Loading...
HomeMy WebLinkAboutSP-20-023 - Supplemental - 1200 Airport Drive (10)Standard Compliance Workbook Instructions This workbook is designed to guide you through how to calculate and demonstrate compliance the standards in the 2017 Vermont State Stormwater Manual (VSMM). Before filling this workbook, you should always refer to the Stormwater Program homepage to ensure that you are using the most recent application materials. Vermont Stormwater Application Materials webpage Filling out the Workbook Blue boxes Yellow boxes Grey boxes This workbook is protected so that the user can only edit blue and yellow boxes. Workbook Tabs This workbook is comprised of a "Summary" tab and several discharge point tabs labelled SN1, SN2, etc. Fill out one tab for each discharge point in your project. This workbook will be supported by sizing calculations and treatment volume (TV) information completed via specific STP worksheets that must also be completed for each practice. The Summary tab provides an overview of how the standards are met across discharge points. This workbook is designed to work with up to nine (9) discharge points or points of interest (POI) which come preloaded. Changing Discharge Point Names: If discharge points need to be renamed, the user must change both the label in line 5 of the summary tab AND the tab label in order for the summary tab to be able to pull data from the right sheet. Designers working on a projects with more discharge points should contact their district reviewer. If your project contains fewer discharge points, unneeded tabs may be deleted, but cannot be added back. It is preferrable to right-click on the tab label and selecting "hide". If you have questions regarding the completion of the workbook, contact the stormwater program: Stormwater Technical Reviewers Types of Impervious When entering impervious on the discharge point tabs, the user is presented with several options depending on the type of permit coverage that is required. Pre Development w Existing Impervious: Any impervious, other than impervious previously authorized under another permit that exists within the drainage area prior to the development for which permit coverage is being sought. w Impervious Previously Authorized under 2002 VSMM: Any impervious previously authorized under the 2002 VSMM that is not being modified by the current permit application. The workbook will not calculate required treatment volumes for this impervious. It is included here only to maintain a record of the total impervious covered by the permit. This will automatically transfer through to the post development totals. Post Development w New Impervious: Impervious created as a part of the proposed development. w Existing Impervious for Permit Coverage: Impervious that existed prior to the proposed development that is not undergoing alteration, but for which permit coverage is being sought. Treatment volumes will be calculated as for new development. w Existing Impervious NOT for Permit Coverage: Impervious that existed prior to the proposed development that is not undergoign alteration and for which permit coverage is not being sought. Treatment volumes will not include this area. w Redeveloped Impervious: Existing impervious that will be redeveloped under the proposed development and meets the jurisdictional threshold for redevelopment. Treatment volumes for this impervious will be calculated in accordance with the Section 2.4 in the Manual. Redevelopment within a discharge point that does meet jurisdictional threshold for redevelopment may be included as "Existing Not for Permit Coverage" unless voluntary permit coverage is being sought. Printing/PDF Instructions In order to select specific tabs of this worksheet to print or save as a pdf, hold down control while clicking on the desired tabs. The summary tab and any discharge points used in the project must be included with the permit application. Notes CNAdj in Tc is currently restricted to 50-95, consistent with NEH, Part 630. If the CNAdj falls outside this range, the outer bound of the range is used. All curve numbers (CN) calculated in this workbook are flow-weighted. Pre and post-development CN are back calculated from the flow volume of the storm of interest. must be filled out by the designer may be filled out by the designer, but are optional contain values calculated from