewater System Permit Wastewater System and Potable Water Supply Rules, Effective September 29, 2007 Chapter 21, Water Supply Rules, Effective April 25, 2005 Permit Number: WW-4-o884-1 PIN: Landowner: Dynapower Burlington Properties Limited Partnership P.O. Box 9210 Burlington VT 05407 This permit affects property identified as Town Tax Parcel ID # South Burlington: 0860-ow2oC and referenced in deeds recorded in Book 273 Page 265 of the Land Records in South Burlington, Vermont. This project, to amend WW-4-o884 to create Lot 3 (27.78 acres +/-) with a previously approved commercial building, served by municipal water and sewer services, located on Meadowland Drive in South Burlington, Vermont, is hereby approved under the requirements of the regulations named above subject to the following conditions. i. GENERAL 1.1 1.2 The project shall be completed as shown on the application, plans and/or documents prepared by Civil Engineering Associates, with the stamped plans listed as follows: Sheet Number Title Plan Date Plan Revision Date C1 Proposed Site Plan 9/2009 4/07/2010 P1 Proposed 4-Lot Subdivision 3/10/2010 4/06/2010 The project shall not deviate from the stamped plans in a manner that would change or affect the exterior water supply or wastewater disposal systems, building location, or, the approved use of the building, without prior review and written approval from the Wastewater Management Division. 1.3 This permit does not relieve the landowner from obtaining all other approvals and permits as may be required from the Act 25o District Environmental Commission, the Department of Environmental Conservation, Water Supply Division — telephone (802) 241-3400, Water Quality Division — telephone (802) 241-3770, the Department Public Safety, Division of Fire Safety— telephone (802) 879-2300, the Department of Health — telephone (802) 863-7221, and local officials prior to proceeding with this project. 1.4 The conditions of this permit shall run with the land and will be binding upon and enforceable against the landowner and all assigns and successors in interest. The landowner shall be responsible for the recording of this permit in the South Burlington Land Records within thirty, (30) days of issuance of this permit and prior to the conveyance of any lot subject to the jurisdiction of this permit. 1.5 Each prospective purchaser of the lot shall be shown copies of the Wastewater System And Potable Water Supply Permit and the stamped plans prior to..FoUMyh5ce Ufffel&.E 1.6 All conditions set forth in Permit #WW-r-}Fo8.84; shtfflrert"ifln eff6ct except as modified or amended herein. OF So. hrlington Land Records Attest: Donna r,:rville C:iF,y Clem Regional Offices — Bar-re/.rabc c 0eL./1Xuuu1Lu/,3y1uty LrLLL111 . IJU,L,Labury 00011622 V a 974 PG: Wastewater System and Potable Wa._ . Supply Permit Page 2 of 2 1.7 By acceptance of this permit, the landowner agrees to allow representatives of the State of Vermont access to the property covered by the permit, at reasonable times, for the purpose of ascertaining compliance with the Vermont environmental and health statutes and regulations. i.8 In issuing this permit, the Division has relied upon the licensed designer's certification that the design - related information submitted was true and correct, and complies with the Vermont Wastewater System and Potable Water Supply Rules and the Vermont Water Supply Rules. This permit may be revoked if it is determined that the project does not comply with these Rules. 1.9 Any person aggrieved by this permit may appeal to the Environmental Court within 3o days of the date of issuance of this permit in accordance with io V.S.A. Chapter 22o and the Vermont Rules of Environmental Court Proceedings. 1.10 The wastewater disposal system for Lot 3 is subject to an easement onto the lands identified as Lot 2. No conveyance of the approved lot is allowed until such time as a copy of the executed easement has been recorded and indexed in the town land records. Failure to do so renders this permit null and void. It is recommended that a copy of the executed easement be sent to the Wastewater Management Division. Justin G. Johnson, Commissioner Department of Environmental Conservation By Vlti�1.- ,t u.4 * Dolores M. Eckert, Assistant Regional Engineer Dated July 30, 2010 cc: South Burlington Planning Commission Civil Engineering Associates z ais� south PLANNING & ZONING November 17, 2010 Matthew Wamsganz Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 Re: 85 Meadowland Drive Dear Applicant: Enclosed, please find a copy of the Findings of Fact and Decision of the above referenced project approved by the South Burlington Development Review Board on November 9, 2010 (effective 11/09/2010). Please note the conditions of approval, including that the amended final plat plans must be recorded in the land records (in mylar format) within 180 days (must be submitted to Ray Belair for recording along with an $13 recording fee per mylar by May 6, 20111 or this approval is null and void. If you have any questions, please contact me. Sincerely, Raymond Belair Administrative Officer Encl. CERTIFIED MAIL RETURN RECEIPT: 701.0 0290 0000 2215 3200 Subdivison Plat Application Permit Number SD- - ✓ APPLICATION FOR SUBDIVISION PLAT REVIEW X Preliminary X Final PUD Being Requested? X Yes ❑ No All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. 1. OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Burlington Properties Limited Partnership, 85 Meadowland Drive, So. Burlington, VT 05403, 860-7200. 2. LOCATION OF LAST RECORDED DEED (Book and page #) Book 273, Page 265. 3. APPLICANT (Name, mailing address, phone and fax#) Burlington Properties Limited Partnership, 85 Meadowland Drive, So. Burlington, VT 05403, 860-7200. 4. CONTACT PERSON (Name, mailing address, phone and fax #) Stephen A. Vock, P.E. or Matthew J. Wamsganz, Civil Engineering Associates, Inc., 10 Mansfield View Lane, So. Burlington, VT 05403, 864-2323 x 313 or 303, 864-2271. a. Contact email address: svock(.6eea-vt.com or mattncea-vt.com 5. PROJECT STREET ADDRESS: 85 Meadowland Drive. 6. TAX PARCEL ID # (can be obtained at Assessor's Office) 0860-01020C. Subdivison Plat Application 7. PROJECT DESCRIPTION a. General Project Description (describe what you are proposing): Subdivision of existing 80 acre lot into 4 lots. b. Existing Uses on Property (including description and size of each separate use): Dynapower Corporation, 123,200 sf building w/ associated parking and utilities on 80 acre lot. c. Proposed Uses on property (include description and size of each new use and existing uses to remain): Dynapower Corporation, 123,200 sf building w/ associated parking and utilities on 27.4 acre lot and 3 additional lots (6.7 ac, 4.9 ac. & 38.6 ac.). d. Total building square footage on property (proposed buildings and existing buildings to remain): 123,200 sf. (Existing). e. Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine): Existing Building +/-30', 2 floors. f. Number of residential units (if applicable, new units and existing units to remain): N/A. g. Number of employees & company vehicles existing and proposed, note office versus non -office employees): 5 h. Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable): Interstate Highway Overlay District, Hinesburg Road - North View Protection Zone, Airport Approach Cone, Surface Water Buffer Standards, Class II Wetlands. i. List any changes to the subdivision, such as property lines, number of units, lot mergers, etc. N/A 9. LOT COVERAGE (ALL information MUST be provided here, even if no change is proposed) a. Size of Parcel: 80.0 (acres /sq. ft.) b. Building Coverage: See Table on SheetC1. Existing square feet % Subdivison Plat Application Proposed square feet % c. Overall Coverage (building, parking, outside storage, etc): See Table on SheetC1. Existing square feet % Proposed square feet % d. Front Yard Coverage(s) (commercial projects only): See Table on SheetC1. Existing square feet % Proposed square feet % 9. WETLAND INFORMATION a. Are there any wetlands (Class I, II, or III) on the subject property? X Yes o No b. If yes, is the proposed development encroaching into any of these wetlands associated 50' buffers (describe) There are Class II wetlands on Lots 3 & 4 but no development is proposed in the wetlands or associated buffer areas. c. If yes, please submit the following with this application: 1. A site specific wetland delineation of the entire property or a written statement that the applicant is relying on the City's wetland map. Since there is no proposed development associated with this subdivision the applicant has relied on the City's wetland mapping and some older delineation from the Meadowland Industrial Park for the 4 lot subdivision. Future development on Lot 3 or 4 will utilize new wetland delineation. 2. Response to the criteria outlined in Section 12.02(E) of the Land Development Regulations (applicant is strongly encouraged to have a wetland expert respond to these criteria) 10. AREA DISTURBED DURING CONSTRUCTION: 0 SQ. FT. * *Projects disturbing more than one (1) acre of land must follow the City's specifications for erosion control in Article 16 of the Land Development Regulations. Projects disturbing more than one (1) acre require a permit from the Vermont Department of Environmental Conservation. Subdivison Plat Application 11. COST ESTIMATES a. Building (including interior renovations): $N/A b. Landscaping: $N/A Please submit itemized list of landscaping proposed) c. Other site improvements (please list with cost) N/A 12. ESTIMATED TRAFFIC a. Average daily traffic for entire property (in and out): 859 b. A.M. Peak hour for entire property (in and out): 125 c. P.M. Peak hour for entire property (In and out): 133 13. PEAK HOURS OF OPERATION: 8 am - 5 pm 14. PEAK DAYS OF OPERATION: Monday -Friday 15. ESTIMATED PROJECT COMPLETION DATE: N/A 16. PLEASE LIST ABUTTING LANDOWNERS, INCLUDING THOSE ACROSS THE STREET. You may attach on a separate sheet. See Attached List 4 Subdivison Plat Application 17. PLANS AND FEE Plat plans shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (11" x 17") of the plans must be submitted. A subdivision application fee shall be paid to the City at the time of submitting the application (see Exhibit A). I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATURE OF APPLICANT E OF PROPERTY OWNER Do not write below this line DATE OF SUBMISSION: , have reviewed this preliminary plat application and find it to be: Complete,., ❑ Incomplete of Planning & Zoning or Designee � r �W-1/1: PRINT NAME Date Subdivison Plat Application EXHIBIT A PRELIMINARY PLAT The following information must be shown on the plans. Please submit five (5) copies and one reduced copy (11" x 17") of the plan. Failure to provide the following information will result in your application being rejected and a delay in the review before the Development Review Board. Please provide (on separate sheet) a list of all abutters to the project property and mailing addresses. o Complete survey of property by a licensed land surveyor drawn to scale (20 ft. is preferred). o Name, license number, seal, and contact number of licensed land surveyor & date prepared. o Survey data (acreage, property lines, zoning boundaries, watercourse, base flood elevation, etc.) o Location of easements, public lands, r.o.w.s, sidewalks, and public or private street (w/names) o Five foot contours (existing and finished) o Location and size of any existing sewers (including septic tanks) and water mains, culverts and drains on the property to be subdivided. o Location, names and widths of existing and proposed streets, private ways, sidewalks, curb cuts, paths, easements, parks, and other public opens spaces. o Numerical and graphical scale, date last revised, and north arrow. o Details of proposed connection with existing water supply or alternative water supply. o Details of proposed connection with the existing sanitary sewage disposal system or adequate provisions for on -site disposal of septic wastes. o Details of storm water facilities in the form of a drainage plan. o Details of all proposed bridges or culverts. o Location of temporary markers. o All parcels of land proposed to be dedicated or reserved for public use and associated conditions. o A list of waivers desired (if any). o Development timetable (including number of phases and start and completion dates). o A report addressing planned residential/unit development criteria of the Zoning Regulations. o Proposed landscaping schedule (number, variety and size). o Location of abutting properties, fire hydrants, existing buildings, existing landscaping o Number and location of parking spaces ( see Section 26.25 of the Zoning Regulations) o Number and location of handicapped spaces (see Section 26.253(a) of the Zoning Regulations) o Lot coverage information: Building footprint, total lot, and front yard o Exterior lighting details (cut sheets). All lights should be downcasting and shielded. o Dumpster locations (dumpsters must be screened) o Bicycle rack as required under Section 26.253(b) of the zoning regulations o If restaurant is proposed, provide number seats and square footage of floor area provided for patron use but not containing fixed seats C-J � 2_zrlle_� Subdivison Plat Application APPLICATION FEE ❑ Preliminary Plat Minor Subdivision $ 261.00* ❑ Preliminary Plat Major Subdivision or PUD $ 511.00* *Includes $11.00 recording fee Burlington Properties Limited Partnership September 2009 PARCVI. ill 0860-00835F OWNER OF RECORD Hinesburg Rd, LLC c/o Jeff Davis 2 Church St. Burlington, VT 05401 0860-00896R WGM Associates c/o Nancy McGovern PO Box 9477 South Burlington, VT 05407 0860-01 OOOC Landrum Phillip Drumheller PO Box 130 Burlington, VT 05407 0860-01035R Mansfield View Properties LLC 1035 Hinesburg Rd. South Burlington, VT 05403 0860-01045R Mansfield View Properties LLC 1035 Hinesburg Rd. South Burlington, VT 05403 0860-01050L Spaniel Properties LLC 1050 Hinesburg Rd, Unit A South Burlington, VT 0403 and Avalanche Development LLC 35 Dorset Lane, Suite 201 Williston, VT 05495 0860-0106OR 0860-1070OR Gamal Eltabbakh 391 Hillspoint Rd. Charlotte, VT 05445 Gamal Eltabbakh 391 Hillspoint Rd. Charlotte, VT 05445 1 0860-01061 L Arthur Rye & Bernice Brisson Trust 63 Sam Web Rd. Fairfax, VT 05454 0860-0100R East Mountain View LLC 1100 Hinesburg Rd, Suite 201 South Burlington, VT 05403 1155-00284C Munson Earthmoving Corp. 85 Shunpike Rd. Williston, VT 05495 1155-00317C Grandview Farm Inc. PO Box 1304 Burlington, VT 05402-1304 1715-00073C The Rock of Greater Burlington, Inc. PO Box 464 Milton, VT 05468 0257-00065 Grandview Farm Inc. c/o Birchwood Burlington, LLC 5524 West Cypress St., Suite B Tampa, FL 33607 0257-00104C Super -Temp Realty Company Inc. 133 Elm St. Winooski, VT 05404 0860-R 11501, Green Acres Inc. c/o Mark Goodrich PO Box 2123 South Burlington, VT 05407 Vermont Agency of Transportation Secretary's Office One National Life Drive Montpelier, VT 05633-5001 4 Aid south PLANNING & ZONING MEMORANDUM TO: South Burlington Planning Commission FROM: Cathyann LaRose, Associate Planner RE: Agenda Item # 4, Burlington Limited Partnership DATE: November 5, 2010 Final plat application #SD-10-34 of Burlington Properties Limited Partnership for a planned unit development to subdivide a 77.6 acre parcel developed with a light manufacturing facility into four (4) lots ranging in size from 4.93 acres to 38.55 acres, 85 Meadowland Drive. The subdivision received final plat approval on April 12, 2010. However, as the plat was not recorded prior to the deadline, the applicant is seeking re -approval of an identical plan. This application seeks re -approval of an identical plan. The regulations that were in effect when the plans were originally approved have changed. However, the material changes to those regulations do not adversely impact any criteria under which this project would be reviewed. Staff has included a draft decision for review by the applicant. This decision is nearly identical (changes to the date and Board members present have been made) to that which was previously issued. Staff recommends that the Board approve Final Plat application #SD-10-34. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com #SD-10-34 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING BURLINGTON PROPERTIES LIMITED PARTNERSHIP - 85 MEADOWLAND DRIVE PRELIMINARY AND FINAL PLAT APPLICATION #SD-10-34 FINDINGS OF FACT AND DECISION Burlington Properties Limited Partnership, hereafter referred to as the applicant, is requesting preliminary and final plat approval of a planned unit development to subdivide a 77.6 acre parcel developed with a light manufacturing facility into four (4) lots ranging in size from 4.93 acres to 38.55 acres, 85 Meadowland Drive. The Development Review Board held a public hearing on November 9, 2010. Matt Wamsganz represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is requesting preliminary and final plat approval of a planned unit development to subdivide a 77.6 acre parcel developed with a light manufacturing facility into four (4) lots ranging in size from 4.93 acres to 38.55 acres, 85 Meadowland Drive. 2. The owner of record of the subject property is Burlington Properties Limited Partnership. 3. The application was received on October 15, 2010. 4. The subject property is located in the Industrial Open Space Zoning Districts. 5. The plan submitted consists of a two (2) page set of plans, page one (1) entitled, "Burlington Properties Limited Partnership 85 Meadowland Drive So. Burlington, VT 05403," dated March 10m 2010m last revised on 9/18/10. PADevelopment Review Boa rd\Findings_Decisions\2010\BurlingtonProperties_SD10_34_ffd.doc #SD-10-34 Zoning District & Dimensional Requirements Table 1. Dimensional Requirements IO Zoniin Diistrict Required Pro osed Min. Lot Size 3 acres 4.93 acres* Max. Building Coverage 40% 10.1 % Max. Overall Coverage 70% 25.8% Min. Front Setback 30 ft. 135 ft Min. Side Setback 10 ft. 82 ft Min. Rear Setback 30 ft. 790 ft Front Yard Coverage 30 % 3% zoning compliance smallest lot proposed The only lot with an existing building is Lot 3. All other lots are vacant at this time. SUBDIVISION CRITERIA Pursuant to Section 15.18 of the South Burlington Land Development Regulations, subdivisions should comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. According to Section 15.13 of the South Burlington Land Development Regulations, the existing public water system should be extended so as to provide the necessary quantity of water, at acceptable pressure. According to Section 15.13 of the South Burlington Land Development Regulations, the subdivider or developer should connect to the public sewer system or provide a community wastewater system approved by the City and the State in any subdivision where off -lot wastewater is proposed. Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. There are no new buildings proposed as part of this application; therefore these criteria are not applicable. The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. The plans do not appear to depict the proposed access for Lots 1 and 2. The Board determines that the access to Lot 1 shall not be from Hinesburg Road, and that it be accessed from the private drive rather than Meadowland Drive. Lot 3 will likely not require any additional access and Lot 4 will be accessible via Bowdoin Street. 