HomeMy WebLinkAboutSP-20-019 - Supplemental - 0057 Hinesburg Road (23)February 12, 2020
Richard Shasteen
Green Mountain Habitat for Humanity
59 Misty Bay Road
Milton, VT 05468
RE: 57 Hinesburg Road – FBC Application
Marla Keene, PE
Development Review Planner
South Burlington Planning & Zoning
575 Dorset St.
South Burlington, VT 05403
Dear Marla,
Please accept this cover letter to my application for proposed development at 57 Hinesburg Road. Attached are the items that address the submission checklist. Only items not covered
in other parts of the submission (drawings etc.) are addressed.
Thank you and Dalila Hall for all your assistance on this project. Please contact me anytime at 802-393-1941 (cell) or rbshasteen@comcast.net with questions.
Sincerely,
Richard Shasteen
Green Mountain Habitat for Humanity Construction Supervisor
Team Members of Application
Owner of Record:
Green Mountain Habitat for Humanity
300 Cornerstone Drive #335
Williston VT 05495
Applicant:
Richard Shasteen for Green Mountain Habitat for Humanity
59 Misty Bay Road
Milton, VT 05468
Engineer:
Anthony Stout
Lakeside Environmental Group LLC
PO Box 4081
Burlington, VT 05406
Architect:
Todd Gray
Creative Drafting and Design
288 Boulder Hill Drive
Shelburne, VT 05482
Landscape Design:
Pat Toporowski
Vermont Stone and Horticulture
1869 Main Street
Colchester, VT 05446
Narrative Accompanying Application
Green Mountain Habitat for Humanity is proposing developing the vacant land at 57 Hinesburg Road. The existing land is a bare lot in zoning district T3. The development will consist
of one four unit residential building; a 4 unit shed structure, 8 parking slots, and landscaping. All of units will be affordable at 80% or less of median and will remain perpetually
affordable by legal contracts. They will be purchased by the Partner Families who will contribute significant volunteer time to Habitat for Humanity building and fund raising efforts.
The new development conforms to elements required per Neighborhood Envelope Standards per section 8.12 of the LDR’s including but not limited to lot width, lot coverage, use, frontage,
entrances, and glazing. See the attached Self Evaluation for detailed line item review of each requirement.
As part of this application, the following items are being submitted for review:
Application
This cover letter
Site Plan Application Submission Checklist
T-3 and T-3+ Building Envelope Standards Checklist and Self Evaluation
Adjoined Property List
Landscape Budget/Cost Requirement and landscape plan
Civil Drawings
C1.0 Site Plan
C2.0 Landscape Plan
Architectural Drawings
A.1 Exterior Elevations
A.2 Typical Unit
A.3 Foundation Plan
A.4 Main level Floor Plan
A.5 Second Level Floor Plan
A.6 Fire Wall and Shed Details
This is the first application for this project
Schedule/Public Infrastructure
Green Mountain Habitat for Humanity hopes to begin construction early spring 2020 and complete construction by March 2021. There will be no phasing; all construction will be completed
at once. There are no public infrastructure improvements proposed as part of this project.
Site Information
See attached civil drawing by Lakeside Environmental (A. Stout) which details disturbance, construction, and site layout.
We do not anticipate the needs for any fill except final topsoil required for landscape plan and driveway coating.
Green Mountain Habitat for Humanity manages construction waste and does not use a dumpster. There is a construction support container on site which will be removed at end of project.
Landscape Features
No existing landscaping will be retained on this project. See landscape plan (C2.0) for details