Loading...
HomeMy WebLinkAboutSD-20-13 - Supplemental - 0510 Shelburne Road (60)Standard Site Plan Review Comments I reviewed the “Bacon Street Commercial- Sketch Site Plan” site plan prepared by Trudell Consulting Engineers, dated 2/24/2020.  I would like to offer the following comments: The proposed project is located in the Englesby Brook watershed. This watershed is listed as stormwater and E. Coli impaired by the State of Vermont Department of Environmental Conservation (DEC).  It is difficult to determine from the level of detail given in the Sketch Site Plan how much impervious surface is being proposed. The Applicant should be advised that if the project proposes to create greater than 1/2 acre of impervious area, the applicant is required to follow the standards set forth in the South Burlington Land Development Regulations (LDRs) Article 12.03. Has the applicant contacted VT DEC to determine if this site is considered to be a stormwater hot spot as per the VT Stormwater Management Manual (VSMM) Section 2.3? Subsequent submittals should discuss how the applicant will handle any contaminated materials during the construction phase. Is there anticipated storage or disposal of contaminated soils? Indicate a location and VT DEC approved requirements. The project proposes to disturb less than 1 acre of area.  It will therefore not require a construction stormwater permit from the Vermont DEC Stormwater Division. The applicant should provide a drainage area map and detail for any proposed stormwater treatment practices. The applicant should show snow storage locations on the site plan- for during and post construction. Work in the City Right of Way (ROW) requires a permit before construction can begin. A “Permit to Open Streets or Right of Way” can be obtained from the South Burlington Department of Public Works on their web site, or by stopping by their office located at 104 Landfill Road. Thank you for the opportunity to comment. -Emmalee