2 PADevelopment Review Board\Findings_Decisions\2010\BurlingtonProperties_SD10_34_ffd.doc #SD-10-34 The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. The plans that the applicant submitted depict a Class II wetland on the subject property. At this time, no new buildings are proposed. If the applicant proposes any development in the wetlands or their associated 50' wide buffer, a Conditional Use Determination (CUD) shall be required from the State of Vermont. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. The proposed subdivision of land is in keeping with the planned development patterns of Industrial Open Space Zoning District. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. As buildings and other associated development are not being proposed as part of this application, this criteria in not applicable at this time. The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. The South Burlington Fire Chief has stated that he will review site plans at the time development is proposed. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. The Recreation Path Committee reviewed the plans at the time of the original subdivision of land. The Board requires a 20 foot recreation path easement along Hinesburg Road, consistent with other properties in the vicinity. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The proposed subdivision of this property is in conformance with the Comprehensive Plan. Landscaping As there are no buildings proposed as part of this application, there is no minimum landscaping budget. 3 PADevelopment Review Board\Findings_Decisions\2010\BurlingtonProperties_SD10_34_ffd.doc #SD-10-34 DECISION Motion by , seconded by to approve Preliminary & Final Plat Application #SD-10-34 of Burlington Properties Limited Partnership, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plat submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. Access to the 6.34 acre lot labeled on the plans as Lot 1 shall be from the existing paved drive to the east, shown on the survey plat as easement E-4. Lot 1 shall not be directly accessed from Hinesburg Road or from Meadowland Drive. 4. Prior to recording the final plat plan, the applicant shall record a recreation path easement deed approved by the City Attorney for the recreation path easement crossing lots #1 and #2. 5. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications should be underground. 6. Any changes to the final plat plan shall require approval of the South Burlington Development Review Board. 7. The final plat plan (survey plat) shall be recorded in the land records within 180 days or this approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy of the survey plat in digital format. The format of the digital information shall require approval of the South Burlington GIS Coordinator. Mark Behr — yea/nay/abstain/not present Matthew Birmingham — yea/nay/abstain/not present John Dinklage — yea/nay/abstain/not present Roger Farley — yea/nay/abstain/not present Gayle Quimby — yea/nay/abstain/not present Michael Sirotkin — yea/nay/abstain/not present Bill Stuono — yea/nay/abstain/not present Motion carried by a vote of Signed this day of 2010, by John Dinklage, Chairman 0 PADevelopment Review Board\Findings_Decisions\2010\BurlingtonProperties_SD10_34_ffd.doc UCTION ng !rs 3r, music 3ining. step- ch. All ,els.Info: rpoint. 195. UCTION weloping ue, cianship, Paul in Blues 3ro, -ury ). Info: www. ;PACE TORY? awe eck out rend care the ow Did day? youmeet CE/ SPACES 3rlake laces rting at all utils. / 3 left. i3-7557, i. Lv. msg. 'ATI ON IONS 2010, Riv- opment n Ken- lication a project ribed as e adjust- •ovements access to a jouse site : parcel As sub- iroject is .ily Lane in Ichester, — Minor Applications. Copies of the application and proposed permit are available for review at the Colchester Town Of- fice, Chittenden County Regional Planning Commission located at 110 West Canal Street, Suite 202, Winooski, and the office listed below. The application and pro- posed permit may also be viewed on the Natural Resources Board's web site (www.nrb.state. vt.us/lup) by clicking on "Act 250 Database" and enteringthe case number above. No hearing will be held unless, on or.'before Friday, November 12, 2010, a party notifies the District Commission of an issue or issues requir- ing the presentation of evidence at a hearing or the commission sets the matter for hearing on its own motion. Any hearing request shall be in writ- ing to the address below, shall state the criteria or subcriteria at issue, why a hearing is required and what additional evi- dence will be presented at the hearing. Any hear- ing request by an adjoin- ing property owner or other interested person must include a petition for party status. Prior to submitting a request for a hearing, please contact the district coordina- tor at the telephone number listed below for more information. Prior to convening a hearing, the District Commis- sion must determine that substantive issues requiring a hearing have been raised. Findings of Fact and Cohclusions of Law will not be prepared unless the Commission holds a public hearing. Should a hearing be held on this*project and you have a disability for which you are going to need accommodation, please notify'us by Fri- day, November 12, 2010. Parties entitled to participate are the Mu- nicipality, the Municipal Planning Commission, the Regional Planning Commission, affected state agencies, and adjoining property own- ers and other persons to the extent they have a particularized interest that may be affected by the proposed project under the 10 criteria. Non-party participants may also be allowed under 10 V.S.A. Section 6085(c)(5). Dated at Essex Junction, Vermont this 18th day of October, 2010. By /s/ Stephanie H. Monaghan' 05452 ` T/802-879-5662 E/ stephanie.mon- aghan@state.vt.us ACT 250 NOTICE MINOR APPLICATION 10 V.S.A., SECTIONS 6001-6092 On October 6, 2010, Clark & Suzanne Hinsdale III and Numondo America, L.P. filed application # 40240 for a project generally described as The construction of a 5 lot PRD. Lot #1 has an existing house and Lots #2-5 will contain a single family house per lot. All five lots will share a community sep- tic mound on Numondo Americas adjoining land. The project is located on State Park Road in the Town of Charlotte, VT. The District 4 Environ- mental Commission will review this application under Act 250 Rule 51 — Minor Applications. Copies of the application and proposed permit are available for review at the Charlotte Town Of- fice, Chittenden County Regional Planning Commission located at 110 West Canal Street, Suite 202, Winooski, and the office listed below. The application and pro- posed permit may also be viewed on the Natural Resources Board's web site (www.nrb.state. vt.us/lup) by clicking on "Act 250 Database" and entering the case number above. No hearing will be held unless, on or before Friday, October 29, 2010, a party notifies the District Commission of an issue or issues requir- ing the presentation of evidence at a hearing or the commission sets the matter for hearing on its own motion. Any hearing request shall be in writ- ing to the address below, shall state the criteria or subcriteria at issue, why a hearing is required and what additional evi- dence will be presented at the hearing. Any hear- ing request by an adjoin- ing property owner or other interested person must include a petition for party status. Prior to submitting a request for a hearing, please contact the district coordina- tor at the telephone number listed below for more information. Prior to convening a hearing, the District Commis- sion must determine that substantive issues requiring a hearing have been raised. Findings of Fact and Conclusions of Law will not be prepared unless the Commission holds a public hearing. need accommodation, please notify us by Fri- day, October 29, 2010. Parties entitled to participate are the Mu- nicipality, the Municipal Planning Commission, the Regional Planning Commission, affected state agencies, and adjoining property own- ers and other persons to the extent they have a particularized interest that may be affected by the proposed project under the 10 criteria. Non-party participants may also be allowed under 10 V.S.A. Section 6085(c)(5). Dated at Essex Junction, Vermont this 8th day of October, 2010. By /s/Stephanie H. Monaghan Stephanie H. Monaghan Natural Resources Board District #4 Coordinator 111 West Street Essex Junction, VT 05452 T/802-879-5662 E/ stephanie.mon- aghan@state.vt.us NOTICE OF PUBLIC MEETINGS Town of Underhill Development Review Board (DRB) Site Visits & Hearings Monday, October 25, 2010 at 6:00 PM (site visit) Saturday, November 6, 2010 at 9:00 AM (site visit) Monday, November 8, 2010 at 6:30 PM (hear- ings) Hearings to be Held at the Underhill Town Hall, Underhill Center, VT The DRB will conduct a public site visit as part of the Conditional Use application of Liz Gib- bons for the placement of fill on her property at 241 Pleasant Valley Road (PV241), in Underhill, VT. This property is located in the Rural Residential and Soil and Water Conservation zoning districts. The site visit at this property will begin at 6:00 PM on October 25, 2010. The hearing is scheduled to begin im- mediately following the second hearing (Perline) on November 8, 2010. The DRB will hold a final hearing on the Bound- ary Line Adjustment application for property owned by Johnathan Drew and Miriam Pendleton, located at 27 Harvey Road (HA027), and property owned by the University of Vermont, located at 58 Harvey Road (HAO58X), in Underhill, VT. These properties are located in the Scenic Preservation Drew/Pendleton lot at 27 Harvey Road (HA027). This hearing is sched- uled to begin at 6:30 PM on November 8, 2010. The DRB will also hold a final hearing on the Con- ditional Use application of Kevin and Kel ly Per - line to offer instructional martial arts classes as a home occupation on property they own at 75 Irish Settlement Road (IS075), in Underhill, VT. This property is located in the Water Conserva- tion zoning district. A site visit at this property will begin at 9:00 AM on November 6, 2010. The hearing is scheduled to begin immediately following the first hear- ing (Drew/Pendleton and UVM) scheduled for 6:30 PM on November 8, 2010. A copy of this application and additional informa- tion may be obtained at the Underhill Town Hall. The site visit and hearing are open to the public. Pursuant to 24 V.S.A. §§ 4464(a) (1) (C) and 4471(a), participation in these local proceed- ings is a prerequisite to the right to take any subsequent appeal. If you cannot attend the hearing but would still like to exercise your right to be heard, comments may be made in writing prior to the hearing and mailed to: Zoning Administrator, P.O. Box 32 Underhill Center, VT 05490 or to underhill- zoning@comcast.net. NOTICE OF TAX SALE The resident and non- resident owners, lien - holders and mortgagees of Lands in the City of Burlington, in the County of Chittenden and State of Vermont, are hereby notified that the real estate taxes assessed by such City for fiscal/ tax year(s) 2007, 2008, 2009 and 2010 and the rental registration fees assessed by such City for rental registration year(s) 2010 remain either in whole or in part, unpaid and delin- quent on the following described lands and premises in the City of Burlington, to wit: Owner(s) of Record: Leo W. Bushey, Jr. and Lawrence J. Bushey Property Address: 256 North Winooski Ave., Burlington VT. Tax Account/Map Lot Number: # 044-3-151- 000. Deed recorded at: Vol. 680, Pg. 478, on May 18, 2001. Reference may be had to said deed for a more particular descrip- tion of said lands and ` so much of the lands will be sold at public auc- tion Conference Room 12, City Hall,149 Church St., Burlington, Vermont 05401 on Novemberl6 at 10:00 o'clock in the forenoon, as shall be requisite to discharge said taxes together with costs and other fees al- lowed by law, unless the same be previously paid or otherwise resolved. Dated at the City of Burlington in the County of Chittenden and State of Vermont this 14th day of October, 2010. Jonathan P. A. Leopold, Jr. Chief Administrative Officer Burlington, Vermont NOTICE OF TAX SALE The resident and non- resident owners, lien - holders and mortgagees of Lands in the City of Burlington, in the County of Chittenden and State of Vermont, are hereby notified that the real estate taxes assessed by such City for fiscal/ tax year(s) 2007, 2008, 2009 and 2010 and the rental registration fees assessed by such City for rental registration year(s) 2010 and the re - inspection fee assessed by such City for the reinsepction year 2009 remain either in whole or in part, unpaid and delinquent on the fol- lowing described lands and premises in the City of Burlington, to wit: Owner(s) of Record: Bushey Property Hold- ings, LLP Property Address:260- 262 North Winooski Ave., Burlington VT. Tax Account/Map Lot Number: # 039-4-001- 000 Deed recorded at: Vol. 813, Pg. 231, on March 6, 2002. Reference may be had to said deed for a more particular descrip- tion of said lands and premises, as the same appears in the Land Records of the City of Burlington: and so much of the lands will be sold at public auc- tion Conference Room 12, City Hall,149 Church St., Burlington, Vermont 05401 on November 16 at 10:00 o'clock in the forenoon, as shall be requisite to discharge said taxes together with costs and other fees al- lowed by law, unless the same be previously paid or otherwise resolved. Dated at the City of Burlington in the County of Chittenden and State of Vermont this 14th day of October, 2010. Jonathan P. A. Leopold, Jr. Chief Administrative Officer Burlington, Vermont PUBLIC HEARING SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD The South Burlington Development Review Board will hold a public hearing in the South Burlington City Hall Conference Room, 575 Dorset Street, South Burlington, Vermont on November 9, 2010 at 7:30 P.M. to consider the following: 1. Master Plan applica- tion #MP-10-01 and pre- liminary plat application #SD-10-28 of Farrell Real Estate for a planned unit development on a 26.1 acre parcel developed with two (2) single fam- ily dwellings. The project consists of:1) razing one (1) single family dwelling, 2) constructing 25 single family dwellings, and 3) constructing 22 two (2) family dwellings,1302, 1340, and 1350 Spear Street. 2. Final plat application #SD-10-34 of Burlington Properties Limited Part- nership for a planned unit development to subdivide a 77.6 acre parcel developed with a light manufacturing facility into four (4) lots ranging in size from 4.93 acres to 38.55 acres, 85 Meadowland Drive. John Dinklage, Chairman South Burlington Devel- opment Review Board Copies of the applica- tions are available for public inspection at the South Burlington City Hall. October18,2010 PUBLICHEARING NOTICE Burlington Compre- hensive Development Ordinance PROPOSED ZA-11-04- Mental Health Crisis Center and ZA-11-05- Tree List (Removal) Pursuant to 24 V.S.A. §4441 and §4444, notice is hereby given of a public hearing by the Burlington Planning Commission to hear comments on the follow- ing proposed amend- ments to the City of Bur- lington's Comprehensive Development Ordinance. The public hearing will take place on Tuesday, November 9, 2010 begin- ning at 7:00pm in the Conference Room #12, City Hall Ground Floor, Burlington VT. .VERMONT C State of Vermont Department of Environmental Conservation Agency of Natural Resources WASTEWATER SYSTEM AND POTABLE WATER SUPPLY PERMIT LAWS/REGULATIONS INVOLVED io V.S.A. Chapter 64, Potable Water Supply and Wastewater System Permit Wastewater System and Potable Water Supply Rules, Effective September 29, 2007 Chapter 21, Water Supply Rules, Effective April 25, 2005 Permit Number: WW-4-o884-1 PIN: Landowner: Dynapower Burlington Properties Limited Partnership P.D. Box 9210 Burlington VT 05407 This permit affects property identified as Town Tax Parcel ID # South Burlington: o86o-o1o20C and referenced in deeds recorded in Book 273 Page 265 of the Land Records in South Burlington, Vermont. This project, to amend WW-4-o884 to create Lot 3 (27.78 acres +/-) with a previously approved commercial building, served by municipal water and sewer services, located on Meadowland Drive in South Burlington, Vermont, is hereby approved under the requirements of the regulations named above subject to the following conditions. 1. GENERAL 1.1 The project shall be completed as shown on the application, plans and/or documents prepared by Civil Engineering Associates, with the stamped plans listed as follows: Sheet Number Title Plan Date Plan Revision Date C1 Proposed Site Plan 9/2009 4/07/2010 P1 Proposed 4-Lot Subdivision 3/10/2010 4/o6/2010 1.2 The project shall not deviate from the stamped plans in a manner that would change or affect the exterior water supply or wastewater disposal systems, building location, or, the approved use of the hnilrl;no Without prior review and written approval from the Wastewater Management Division. _ ...ir from obtaining all other approvals and permits as may be requireu uuin the Act 25o District Environmental Commission, the Department of Environmental Conservation, Water Supply Division — telephone (802) 241-3400, Water Quality Division — telephone (802) 241-3770, the Department Public Safety, Division of Fire Safety— telephone (802) 879-2300, the Department of Health — telephone (802) 863-7221, and local officials prior to proceeding with this Project. 1.4 The conditions of this permit shall run with the land and will be binding upon and enforceable against the landowner and all assigns and successors in interest. The landowner shall be responsible for the recording of this permit in the South Burlington Land Records within thirty, (3o) days of issuance of this permit and prior to the conveyance of any lot subject to the jurisdiction of this permit. 1.5 Each prospective purchaser of the lot shall be shown copies of the Wastewater System And Potable Water Supply Permit and the stamped plans prior to conveyance of the lot. 1.6 All conditions set forth in Permit #WW-4-o884 shall remain in effect except as modified or amended herein, Regional Offices — Barre/Essex Jct./Rutland/Springfield/St. Johnsbury Wastewater System and Potable X _ Supply Permit ` WW-4-o884-1 Page 2 of 2 1.7 By acceptance of this permit, the landowner agrees to allow representatives of the State of Vermont access to the property covered by the permit, at reasonable times, for the purpose of ascertaining compliance with the Vermont environmental and health statutes and regulations. 1.8 In issuing this permit, the Division has relied upon the licensed designer's certification that the design - related information submitted was true and correct, and complies with the Vermont Wastewater System and Potable Water Supply Rules and the Vermont Water Supply Rules. This permit may be revoked if it is determined that the project does not comply with these Rules. 1.9 Any person aggrieved by this permit may appeal to the Environmental Court within 3o days of the date of issuance of this permit in accordance with io V.S.A. Chapter 22o and the Vermont Rules of Environmental Court Proceedings. 