the information entered in the blue boxes 0 0 0 0 0 0 Project Name Site Summary Do not fill this tab out, apart from the project name and notes. It will auto-populated based on the values on the discharge point tabs. Discharge points (SN) will only show on the summary if an area has been entered on that tab. Areas listed below are those seeking permit coverage. Impervious Recharge Water Quality A minimum WQV of 0.2" (P*RV) is required for sites with low impervious (<16.67%). This calculation has not been incorporated into this workbook. Designers should check that the minimum WQV has been met for their site. Channel Protection Overbank Flood Protection Extreme Flood Protection General Notes New Redeveloped Existing Previously Authorized Total Site Area Latitude Longitude Required Provided Standard met? Notes: Required Provided Standard met? Notes: Standard Applies? Waiver Method HCV TV Provided Notes: Notes: Notes: Burlington International Airport, Construct Remain Overnight Apron (Phase 7) The name above will appear on all the discharge point tabs Total 1.44 2.38 0 0 3.82 3.82 Receiving Water Total 0.072 0 No Cannot use recharge since the project is a hotspot Total 0.221125 0.2228 Yes Total 0.199846376288315 0 Standard Applies? Pre-Dev Q (cfs) Routed, Post-Dev Q (cfs) Waiver Standard Applies? Pre-Dev Q (cfs) Routed, Post-Dev Q (cfs) Waiver SN1 1.44 2.38 0 0 3.82 3.82 44.46446 -73.15187 Potash Brook SN1 0.072 0 No SN1 0.221125 0.2228 Yes SN1 Yes n/a Alternate Extended Detention 0.199846376288315 0 SN1 Yes 7.85 6.77 n/a SN1 Yes 8.44 8.4 n/a SN2 0 0 0 0 0 0 0 0 0 SN2 0 0 n/a SN2 0 0 n/a SN2 Yes n/a Hydrologic Condition Method 0 0 SN2 Yes 0 0 n/a SN2 Yes 0 0 n/a SN3 0 0 0 0 0 0 0 0 0 SN3 0 0 n/a SN3 0 0 n/a SN3 Yes n/a Hydrologic Condition Method 0 0 SN3 Yes 0 0 n/a SN3 Yes 0 0 n/a SN4 0 0 0 0 0 0 0 0 0 SN4 0 0 n/a SN4 0 0 n/a SN4 Yes n/a Hydrologic Condition Method 0 0 SN4 Yes 0 0 n/a SN4 Yes 0 0 n/a SN5 0 0 0 0 0 0 0 0 0 SN5 0 0 n/a SN5 0 0 n/a SN5 Yes n/a Hydrologic Condition Method 0 0 SN5 Yes 0 0 n/a SN5 Yes 0 0 n/a SN6 0 0 0 0 0 0 0 0 0 SN6 0 0 n/a SN6 0 0 n/a SN6 Yes n/a Hydrologic Condition Method 0 0 SN6 Yes 0 0 n/a SN6 Yes 0 0 n/a SN7 0 0 0 0 0 0 0 0 0 SN7 0 0 n/a SN7 0 0 n/a SN7 Yes n/a Hydrologic Condition Method 0 0 SN7 Yes 0 0 n/a SN7 Yes 0 0 n/a SN8 0 0 0 0 0 0 0 0 0 SN8 0 0 n/a SN8 0 0 n/a SN8 Yes n/a Hydrologic Condition Method 0 0 SN8 Yes 0 0 n/a SN8 Yes 0 0 n/a SN9 0 0 0 0 0 0 0 0 0 SN9 0 0 n/a SN9 0 0 n/a SN9 Yes n/a Hydrologic Condition Method 0 0 SN9 Yes 0 0 n/a SN9 Yes 0 0 n/a General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices NOTE: Please include a copy of the appropriate STP worksheet(s) with the application. Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 1.44 0 0 2.38 A 0 0 0 1.44 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0.072 0 0.072 No n/a n/a n/a 0.072 No Recharge not permitted for a hotspot (ac-ft) 0.123916666666667 9.72083333333333E-02 0.221125 0 0.221125 Tier 2 & 3 Water Quality Practice Filter (not designed to infiltrate) Providing 9707 cf treatment volume with a 24" deep sand filter. No 0.530148025987057 Underground manufactured chambers (lined) 98 orifices and weirs in the outlet structure provided to meet this standard No Chamber Infiltration 86.0510939703812 98 achieved through use of a lined manufactured underground chamber system No chamber infiltration 81.9502051772458 98.0000000000001 Achieved through use of a lined manufactured underground chamber system Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 1.89 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0.221125 0 0.221125 No 96.8625238234709 96.8625238234709 n/a Reason recharge not required (if No is selected): Standard not applicable. % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has not been fully met. Either increase Tv credit to fully meet HCM or provide extended detention. ac-ft → Post Development TC (min) The QP10 standard has not been fully met. Provide additional STPs to ensure post development peak runoff does not exceed pre development peak runoff for the 10 yr, 24 hour storm event. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme standard has not been fully met. Provide additional STPs to ensure post development peak runoff does not exceed pre development peak runoff for the 100 yr, 24 hour storm event. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) S/N 001 Potash Brook 44.46446 -73.15187 10 yr, 24 hr 3.24 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0.330301649698742 0.530148025987057 CP 0.199846376288315 0 0.199846376288315 No 98 98 90.5535899273802 Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: 7.85 17.53 6.77 8.44 35.89 8.4 NOAA Atlas 14 100 yr, 24 hr 4.84 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 1.2 1.24 10 yr, 24-hr 0.596550990137171 0.957336593874777 TV (ac-ft) QP10 0.360785603737607 0 0.360785603737607 No 98 98 86.0510939703812 Hotspot land use 1 0 0 WQV Provided (ac-ft) 0.2228 0.2228 Yes 2 24 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 24 22.6648053115897 35.9806551038222 22.6648053115897 41.3987535650261 22.6648053115897 Total 1.44 0 0 2.38 0 3.82 Total 0 0 0 1.44 0 2.38 0 3.82 3.82 0 0 Hydraulic Length, l (ft) 1686 1550 100 yr, 24-hr 0.933276423075327 1.46542409199934 QP100 0.532147668924012 0 0.532147668924012 No 98.0000000000001 98.0000000000001 81.9502051772458 2 1 Apply Reduction? Tier Tier 3 ac-ft 1 detention time (hrs) (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0.37696335078534 0 0 0.62303664921466 0 0 1 True General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 0 0 0 0 A 0 0 0 0 0 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0 0 0 n/a n/a n/a n/a 0 n/a (ac-ft) 0 0 0 0 0 Tier 2 & 3 Water Quality Practice Yes n/a need rainfall Yes need rainfall need rainfall Yes need rainfall need rainfall Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 0 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0 0 0 Yes n/a n/a n/a % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. ac-ft → Post Development TC (min) The QP10 standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme flood standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) 10 yr, 24 hr 0 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0 0 CP 0 0 0 Yes need rainfall need rainfall need rainfall Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: NOAA Atlas 14 100 yr, 24 hr 0 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 0 0 10 yr, 24-hr 0 0 TV (ac-ft) QP10 0 0 0 Yes need rainfall need rainfall need rainfall 1 0 0 WQV Provided (ac-ft) 0 Yes 1 12 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 0 0 0 0 0 Total 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Hydraulic Length, l (ft) 0 0 100 yr, 24-hr 0 0 QP100 0 0 0 Yes need rainfall need rainfall need rainfall 1 1 Apply Reduction? Tier ac-ft 1 (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0 0 0 0 0 0 1 False General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 0 0 0 0 A 0 0 0 0 0 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0 0 0 n/a n/a n/a n/a 0 n/a (ac-ft) 0 0 0 0 0 Tier 2 & 3 Water Quality Practice Yes n/a need rainfall Yes need rainfall need rainfall Yes need rainfall need rainfall Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 0 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0 0 0 Yes n/a n/a n/a % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. ac-ft → Post Development TC (min) The QP10 standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme flood standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) 10 yr, 24 hr 0 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0 0 CP 0 0 0 Yes need rainfall need rainfall need rainfall Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: NOAA Atlas 14 100 yr, 24 hr 0 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 0 0 10 yr, 24-hr 0 0 TV (ac-ft) QP10 0 0 0 Yes need rainfall need rainfall need rainfall 1 0 0 WQV Provided (ac-ft) 0 Yes 1 12 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 0 0 0 0 0 Total 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Hydraulic Length, l (ft) 0 0 100 yr, 24-hr 0 0 QP100 0 0 0 Yes need rainfall need rainfall need rainfall 1 1 Apply Reduction? Tier ac-ft 1 (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0 0 0 0 0 0 1 False General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 0 0 0 0 A 0 0 0 0 0 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0 0 0 n/a n/a n/a n/a 0 n/a (ac-ft) 0 0 0 0 0 Tier 2 & 3 Water Quality Practice Yes n/a need rainfall Yes need rainfall need rainfall Yes need rainfall need rainfall Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 0 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0 0 0 Yes n/a n/a n/a % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. ac-ft → Post Development TC (min) The QP10 standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme flood standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) 10 yr, 24 hr 0 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0 0 CP 0 0 0 Yes need rainfall need rainfall need rainfall Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: NOAA Atlas 14 100 yr, 24 hr 0 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 0 0 10 yr, 24-hr 0 0 TV (ac-ft) QP10 0 0 0 Yes need rainfall need rainfall need rainfall 1 0 0 WQV Provided (ac-ft) 0 Yes 1 12 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 0 0 0 0 0 Total 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Hydraulic Length, l (ft) 0 0 100 yr, 24-hr 0 0 QP100 0 0 0 Yes need rainfall need rainfall need rainfall 1 1 Apply Reduction? Tier ac-ft 1 (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0 0 0 0 0 0 1 False General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 0 0 0 0 A 0 0 0 0 0 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0 0 0 n/a n/a n/a n/a 0 n/a (ac-ft) 0 0 0 0 0 Tier 2 & 3 Water Quality Practice Yes n/a need rainfall Yes need rainfall need rainfall Yes need rainfall need rainfall Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 0 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0 0 0 Yes n/a n/a n/a % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. ac-ft → Post Development TC (min) The QP10 standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme flood standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) 10 yr, 24 hr 0 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0 0 CP 0 0 0 Yes need rainfall need rainfall need rainfall Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: NOAA Atlas 14 100 yr, 24 hr 0 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 0 0 10 yr, 24-hr 0 0 TV (ac-ft) QP10 0 0 0 Yes need rainfall need rainfall need rainfall 1 0 0 WQV Provided (ac-ft) 0 Yes 1 12 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 0 0 0 0 0 Total 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Hydraulic Length, l (ft) 0 0 100 yr, 24-hr 0 0 QP100 0 0 0 Yes need rainfall need rainfall need rainfall 1 1 Apply Reduction? Tier ac-ft 1 (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0 0 0 0 0 0 1 False General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 0 0 0 0 A 0 0 0 0 0 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0 0 0 n/a n/a n/a n/a 0 n/a (ac-ft) 0 0 0 0 0 Tier 2 & 3 Water Quality Practice Yes n/a need rainfall Yes need rainfall need rainfall Yes need rainfall need rainfall Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 0 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0 0 0 Yes n/a n/a n/a % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. ac-ft → Post Development TC (min) The QP10 standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme flood standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) 10 yr, 24 hr 0 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0 0 CP 0 0 0 Yes need rainfall need rainfall need rainfall Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: NOAA Atlas 14 100 yr, 24 hr 0 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 0 0 10 yr, 24-hr 0 0 TV (ac-ft) QP10 0 0 0 Yes need rainfall need rainfall need rainfall 1 0 0 WQV Provided (ac-ft) 0 Yes 1 12 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 0 0 0 0 0 Total 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Hydraulic Length, l (ft) 0 0 100 yr, 24-hr 0 0 QP100 0 0 0 Yes need rainfall need rainfall need rainfall 1 1 Apply Reduction? Tier ac-ft 1 (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0 0 0 0 0 0 1 False General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 0 0 0 0 A 0 0 0 0 0 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0 0 0 n/a n/a n/a n/a 0 n/a (ac-ft) 0 0 0 0 0 Tier 2 & 3 Water Quality Practice Yes n/a need rainfall Yes need rainfall need rainfall Yes need rainfall need rainfall Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 0 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0 0 0 Yes n/a n/a n/a % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. ac-ft → Post Development TC (min) The QP10 standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme flood standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) 10 yr, 24 hr 0 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0 