Loading...
HomeMy WebLinkAboutAgenda 07_MP-20-01_255 Kennedy Dr_OBrien Farm Rd LLC#MP‐20‐01  1  CITY OF SOUTH BURLINGTON  DEVELOPMENT REVIEW BOARD  MP‐20‐01_255 Kennedy Dr_OBrien Farm Rd LLC_2020‐04‐ 07.docx  DEPARTMENT OF PLANNING & ZONING   Report preparation date: April 1, 2020  Plans received: March 10, 2020  255 Kennedy Drive  Master Plan Application #MP‐20‐01  Meeting date: April 7, 2020  Owner/Applicant  O’Brien Farm Road, LLC  1855 Williston Road  South Burlington, VT 05403  Engineer  Krebs & Lansing Consulting Engineers, Inc.  164 Main Street  Colchester VT 05446  Property Information  Tax Parcel 0970‐00255  Residential 12, Commercial 1‐LR, and Residential 1‐PRD Zoning Districts  39.16 acres       Location Map            #MP‐20‐01  2  PROJECT DESCRPTION    Master plan application #MP‐20‐01 of O’Brien Farm Road, LLC to amend a previously approved master  plan for a planned unit development to develop 39.16 acres with a maximum of 458 dwelling units and  45,000 square feet of office space.  The amendment is to add 0.60 acres to Zone 2A without changing the  approvals or use for that zone and remove 0.60 acres from Zone 7, 255 Kennedy Drive.      PERMIT HISTORY    In 2017, the applicant obtained master plan approval MP‐17‐01 for up to 458 dwelling units and 45,000  sf of office space on 39.16 acres.  In 2018, the DRB reviewed sketch plan application SD‐18‐24 for 322  units in six (6) multifamily buildings near the northern corner of the master plan area.  That application  presented  a  configuration  which  differed  from  what  was  contemplated  in  the  original  master  plan  approval and which required an additional 0.6 acres to be added to the master plan area.  This additional  0.6 acres is located in an area zoned C1‐LR.    CONTEXT    The applicant has previously been approved for a 39.16 acre master plan.  In this application, they are  proposing to add 0.6 acres to an area described in MP‐17‐01 as “Zone 2A,” but not to change any approvals  for that zone.    COMMENTS    Development Review Planner Marla Keene and Director of Planning and Zoning Paul Conner (“Staff”)  have reviewed the plans submitted on 12/20/2018 and offer the following comments.    A) APPROVAL AND AMENDMENT OF MASTER PLAN    Section 15.07(D)(3) of the South Burlington Land Development regulations states    Any application for amendment of the master plan, preliminary site plan or preliminary plat that  deviates from the master plan in any one or more of the following respects, shall be considered a new  application for the property and shall require sketch plan review as well as approval of an amended  master plan:    (a) An increase in the total FAR or number of residential dwelling units for the property subject to  the master plan;  (b) An increase in the total site coverage of the property subject to the master plan;  The applicant is proposing to increase the area by 0.6 acres but the proposed lot and building  coverage, approved at 50% and 35% respectively, are proposed to remain the same.  (c) A change in the location, layout, capacity or number of collector roadways on the property  subject to the master plan;  (d) Land development proposed in any area previously identified as permanent open space in the  approved master plan application; and/or  (e) A change that will result in an increase in the number of PM peak hour vehicle trip ends  projected for the total buildout of the property subject to the master plan.  None of these criteria apply, so a new sketch plan review is not needed.  #MP‐20‐01  3    B) PLANNED UNIT DEVELOPMENT STANDARDS    Pursuant to Section 15.18 of the South Burlington Land Development Regulations, Master plans shall  comply with the standards for Planned Unit Development (PUD).      The applicant has recently submitted a preliminary plat application for the next phase of this master plan  development consisting of the six (6) multifamily buildings reviewed in sketch plan application SD‐18‐34.   These units are proposed to be located in the area that is the subject of this master plan amendment.  Review  of the proposed development in this area will be done as part of that master plan application.  The following  review only addresses standards which are affected by the addition of 0.6 acres to the master plan area, with  limited review of the proposed use of that area as no change to the approved use of the master plan Zone 2A  is proposed.     (1) Sufficient water supply and wastewater disposal capacity is available to meet the needs of  the project in conformance with applicable State and City requirements, as evidenced by a  City water allocation, City wastewater allocation, and/or Vermont Water and Wastewater  Permit from the Department of Environmental Conservation.    (2) Sufficient  grading  and  erosion  controls  will  be  utilized  during  construction  and  after  construction  to  prevent  soil  erosion  and  runoff  from  creating  unhealthy  or  dangerous  conditions on the subject property and adjacent properties. In making this finding, the DRB  may  rely  on  evidence  that  the  project  will  be  covered  under  the  General  Permit  for  Construction issued by the Vermont Department of Environmental Conservation.    (3) The project incorporates access, circulation and traffic management strategies sufficient to  prevent unreasonable congestion of adjacent roads. In making this finding the DRB may rely  on the findings of a traffic study submitted by  the applicant, and the findings of any  technical review by City staff or consultants.  These criteria were found to be met at the master plan level.  No change in use is proposed.   Staff considers the project’s compliance with these criteria unaffected by the proposed  amendment.    (4) The project’s design respects and will provide suitable protection to wetlands, streams,  wildlife habitat as identified in the Open Space Strategy, and any unique natural features  on the site. In making this finding the DRB shall utilize the provisions of Article 12 of these  Regulations related to wetlands and stream buffers, and may seek comment from the  Natural Resources Committee with respect to the project’s impact on natural resources.  Staff considers there are no natural resources in the 0.6 acre area proposed to be added to  Zone 2A.  In addition to the color master plan showing the area to be added, the applicant  has  submitted  an  overall  master  plan  map  which  shows  the  topography  of  the  area  in  question.  Staff considers this criterion met.  (5) The project is designed to be visually compatible with the planned development patterns in  the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in  which it is located.  #MP‐20‐01  4    Staff considers the proposed amendment, which is to support the master‐plan approved  number of units, meets this criterion.  (6) Open space areas on the site have been located in such a way as to maximize opportunities  for creating contiguous open spaces between adjoining parcels and/or stream buffer areas.     The original master plan included a plan for open spaces.  No approved open spaces are  affected by this amendment.  Staff considers this criterion met.  (7) The layout of a subdivision or PUD has been reviewed by the Fire Chief or his designee to  insure that adequate fire protection can be provided, with the standards for approval  including,  but  not  be  limited  to,  minimum  distance  between  structures,  street  width,  vehicular access from two directions where possible, looping of water lines, water flow and  pressure, and number and location of hydrants. All aspects of fire protection systems shall  be  designed  and  installed  in  accordance  with  applicable  codes  in  all  areas  served  by  municipal water.    (8) Roads,  recreation  paths,  stormwater  facilities,  sidewalks,  landscaping,  utility  lines  and  lighting have been designed in a manner that is compatible with the extension of such  services and infrastructure to adjacent properties.    (9) Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is  consistent with City utility and roadway plans and maintenance standards, absent a specific  agreement with the applicant related to maintenance that has been approved by the City  Council.    No development is proposed as part of this amendment.  Staff considers these three criteria  not applicable.  (10) The project is consistent with the goals and objectives of the Comprehensive Plan for the  affected district(s).    The project is located in the Northwest Quadrant.  Objectives of the Comprehensive Plan for  the Northwest Quadrant address maintaining existing affordable diverse residential  neighborhoods and access to park, allowing for infill development supporting the character  of existing neighborhoods with a focus on replacement of small single‐family affordable  homes that have been acquired by the airport, and establishing a community vision for the  future of this area.  Staff considers this criterion met.    (11) The project’s design incorporates strategies that minimize site disturbance and integrate  structures, landscaping, natural hydrologic functions, and other techniques to generate less  runoff from developed land and to infiltrate rainfall into underlying soils and groundwater  as close as possible to where it hits the ground. For Transect Zone subdivisions, this standard  shall  apply  only  to  the  location of  natural  resources  identified in Article XII of these  Regulations.    #MP‐20‐01  5  No development is proposed as part of this amendment.  Staff considers this criterion not  applicable.    RECOMMENDATION    Staff recommends that the Board discuss the project with the applicant and conclude the hearing.     