1.10 The wastewater disposal system for Lot 3 is subject to an easement onto the lands identified as Lot 2. No conveyance of the approved lot is allowed until such time as a copy of the executed easement has been recorded and indexed in the town land records. Failure to do so renders this permit null and void. It is recommended that a copy of the executed easement be sent to the Wastewater Management Division. Justin G. Johnson, Commissioner Department of Environmental Conservation By &UU41n C'. k,.t Dolores M. Eckert, Assistant Regional Engineer Dated July 30, 2010 cc: South Burlington Planning Commission Civil Engineering Associates r �� r441 .A�®� southburlinoon PLANNING & ZONING April 26, 2010 Heilmann, Ekman and Associates, Inc. Attn: Thomas F. Heilmann 231 South Union Street PO Box 216 Burlington, VT 05402-0216 Re: Burlington Properties Limited Partnership — reconsideration request of #SD-10-09 Dear Mr. Heilmann: Enclosed, please find a copy of the Findings of Fact and Decision of the above referenced request by the South Burlington Development Review Board on April 20, 2010 (effective 4/20/2010). Please note that the reconsideration request was denied. If you have any questions, please contact me. Sincerely, Jana Beagley Planning & Zoning Assistant Encl. Cc: Daron Pollack 85 Meadowland Drive South Burlington, VT 05403 CERTIFIED MAIL RETURN RECEIPT: 7009 0820 0001 4397 4370 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com DEVELOPMENT REVIEW BOARD 6 APRIL 2010 PAGE 3 Ms. Quimby moved to approve Site Plan Application #SP-10-19 of City of Burlington/ Burlington International Airport subject to the stipulations in the draft motion. Mr. Farley seconded. Motion passed unanimously. 6. Sketch Plan Application #SD-10-06 of Peter, David & Jesusa Krag to subdivide a 10,357 sq. ft. lot developed with a single family dwelling and detached accessory residential unit into two lots of 12,100 sq. ft. (lot #1) and 10, 357 sq. ft. (lot #2), 250 Spear Street: - Mr. Dinklage noted receipt of a letter from George Passage of 220 Spear Street expressing concern that this will create a non -conforming structure. Mr. Belair said the accessory apartment will become a principal structure that will not meet the setback requirements. He added that the only way to approve it would be to construct the single family home after the accessory apartment. There would still be a time when there is a violation, but it would be corrected. Mr. Dinklage asked if the owner could treat this as a PUD. Mr Belair said he could, and that would result in no violations. As part of the application, the accessory apartment could remain as it is or as an accessory apartment to the unit to be built. The applicant could come back later and subdivide so there could be 2 separate owners. This would result in two totally conforming situations. A neighbor asked whether there is a restriction on how many people can live there. Mr. Dinklage said 4 unrelated adults can occupy a single family dwelling. He asked the applicant what would be in the new house. Dr. Krag said they will build another single family unit. The plan is to ultimately sell one of the sides. He had no plan to rent to a lot of college kids. Mr. Conner noted that if the DRB were to approve a single family home with an accessory unit, the single family home would have to be owner -occupied. Both units could not be rented out. Mr. Dinklage said that however the plan comes to the Board, it will have to be squeaky clean. Dr. Krag said his goal is to comply. He indicated he would come back with a new Zim 7. eliminary & Final Plat Application #SD-10-09 of Burlington Properties it __.partnership to subdivide a 77.6 acre parcel developed with a light manufacturing facility into four lots ranging in size from 4.93 acres to 38.55 acres, 85 Meadowland Drive: - Mr. Wamsganz said all lots are now in conformance. He said the applicant would like to remove the condition that lot #1 can't come off Meadowland Drive. Mr. Dinklage noted that Meadowland Drive will be a major connector, and the Board would prefer not to have an access from it. Mr. Pollack said there are 2 large industrial buildings there with a lot of truck traffic and employees. It would be an access from a private, paved drive. He DEVELOPMENT REVIEW BOARD 6 APRIL 2010 PAGE 4 said it is fairly congested as it is. Mr. Belair said there could be no condition regarding access now and then deal with it when there is a plan for a building on that lot. Mr. Pollack noted there is also a statement that lot #3 will likely not see any further development. He said this is not true. Mr. Wamsganz said there is plenty of room for development. Ms. LaRose noted that the Rec Path Committee is OK with the plan at this point. Ms Quimby moved to approve Preliminary & Final Plat Application #SD-10-09 of Burlington Properties Limited Partnership subject to the stipulations in the draft motion. Mr. Farley seconded. Motion passed unanimously. 8. Sketch Plan Application #SD-10-13 of University of Vermont to construct a 275' x 600' track (only a portion of which is located in South Burlington, 147 Spear Street: Ms. Ravin said they were permitted for this 4-5 years ago, but it was never built and the permit has expired. The plan is the same except that storm water has been routed into the City of Burlington. Mr. Belair said staff has no issues. 9. Final Plat Application #SD-10-07 of Bullrock Corporation to amend a previously approved planned unit development consisting of five multi -family dwellings for a total of 160 units and a 40-unit congregate housing facility. L The amendment consists of constructing a 100-unit assisted living facility, 250 Quarry Hill Road: - Ms. LaRose distributed comments from the Public Works and Fire Departments and a traffic memorandum. Mr. Thomas reviewed the history of the project. He noted that one of the main issues still open was landscaping. He said they now show adherence to the landscaping regulations. Ms. Henderson -King gave members the revised landscaping plan. She noted that in the previous plan they didn't meet requirements for plantings. She also noted that there are restrictions against tall trees. She also noted that the parking lot is landscaped as well as they can get it. They have added the following: 1. Increased shrubbery on the north side 2. More trees on the east side 3. Increased size of some plantings C HEILMANN, EKMAN & ASSOCIATES, INC. ATTORNEYS AT LAW 231 SOUTH UNION STREET THOMAS F. HEILMANN P.O. BOX 216 CHRISTOPHER D. EKMAN BURLINGTON, VERMONT 05402-0216 JAWS M. COOLEY WILLIAM L. GAGNON (802) 8644555 • FAX (802) 8644659 April 16, 2010 Raymond Belair, Administrative Officer South Burlington Planning and Zoning 575 Dorset Street South Burlington, Vermont 05403 Re: BPLP Subdivision Application #SD-10-09 Dear Ray: theilmann@healaw.com As we discussed in our telephone conversation earlier this week, our client, Burlington Properties Limited Partnership (BPLP), is concerned about two aspects of the subdivision approval Findings of Fact and Decision. First, we are concerned about the language of the permit approval regarding Lot 1 that suggests no access to Lot 1 from Meadowland Drive but rather that Lot 1 be accessed from the private drive rather than Meadowland Drive. BPLP has made the point repeatedly that, at this point, this is only a four (4) lot subdivision request and there is no specific plan for development on Lot 1. We suggest that the Development Review Board's (DRB) concerns about this access may be premised on preconceived notions and assumptions about how and for what purposes, consistent with the South Burlington regulations, this Lot may be developed. Therefore, we urge the DRB to consider the access question only in light of an articulated, defined plan for development of this Lot. At such time as Lot 1 is developed, BPLP or the then owner of Lot 1 will most assuredly submit complete details of any development. We would request the DRB keep an open mind with respect to the access to Lot 1 as part of any such plan when the plan is actually prepared and submitted. Similarly, we are concerned about the language applicable to Lot 3 indicating that additional access on Meadowland Drive is "not likely". There was no evidence submitted to the DRB that future access would not be likely. Further, there appears to be no reason whatsoever why additional or alternate accesses to Lot 3 from Meadowland Drive would be inappropriate in the context of a specific proposal for further or modified development of Lot 3 either independently of Lot 1 or in conjunction with the development of Lot 1. Page 1 of 2 The current lot coverage for Lot 3 clearly permits additional development on this Lot and, in consideration of such development, it may be the appropriate course of action to have an additional or alternate access for Lot 3 onto Meadowland Drive other than the current right of way serving the Dynapower and Lane Press buildings. Again, we would request that the Planning Commission keep an open mind with respect to any future applications for development of either of these parcels, either separately or as part of a coordinated Lot 1, Lot 3 development plan. In light of the above, we would respectfully request that the DRB reconsider its Findings of Fact and Decision on these points. In any event, we trust the DRB would not consider these aspects of its Decision to be immutable and would consider the access issue in connection with the actual development of Lot 1 or further development of Lot 3. Thank you for your attention and consideration. TFH/acl Very truly yours, 6VI, l Thomas F. Heilmann cc: Aaron Pollak via email: aaollak@dvnapower.com Peter Pollak via email: ppollak c dynapower.com Matthew Wamsganz via email: mattawcea-vt.com Page 2 of 2 I A og q Interested Persons Record and Service List southLmr ington vex: ou7 Under the 2004 revisions to Chapter 117, the Development Review Board (DRB) has certain administrative obligations with respect to interested persons. At any hearing, there must be an opportunity for each person wishing to achieve interested person status to demonstrate compliance with the applicable criteria. 24 V.S.A. § 4461(b). The DRB must keep a written record of the name, address and participation of each person who has sought interested person status. 24 V.S.A. § 4461(b). A copy of any decision rendered by the DRB must be mailed to every person or body appearing and having been heard by the DRB. 24 V.S.A. § 4461(b)(3). Upon receipt of notice of an appeal to the environmental court, the DRB must supply a list of interested persons to the appellant in five worljng days. 24 V.S.A. § 4471(c). HEARING DATE: PLEASE PRINT CLEARLY! NAME olo MAILING ADDRESS PRCJEC T OF INTEREST ��1 �T u �/ M��� 5 e- Q r, v�o i,V Gou c g vlod,&2oL Goi' - fS' _� Y^K I NO Interested Persons Record and Service List snuthburli gto -E 9 N1 O NT Under the 2004 revisions to Chapter 117, the Development Review Board (DRB) has certain administrative obligations with respect to interested persons. At any hearing, there must be an opportunity for each person wishing to achieve interested person status to demonstrate compliance with the applicable criteria. 24 V.S.A. § 4461(b). The DRB must keep a written record of the name, address and participation of each person who has sought interested person status. 24 V.S.A. § 4461(b). A copy of any decision rendered by the DRB must be mailed to every person or body appearing and having been heard by the DRB. 24 V.S.A. § 4461(b)(3). Upon receipt of notice of an appeal to the environmental court, the DRB must supply a list of interested persons to the appellant in five working days. 24 V.S.A. § 4471(c). HEARING DATE: PLEASE PRINT CLEARLY! .NAME R MAILING ADDRESS PROJECT OF INTEREST S� (2l� /c �p blLv'� 00061 U � 3 ARI kam �, Interested Persons Record and Service List southhurling"Lon NERM ON Under the 2004 revisions to Chapter 117, the Development Review Board (DRB) has certain administrative obligations with respect to interested persons. At any hearing, there must be an opportunity for each person wishing to achieve interested person status to demonstrate compliance with the applicable criteria. 24 V.S.A. § 4461(b). The DRB must keep a written record of the name, address and participation of each person who has sought interested person status. 24 V.S.A. § 4461(b). A copy of any decision rendered by the DRB must be mailed to every person or body appearing and having been heard by the DRB. 24 V.S.A. § 4461(b)(3). Upon receipt of notice of an appeal to the environmental court, the DRB must supply a list of interested persons to the appellant in five working days. 24 V.S.A. § 4471(c). HEARING DATE: 4. ov. . ( 0 PLEASE PRINT CLEARLY! NAME MAILING ADDRESS PROJECT OF INTEREST �Cv t P4. PEA34 u-r c, u, t2o Ile k ' vZ 3 Fl N tQ FFG LLB' I v� 2-0 0 WV A�ACP �&!JCA) VL4 LI S"S GEzc5t�74-> Fri n e3 ;' Cs�� x, yr US 4 s a Ma p� Interested Persons Record and Service List so l.! h! 0.M�.IIL�i gton VERM04T Under the 2004 revisions to Chapter 117, the Development Review Board (DRB) has certain administrative obligations with respect to interested persons. At any hearing, there must be an opportunity for each person wishing to achieve interested person status to demonstrate compliance with the applicable criteria. 24 V.S.A. § 4461(b). The DRB must keep a written record of the name, address and participation of each person who has sought interested person status. 24 V.S.A. § 4461(b). A copy of any decision rendered by the DRB must be mailed to every person or body appearing and having been heard by the DRB. 24 V.S.A. § 4461(b)(3). Upon receipt of notice of an appeal to the environmental court, the DRB must supply a list of interested persons to the appellant in five working days. 24 VV.S.A.. § 4471(c). HEARING DATE: OIL0-c>/D 6 PLEASE PRINT CLEARLY! NAME MAUNG ADDRESS PROJECT OF INTEREST RDSA�)06 (r,3 F6L)R. S/S �25 S1��4 M6,A-b0r)S C—RECO So T3u1,-,zj,)CZ`oN. Li e, too C-c.Yz, Av��Uc- sNrr� Z� LAv � 1��'4, s� Axt' 10 Pi s r lei t�ocW l U/v eta® a�;s, ROOM 12 ;`00% VInterested Persons Record and Service List sou-thhurlyffiligumn Under the 2004 revisions to Chapter 117, the Development Review Board (DRB) has certain administrative obligations with respect to interested persons. At any hearing, there must be an opportunity for each person wishing to achieve interested person status to demonstrate compliance with the applicable criteria. 24 V.S.A. § 4461(b). The DRB must keep a written record of the name, address and participation of each person who has sought interested person status. 24 V.S.A. § 4461(b). A copy of any decision rendered by the DRB must be mailed to every person or body appearing and having been heard by the DRB. 24 V.S.A. § 4461(b)(3). Upon receipt of notice of an appeal to the environmental court, the DRB must supply a list of interested persons to the appellant in five working days. 24 V.S.A. § 4471(c). HEARING DATE: PLEASE PRINT CLEARLY! NAME MAILING ADDRESS PROJECT OF INTEREST P bU 2 S'� Q� LrL 'r� A west side of SL Paul 04/07/10 nlcai Services a grid layout at 45 foot which alleges that you you may not be able to Bay Drive. Colchester, i Street hggjnning 30 feet intervals within a 32+/- have breached the terms bringthemupatall. Vermont, - north of Cherry Street Materlal in (Brackets) Adopted 2/18/2010; Pub- acre property located off of a Promissory Note and Even if you have insur- Defendants. antl continuin¢ north for delete. lished 03117/10; Effective the end of Dubois Drive Mortgage Deed dated ance and the insurance 125 f effect f tiv from Material underlined add. 04/07/10 in South Budington. July 17.2002. Plaintiffs company will defend S a.m. to 60.m. Monday action may effect your you, you must still file through Fdtlav- CITY Of BURLINGTON Material in 18rackets] VESCO has submitted interest in the property any Counterclaims you NOTICE OF SALE TRAFFIC REGULATIONS delete. plans for the construc- described in the Land may have. (12) through(19) As Material underlined add. tion ofan electric Records ofthe Town of Byvinueand inexecu- 5)Mary HenrickMot / Written The following traffic generation/transmission Milton at Volume 24S, 7. LEGALASSISTANCE. tion ofthe Powerof Sale LJC Inc regulations are hereby PUBLIC HEARING facility in advance ofits Page 43. The Complaint You may wish to get contained in a certain Establish open air (b)As Written enacted by the Public SOUTH BURLINGTON submission ofan ap. also seeks relief on legal help from alawyer. Mortgage Deed dated market on the second Works Commission as DEVELOPMENT REVIEW plication for a certificate the Promissory Note If you Cannot afford a July7, 2005 from Robert and fourth Sundays. Adopted this 18th day amendments to Ap- BOARD of public good from the executed by you. A copy lawyer, you should ask K. Bain and Dawn M. May through September, of February 2010 by the pendix C, Motor Vehicles, Vermont Public Service of the Complaint is on the court clerk for in- Bain to Mortgage 10:00am Board of Public Works and the City ofeuding. The South Burlington Board. ma file and y be obtained formation about places Electronic Registration to 3:00pm. Commissioners: tons Code of Ordinances: Development Review at the Office of the Clerk where you can get free Systems. Inc.(MERS), as Board will hold a public The purpose of the Pub- of the Superior Court for legal help. Even if you Nominee for Flexpolnt 4.10-0685CU:142-144 Attest Norman Baltlwin, Sec. 7. No -Parking Areas. hearing In the South lic Hearing will be t0 pro -the County of Chitten- cannot get legal help, Funding Corporation. North Champlain RE. Burlington City Hall vide public Input to the den, State of Vermont. you must still give the Said Mortgage Deed Avenue(NMU. Ward 3) Assistant Director -Tech- No person shall park any Conference Room, 575 Planning Commission court a written Answer was recorded on July SWB LLC nical Services vehicle at any time in Dorset Street, South as it prepares written 3. YOU MUST REPLY to protect your rights or 13.2005 in Volume 530, Demolition of fire dam- the following locations: Burlington, Vermont on recommendations to the WITHIN 41 DAYS TO you may lose the case. Pages 556-573 of the aged building. Adopted 211812010: Pub- Tuesday, April 6, 2010 at Public Service Board. PROTECT YOUR RIGHTS. Town ofcnlchester Land lished 03117/10: Effective (1) through (102) As 7:30 P.M. to consider the You mustgive or mail ORDER Records. The subject S.10-0678VR: 617 River- (14107/10 Written following: Pursuant to 24 VSA the Plaintiff a written Promissory Note and side (NMU. Ward 2)Com- side (N §4413, electric transmis- response called an An- The Affidavit duly filed Mortgage were as - Health Center o/ Material in [Brackets] (103) (Reserved.( tin- 1. Final plat application sion and gene ration swer within 41 days after in this action shows that signed from mortgage Burlingtonmun delete. the north side of Cherry #SD-10.07 of Bullrock facilities regulated under the date on which this service cannot be made Electronic Registration Request for Variance Material underlined add. Street for a di stance of Corporation to amend 30 VSA§248 are not Summons was first pub- with due diligence by Systems. Inc.