0 CP 0 0 0 Yes need rainfall need rainfall need rainfall Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: NOAA Atlas 14 100 yr, 24 hr 0 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 0 0 10 yr, 24-hr 0 0 TV (ac-ft) QP10 0 0 0 Yes need rainfall need rainfall need rainfall 1 0 0 WQV Provided (ac-ft) 0 Yes 1 12 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 0 0 0 0 0 Total 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Hydraulic Length, l (ft) 0 0 100 yr, 24-hr 0 0 QP100 0 0 0 Yes need rainfall need rainfall need rainfall 1 1 Apply Reduction? Tier ac-ft 1 (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0 0 0 0 0 0 1 False General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 0 0 0 0 A 0 0 0 0 0 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0 0 0 n/a n/a n/a n/a 0 n/a (ac-ft) 0 0 0 0 0 Tier 2 & 3 Water Quality Practice Yes n/a need rainfall Yes need rainfall need rainfall Yes need rainfall need rainfall Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 0 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0 0 0 Yes n/a n/a n/a % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. ac-ft → Post Development TC (min) The QP10 standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme flood standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) 10 yr, 24 hr 0 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0 0 CP 0 0 0 Yes need rainfall need rainfall need rainfall Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: NOAA Atlas 14 100 yr, 24 hr 0 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 0 0 10 yr, 24-hr 0 0 TV (ac-ft) QP10 0 0 0 Yes need rainfall need rainfall need rainfall 1 0 0 WQV Provided (ac-ft) 0 Yes 1 12 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 0 0 0 0 0 Total 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Hydraulic Length, l (ft) 0 0 100 yr, 24-hr 0 0 QP100 0 0 0 Yes need rainfall need rainfall need rainfall 1 1 Apply Reduction? Tier ac-ft 1 (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0 0 0 0 0 0 1 False General Discharge Point Information Precipitation Data Storm Precipitation (inches) Drainage Area Information Pre Development Land Use (acres) Landuse Grass Meadow Woods Existing Impervious Post Development Land Use (acres) Landuse Grass Meadow Woods New Impervious Existing for Permit Coverage (Treated to New Standards) Information for Calculating TC by the Watershed Lag Method Runoff Calculations Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Tier 1/Runoff Reduction Practices List all Tier 1 practices below with the associated treatment volume (TV). The TV will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Runoff Reduction Calculations Standard TV Required (ac-ft) TV Provided (ac-ft) TV Remaining (ac-ft) Standard met with HCM? Post-Development CN CNadj Pre-Development CN Groundwater Recharge Standard (Re) Standard Applicable? ReV Standard met with Tier 1 Practices? Recharge Notes: Water Quality Treatment Standard (WQ) WQV - New & Existing WQV - Redevelopment Total WQV WQV met with Tier 1 practices WQV to be met with Tier 2 and/or Tier 3 practices Water Quality Notes: Channel Protection Standard (CP) Standard Applicable? Standard Met with HCM? Provide Extended Detention for: Warm or Cold Water Fishery? See the Vermont Water Quality Standards for warm and cold water designations Extended Detention STP: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. CNAdj Channel Protection Notes: Overbank Flood Protection (QP10) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP10 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through Tier 1 practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Overbank Flood Notes: Extreme Flood Protection (QP100) Standard Applicable? Standard Met with HCM? STP used: Modeling Info: When demonstrating QP100 compliance in a hydrologic model, use the following CN and TC below, if the practice used to meet QP100 is not a Tier 1 practice. The CNAdj takes into account the reduction in runoff volume achieved through runoff reduction practices. The TC is calculated by the watershed lag method using CNAdj as CN'. Pre-Development CN (Flow-weighted composite) CNAdj Extreme Flood Notes: * Preciptation values shall be obtained from WQ Storm 1 A 0 0 0 0 A 0 0 0 0 0 Impervious previously authorized under 2002 VSMM TV (ac-ft) Re 0 0 0 n/a n/a n/a n/a 0 n/a (ac-ft) 0 0 0 0 0 Tier 2 & 3 Water Quality Practice Yes n/a need rainfall Yes need rainfall need rainfall Yes need rainfall need rainfall Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) 1 yr, 24 hr 0 B 0 0 0 0 B 0 0 0 0 0 Practice WQ 0 0 0 Yes n/a n/a n/a % Net Reduction % Removed Existing Impervious (Redevelopment) The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. ac-ft → Post Development TC (min) The QP10 standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) The extreme flood standard has been fully met. No additional STPs are required. Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre Development TC (min) Post Development TC (min) Burlington International Airport, Construct Remain Overnight Apron (Phase 7) 10 yr, 24 hr 0 C 0 0 0 0 C 0 0 0 0 0 Pre Development Post Development 1 yr, 24-hr 0 0 CP 0 0 0 Yes need rainfall need rainfall need rainfall Is all impervious treated by disconnection? Total WQV Provided (ac-ft) Is the WQV Standard met? Provide: NOAA Atlas 14 100 yr, 24 hr 0 D 0 0 0 0 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area D 0 0 0 0 0 Existing Impervious Not for Permit Coverage Redeveloped Impervious Total Site Area Total Impervious for Permit Coverage Net Reduced Impervious Reduced Existing Impervious (for redevelopment) Average Catchment Slope, Y (%) 0 0 10 yr, 24-hr 0 0 TV (ac-ft) QP10 0 0 0 Yes need rainfall need rainfall need rainfall 1 0 0 WQV Provided (ac-ft) 0 Yes 1 12 hours of extended detention OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 0 0 0 0 0 Total 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 Hydraulic Length, l (ft) 0 0 100 yr, 24-hr 0 0 QP100 0 0 0 Yes need rainfall need rainfall need rainfall 1 1 Apply Reduction? Tier ac-ft 1 (Watershed Lag Method) 1 (Watershed Lag Method) 1 (Watershed Lag Method) % 0 0 0 0 0 0 1 False Curve Numbers Landuse Grass Meadow Woods Gravel/ Unpaved Roads Pavement, Roofs, and other impervious S=1000/CN - 10 Landuse Grass Meadow Woods Gravel/ Unpaved Roads Pavement, Roofs, and other impervious (not gravel) Recharge Factors Hydrologic Soil Group Recharge Factor Simple Disconnection Required Treatment Length HSG A/B C/D Disconnection to filter strips and vegetated buffers - Required Treatment Lengths HSG A/B C/D Hydrologic Soil Group A 39 30 30 96 98 Hydrologic Soil Group A 15.6410256410256 23.3333333333333 23.3333333333333 0.416666666666666 0.204081632653061 A 0.6 Disconnection Slope <8% 35 65 Disconnection Slope <4% 35 65 B 61 58 55 96 98 B 6.39344262295082 7.24137931034483 8.18181818181818 0.416666666666666 0.204081632653061 B 0.35 8-15% 50 85 4-6% 50 85 C 74 71 70 96 98 C 3.51351351351351 4.08450704225352 4.28571428571429 0.416666666666666 0.204081632653061 C 0.25 6-8% 65 105 D 80 78 77 96 98 D 2.5 2.82051282051282 2.98701298701299 0.416666666666666 0.204081632653061 D 0 Waivers Recharge Waivers All Redevelopment HSG D Soils Hotspot land use STPs Tier 1/Runoff Reduction Practices Reforestation Simple Disconnection Disconnection to FS/VB Bioretention (infiltrating) Dry Swales (infiltrating) Infiltration Basin Infiltration Chambers Infiltration Trench Drywell(s) Filters (infiltrating) Permeable Pavement Rainwater Harvesting Green Roofs Reduced Impervious Re-development Net Reduction CPv All Redevelopment Direct discharge to drainage area ≥10 sq.mi <2 cfs pre-routed, post development 1 yr discharge Net Reduction Tier 2 & 3 WQ Practices STP Bioretention (not designed to infiltrate) Filter (not designed to infiltrate) Dry Swale (not designed to infiltrate) Wet Pond Shallow Surface Wetland Gravel Wetland Alternative Treatment Practice Minimum WQ depth Yes No QP10 All Redevelopment Direct discharge to drainage area ≥10 sq.mi <2 cfs pre-routed, post development 10 yr discharge Downstream analysis Net Reduction Tier Tier 2 Tier 3 Tier 3 Tier 3 Tier 3 Tier 2 Justification Required QP100 All Redevelopment <10 acres impervious Direct discharge to drainage area ≥10 sq.mi Net Reduction Downstream analysis Extended Detention Practices Wet Pond Shallow Surface Wetland Gravel Wetland Dry Pond Subsurface Detention Waiver Name All Redevelopment <10 acres impervious Direct discharge to drainage area ≥10 sq.mi Net Reduction Downstream analysis <2 cfs pre-routed, post development 10 yr discharge <2 cfs pre-routed, post development 1 yr discharge Short Name n/a Re-dev < 10 ac impervious ≥10 sq mi Net Reduction Down-stream Analysis <2 cfs <2cfs