Loading...
HomeMy WebLinkAboutAgenda 05_SD-20-23_1430 Spear St_Philips1 Marla Keene From:Kim Phillips <kimkimphillips@aol.com> Sent:Thursday, July 30, 2020 8:58 AM To:Marla Keene Subject:EXTERNAL: RE: Link to 8/4/2020 Packet Attachments:Spear water ability to serve CWD.pdf; Spear GMP power ability to serve and new driveway requirements.pdf; Spear WW ability to serve SBPW.pdf         This message has originated from an External Source. Please use proper judgment and caution when opening  attachments, clicking links, or responding to this email.         Hi Marla, I have some extra information to be included in our DRB meeting. I thought the lot coverages were addressed at the preliminary meeting, my apologies for not including them. Lot #1 : Coverage is 48812 sq Building is 2430 sq Driveway is 3642 sq Total is 6072 sq, or 12 % Lot #2 Coverage is 39210 sq Estimated building 3000 sq Current driveway 2040 sq Estimated driveway 3300sq Estimated total of 6500 sq or 16 % In addressing the comment on page 7 number 10 about "no preliminary allocation has been procured". Attached please find letters of ability to serve for the wastewater, water, and power. We will call the fire chief to obtain a letter from them concerning the sprinkler system. Please let me know you have received this. I also had mailed you 2 maps, one was the survey and the other showed a preliminary of a single-family home that was an estimated building envelope, and I am hoping you have received them. If you have not please let me know and I will be sure to get you them tomorrow. Thanks very much for your time. Kim -------- Original message -------- From: Marla Keene <mkeene@sburl.com> Date: 7/29/20 10:55 AM (GMT-05:00)