(MERS). as from height require- 30 feet. west of St Paul a previously approved regulated by municipal fished. which is March any of the methods pro- Nominee for Flexpoint ments from 35ft to 40f. CITY OF BURLINGTON Street planned unit develop- zoning of subdivision 10, 2010. You must send vided in Rules 4(d)-(t1, Funding Corporation t0 TRAFFIC REGULATIONS ment consisting of regulations. a copy of your answer to (k), or(I) of the Vermont Deutsche Bank Trust Plans may be viewed (104) lReserveoll On the five(5)multi-family the Plaintiffor the Plain- Rules of Civil Proce- Company Americas, f/k/a in the Planning and The following traffic 18eaLsjde of St Paul dwellings for a total Of Copies of the plans tiffs attorney, Joshua dure. Accordingly, it is Bankers Trust Company. Zoning ofhce,(City regulations are hereby StreetfaUdis[ancc of 160 units and a 40 unit are available for public B. Lobe, located at 30 ORDERED that service of asTrustee and Custo- Hall Church Street enacted by the Public 30feet north of Cherry congregate housing inspection at the South Kimball Avenue, Suite the Summons set forth than for l%IS 2005-HE3, ,149 Burlington). between the Works Commission as street, facility. The amendment Burlington City Hall. 306, South Burlington, above shall be made by Saxon Mortgage Ser. hours of 8:00 a.m. and amendments to Ap. consists ofconstructing VT 05403. You must also upon the defendant, vices, Inc., f/k/a Meritech 4:30 p.m. pendix C. Motor Vehicles, (105) through (288) As a 100 unit assisted living March 17, 2010 give or mail your Answer Letitia M. Carstensen, by Mortgage Services, Inc.. and the City of Burling- Written facility 250 Quarry Hill to the Court located at publication as provided as its Attomey-in-Fact. This may not be the final tons Code of Ordinances: Roar]. STATE OF VERMONT 175 Main Street, Burling- In Rufe[sl 14(d)(1) and) by Assignment dated order in which items will (289) ]On the north side CHITTENDEN COUNTY, ton. Vermont 4(g) of those Rules. February 12. 2008 and be he at the meeting. Sec. 9. Fifteen -Minute of Cherry Street, for 2: Preliminary and final S5. recorded on February Please view the Mal Parking. a distance of110 feet plat application#SD-10- CHITTENDEN SUPERIOR 4, YOU MUST RESPOND This order shall be 22. 2008 in Volume Agenda. opposite the entrance 09 of Burlington Proper- COURT TO EACH CLAIM. Tire published once a week 606, Page 264 of the a t www.ci.Durlington. at www.nning/tlrbor (a) No per son shah park to Burlington Square ties Limited Partnership DOCKET NO. S1444-09 Answer is your written for 2 weeks beginning Town of Colchester Land a vehiclelonger than parking garage.] On the to subdivide a 77.6 acre CnC response to the Plain- on March 10, 2010 in the Records, posted on the Planning fifteen (IS) minutes, be- south side of cherry parcel developed with tiffs Complaint. In your Seven Days. a newspaper and Zoning Office notice tween the hours of 8:00 Stree[he¢Inn reat a light manufacturing Chase Home Finance, Answer you must state of general circulation in The undersigned board, one week before a.m. and 10:00 p.m., the entrance to the facility into four(4) lots U.C. whether you agree or CMttenden County, and represents the present the hearing for the see- Sundays and holidays Iakev ew Parking data.. ranging In size from 4.93 Plaintiff disagree with each pars- a copy of this summons holder for breach of citric Order in which items e,cepted. in the follow- and continuin+ east for acres to 38.55 acres, 85 v. graph of Complaint. and order as published the conditions of said Will be heard. ing areas: 40 feet. Meadowland Dnve. Dean M. Carstensen, Ifyou believe the Plain- shall be mailed to the Mortgage and for the Letitia M. Carstensen, tiff should not be given defendant, Letitia M. purpose offoreclosing CITY OF BURLINGTON (1) through (25) As (290) through (349) As John Dinklage, Chairman Wells Fargo Bank, N.A., everythingasked for in Carstensen, If an address the same which will be TRAFFIC REGULATIONS Written Written South Burlington Devel- General Motors ACcep- the Complaint you must is known. sold at Public Auction Z G opment Review Board Lance Corp., say so In your Answer. at 1:00 o'clock PM, on The following traffic (26)(Reserved.) On the. (350)(Reserved.1 firs and Occupants residing Dated at Burlington, the 9th day of April, A.D. regulations are hereby east side Of North Chain- the north Side of Cherry Copies or the applica- at 11 Roberts Court f/k/a S. YOU WILL LOSE YOUR Vermont this 24th day of 2010. at the subject c enacted by the Public olain Street beginning Street beamninv at the bons are available for Lot 15. Milton, Vermont, CASE IF YOU DO,NOT February, 2010. premises of 318 Eagle w Works Commissn as io 25 feet south of North easternmost drivewav public inspection at the Defendants GIVE YOUR WRITTEN Bay Drive, Colchester. amendments to Ap- Street and continuin¢ to 3 fa[hedral Snare South Burlington City ANSWER TO THE COURT. Hon. Helen Toor Vermont all and singular '^ pendix C, Motor Vehrdes, south for 20 feet ane continuldg east for Hall. SUMMONS& ORDER FOR If you do hot Answer Presiding Judge the premises described and the City of Burling- Gn feet PUBLICATION within 41 days after Chittenden Superior In said mortgage will be torts Code of Ordinances: (27) through (126) AS March 17, 2010 the date on which this Court sold as a whale. Written (351) through(367) As THIS SUMMONS IS Summons was first Written PUBLIC HEARING DIRECTED TO: Letitia M. published and file it with STATE OF VERMONT To wft: H Sec. 16. Buz stop. (b) No person shall park SOUTH BURLINGTON Carstensen the Court you will lose CHITTENDEN COUNTY, `Being all and the same Q any vehicle, at any time, (368)]Reserved.] 0a PLANNING COMMISSION this case. You will not SS. land and premises n paces lowing designated c (a)Thehereby are tlesignate0 as longer than 15 minutes [he east sitle of Nortn 1. YOU ARE BEING SUED. get to tell your side of CHITTENDEN SUPERIOR conveyed to Robert K. Stops. Dust stops. at the following coca- Champlain Street beein- Pursuant to 30 VSA The Plaintiff has started the story, and the Court COURT Bain and Dawn M. Bain c toons: ni t Norm Street and figs 248 , the South § (f) a lawsuits against g you. a decide against may g you DOCKET NO. S278-08 by Warranty Deed of (1)As Written cantinuing south for Burlington Planning A copy of the Plaintiffs and award the Plaintiff CnC Thomas J. Hergenrother (1) though(281 As 25 feet. Commission Will hold Complaint against you everything asked for in and Rachel D. Hergen. (2) [Reserved.] On me Written a public hearing in the Is on fife and maybe the complaint Deutsche Bank Trust rother dated 22 August < Cherry (369) through (5061 As South Burlington City obtained at the office of Company Americas f/k/a 1991 and recorded in is north side of streeW S31, Adopted this lath day Written Hall Conference Room, the clerk of this court. 6. YOU MUST MAKE ANY Bankers Trust Company.volume 183. Page 403 of of St Paul Street �y west of St.Paultreet of February 2010 by the 575 Dorset Street South Chittenden Superior CLAIMS AGAINST THE as Trustee and Cust the Land Records of the for Board of Public Works Adopted this 18th day Budington. Vermont on Court 17S Main Street, PLAINTIFF IN YOUR RE- dian for IRIS 2005-HE3,. Town of Colchester. and and from BO feet from Commissioners: of February2010 the �' Tuesday, March 23,2010 y Burlington, Vermont HL PLY. Your Answer must b Saxon Mortgage y Set- `A lot of land with all effective et effective S a to 6 m_ Monday Board of Public Works ' at 7:30 P.M. to consider Do not throw this paper state any related legal vices, Inc, f/k/a Meritech buildings thereon situ - in n Attest Norman Baldwin. Commissioners: the following: away. It Is an official claims you have against Mortgage Services, Inc., ated on the easterly side P.E. paper that affects your the Plaintiff. Your claims as its AttomeyAn-Fact, of Eagle Park Drive, so- (3)through (101As Assistant Director -Tech- Attest Norman Baldwin. 1. VESCO Proposed South rights. against the Plaintiff are Plaintiff, called, the newly erected Written nical Services P.E. Burlington Solar Farm called Counterclaims. v dwelling house on said Assistant Director -Tech- proposal to consist of 2. PLAINTIFFS CLAIM. If you do not make Robert K Bain and Dawn lot being known and des - g Adopt ed2/1812010:Pub- 498+/-AIISun Solar Plaintiffs claim is a your Counterclaims In M. Bain, and Any Other ignated as No. 35 Eagle (ll)[Reserved.)OI1tDe- CP fished 03117AO: Effective Tracker solar panelsin Complaint in Foreclosure writing in your answer Occupants of318 Eagle Park Drive, said land hav- CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING DEVELOPMENT REVIEW BOARD Report preparation date: April 1, 2010 \drb\sub\meadow1and\pre1im_final4lot.doc Application received: March 10, 2010 MEADOWLAND DRIVE— 4- LOT SUBDIVISION PRELIMINARY & FINAL PLAT APPLICATION #SD-10-09 enda #7 Meeting Date: April 6, 2010 Owner/Applicant Burlington Properties Limited Partnership 85 Meadowland Drive South Burlinqton, VT 05403 Engineer/Surveyor Property Information Stephen Vock, P.E. Tax Parcels 0860-01020C Civil Engineering Associates Inc Industrial Open Space Zoning District 10 Mansfield View Lane 77.6 acres South Burlinqton, VT 05403 Location Map CITY OF SOUTH BURLINGTON 2 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\meadowland\sketch 4-lot.doc Burlington Properties Limited Partnership, hereafter referred to as the applicant, is requesting preliminary and final plat approval of a planned unit development to subdivide a 77.6 acre parcel developed with a light manufacturing facility into four (4) lots ranging in size from 4.93 acres to 38.55 acres, 85 Meadowland Drive. The Board held a meeting to discuss the sketch plan on October 6, 2009 (minutes attached). Associate Planner Cathyann La Rose and Administrative Officer Ray Belair, referred to herein as Staff, have reviewed the plans submitted on March 10, 2010 and have the following comments. Zoning District & Dimensional Requirements Table 1. Dimensional Requirements 10 Zoning District Required Proposed Min. Lot Size 3 acres 4.9 acres 4Max. Building Coverage 40% 10.1 % Max. Overall Coverage 70% 25.8% Min. Front Setback 30 ft. 135 ft Min. Side Setback 10 ft. 82 ft Min. Rear Setback 30 ft. 790 ft Front Yard Coverage 30 % 3% 4 zoning compliance The only lot with an existing building is Lot 3. All other lots are vacant at this time. 1. The lot area information in the Dimensional Summary Table shall be revised to reflect the correct lot sizes. SUBDIVISION CRITERIA Pursuant to Section 15.18 of the South Burlington Land Development Regulations, subdivisions should comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. According to Section 15.13 of the South Burlington Land Development Regulations, the existing public water system should be extended so as to provide the necessary quantity of water, at acceptable pressure. According to Section 15.13 of the South Burlington Land Development Regulations, the subdivider or developer should connect to the public sewer system or provide a community wastewater system approved by the City and the State in any subdivision where off -lot wastewater is proposed. Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. CITY OF SOUTH BURLINGTON 3 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\meadowland\sketch 4-lot.doc There are no new buildings proposed as part of this application; therefore these criteria are not applicable. The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. The plans do not appear to depict the proposed access for Lots 1 and 2. While this will need to be finalized when buildings are proposed for the subject lots, the Board should give direction at this stage as to a general location of an entrance, as well as where they should not be located. Staff strongly recommends that the access to Lot 1 NOT be from Hinesburg Road, and that it preferably be accessed from the private drive rather than Meadowland Drive. Lot 3 will likely not include any further development and Lot 4 will be accessible via Bowdoin Street. 2. Access to the 6.34 acre lot labeled on the plans as Lot 1 shall be from the existing paved drive to the east, shown on the survey plat as easement E-4. Lot 1 shall not be directly accessed from Hinesburg Road or from Meadowland Drive. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. The plans that the applicant submitted depict a Class II wetland on the subject property. At this time, no new buildings are proposed. If the applicant proposes any development in the wetlands or their associated 50' wide buffer, a Conditional Use Determination (CUD) shall be required from the State of Vermont. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. Staff feels that the proposed subdivision of land is in keeping with the planned development patterns of Industrial Open Space Zoning District. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. As buildings and other associated development are not being proposed as part of this application, this criteria in not applicable at this time. The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. The South Burlington Fire Chief has stated that he will review site plans at the time development is proposed. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. CITY OF SOUTH BURLINGTON 4 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\meadowland\sketch 4-lot.doc The Recreation Path Committee reviewed the plans at the time of the original subdivision of land. Staff recommends a 20 foot recreation path easement along Hinesburg Road, consistent with other properties in the vicinity. The Committee is meeting on Monday evening and should have comments ready for Tuesday's Development Review meeting. 3. The applicant shall adhere to the recommendations of the Recreation Path Committee. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. 4. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications should be underground. The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). Staff feels the proposed subdivision of this property is in conformance with the South Burlington Comprehensive Plan. Landscaping As there are no buildings proposed as part of this application, there is no minimum landscaping budget. RECOMMENDATION Staff recommends that the Board approve Preliminary and Final Plat application #SD-10-09. Respectfully submitted, athy n LaRose, Associate Planner Copy to: Steve Vock, contact for applicant DEVELOPMENT REVIEW BOARD 6 OCTOBER 2009 PAGE 7 can go ahead with something that is not in the spirit of what the "people" want. Mr. Behr explained that the Board has very little right to deny a project that fits within the regulations. If they do, and if it then goes to Court, the city would have no case. Mr. Seff, President of Swift Estates, asked if there has ever been a project built using TDRs. Mr. Belair said there has. Ms. Quimby then moved to continue Sketch Plan Application #SD-09-42 Of Gary Farrell et al until 17 November 2009. Mr. Farley seconded. Motion passed unanimously. S. Sketch Plan Application #SD-09-43 of O'Brien Family LLC, for a planned unit development consisting of subdividing a 64.51 acre parcel into nine lots ranging in size from 1.5 acres to 23.1 acres, 200 Old Farm Road & Kimball Avenue: Ms. O'Brien showed the location of the area. She noted there are 3 zones within the parcel. Lot # 1 is zoned C-1, Lots #2-8 are zoned I-C, and Lot 49 is R-1. No development is planned for lot 49 at this time. Mr. Homestead indicated they are proposing a new city street ending in a cul de sac with future connection to Tilley Drive. He showed the location of this on an aerial photo. They are approximating the intent of the road on the official city map. They have reasons for not wanting it where it is on the map. Their proposal for the road would skirt an area of ledge so there would be less slope and less blasting. Mr. Homestead showed existing curb cuts. They are proposing one additional curb cut to access lot #1. Lot #8 would be accessed off the new road. Plans for this will be submitted to the Fire Chief. Mr. Knudsen questioned how curb cuts line up with those across the street. Mr. Homestead said there is a Class 2 wetland across from the curb cut on the opposite side of the road and a very steep slope across from another curb cut. Ms. LaRose noted that when Exit 12B is built, there could be a light in this area. Access should be lined up with the location of that light as there could be significant traffic in the area. Ms. O'Brien stressed the amount of ledge involved. Mr. Behr said the Board has to be sure that in the future this road won't be a major issue for the city. Mr. Behr said the Board will also want to see a potential plan for build -out. The applicant wouldn't be held to it, but the Board needs an idea about potential sharing of accesses, etc. The Board agreed to let the applicant go on to preliminary plat with the understanding th _the-$oaxd would rule on whatever the applicant proposes to deal with issues raised. (Plartnership 9. Sketc+� Plan Application #SD-09-46 of Burlington Properties Limited fdr a planned unit development to subdivide a 77.6 acre parcel into four lots ranging in size from 4.9 acres to 38.6 acres, 85 Meadowland Drive (Dynapower): DEVELOPMENT REVIEW BOARD 6 OCTOBER 2009 ' : GN-91 Mr. Belair indicated the issues that concern staff. Future access to lots 1 & 2 must be indicated. The applicant should meet with the Rec Path Committee and should adhere to their recommendations regarding the location of the rec path. All new utility lines, etc., must be underground. Finally, there must be a survey of the property done -by a licensed surveyor and submitted with preliminary plat. The Board had no issues. An abutting neighbor raised an issue concerning signage. He noted that with the subdivision, the Lane Press sign is now off the premises, and this is not allowed. With the proposed new subdivision, the Dynapower sign will also be off the Dynapower premises. The question of grandfathering the sign locations was raised. Mr. Belair noted that there is no grandfathering for signs. He added that if this were a PUD with just one lot, it would be different story; however, individual property lines are being proposed. Mr. Behr noted that without the property lines, the applicant can't sell the lots. The applicant said this will have to be discussed with the client. A strip of private road in front of the 2 properties that could contain the signs was suggested. Mr. Belair reminded the Board that they do not have jurisdiction over signage. As there was no further business to come before the Board, the meeting was adjourned at 11:40 p.m. Clerk Date - Easement NotE ) E1. A 20-fool-wide easement for future recreation path is PROPOSED serving the City of South Burlington. E2. 10-foot-wide easement for electric & communication lines conveyed to Green Mountain Power Corp. (GMP) and New England Telephone & Telegraph Co. (NETT) Vol. 176 Pg. 138). E3. 30-foot-wide easement for gas serving Vermont Gas Systems,lnc. (Vol. Pg. ) and water line conveyed to City of South Burlington (Vol. Pg. ). E4. 50-foot-wide easement for access, snow storage, electric & telephone line conveyed to (Vol. Pg. ). E5. 20-foot-wide sewer easement conveyed to City of South Burlington (Vol. 179 Pg. 510). E6. 20-foot-wide power & communications easement serving Green Mountain Power Corp. and New England Telephone & Telegraph Co. (Vol. 275 Pg. 464) „ E7. 10-foot-wide easement for gas serving Vermont Gas Systems, Inc. (Vol. 274 Pg.587) E8. 20-foot-wide waterline easement, 30-foot-wide sewer easement and U 30-foot-wide combined water and sewer easements across Landrum to serve Dynapower building. (Vol. 278 Pg. 120) ¢ I P I E9. 20-foot-wide sewe r easement running southerly and easterly from cc77 pump station, conveyed to City of South Burlington (Vol. 651 Pg. 140) j Also sewer line easement (12 feet wide) conveyed to Summer Ice Joint y Ventures by Burlington Properties LP (Vol. 651 Pg. 140), apparently for 2 the same sewer line. 2 E10.3G-foot-wide water and sewer and access easement to pump station conveyed to City of South Burlington (Vol. 176 Pg. 516). E11. 200' x 25' easement for electric & telephone conveyed by Burlington Properties Limited Partnership to Green Mountain Power Corp. and New England Telephone, dated 4/12/1989 (Vol. 281 Pg. 221-22). El 2. Sewer Pump Station (conveyed in fee) and 60' x 100 easement O conveyed to City of South Burlington (Vol. 176 Pg. 516). In El 3. Sewer line easement (20 feet wide) for possible future use, -9 F cc conveyed to City of South Burlington (Vol. 176 Pg. 518). W C7 E14. 15-foot-wide pedestrian trail easement conveyed to City of South Burlington (Vol. 176 Pg. 514). m E115. A 20' x 42'sewer easement conveyed by Burlington Properties W Limited Partnership to CEA Properties, LLC, dated 1172008 ? (Vol. 804 Pg. 510-20). _ E16. Agreement for utilization of signage between Burlington Properties LP and Lane Press, Inc. (Vol. 280 Pg. 398).� I a� Highway or Street Notes - � 11- H.1. Meadowland Drive (f/k/a Swift Street Extension) an 80-foot- m wide right-of-way is subject to an Irrevocable Offer of Dedication I I� from Burlington Properties Limited Partnership to the City of South Burlington, dated 9/12/1995 (Vol. 384 Pg. 104-108). This Irrevocable Offer of Dedication apparently supersedes a previous Irrevocable Offer of Dedication recorded (Vol. 176 Pg. 518) H.2. Hinesburg Road (VT Rte. 116) is a public highway or street with a right-of-way width of 4 rods (66 feet) per record found in Volume Page_ , _ City _ Records. H.3. Interstate Highway 89 is a public highway with avariable-width of R v right-of-way. Reference Volume 48 Page 489 ,City Land Records, and Reference Plan 1. No access to 1-89 from Lot 4. H.A. Thompson and Bowdoin Streets are 60-foot-wide rights -of -way subject to an Irrevocable Offer of Dedication from Burlington Properties Limited Partnership to the City of South Burlington, dated (Vol. _ Pg. �. - Zoning Data - "INDUSTRIAL -OPEN SPACE" DISTRICT LOT AREA 3 AC. FRONT SETBACK 50' SIDE SETBACK 35' REAR SETBACK 50' BUILDING COVERAGE 30% LOT COVERAGE 50% FRONT YARD COVERAGE 30% OWNER of RECORD: BURLINGTON PROPERTIES LIMITED PARTNERSHIP 85 MEADOWLAND DRIVE SOUTH BURLINGTON, VT 05403 WGM ASSOCIATES V. 655 P. to V. 675 P. 550 Bc N 4PE 727.43 aI ----- LOT 1 6.34 AC. 4 SOlP00'1PE ,�,.' E1 OS AG SPANIEL PROPERTIES, LLC $ I V. ea5 P. 372 ow 0. ELTABBAKH V. t1W P. 1lBe CIPF II ; G. ELTABBAKH t It I V "P. 24 Lss- fN83,0 1 ,43,E 2G.W EAST MOUNTAIN VIEW, LLC V 754 P. 53 Survey Notes - at, AG LOT 2 4.93 AC. - legend - 1 \ \ SUBJECT PROPERTY LINE - - OTHER (APPROX.) PRO. LINE EASEMENT QfU!/ - -SS- - GRAVITY SEWER LINE � - - G - - GAS LINE - - W - - WATER LINE - - UE - - UNDERGROUND ELECTRIC \ - - UT - - UNDERGROUND TELEPHONE \ IPF/CIPF O IRON PIPE / CAPPED 'RON PIPE FOUND \ IRF/CIRF ® IRON ROD / CAPPED IRON ROD FOUND zG' Ac GRID NORTH CMF ❑ SQUARE CONC. MARKER FOUND SEENOTE2 IRS ® IRON ROD SET (NOTE 5) / CMS E) CONC. MARKER SET (NOTE 5) 0 AG / BG ABOVE / BELOW GRADE / / E14 E3 CORRESPONDS W/ EASEMENT NOTE ' O SEWER MANHOLE I N tra2s 47.WW LANDRUM V. 218 P.514 I ,u1Ty�3 0 'Tire Lane PrOW �/LGtj/jl\\L`1 4 GBr ae' AG / 1.9 Q flop-/ 97 LOT 3 ----------------------------------------- As 0. 1' BO MUNSON EARTHMOVING CORP. V. 651 R 152 1. Purpose of this survey and plat was to: 5. Iron pipes found are typically described with inside diameters. Iron rods found are a.) Retrace, document, monument and perpetuate the perimeter boundaries of land typically described with outside diameters. Comer or line markers (monuments) set or conveyed to Burlington Properties Limited Partnership by deed of Orchard Lake Road proposed shall typically consist of 40" x 5/8" diameter steel reinforcing rods or 4" square Properties, dated 12/15/1998 and recorded in Volume 273 Page 265 of the South Burlington reinforced concrete markers with aluminum caps embossed "CIVIL ENGINEERING Land Records. ASSOCS. - VT LS 597", typically set Bush with existing grade. New markers set in b.) Depict the proposed subdivision of the surveyed parcel into four (4) lots as shown. woodlands are typically set with 4" - 10" of reveal. Other neighboring property lines may be shown approximately and are for reference 6. The subject property MAY be subject to buried utilities, easements, rights -of -way, purposes only. restrictions, covenants, licenses, permits, regulations and/or set -back lines not readily apparent from normal inspection of the property or land records. No liability is assumed by 2. Field surveying was conducted during January 2010 and consisted of a closed -loop Civil Engineering Associates, Inc., or the undersigned, for any loss associated with the traverse utilizing electronic total -station and GPS instruments unless otherwise noted. existence of any undiscovered easements, uses, or restrictions on use of the property whic Bearings shown are from Grid North, Vermont Coordinate System of 1983 (_ are not evident in the record or are not readily apparent from normal inspection of the Adjustment) based upon our GPS observations on or near the site property or land records. 3. Some dimensional information shown hereon may differ significantly from existing land records, plats or deeds, due to differences in orientation or methods of measurement. 4. Areas of proposed Lots 2 and 3 are calculated to the sidelines of Meadowland Drive, as shown. APPROVED BY RESOLUTION OF THE SOUTH BURLINGTON, VERMONT, DEVELOPMENT REVIEW BOARD, ON THE DAY OF 2 , SUBJECT TO THE REQUIREMENTS AND CONDITIONS OF SAID RESOLUTION SIGNED THIS DAY OF 2 BY , CHAIRPERSON. tte rnoecr 1 -4V2W ST9Ileof V � 11 sa, LOCATION MAP 9 - NOT to SCALE __- iI I.3' AG / / I I m / rn / �m n I � l LOT 4 I `� 38.55 Ac. / RECEIVE® / MAR 10 2010 I 27.78 AC. I City Of So. Burlington � b /46IP � 3 ' pRF � 3 CIRF _ _.0'AC __ ______ _ - fLUSH __----------------------- P _ _ -__-_-_-__--os' Al __-_SBTOpOa'w CIRF �N83°Q1'UB.BO' /a' uaf 701.4E 3/B" WX 9a3'01'QRMr 6ti0.Os auf Qe' AG I. ]' AC os'Ac y GRANDVIEW I I ® SUPER -TEMP REALTY I FARM, Inc. T e ROCK of GREATER I I BIRCHWOOD BI I COMPANY Inc. I BURLINGTON, Inc. I BURLINGTON, LLC I I V.-P.- I � �� V. 755 P. 156 / \�\I V. 745 P. 454 8 O ® V. 822 P.87 y - Reference Plats or Maps A. "Consolidalioi of Lot 8 & 9 Meadowland Business Park for Birchwood Burlington, LLC' last revised 9/162008, by Civil Engineering Associates, Inc. Recorded in Map Slide 534.3 South Burlington Land Records. B. "Boundary Plat - Dnus & Sue Wiles' , dated March 11, 2003, by Trudell Consulting Engineers, Inc. Vol. 425 Pg. 3 South Burlington Land Records. C. "Meadowland Business Park -Subdivision Plat ",last revised 827/1996, by Trudell Consulting Engineers, Inc. Vol. 386 Pg. 98 (now Map Slide 193) South Burlington Land Records. D. "Landrum and Orchard Lake Road Properties ", last revised 2/03/1988, by Trudell Consulting Engineers, Inc. Vol. 252 Pg. 72 (now Map Slide 208.5) South Burlington Land Records. E. "Plat of Land of Semicon Components, Inc. ", last revised 829/1986, by Trudell Consulting Engineers, Inc. Vol. 200 Pg. 71 South Burlington Land Records. F. "Plat of Lard of Motel, Inc. ", last revised 521/1984, by Trudell Consulting Engineers, Inc. Vol. 193 Pg. 33 (now Map Slide 170.4) South Burlington Land Records. G. "Mountain View Industrial Park ", last revised12/03/1981, by Trudell Consulting Engineers, Inc. Vol. 173 Pg. 42 ;now Map Slide 153.4) South Burlington Land Records. H. "Property Sur✓ey- Wright Farm ", dated February 7,1979, by Engineers Incorporated of Vermont. Vol. 173 Pg. 22 (now Map Slide 150.1) South Burlington Land Retards. I. "Interstate Project in the Towns of Williston & South Burlington - Project 1-89-3 (14) ", Sheets 15-16 of 115, circa April 1961, by Boswell Engineering Co., VTrans District 5 Engineer's Office. 1� GRAPHIC SCALE IINFMI I inch = 150 h SOUTH BURLINGTON CITY CLERK'S OFFICE RECEIVED FOR RECORD This day of , 2010, at _ o'clock _ minutes _M and recorded in map slide _ page/number_ Attest City Clerk To the best of my knowledge & belief this plat properly depicts the results of a survey conducted under my direct supervision, based upon our analysis of record and physical evidence found. Existing boundaries shown are substantially consistent with the record unless otherwise shown. This plat is in substantial compliance with 27 VSA 1403. This statement valid only when accompanied by my original signature and seal. R.Cowan VT LS 597 SURVEYED BY: r r. CIVIL IMG LETI�II`I Itu ASSOCIAXES. INC'. 10 MANSFIELD VIEW LANE SOUTH BURLINGTON, VT 05403 PROW 80110411164312 FAtr 8024064M :OPY .=(6 Born - ALL WGBre aisit"M oBABN MJW/TRC co- JLM APPRom TRC I un Ita'rDl REVISION I PROPOSED 4-LOT SUBDIVISION BURLINGTON PROPERTIES LIMITED PARTNERSHIP 85 MEADOWLAND DRIVE SOUTH BURLINGTON, VERMONT OATR URARING N-IsER MAR. 10, 2010 ORIGINAL BCALR P 1 1" = 150' PRO. No. 09202 DIMENSIONAL SUMMARY EXISTING PROPOSED PROPOSED PROPOSED PROPOSED REO'D. CONDITIONS LOT 1 LOT 2 LOT 3 LOT 4 LOT AREA 3 AC 80.0 AC 6.2 AC 4.9 AC 27.9 AC 38.6 AC FRONT SETBACK 50' 820 NIA NIA 135' NIA SIDE SETBACK 35' 82 NIA NIA 82, NIA REAR SETBACK 50, 2109 NIA NIA 790' NIA BUILDING COVERAGE 30% 3.5% 0.0% 0.0% 10.1% 0.0% LOT COVERAGE 50 % 9.0% 0.0% 0.0% 25.8% 0.0% FRONT YARD COVERAGE 30% 7.6% 0.0% 0.0% 3.0% 0.0% *THE 80' R.O. W. FOR MEADOWLAND DRIVE WAS CALCULATED IN EXISTING CONDITIONS BUT NOT SHOWN AS A LOT IN PROPOSED CONDITIONS. WGM ASSOCIATES ) ELTABBAKH II II I 1 I i EAST MOUNTAIN VIEW LLC 10 ELECTRICAL EASEMENT BUILDING }-----------------=: 20 SEWER EASEMENT I I GENERAL NOTES: 1. UTILITIES SHOWN DO NOT PURPORT TO CONSTITUTE OR REPRESENT ALL UTILITIES LOCATED UPON OR ADJACENT 70 THE SURVEYED PREMISES. EXISTING UTILITY LOCATIONSAREAPPROMMATEONLY. THE CONTRACTORSHALL FIELD VERIFYALL URLRY CONFLICTS ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. THE CONTRACTOR SHALL CONTACT DIG SAFE (SN8 .-72.) PRIOR TO ANY CONSTRUCTION. 2. THE CONTRACTOR SHALL REPAIR/RESTORE ALL DISTURBED AREAS (ON OR OFF THE SITE) AS A DIRECT OR INDIRECT RESULT OF THE CONSTRUCTION. S. ALL GRASSED AREAS SHALL BE MAINTAINED UNTIL FULL VEGETATION IS ESTABLISHED. 4. MAINTAIN ALL TREES OUTSIDE OF CONSTFPJC71ON LIMITS 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARYFORCOMPLETE AND OPERABLE FACILITIES & UTILITIES. ALL PROPOSED UTILITIES SHALL BE UNDERGROUND. \ \ R LEGEND apy+� \ � �I ] —�6�-- ---- EXISTING CONTOUR \ \ \"m APPROXIMATE PROPERTY LINE \ \ \ \ cq' V•� — — — — SETBACK LINE\ \ \ \ \ fv0, p ------------------- EASEMENT LINE \ �` \ wx 100 — \ �7 \ — TATION —SS- -- GRAVITY SEWER LINE \ \ \ \ S\ Q EASEMENT — — G -- GAS LINE I � — — IN WATER LINE ——UE&T-- UNDERGROUND ELEC. & TEL I / � � `- r — —ST — — STORM DRAINAGE LINE o 4 �_/)/ ' _I__T__ �•-ti P. •�•�• \ \ G SEWER MANHOLE SS SITE ENGINEER: _\ CIVIL ENGINEERING ASSOCIATES INC TDANASWVEWLAW SOUR,ak%WGTW VTO6400 8VY.Sr{.29t8 FAX SoeeM-22n . ww.osH_ DRA N MJW —cm JLM —Rom SAV OWNER: BURLINGTON PROPERTIES LIMITED PARTNERSHIP : If \ . •'< . ...: ^ >� T 85 MEADOWLAND DRIVE / 'W \, \.�:.'•'.'.: i•_ \� �' SO. BURLINGTON, VTO5403 `20SEWER * _ ' 1— /�:: •: -: -: -: `\I \•LEASEMEIT All (— = PROJECT: za SEWER PROPOSED j;- / f' EASE*Arr } PLANNED UNIT DEVELOPMENT �.• �•.• •—:�' • � ice. , I ao CLASS WETLAND j 85 MEADOWLAND DRIVE / i I ( 2 SO. BURLINGTON, VT 05403 BUFFER I �'•'• '''•� l I � F =� . '•'•': , it ... • ..'� .... •... f /) CLASS I/ ( - �' / WETLAND J ,' I 11 LOT 4 38 55 Ac. �'../'.'••'•'.':< .-�-y ••� � l III �I CLASS III ( SURFACE WATER335 111 I11 I Ea wumD BUFFER LOT 3 \ *CLASS iS ft—�. _ ' ��..-s: ` BUFF /f .:j P/ o i 1 ; I/ 1 ill LOCATION MAP / r , l , / /.l•'•':._:_J' :: :,...1 :•.-.-:•:•. , ,l d. , 1 �/ , .I ,I r) ,^=2000 BUILDING .y _ {'?• Tt:':. 15' PEDESTRIAN i CK BUILDING jt •'- .:•:• ... -C.{' •, .•.•�•'•'.•.•:•: '..• . f / i 7 %• SETBACK 't •.�.._y.i.-.. .-.. _ \ _ • ... ,.... •-'-' � EASEMENT L l III `r T-------- - -i---------- --------------- 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARYFOR COMPLETE AND OPERABLE FACILITIESAID UTILITIES. 0. IN ADDITION TO THE REQUIREMENTS SET IN THESE PLANS AND SPECIFICATIONS, THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITHALL PERMIT CONDITIONSANO THE CITY OF SOUTH BURLINGTON PUBLIC WORKS STANDARDS. 7. THE TOLERANCE FOR FINISH GRADES FORALL PAVEMENT, WALKWAYSANDLAWN AREAS SHALL BE 0.1 FEET. S. THIS IS NOT A BOUNDARY SURVEY AND NOT INTENDED TO BE USED AS ONE. D. IF THERE ARE ANY CONFLICTS OR INCONSISTENCIES WITH THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR VERIFICATION BEFORE WOFV( CONTINUES ON THE ITEM IN QUESTION. ® SHUT—OFF 30 SEWER, WATER%AND / ix HYDRANT ELECTRICAL EASEMENT/ , WETLAND / I / / r^, ,_���T I 1 r�/ is �• +• ..- -.'/Y� I'•'s' �_ �y q 355 yl� .L �.-:•:•:•..:.•-•t.....• -• tom. .a, -, Act Zi -r.••..:... f \ ; GRANDVTEW FARM INC t� I arc } l I y I I ` R4EROCKOFGREATER I I I` BU UNGTON, INC. GRAPHIC SCALE ( RT FEET % I i—h = 120 [t. _ _------- _ ---- ------------- ------------------------- --- _ 1371.4' 1 t � r owwOVlEw FARM/Nc. I z l� SUPER -TEMP REALTY coMPANYINc. PROPOSED SITE PLAN OWNER OF RECORD & APPLICANT ZONING DISTRICT.- DATB ORAITING NUYBSS BURLINGTON PROPERTIES INDUSTRIAL - OPEN SPACE SEPT., 2009 LIMITED PARTNERSHIP BGMB 85 MEADOWLAND DRIVE 1" = 120' C 1 SO. BURLINGTON, VT 05403 PROD. N0. 09202 Subdivison Plat Application Permit Number SD- - v APPLICATION FOR SUBDIVISION PLAT REVIEW X Preliminary X Final PUD Being Requested? X Yes n No All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. 1. OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Burlington Properties Limited Partnership, 85 Meadowland Drive, So. Burlington, VT 05403. 860-7200. 2. LOCATION OF LAST RECORDED DEED (Book and page #) Book 273, Page 265. 3. APPLICANT (Name, mailing address, phone and fax#) Burlington Properties Limited Partnership, 85 Meadowland Drive, So. Burlington, VT 05403, 860-7200. 4. CONTACT PERSON (Name, mailing address, phone and fax #) Stephen A. Vock, P.E. or Matthew J. Wamsganz, Civil Engineering Associates, Inc., 10 Mansfield View Lane, So. Burlington, VT 05403, 864-2323 x 313 or 303, 864-2271. a. Contact email address: svockn,cea-vt.com or matt(a>,cea-vt.com 5. PROJECT STREET ADDRESS: 85 Meadowland Drive. 6. TAX PARCEL ID # (can be obtained at Assessor's Office) 0860-01020C. Subdivison Plat Application 7. PROJECT DESCRIPTION a. General Project Description (describe what you are proposing): Subdivision of existing 80 acre lot into 4 lots. b. Existing Uses on Property (including description and size of each separate use): Dvnapower Corporation, 123,200 sf building w/ associated parking and utilities on 80 acre lot. c. Proposed Uses on property (include description and size of each new use and existing uses to remain): Dvnapower Corporation, 123,200 sf building w/ associated parking and utilities on 27.4 acre lot and 3 additional lots (6.7 ac, 4.9 ac. & 38.6 ac.). d. Total building square footage on property (proposed buildings and existing buildings to remain): 123,200 sf. (Existing). e. Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine): Existing Building +/-30', 2 floors. f. Number of residential units (if applicable, new units and existing units to remain): N/A. g. Number of employees & company vehicles existing and proposed, note office versus non -office employees): ��e S e— y� h. Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable): Interstate Highway Overlay District, Hinesburg Road - North View Protection Zone, Airport Approach Cone, Surface Water Buffer Standards, Class II Wetlands. i. List any changes to the subdivision, such as property lines, number of units, lot mergers, etc. N/A 9. LOT COVERAGE (ALL information MUST be provided here, even if no change is proposed) a. Size of Parcel: 80.0 (acres /sq. ft.) b. Building Coverage: See Table on SheetC1. Existing square feet % Subdivison Plat Application Proposed square feet % c. Overall Coverage (building, parking, outside storage, etc): See Table on SheetC1. Existing square feet % Proposed square feet % d. Front Yard Coverage(s) (commercial projects only): See Table on SheetC1. Existing square feet % Proposed square feet % 9. WETLAND INFORMATION a. Are there any wetlands (Class I, ll, or III) on the subject property? X Yes ❑ No b. If yes, is the proposed development encroaching into any of these wetlands associated 50' buffers (describe) There are Class II wetlands on Lots 3 & 4 but no development is proposed in the wetlands or associated buffer areas. c. If yes, please submit the following with this application: 1. A site specific wetland delineation of the entire property or a written statement that the applicant is relying on the City's wetland map. Since there is no proposed development associated with this subdivision the applicant has relied on the City's wetland mapping and some older delineation from the Meadowland Industrial Park for the 4 lot subdivision. Future development on Lot 3 or 4 will utilize new wetland delineation. 2. Response to the criteria outlined in Section 12.02(E) of the Land Development Regulations (applicant is strongly encouraged to have a wetland expert respond to these criteria) 10. AREA DISTURBED DURING CONSTRUCTION: 0 SQ. FT. * *Projects disturbing more than one (1) acre of land must follow the City's specifications for erosion control in Article 16 of the Land Development Regulations. Projects disturbing more than one (1) acre require a permit from the Vermont Department of Environmental Conservation. Subdivison Plat Application 11. COST ESTIMATES a. Building (including interior renovations): $N/A b. Landscaping: $N/A Please submit itemized list of landscaping proposed) c. Other site improvements (please list with cost) N/A 12. ESTIMATED TRAFFIC a. Average daily traffic for entire property (in and out): 859 b. A.M. Peak hour for entire property (in and out): 125 c. P.M. Peak hour for entire property (In and out): 133 13. PEAK HOURS OF OPERATION: 8 am - 5 pm 14. PEAK DAYS OF OPERATION: Monday -Friday 15. ESTIMATED PROJECT COMPLETION DATE: N/A 16. PLEASE LIST ABUTTING LANDOWNERS, INCLUDING THOSE ACROSS THE STREET. You may attach on a separate sheet. See Attached List 4 Subdivison Plat Application 17. PLANS AND FEE Plat plans shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (11" x 17") of the plans must be submitted. A subdivision application fee shall be paid to the City at the time of submitting the application (see Exhibit A). I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATURE OF APPLICANT E OF PROPERTY OWNER Do not write below this line DATE OF SUBMISSION: 11b1l, I have reviewed this preliminary plat application and find it to be: Complete Incomplete 1h Direcffir of Planning & Zoning or Designee PRINT NAME Date r (� CIVIL sI IGAI EERIl Ir ASSOClAMSO, 11 IC, 10 Mansfield View Lane South Burlington, VT 05403 March 10, 2010 Mr. Raymond Belair Administrative Officer City of South Burlington - Department of Planning and Zoning 575 Dorset Street South Burlington, Vermont 05403 Re: Application for Preliminary & Final Subdivision Review Burlington Properties Limited Partnership Meadowland Drive, South Burlington, VT Dear Ray: Phone: 802-864-2323 Fax: 802-864-2271 E-Mail: mail@cea-vt.com Please find attached an Application for Preliminary & Final Subdivision & fee, 5 full size sets of plans and 1 reduced (11 x 17) set of plans for the Burlington Properties Limited Partnership on Meadowland Drive. Burlington Properties Limited Partnership is seeking to subdivide their existing 80.0 acre lot into 4 lots total. All of the proposed lots meet setback & coverage requirements. An existing facility for Dynapower Corporation will remain on Lot 3 and Lots 1, 2 & 4 will remain undeveloped at this time. If you should require any additional information or should have any questions, please email me at maa(aa cea-vt.com or call me at 864-2323 x303. Sincerely, Matthew J. Wamsganz Project Manager Attachments: Application & fee 5 full size and 5 reduced plans Cc: Burlington Properties Limited Partnership Tom Heilmann P:WutoCADD Projects\2009\09202\09202 Belair Letter.doc Burlington Properties Limited Partnership September 2009 PARCEL ID 0860-00835F OWNER OF RECORD Hinesburg Rd, LLC c/o Jeff Davis 2 Church St. Burlington, VT 05401 0860-00896R WGM Associates c/o Nancy McGovern PO Box 9477 South Burlington, VT 05407 0860-01 OOOC Landrum Phillip Drumheller PO Box 130 Burlington, VT 05407 0860-01035R Mansfield View Properties LLC 1035 Hinesburg Rd. South Burlington, VT 05403 0860-01045R Mansfield View Properties LLC 1035 Hinesburg Rd. South Burlington, VT 05403 0860-01050L Spaniel Properties LLC 1050 Hinesburg Rd, Unit A South Burlington, VT 0403 and Avalanche Development LLC 35 Dorset Lane, Suite 201 Williston, VT 05495 0860-0106OR 0860-1070OR Gamal Eltabbakh 391 Hillspoint Rd. Charlotte, VT 05445 Gamal Eltabbakh 391 Hillspoint Rd. Charlotte, VT 05445 1 0 0860-01061 L Arthur Rye & Bernice Brisson Trust 63 Sam Web Rd. Fairfax, VT 05454 0860-0100R East Mountain View LLC 1100 Hinesburg Rd, Suite 201 South Burlington, VT 05403 1 155-00284C Munson Earthmoving Corp. 85 Shunpike Rd. Williston, VT 05495 1155-00317C Grandview Farm Inc. PO Box 1304 Burlington, VT 05402-1304 1715-00073C The Rock of Greater Burlington, Inc. PO Box 464 Milton, VT 05468 0257-00065 Grandview Farm Inc. c/o Birchwood Burlington, LLC 5524 West Cypress St., Suite B Tampa, FL 33607 0257-00104C Super -Temp Realty Company Inc. 133 Elm St. Winooski, VT 05404 0860-IZ 1 150E Green Acres Inc. c/o Mark Goodrich PO Box 2123 South Burlington, VT 05407 Vermont Agency of Transportation Secretary's Office One National Life Drive Montpelier, VT 05633-5001 P) a s-' I t e r' RENEWABLES �(J Susan Hudson Vermont Public Service Board 112 State Street Drawer 20 Montpelier, VT 05620-2701 Re: Dynapower Corporation NM application Dear Sue, Attached, please find our net metering application filed on behalf of Dynapower Corporation for a proposed (2) NW100 wind turbines installation and utility energy storage & demand response system. This application includes: PSB application form List of property abutters Project Construction summary One line diagram of the entire installed system Dynapower's daily load profile chart NW100 specifications Google Earth depiction of 2 turbine installation Photo simulation View Shed analysis and narrative Green Mountain Power letter of support A full copy of the CPG and exhibits has been sent to the parties listed below. A cover letter and the CPG application have been sent to all property abutters. Copies of the technical exhibits will be made available upon request by any property abutter. FAA approval has been submitted and will be forwarded upon receipt. Thank you for your support with this project, should you have any questions, please contact us via phone or email. Sincerely, t— Nils Behn, Director - Wind Division Alteris Renewables, Inc. cc: VT Department of Public Service Public Service Board Agency of Natural Resources, Planning Division Town of S. Burlington Planning Commission Town of S. Burlington Select Board Green Mountain Power 5197 Main Street Suite 2A 1 Waitsfield, VT 05673 1 t: 877,229.1588 1 f: 802.329.2218 1 www.alterisine.com State of Vermont Public Service Board Application for a Certificate of Public Good for Interconnected Net. Metered Power Systems General Instructions: Applicants must complete sections 1-3 and any other sections applicable to the type of system to be installed. Specific instructions for each type of system are included under the applicable section. For example, an applicant for a wind turbine system must complete sections 1-3, 5 and 8. Failure to complete all applicable sections of this application may result in delay or denial. Once the application form is completed, the applicant must mail the applicable sections of the completed application to the Public Service Board, the Vermont Department of Public Service, the applicant's respective utility, and to all other parties as specified in each of the sections applicable to the net metering project. For example, an applicant for a photovoltaic system installed on an existing structure is required to mail copies to the Public Service Board, the Department of Public Service, and his or her utility. Applicants must also submit a list of the persons that they have mailed a copy of the application in accordance with the instructions for each type of installation along with the completed application. It is recommended that the applicant contact their utility prior to applying for a certificate in order to determine whether the utility's capacity regarding net metering projects has been met. Please contact the Public Service Board at (802) 828-2358 if you have any questions regarding this application form. Notice To Those With Concerns About The Net Metering Proposal If you have received a copy of this application, you have the opportunity to comment on the project and to request a hearing before the Public Service Board to raise any concerns you may have regarding this project. For all systems with the exception of photovoltaic systems on existing structures, if you wish to comment to the Public Service Board about this proposal or request a hearing, you must file the comments and/or requests for hearing with the Board within 30 days of the date that the application was sent to the Board and all required parties. With respect to photovoltaic systems on existing structures, if you wish to comment to the Public Service Board about this proposal or request a hearing, you must file the comments and/or requests for hearing with the Board within ten working days of the date that the application was sent to the Public Service Board and all required parties. If you request a hearing, you must make a showing that the application raises a significant issue regarding one or more of the substantive criteria pursuant to 30 V.S.A. § 248. The Board may determine to hear evidence on the issue if it concludes that the project raises a significant issue with respect to one or more of those substantive criteria. Comments and requests for a hearing must be in writing and sent to the Board at 112 State St., Drawer 20, Montpelier, VT 05620-2701. If you have any questions, contact the Clerk of the Public Service Board at (802) 828-2358, e-mail address: psb.clerk@state.vt.us. Applicant ' Information (Please print all information clearly) Name: Dvnapower Corporation Service Address (please include street name and number; no P.O. Town/City/State: South Burlington, Vermont Zip Code: 05403 Mailing Address (if different from above): Daytime telephone: Utility Account #:Green Mountain Power-162063 Property owner name (if different than above): Mailing address: Town/City/State: Zip Code: Daytime Telephone: boxes): 85 Meadowland Drive Date application was sent to the Public Service Board and other parties as required by type of net metering project: September 25, 2009 Applicant must indicate the date the application was sent to the Board and other parties, and also submit a list of the names and addresses of the parties notified of this application along with the completed application. Installer InformationSection Installer Name: Alteris Renewables, Inc. Mailing Address: 5197 Main Street, Ste 2A Town/City/State: Waitsfield, VT Zip Code: 05673 Daytime Telephone: (802) 496-5157 Certification Section The undersigned declares, under the pains and penalties of perjury, that: (1) having exercised due diligence and made reasonable inquiry, the information which I have provided on this form and any attachments is true and correct to the best of my knowledge; (2) the project for which this application seeks approval is in compliance with the land conservation measures contained in the applicable Town Plan which would apply if the project were not subject to 30 V.S.A. § 248; (3) the project is in compliance with all applicable state and federal requirements and has the necessary approvals for operation of this type of system; (4) any waste generated by the construction of this project will be disposed of at a state -approved disposal facility; (5) any construction activities will follow the recommendations of the Vermont Erosion Control Handbook (available from the Agency of Natural Resources, 1-802-241-3770); (6) the system is covered by an insurance policy with a minimum general liability of $100,000 for residential systems and $300,000 for non-residential sites; (7) the system will be installed in compliance with the interconnection safety and technological requirements of Public Service Board Rule 5.100; and (8) I have sent a copy of this complete application to all parties as required by this form. Making false or misleading statements on this application is subject to penalties under 30 V.S.A. § 30 and/or revocation of any approval granted. SignatureDate /O y Applicant If installing a photovoltaic (PV) system, complete Section 4.* If installing a wind system complete, Sections 5 and 8. If installing another type of net metering system, complete Sections 6 and 8. If installing a group system, complete the sections applicable to the net metering system employed and Section 7. *Some PV systems must complete Section 8 (environmental information). See instructions in Section 4 below. - Section 4. PV Module Manufacturer: Module Model Number: Number of Modules: Power Rating per Module: DC Watts Total Array Output: DC Watts (no. of modules x power rating) System Rated Output: AC Watts (total array output x .95) Inverter Manufacture: Inverter Model Number: Inverter's Continuous AC Rating: AC Watts Describe the physical location of the installation and/or mounting structure: Describe the physical location of the facility's lockable disconnect switch: State whether you are installing your PV system on (answer yes or no): an existing home or business a new home or business_ a pole mount_ other (please describe) If you are installing a system that is not attached to a an existing or new home or business, you must also complete Section 8 of this application. Notice Requirements: If you are installing a PV system on a new or existing home or business, you must send copies of this application to the Public Service Board at 112 State Street, Drawer- 20, Montpelier, VT 05620-2701, the Vermont Department of Public Service at 112 State St., Drawer 20, Montpelier, VT 05620-2601; and your utility. If you are otherwise installing your PV system on a new structure, such as a pole mounted system, then you must send a copy of the application to the Public Service Board, the Vermont Department of Public Service, your utility, the Planning Division, Agency of Natural Resources, Center Building - Third Floor, 103 South Main Street, Waterbury, VT 05671-0301; your local planning commission; the municipal legislative body for the town in which the system is to be installed (typically, the selectboard); and all adjoining landowners. Please note that all applicants must submit a list of the parties notified along with the completed application. Wind System Information " 5. Wind Turbine Manufacturer: Northern Power Systems, Barre VT Turbine Model Number: 2 Northwind 100s Turbine Tower Height: 121 ft each turbine Rotor Diameter: 69 ft each turbine Wind Turbine Power Output: 100 KWs each turbine (Peak output up to 30mph wind speed) AC Source (circle one): Synchronous Generator Describe the physical location of the installation and/or mounting structure: Please see the attached detail Describe the physical location of the facility's lockable disconnect switch: Please see the attached detail If using an inverter, complete the following: Inverter Manufacturer: The NW 100 turbine inverter is manufactured by Northern Power Systems (turbine manufacturer) and is integrated into the turbine in the nacelle. Inverter Model Number: Inverter's Continuous AC Rating: 100,000 AC Watts each turbine System Rated Output: 95,000 AC Watts each turbine (wind turbine power output x .95) All applicants for wind systems must also complete Section 8 (Environmental Information) below. Notice Requirements: If interconnecting a wind system, you must send copies of this application to the Public Service Board at 112 State Street, Drawer 20, Montpelier, VT 05620-2701, the Vermont Department of Public Service, 112 State St., Drawer 20, Montpelier, VT 05620-2601; your utility; your local planning commission; the municipal legislative body for the town in which the system is to be installed (typically, the selectboard); the Planning Division, Agency of Natural Resources, Center Building - Third Floor, 103 South Main Street, Waterbury, VT 05671-0301; and your adjoining landowners. Please note that all applicants must submit a list of the parties notified along with the completed application. (Please see the attached list of property abutters) Other Types of Systems ' Description of the type of net metering system employed (fuel cell, hydroelectric, biomass, etc.) Manufacturer: Model Number: Rated Power Output (AC continuous): System Rated Output (power output x .95) : AC Watts AC Source (circle one): Inverter Synchronous Generator Induction Generator Describe the physical location of the installation and/or mounting structure: Describe the physical location of the facility's lockable disconnect switch: If using an inverter, complete the following; Inverter Manufacturer: Inverter Model Number: Inverter's Continuous AC Rating: AC Watts Describe the physical location of the installation and/or mounting structure: Describe the physical location of the facility's lockable disconnect switch: All applicants for systems under this section must also complete Section 8 (Environmental Information) below. Applicants for hydroelectric systems must submit copies of all necessary federal and state approvals for the project along with this application. Notice Requirements: If interconnecting a system, you must send copies of this application to the Public Service Board at 112 State Street, Drawer 20, Montpelier, VT 05620-2701, the Vermont Department of Public Service, 112 State St., Drawer 20, Montpelier, VT 05620-2601; your utility; your local planning commission; the municipal legislative body for the town in which the system is to be installed (typically, the selectboard); the Planning Division, Agency of Natural Resources, Center Building - Third Floor, 103 South Main Street, Waterbury, VT 05671-0301; and your adjoining landowners. Please note that all applicants must submit a list of the parties notified along with the completed application. Please note that in order for a system to be eligible for net metering it must employ a renewable energy source that is being consumed at a harvest rate at or below its natural regeneration rate, pursuant to Board Rule 5.100. R, M, - Section 7. If interconnecting a group system, applicants must provide the required application information corresponding to the type of net metering systems) to be constructed as outlined in sections 4-6. In addition, applicants must also provide on a separate sheet: (1) the meters to be included in the group system identified by account number and location; (2) a method for adding and removing meters included in the group system; (3) a designated person, including address and telephone number, responsible for all communications from the system to the serving electric utility, for receiving and paying bills for any service provided by the serving utility for the system, and for receiving and other communications regarding the group system; and (4) a binding process for the resolution of any disputes within the group system relating to net metering that does not rely on the serving electric utility, the Public Service Board or the Department of Public Service. Applicants for group systems must also provide a map or site plan showing the property on which the generation facility is located and the locations of the group members' properties. Please note that all meters included in a group system must be within the same electric utility service territory in which the generation facility is located. Environmental Information You must complete this section if you are installing any one of the following: X A PV system on a new structure which is not a home or a business under Section 4 X A wind system under Section 5 X A system under Section 6 (1) State whether the system will be sited on, near, or within any of the following (answer yes or no): a floodway NO shoreline NO stream NO wetland NO historic site or district NO rare and irreplaceable natural area NO necessary wildlife habitat NO area where an endangered species is present NO If the answer to any one of the foregoing is yes, please attach a separate sheet: (a) showing the location of the system in relation to the resource, and (b) stating the impact which the system, including its installation, will have on the protected resource and what measures, if any, will be taken to minimize any such impact. (2) On a separate sheet, describe the visible and aesthetic impact of the project and why it will not have an undue adverse effect on aesthetics and the scenic and natural beauty of the area. Include a specific statement about the visibility of the facility from adjoining properties; and, if it is highly visible, what measures you have taken, if any, to minimize the visible impact. (Please see the attached Google Earth images, Photo Simulation and Viewshed analysis and narrative.) Name Street Address City 896 Hinesburg Road South Burlington 900 Hinesburg Road South Burlington 1060 Hinesburg Road South Burlington State Zip WGM Associates VT 05403 WGM Associates VT _ 05403 Eltabbakah Gamal VT 05403 _ Avalanche Development LLC _ 1050 B&C Hinesburg Road South Burlington VT 05403 Spaniel Properties LLC 1050 A Hinesburg Road South Burlington VT 05403 Eltabbakah Gamal _ 1070 Hinesburg Road South Burlington VT 05403 _ East Mountain View LLC 1100 Hinesburg Road South Burlington VT 05403 _ Green Acres Inc. _ _ _ _ 1150 Hinesburg Road Mansfield View Properties LLC _ 1035 Hinesburg Road Mansfield View Properties LLC 1045 Hinesburg Road _ Rye Arthur & Brisson Bernice 1061 Hinesburg Road Grandview Farm c/o Birchwood Burlington LLC 5524 West Cypress Street Suite B Super Temp Realty Company Inc 133 Elm Street Landrum _ _ _ Box 130 _ Rock of Greater Burlington Inc. PO Box 464 South Burlington South Burlington VT VT 05403 05403 South Burlington VT 05403 05403 South Burlington VT !Tampa FL 33607 !Winooski VT 05404 Burlington =VT 05407 Milton _ JVT 05468 solar C- thermal J alteris-, RENEWABLES wind C� Project Construction summary Pre Construction Preparation: Dynapower has taken significant measures to understand its internal electrical demand including detailed data collection and continued monitoring. This data has dictated the generation and storage size as proposed and is available upon request. Design: The energy management design will be coordinated by Jack McCarthy, Dynapower's Technical Director who has 20 full time electrical engineers with significant high power experience. The UL1741 certified inverter technology will be designed into a custom enclosure that houses the energy storage system. The wind engineering will be coordinated by Alteris Renewables. This effort will include wind turbine foundation, tower structural and electrical design. A full civil survey of the proposed site will be performed for all components with the granting of the CPG. Construction Activities: After CEDF funding is secured the following work will commence Site Preparation (month one) Once permits for construction are received, work will begin on prepping the location for the turbine installation. A site work plan incorporating best practices, and in accordance with local and national electrical and building codes, will be developed and subcontractor construction activities will be managed under this plan. At the wind turbine locations, erosion control measures will be put into place, the area will be prepared for the foundation. A 10' diameter foundation hole will be excavated as will trenching for conduit from the turbine location to the existing building switchgear. Additional site work will include a 44' x 11' pad for mounting the energy storage system enclosure, and trenching for electrical interconnections to the power conditioning equipment in the main building The turbine staging area and all areas where there will be modification to the existing landscape will be prepared and restored using the site work plan including, fencing, erosion mitigation measures, and reseeding and mulching as appropriate. Distribution Line & Switch Gear (month one) Electrical and control cable from the energy storage system enclosure and wind turbines to the electrical and controls infrastructure within the main building will be installed after CPG approval. 5197 Main Street Suite 2A Waitsfield, VT 05673 t: 877.229.1588 f: 802.329.2218 www.alterisinc.com The contractor will connect the buried electrical line to the utility service in the existing building and to the transformers at the wind turbines. The feed from the transformers will be 480VAC. Utility disconnect switches will be located at both locations. Foundation (month one) The contractor will transport all foundation materials to the work site. The wind turbine foundations will be formed per a design by Patrick and Henderson which will be completed shortly after approval of all permits. Embedded foundation conduit, foundation grounding, and tower embedment ring and bolts will be put in place per engineered design in preparation for pouring concrete. The foundation contractor will also form and pour the turbine transformer pads. Conduit will be run through the foundation and transformer pads and out to the existing conduit going to the building switchgear. All work will be inspected to ensure compliance to foundation design and tolerances. An inspection report will be submitted to the foundation designer for verification of compliance. The foundation will be given a minimum of 20 days to cure. Turbine Installation (month two) A transformer will be installed on the transformer pad. When the tower, turbine nacelle and blades arrive at Dynapower they will be off loaded with a 60 ton crane. Once all equipment is staged at the site, a 115 ton crane will be brought to the site for turbine erection. Due to proximity to the Burlington International Airport FAA approval will be secured for crane work. With the materials on site we will proceed to erect the towers. Work will only proceed when environmental conditions are favorable and a safe working environment is confirmed. Construction of the tower, nacelle and blades will be supervised at all times by personnel who have been through the Northern Power installation training. On the day following tower erection, the turbine nacelle will be placed on top of the tower while the rotor is being assembled and the blades are pitched. With the nacelle in place, the rotor will be fitted and secured. Tag lines will be used for stabilization, safety and orientation of equipment during installation. Energy Storage System (month two) After preparation of the site with a pad and wiring in place, the prefabricated enclosure will be placed on the pad. The energy storage container, complete with enclosed inverter and controls will then be electrically grounded at the installation site. AC Power will enter through the pad at the bottom of the enclosure and be connected to landings under the switchgear. Approximately 1600 batteries will be delivered separately and installed in the racks inside the enclosure prior to making final DC connections. Final wiring and commissioning (month two) After all components of the total system are installed all remaining connections to the transformers, power conditioning equipment, power converters, and inverters, and subsequently the grid connection will be made by a master electrician. Wireless turbine HMI ("SmartView") will be initialized. Final commissioning for the turbines will be completed with the assistance of Northern Power technicians and will have factory sign off. 5197 Main Street Suite 2A Waitsfield, VT 05673 t: 877.229.1588 f: 802.329.2218 www.alterisinc.com Dynapower personnel will be trained on the "SmartView" monitoring system for the wind turbine and will be provided with all project documentation. 5197 Main Street Suite 2A I Waitsfield, VT Q5673 I t: 877.229.1588 1 f: 802.329.2218 1 www.alterisinc.com ci alteris TIM RENEWABLES The one line diagram below shows the entire energy storage and demand response system layout. solar ICU J thermal wind CC The pilot demonstration system will consist of a battery based energy storage component, a highly efficient power electronic inverter, wind & solar (CPG application for the solar component of this system will be submitted by our Montpelier office) renewable generation and the associated controls to manage the system and communicate with the utility. The project will demonstrate how the technologies necessary to manage the power transfer, control and communication among the various components of the system in order to optimize the benefits. Environmental impact and social benefits will be realized through significant onsite generation with a total installed generation capacity of 351kW and onsite energy storage of 1MWhr and power of 1.5MW. This project will be a highlight of renewable integration in Vermont and a blueprint for industrial and community installations. ALTERS WIND SC OFE CF _APPLY (?COKW) ALTERIS SOLAR SCOPE OP SJPPLY k 101 KW) TUR3INE 1 TUR3I1NE 2 �-�Hi:H� I DYNAPON'ER ENERGY NANACiENENr SYSTEM .-r.erv+ �I s •rv..»... w IIMWMR I.3MW1 •9rrrwr Ci ,wwcre I � 111J � ® I_.. _. - 4 � + I -4 -,- •iwwnvO•>+�uaq I I I 6J Yf iP kWr (.��w lra ra.rl OangwY. -D I • — f `-1--� I EXISTING EOUIPNENr _ ..-. _.. ._ _.. _. _' _ .'- __ __ _ �� o.w mix ere ec•:•.«x: •w •I �: rvn._• 5197 Main Street Suite 2A 1 Waitsfield, VT 05673 1 t: 877.229.1588 1 f: 802.329.2218 www.alterisinc.com ci alteris TM RENEWABLES Dynapower daily load profile CLJ GL Many industrial facilities have electrical load profiles that require significant additional peak demand generation capacity (see graph below) to be online to provide power as their power usage peaks at various load cycles throughout the day or season. This additional peak capacity requires the utility to design their delivery infrastructure to handle these power peaks at significant added cost to the utility and subsequently rate payers. Dynapower in South Burlington VT is no exception. While producing power conversion equipment for many industries, assemblies are fabricated and tested at different rates which generate peak demand from the serving utility. The addition of distributed generation on the grid, specifically located and feeding peak power users such as Dynapower will reduce the stress on the local grid. Combining the benefits of renewable generation with energy storage will optimize the use of the variable renewable generation source further benefiting the utility and the industrial end user. Communication between the utility and the system will provide the utility knowledge of the status of the system, predicted availability and reserve capacity in both directions. The utility may demand the use of energy reserves located in the storage and/or provide excess power to the system to best suit its needs. Typical Dynapower Daily Load Profille (24 hr) 600 500 400 300 200 100 0 Y N O N O 0 lh N N O N O Ih Oi N O �O Ih Gf O N V O 5197 Main Street Suite 2A 1 Waitsfield, VT 05673 1 t: 877.229.1588 1 f: 802.329.2218 1 www.alterisinc.com r'-sPec,Of1cac17tio7 Power Curve: 21-Meter Rotor standard Air Density (1.225 kgim3) Wind Speed Powel 120 IN 1 lkWcv (m/s) (kWe) 0 14 97.3 f 3 - -- 16 100.8 - so / 4 17 100.6 5 0.5 18 99.8 6 9.J 19 09.4 29.4 20 98.6 8 41.0 21 97.8 j1= 40 : - 9 54.3 22 97.3 10 66.8 23 97.3 20 1 77.7 24 98.0 u 86.4 25 99.7 0-, 13 92.8 0 1 2 3 4 5 6 7 8 9 10 IL 12 13 14 15 16 17 18 19 20 21 22 23 24 25 -- _ Mod Ijj)Pt?(I at Huh hF',ght lm/:i) Iinl;,=2.",4 nipn Annual Energy Production*: 21-Meter Rotor standard air Density, Rayleigh wind speed Distribution 400 /. 350 300 250 200 150 .. a.-. 100 50 - fi 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 Annual Average Wind Speed at Iluh iwight (m/s) Avwuiie Annn,11 Wind Speed (mph) 8.9 Avr rage Annual Wind SI,)eed (m/9) 4.0 Annual Energy Output (MWh/yr) 77 10 4.5 110 11 5.0 145 12 5.5 183 13 6.0 222 15 6.5 260 16 TO 298 17 7.5 334 18 8.0 368 19 8.5 400 *Annual enemy rood-CtCn asnrlates standard cendr5o,a5, !CCX, avadasi,ty assume and no losses. l Specifications GENERAL CONFIGURATION Model DESCRIPTION Northwind 100 Design Class IEC IIA (air density 1.225 kg/m', average annual wind below 8.5 m/s, 50-yr peak gust below 59.5 m/s) Design Life 20 years Hub Height 37 m (121 fU Tower Type Tubular steel monopole Orientation Upwind Rotor Diameter 21 m (69 ft) Power Regulation Variable speed, stall control PERFORMANCE Rated Electrical Power DESCRIPTION (standard conditions: air density of 1.225 kg/m', equivalent to 15°C (59°F) at sea level) 100 kW, 3 Phase, 480 VAC, 60 Hz Rated Wind Speed 14.5 m/s (32.4 mph) Maximum Rotation Speed 59 rpm Cut -In Wind Speed 3.5 m/s (7.8 mph) Cut -Out Wind Speed 25 m/s (56 mph) Extreme Wind Speed 59.5 m/s (133 mph) WEIGHT Rotor (21-meter) DESCRIPTION 1,400 kg (3,100lbs) Nacelle (standard) 5.800 kg (13.000lbs) Tower (37-meter) 13,800 kg (30,000lbs) DRIVE TRAIN Gearbox Type DESCRIPTION No gearbox (direct drive) Generator Type Permanent magnet, passively cooled BRAKING SYSTEM Service Brake Type DESCRIPTION Two motor -controlled calipers Normal Shutdown Brake Generator dynamic brake and two motor -controlled calipers Emergency Shutdown Brake Generator dynamic brake and two spring -applied calipers YAW SYSTEM Controls DESCRIPTION Active, electromechanically driven with wind direction/speed sensors and automatic cable unwind CONTROL/ELECTRICAL SYSTEM Controller Type DESCRIPTION DSP-based multiprocessor embedded platform Converter Type Pulse -width modulated IGBT frequency converter Monitoring System SrTiartView remote monitoring system, ModBus TCP over ethernet Power Factor Set point adjustable between 0.9 lagging and 0.9 leading Reactive Power +/- 45 kVAR NOISE Apparent Noise Level DESCRIPTION 55 dBA at 40m (131 ft) ENVIRONMENTAL SPECIFICATIONS Temperature Range: Operational DESCRIPTION -20°C to 50°C (-4°F to 122°F) Temperature Range: Storage -40°C to 550C (-40°F to 131°F) IP Class: Generator/Nacelle IP55AP54 Lightning Protection Receptors in blades, nacelle lightning rod and electrical surge protection solar �J i �� s thermal �(.,JaIt e r RENEWABLES wind C(J Google Earth image of 2 NW 100 turbine installations at Dynapower Corporation, 85 Meadowland Drive, S. Burlington, VT 05403: The proposed proposed location for the 2 wind turbines is directly west of Dynapower's building (building on the right). Turbine orientation and spacing will be optimized on the site to take best advantage of the prevailing wind and reduce the potential for rotor wash from one turbine to the other. Most of the lands surrounding the project area are built on with predominately light industrial and/or commercial uses. Dynapower itself is a large facility and the placement of the turbines will fit the landscape without looking out of place. The visibility from I89 is very beneficial to statewide awareness of renewable energy generation efforts in Vermont. 5197 Main Street Suite 2A i Waitsfield, VT 05673 1 t: 877.229.1588 1 f: 802.329.2218 www.alterisinc.com ■ .10 - e t .F� �z c Mppp�hg b I Cm A AM M � I. .4, 1 1.­ f I Dynapower Northwind 100 Viewshed Analysis 41, Viii, Nr *W X, ;u L 71 ism 7 1 ski IL or Systems -D-ps.-duo-i-L�,,�F�-rgreen-Mpxt-d- W o o•v CD e fes w - Spatial Analyst 1. LNG k v _AL .Z Viewshed Determination A "traditional" approach for Viewshed analysis involves calculating the locations from which a wind turbine would be seen using topographic GIS data. We have done this using available elevation models provided to and for the State of Vermont. We have also included a vegetation calculator which adds 40 feet of elevation to any areas which are designated as forest cover, based upon a Land Use Land Cover map (2006) provided for the State of Vermont. While this Viewshed accurately represents locations from which the turbines at Dynapower will be seen, we are not able to take into consideration all the aspects a real time, on the ground analysis would provide. This is in part due to new and existing buildings, seasonal changes, quality of sight, and other aspects of built environments. Normally, terrain dominates the issue of visibility. Given Dynapower's relatively flat location, our Viewshed map greatly overestimates on the ground visibility of the proposed wind turbines. There is a currently a wind turbine located at the Dynapower site. While the AOC15-50 wind turbine currently onsite is not as tall as the Northwind 100 (approximately 100 feet as opposed to the proposed 156 feet), it provides an example of what a significantly sized tower looks like at that location, and where it can be seen from surrounding locations. We believe the Northwind 100 wind turbines are well adapted to this landscape as they are modest in size and suited for such applications as large businesses, office buildings, schools, or universities. GREEN MOUNTAIN POWER Mr. Adam Knudsen Chief of Operations Dynapower Corporation 85 Meadowland Dr. South Burlington, V'1' 05403 RE: Green Mountain Power Partnership with Dynapower on the DREMS-DP Dear Adam: Green Mountain Power (GMP) is very excited to collaborate, as a partner, with you in the Demand and Renewable Energy Management Demonstration Project (DREMS-DP). Our team at GMP has created an Energy Plan that includes the deployment of Renewable Energy solutions. The Demonstration Project technology contains storage capabilities that compliment GMP's need to regulate the Renewable energy release to our distribution system during peak times. This provides many benefits to our delivery system and to our customers. One benefit includes the flattening of our load curve allowing us to avoid expensive market power costs to cover our peaks; this is an economic benefit to our customers. This technology will also benefit GMP in its efforts to deploy smart grid technology over the next few years. We appreciate having a company, such as Dynapower in our service territory that has the technical expertise, an understanding of the power delivery business and a mechanism to assist in providing an efficient energy storage solution. We believe Dynapower's solution has the potential to impact not only Vermont electric utility customers but utility customers globally. We are very eager and anticipate working with your team on the DREMS- Demonstration Project. Best regards, Don Lorraine Commercial Account Manager Cc: Robert Griffin -- VP of Risk and Power Supply GMP Robert Dostis — Director of Customer Relations and External Affairs GMT' Ken Couture — Manager of Engineering GMP Green Mountain Power Corporation 163 Acorn Lane Colchester Vermont 05446.6611 P(802)864.5731 F(W2)655-8419 www.gmpvt.com / DEVELOPMENT REVIEW BOARD 6 OCTOBER 2009 PAGE 7 can go ahead with something that is not in the spirit of what the "people" want. Mr. Behr explained that the Board has very little right to deny a project that fits within the regulations. If they do, and if it then goes to Court, the city would have no ease. Mr. Seff, President of Swift Estates, asked if there has ever been a project built using TDRs. Mr. Belair said there has. Ms. Quimby then moved to continue Sketch Plan Application #SD-09-42 Of Gary Farrell et al until 17 November 2009. Mr. Farley seconded. Motion passed unanimously. 8. Sketch Plan Application #SD-09-43 of O'Brien Family LLC, for a planned unit development consisting of subdividing a 64.51 acre parcel into nine lots ranging in size from 1.5 acres to 23.1 acres, 200 Old Farm Road & Kimball Avenue: Ms. O'Brien showed the location of the area. She noted there are 3 zones within the parcel. Lot #1 is zoned C-1, Lots #2-8 are zoned I-C, and Lot #9 is R-l. No development is planned for lot #9 at this time. Mr. Homestead indicated they are proposing a new city street ending in a cul de sac with future connection to Tilley Drive. He showed the location of this on an aerial photo. They are approximating the intent of the road on the official city map. They have reasons for not wanting it where it is on the map. Their proposal for the road would skirt an area of ledge so there would be less slope and less blasting. Mr. Homestead showed existing curb cuts. They are proposing one additional curb cut to access lot #1. Lot #8 would be accessed off the new road. Plans for this will be submitted to the Fire Chief. Mr. Knudsen questioned how curb cuts line up with those across the street. Mr. Homestead said there is a Class 2 wetland across from the curb cut on the opposite side of the road and a very steep slope across from another curb cut. Ms. LaRose noted that when Exit 12B is built, there could be a light in this area. Access should be lined up with the location of that light as there could be significant traffic in the area. Ms. O'Brien stressed the amount of ledge involved. Mr. Behr said the Board has to be sure that in the future this road won't be a major issue for the city. Mr. Behr said the Board will also want to see a potential plan for build -out. The applicant wouldn't be held to it, but the Board needs an idea about potential sharing of accesses, etc. The Board agreed to let the applicant go on to preliminary plat with the understanding that the Board would rule on whatever the applicant proposes to deal with issues raised. 9. Sketch Plan Application #SD-09-46 of Burlington Properties Limited Partnership for a planned unit development to subdivide a 77.6 acre parcel into four lots ranging in size from 4.9 acres to 38.6 acres, 85 Meadowland Drive (Dynapower): DEVELOPMENT REVIEW BOARD 6 OCTOBER 2009 PAGE 8 Mr. Belair indicated the issues that concern staff. Future access to lots 1 & 2 must be indicated. The applicant should meet with the Rec Path Committee and should adhere to their recommendations regarding the location of the rec path. All new utility lines, etc., must be underground. Finally, there must be a survey of the property done by a licensed surveyor and submitted with preliminary plat. The Board had no issues. An abutting neighbor raised an issue concerning signage. He noted that with the subdivision, the Lane Press sign is now off the premises, and this is not allowed. With the proposed new subdivision, the Dynapower sign will also be off the Dynapower premises. The question of grandfathering the sign locations was raised. Mr. Belair noted that there is no grandfathering for signs. He added that if this were a PUD with just one lot, it would be different story; however, individual property lines are being proposed. Mr. Behr noted that without the property lines, the applicant can't sell the lots. The applicant said this will have to be discussed with the client. A strip of private road in front of the 2 properties that could contain the signs was suggested. Mr. Belair reminded the Board that they do not have jurisdiction over signage. As there was no further business to come before the Board, the meeting was adjourned at 11:40 p.m. wl Clerk J /1) /l1 Date CITY OF SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD \drb\sub\meadowland\sketch_41ot.doc DEPARTMENT OF PLANNING & ZONING Report preparation date: September 30, 2009 Application received: September 25, 2009 MEADOWLAND DRIVE— 4- LOT SUBDIVISION SKETCH PLAN APPLICATION #SD-09-46 nda #9 Meetino Date: October 6. 2009 Owner/Applicant Burlington Properties Limited Partnerhsip 85 Meadowland Drive South Burlington. VT 05403 Engineer/Surveyor Property Information Stephen Vock, P.E. Tax Parcels 0860-01020C Civil Engineering Associates Inc Industrial Open Space Zoning District 10 Mansfield View Lane 77.6 acres South Burlington, VT 05403 Location Map CITY OF SOUTH BURLINGTON 2 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\meadowland\sketch 4-lot.doc Burlington Properties Limited Partnership, hereafter referred to as the applicant, is requesting sketch plan review of a planned unit development to subdivide a 77.6 acre parcel into four (4) lots ranging in size from 4.9 acres to 38.6 acres, 85 Meadowland Drive. Associate Planner Cathyann LaRose and Administrative Officer Ray Belair, referred to herein as Staff, have reviewed the plans submitted on September 25, 2009 and have the following comments. Zoning District R Dimensional Requirements Table 1. Dimensional Requirements 10 Zoning District_ Required Proposed Min. Lot Size 3 acres 4.9 acres 4Max. Building Coverage 40% 10.3% Max. Overall Coverage 70% 26.3% Min. Front Setback 30 ft. 135 ft Min. Side Setback 10 ft. 82 ft Min. Rear Setback 30 ft. 790 ft zoning compliance The only lot with an existing building is Lot 3. All other lots are vacant at this time. SUBDIVISION CRITERIA Pursuant to Section 15.18 of the South Burlington Land Development Regulations, subdivisions should comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. According to Section 15.13 of the South Burlington Land Development Regulations, the existing public water system should be extended so as to provide the necessary quantity of water, at acceptable pressure. According to Section 15.13 of the South Burlington Land Development Regulations, the subdivider or developer should connect to the public sewer system or provide a community wastewater system approved by the City and the State in any subdivision where off -lot wastewater is proposed. Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. There are no new buildings proposed as part of this application; therefore these criteria are not applicable. The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. CITY OF SOUTH BURLINGTON 3 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\meadowland\sketch 4-lot.doc The plans do not appear to depict the proposed access for Lots 1 and 2. While this will need to be finalized when buildings are proposed for the subject lots, the Board should give direction at this stage as to a general location of an entrance, as well as where they should not be located. Staff strongly recommends that the access to Lot 1 NOT be from Hinesburg Road, and that it preferably be accessed from the private drive rather than Meadowland Drive. Lot 3 will likely not include any further development and Lot 4 will be accessible via Bowdoin Street. 1. The Board should discuss future access to Lots 1 and 2. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. The plans that the applicant submitted depict a Class II wetland on the subject property. At this time, no new buildings are proposed. If the applicant proposes any development in the wetlands or their associated 50' wide buffer, a Conditional Use Determination (CUD) shall be required from the State of Vermont. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. Staff feels that the proposed subdivision of land is in keeping with the planned development patterns of Industrial Open Space Zoning District. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. As buildings and other associated development are not being proposed as part of this application, this criteria in not applicable at this time. The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate Fire protection can be provided. The South Burlington Fire Chief has stated that he will review site plans at the time development is proposed. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. The Recreation Path Committee reviewed the plans at the time of the original subdivision of land. They should review the plans again. Staff recommends a 20 foot recreation path easement along Hinesburg Road, consistent with other properties in the vicinity. 2. The applicant should meet with the Recreation Path Committee. The applicant shall adhere to the recommendations of the Recreation Path Committee. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. CITY OF SOUTH BURLINGTON 4 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\meadowland\sketch 4-lot.doc 3. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications should be underground. The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). Staff feels the proposed subdivision of this property is in conformance with the South Burlington Comprehensive Plan. Landscaping As there are no buildings proposed as part of this application, there is no minimum landscaping budget. Other 4. The preliminary plat submittal should include a property boundary survey prepared by a licensed land surveyor. Staff recommends that the applicant address the numbered items in the "Comments Section" of this document and include the changes in the preliminary plat application. Respectfully submitted, C thyann aRose, Associat Planner Copy to: Steve Vock, contact for applicant \ \ \ SITE ENGINEER: DIME NAL SUMMARY \ \ \ EXISTING PROPOSED PROPOSED PROPOSED PROPOSED J J) RECEIVE �P REQ'D. CONDITIONS LOT 1 LOT 2 LOT 3 LOT 4 LOT AREA 3 AC 80.0 AC 6.7 AC 4.9 AC 27.4 AC 38.6 AC \ CIVIL ENGINEERING ASSOCIATE& INC SEP 2 5 2009 10AIANSMDWEWLW SOIRRBI8AV MN, To5a FRONT SETBACK 50' 820' NIA NIA 135' NIA a-2sas LEGEND 802-eFAX mz V;,j wee. SIDE SETBACK 35' 82' NIA NIA 82 NIA \ -YwTOx, 0 20wE3EBYED REAR SETBACK 501 2106 NIA NIA 790' NIA - 365 - EXISTING CONTOUR City of So. Burlington D�wH BUILDING COVERAGE 30% 3.5% 0.0% 0.0% 10.3% 0.0% - - APPROXIMATE PROPERTY UN1 MJ W cxecxxD LOTCOVERAGE 50% 9.0% 0.0% 0.0% 26.3% 0.0% - - - - - - SETBACK LINE JLM FRONT YARD COVERAGE 30% 7.6% 0.0% 0.0% 3.1 % 0.0% \ ------------- EASEMENT LINE \ 60xP APPROVED --------- .�• \ � PUMP � � 1 STATION SAV *THE 80' R.O.W. FOR MEADOWLAND DRIVE WAS CALCULATED IN EXISTING -SS- - GRAVITY SEWER LINE v {I CONDITIONS BUT NOT SHOWN AS A LOT IN PROPOSED CONDITIONS. - - G - - GAS LINE _ _� EASEMENT STgT \ OWNER: --W-- WATERLINE 1 I o' \\`\\ EOP VFH,y/Ow/ \\BURLINGTON -UE&T- - UNDERGROUND ELEC. & TEL. I• ! ; I \• `FRSTq� \ PROPERTIES 1_ -- - - r� r \'`l. � LIMITED - -ST - - STORM DRAINAGE LINE J SQ SEWER MANHOLE ( --- -"- -_ ,•�,"_\,\ 1 \ \ PARTNERSHIP ® SHUT-OFF ;l, l• _:. .r.__ , r \ �.� 64 WGM ASSOCIATES I HYDRANT 30' SEWER, WATEF;IAND ' ' --\\.7w- \ \ \ S058UR MEADOWLAND NGTON, VT 05403 1GS ELECTRICAL EAS MENT/' 1 I ` ! \ \ I 10 ELECTRICAL _ �. I l 3d WATER AND EASEMENT I . ". •) WETLAND / 1 SEWER EASEMENT I / / / • ; /; I 7g0,/M.�'` NHS ` '-•_ ) PROJECT: 7 LANDRUM / / y 2d SEWER PROPOSED r � - -'� =- I ; !! - �N �:..: - ,�F 1•. ; �- EASEMENTI BeI PLAN NED BUILDING-,_ I SEMACK UNIT I::.: 1 C ; �`? I DEVELOPMENT Lor y :\ r I / lL7ACRES - �:: jam• 5a CIASS 1/ / r 85 MEADOWLAND DRIVE 6 ,SO. % WETLAND BURLINGTON, VT 05403 [[ gam•. . l 50' EASEMENT FOR -� /,r' , '�" `_ �1-.- •r - _ ` 4' BUFFER I / 1 ELECTRIC, ACCESS / BUNDlNp \ / , / / �_ •� % . / &SNOW STORAGE %',/ SET�AOK / 7 .�r . _ �L� / .. •. 1, 'C./ 11 I I �1 Ad CLASS It /' , wEnAND 40 I I /,!- `-r • -t - . - . � . � / � I ,l/ ti �/ 1 /�::•':':�a.-:;... '��� '••.A.r�! / \ /O? 20SLWER l •Q c •2 % ,r-.-I-.. EASEMENT 1/ / \ �G �', d'. , • I % LOT 4 II I _ .. \\ \\ PG \ I�:::T� I �"�.� �/' % 38.6ACRES ` I\ 1 I e 89 �� ' BUILDING �' % I I \ II,I i P ro -WZ- - - .� � `� \ \ FF,t/•39&a �/ ���� I �S� Ile I •-.L. `•✓. •�Z/ I I I I ioaibv �� \ �• % I II q J I�� i� /!•-.+q&� \ a.\ / i /� � � •� I ! � t `��� \V� lqy �/ 1-, I� \ I' II � 0� - 423.0 \ ` I \ _ / I,r /\'••1 \ I SURFACE WATERCLASS 1I�$PANT EC +TW AV MENTLLC BUFFER it r)4 I 0 D- - IJ \ }_ 80'A.O.W.7OTHE \ \ � +� � � IC SdCLASS /i ,.�::..'.-; ..: /.•/ / I ' \v moFSourR WETLAW I IC �.•- �' } 4, �, } EL BAKH BURLINOTON BUFFF)ER i� �7 ' .,...: 1: '•'•'::�•'./ f / i ) LOCATION MAP j v il^� • � ms LOT 3 � ,��:::",�'::-: ' - ... -. � � / I \� . 27.4ACRES 'I % �• :I'.' ;. :....� I o LOT- t , ! f I` / .r" ) "`�!', •./: I� i III >�® BsvtsTox 4.8ACRES I. i-_. - . x/\ - ) 5 .��i)'�•.:.: •-. '^ •' •':�=� �s-'I w�.c_��._•... _•:..:_•-- :_• •.:`••.'•-.:• '--:'- :_ _.��_ '..-.:i•'j., g i1.� 1. .`� II' � Jf 1•. �,p� -- ---- BUILDING - I EDESTRIAN \ _ye-w --------------- ---JEASEMEN� ELTABBAO15P BUILDING SETBACK TBU/LDINO ---------------------- --- --------------r 'SETBACK -----------_ - ----I II I;Il II ------------------ \i - 27SEW� EASEMENT `. �v ��'��� A� ti I I I I ' �� I I �L ✓ ^i I �I -__ [:AST MOUNTAIN VIEW LLC I w - - I IREROCK GRANDVIEW FARM INC. { 7OF GREATER I GRANOVIEW FRAM LNC. pppp2 SUPER-7E'MP RFALTYCOMPANY INC. PROPOSED MUNSON EFARTT IMOVING BURUNGTON, INC. I O I SITE P LAN N GENERAL NOTES I. U77LI77ES SHOWN DO NOT PURPORT 70 CONSTITUTE OR REPRESENrALL UTILITIES 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARYFOR COMPLETE LOCATED UPON OR ADJACENT TO THE SURVEYED PREMISES. EXISTING URLITY AND OPERABLE FACILITIES AND UTILITIES LOCATIONS ARE APPROXIMATE ONLY THECONTRACTORSHALLF/ELDVEPoF1'ALL GRAPHIC SCALE: OWNER OF RECORD & APPLICANT UTILRY CONFLICTS. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. e. IN ADDITION TO THE REQUIREMENTS SET IN THESE PLANS AND SPECIFICATIONS, ZONING DISTRICT: THE CONTRACTOR SHALL CONTACT DIG SAFE(888J"-7233) PRIOR TO ANY CONSTRUCTION.. THE CONTRACTOR SHALL COMPLETE THE WOW IN ACCORDANCE W17H ALL PERMIT 120 CONDITIONS AND THE CITY OF SOUTH BURLINGTON PUBLIC WORKS STANDARDS --4 DATE RRAwTNC NUMBER 2. THE CONTRACTOR $HALLREPAIR)RESTOREALL DISTURBED AREAS (ON OROFF THE BURLINGTON PROPERTIES INDUSTRIAL SEPT., 2009 SITE)ASADIRECi OR INDIRECT RESULT OF THE CONSTRUCTION.T. THE TOLERANCE FOR FINISH GRADES FOR ALL PAVEMENT, WALKWAYS AND LAWN -OPEN SPACE AREAS SHALL BE0.1FEET. I IN ewer ) LIMITED PARTNERSHIP 3. ALL GRASSED AREAS SHALL BE MAINTAINED UNTIL FULL VEGETATION IS ESTABLISHED. I inch = 120 It SCALE <. MWNTNNALL TREES OUTSIDE OFCONSTRUCTIONLIMITS. e. THIS IS NOTA BOUNDARY SURVEY AND IS NOT INTENDED TO BE USED AS ONE. 85 MEADOWLAND DRIVE �" = 120' ///''\�� / e. IF THERE ARE ANY CONFLICTS OR INCONSISTENCIES WITH THE PLANS OR SOBURLINGTON, VT 05403 v S. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARYFOR COMPLETE. SPECIFICATIONS THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR VERIFICATION AND OPERABLE FACILITIES AND LMLI77ES BEFORE WORK CONTINUES ON THE ITEM /N QUESTION. T. N0. 09202 Permit Number SD- O - APPLICATION FOR SUBDIVISION SKETCH PLAN REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. For amendments, please provide pertinent information only. 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Burlington Properties Limited Partnership, 85 Meadowland Drive, So. Burlington, VT 05403, 860-7200. 2) LOCATION OF LAST RECORDED DEED (Book and page #) Book 273, Page 265. 3) APPLICANT (Name, mailing address, phone and fax #) Burlington Properties Limited Partnership, 85 Meadowland Drive, So. Burlington, VT 05403, 860-7200. 4) APPLICANT'S LEGAL INTEREST IN THE PROPERTY (fee simple, option, etc.) Owner. 5) CONTACT PERSON (Name, mailing address, phone and fax #) Stephen A. Vock, P.E. or Matthew J. Wamsganz, Civil Engineering Associates, Inc., 10 Mansfield View Lane, So. Burlington, VT 05403, 864-2323 x 313 or 303, 864-2271. Contact email address-svockna,cea-vt.com or matt(ikea-vt.com. 6) PROJECT STREET ADDRESS: 85 Meadowland Drive. 7) TAX PARCEL ID # (can be obtained at Assessor's Office) 0860-01020C. 8) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use) Dvnapower Corporation, 123,200 sf building w/ associated parking and utilities on 80 acre lot. b) Proposed Uses on property (include description and size of each new use and existing uses to remain) Dvnapower Corporation, 123,200 sf building w/ associated parking and utilities on 27.4 acre lot and 3 additional lots (6.7 ac, 4.9 ac. & 38.6 ac.). A c) Total building square footage on property (proposed buildings and existing buildings to remain) 123,200 sL (Existing). d) Proposed height of building (if applicable) N/A (Existing Building +/-301). e) Number of residential units (if applicable, new units and existing units to remain) N/A. f) Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable) Interstate Highway Overlay District, Hinesburg Road - North View Protection Zone, Airport Approach Cone, Surface Water Buffer Standards, Class II Wetlands. 9) LOT COVERAGE See Table on SheetC1. a) Building: Existing % Proposed % b) Overall (building, parking, outside storage, etc) Existing % Proposed % c) Front yard (along each street) Existing % Proposed % 10) TYPE OF EXISTING OR PROPOSED ENCUMBRANCES ON PROPERTY (easements, covenants, leases, rights of way, etc.) Water, sewer, electrical4access and snow storage easements. 11) PROPOSED EXTENSION, RELOCATION, OR MODIFICATION OF MUNICIPAL FACILITIES (sanitary sewer, water supply, streets, storm drainage, etc.) N/A. 12) OWNERS OF RECORD OF ALL CONTIGUOUS PROPERTIES & MAILING ADDRESSES (this may be provided on a separate attached sheet) See Attached List. 13) ESTIMATED PROJECT COMPLETION DATE N/A (Subdivision only, no proposed construction). 2 14) PLANS AND FEE Plat plans shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (I I" x 17") of the plans must be submitted. A sketch subdivision application fee is $125. I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. CANT i a0to: �--' OF PROPERTY OWNER Do not write below this line DATE OF SUBMISSION: J J I have reviewed this sketch plan application and find it to be: Comp: 3 Burlington Properties Limited Partnership September 2009 PARCEL ID 0860-00835F OWNER OF RECORD Hinesburg Rd, LLC c/o Jeff Davis 2 Church St. Burlington, VT 05401 0860-00896R WGM Associates c/o Nancy McGovern PO Box 9477 South Burlington, VT 05407 0860-01 OOOC Landrum Phillip Drumheller PO Box 130 Burlington, VT 05407 0860-01035R Mansfield View Properties LLC 1035 Hinesburg Rd. South Burlington, VT 05403 0860-01045R Mansfield View Properties LLC 1035 Hinesburg Rd. South Burlington, VT 05403 0860-01050L Spaniel Properties LLC 1050 Hinesburg Rd, Unit A South Burlington, VT 0403 and Avalanche Development LLC 35 Dorset Lane, Suite 201 Williston, VT 05495 0860-0106OR Gamal Eltabbakh 391 Hillspoint Rd. Charlotte, VT 05445 0860-1070OR Gamal Eltabbakh 391 Hillspoint Rd. Charlotte, VT 05445 0860-01061 L Arthur Rye & Bernice Brisson Trust 63 Sam Web Rd. Fairfax, VT 05454 0860-0100R East Mountain View LLC 1100 Hinesburg Rd, Suite 201 South Burlington, VT 05403 1155-00284C Munson Earthmoving Corp. 85 Shunpike Rd. Williston, VT 05495 1155-00317C Grandview Farm Inc. PO Box 1304 Burlington, VT 05402-1304 1715-00073C The Rock of Greater Burlington, Inc. PO Box 464 Milton, VT 05468 0257-00065 Grandview Farm Inc. c/o Birchwood Burlington, LLC 5524 West Cypress St., Suite B Tampa, FL 33607 0257-00104C Super -Temp Realty Company Inc. 133 Elm St. Winooski, VT 05404 0860-R1150L Green Acres Inc. c/o Mark Goodrich PO Box 2123 South Burlington, VT 05407 Vermont Agency of Transportation Secretary's Office One National Life Drive Montpelier, VT 05633-5001 2 1 Ar southburlington PLANNING & ZONING September 28, 2009 Burlington Properties Limited Partnership 85 Meadowland Drive South Burlington, VT 05403 Re: 85 Meadowland Drive Dear Property Owner: Enclosed is the draft agenda for the October 6th, 2009 South Burlington Development Review Board Meeting. It includes an application for development on your property. This is being sent to you and the abutting property owners to make aware that a public meeting is being held regarding the proposed development. The official agenda will be posted on the City's website (www.sburl.com) by the Friday prior to the meeting. Under Title 24, Section 4464 of State law, participation in a municipal regulatory proceeding is required in order to preserve your right to appeal a local development approval to the Vermont Environmental Court. State law specifies that "Participation in a local regulatory proceeding shall consist of offering, through oral or written testimony, a statement of concern related to the subject of the proceeding." If you would like to know more about the proposed development, you may call this offit:e at 846-4106, stop by during regular office hours, or attend the scheduled public meeting. Sincerely, ?Jana Beagley Planning & Zoning Assistant Encl. Cc: MatthewJ. Wamsganz and Stephen A. Vock, P.E. Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburi.com �O �iM ld southburlington PLANNING & ZONING September 28, 2009 Hinesburg Road, LLC c/o Jeff David 2 Church Street Burlington, VT 05401 Re: 85 Meadowland Drive Dear Property Owner: Enclosed is a copy of the draft agenda for the October 6th, 2009 South Burlington Development Review Board meeting. The enclosure includes a proposal that abuts property you own. The official agenda will be posted on the City's website (www.sburl.com) by the Friday prior to the meeting. Under Title 24, Section 4464 of State law, participation in a municipal regulatory proceeding is required in order to preserve your right to appeal a local development approval to the Vermont Environmental Court. State law specifies that "Participation in a local regulatory proceeding shall consist of offering, through oral or written testimony, a statement of concern related to the subject of the proceeding." If you would like to know more about the proposed development, you may call this office at 846- 4106, stop by during regular office hours, or attend the scheduled public meeting. Sincerely, Jana Beagley Planning & Zoning Assistant Encl. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com