Respectfully submitted,      ____________________________________  Marla Keene, Development Review Planner      VIA HAND DELIVERY AND ELECTRONIC MAIL February 13, 2020 South Burlington Development Review Board C/O Ms. Marla Keene, Development Review Planner City of South Burlington 575 Dorset Street South Burlington, VT 05403 Re: Amendment Request Hillside at O’Brien Farm Master Planned Community Dear Board Members: O’Brien Farm Road, LLC (“Applicant”) is filing for Preliminary Plat Review for a proposed development of 390 multi-family rental dwelling units including 48 units priced at below 80% of AMI and 47 offset units provided under the new inclusionary zoning ordinance, as well as associated parking, landscaping and stormwater improvements. This proposed development will be located on six existing lots adjacent to Kennedy Drive and Kimball Avenue and will make use of road networks and improvements permitted in City of South Burlington Final Plat Approval SD-17-17 (the “Final Plat” or the “Final Plat Approval”), as well as South Burlington Master Plan Approval MP-16-03, as amended at MP- 17-01 (collectively herein the “Master Plan” or the “Master Plan Approval”). In that application in order to accommodate the inclusionary requirement which now exists but did not exist at the time the Master Plan was permitted, one of the buildings and a trash structure associated with the building needed to be partially located on land outside of the initial Master Plan area. This application requests an amendment to the approved Master Plan MP-17-01 to expand Zone 2A by .6 acres and to decrease Zone 7 by .6 acres, the “Project.” No other changes are proposed to the approved Master Plan. As outlined above the reason for the request is simply to have the master plan area in which the buildings are planned align with the building footprints as now proposed. The density associated with this land is not proposed for construction and therefore no density increase to the Master Plan area is proposed. Additionally, no increase in the total coverage for the Master Plan is proposed. The Master Plan approved 35% building and 50% total coverage. The Applicant is happy to maintain those thresholds. Additionally, the Master Plan set a limit of 85% coverage in Zone 2A and 90% coverage in Zone 2B. Both of those coverage limitations are also in place and unchanged. No changes to the roadways or open space are proposed and no increase of the PM Peak hour trips will result. 2 As such, we believe no new sketch plan application is needed, and that this amendment application can be granted. We appreciate your feedback on this application and we look forward to working through this project with you. Thank you. Sincerely, Andrew Gill, Director of Development Enclosures VIA HAND DELIVERY AND ELECTRONIC MAIL March 10, 2020 South Burlington Development Review Board C/O Ms. Marla Keene, Development Review Planner City of South Burlington 575 Dorset Street South Burlington, VT 05403 Re: Amendment Request Hillside at O’Brien Farm Master Planned Community Supplement to 02 14 20 filing; Response to Email from Marla Keene Dated 3/10/20 Dear Board Members: O’Brien Farm Road, LLC (“Applicant”) filed a request for Master Plan Amendment on February 14, 2020. This application was reviewed by City Staff on March 10, 2020, and additional information was requested. Further to the specific requests of the email from Marla Keene dated March 10, 2020, please find the following supplemental information and exhibits. 1. Application Form: Further to your request we have provided comments in the Application form attached to supplement what is written in the cover letter submitted to ensure clarity for staff and the Board. Please see the attached updated Application Form. 2. Update Master Plan and Uniquely Demarcate Area of Change: Further to your request attached please find updated exhibits which are as follows: a. Exhibit 002: Sheet C-1 shows the proposed multi-family development that will proceed through permitting simultaneous with this Master Plan amendment. That multi-family project will have its own application and the details will be available at that time. This application only uses that plan to demonstrate that in the layout we are pursuing to achieve the goals of the approved Master Plan requires slightly more area than was included in the original Master Plan. As outlined in the original application, the Applicant seeks to expand Zone 2A the “Multi-Family and Mixed-Use Zone” of the original master plan by .6 acres. This will necessarily reduce Zone 7 the “Remaining Lands,” by .6 acres. The area of this expansion is highlighted on Sheet C-1. b. Exhibit 003: Exhibit 003 is the Master Plan that was issued for the Project originally amended to show the expansion. This would be the new Master Plan sheet if this amendment is approved. The area of expansion is again highlighted for your reference. 2 c. Density: While the amendment is expanding the Master Plan .6 acres into land zoned with 12 units per acre of density, the Applicant is not seeking to increase the overall density of the Master Plan at this time. The overall Master Plan density will remain unchanged, the area will simply expand. The original base density prior to any inclusionary zoning offsets will remain unchanged. As mentioned in the original application and as now highlighted on the Application Form attached as Exhibit 001 to this letter, the Master Plan Amendment proposed does not seek to increase the allowable coverage percentage within the Master Plan. The issued Master Plan approved 35% building and 50% total coverage. The Applicant is happy to maintain those thresholds. While both the numerator and denominator of the coverage percentage calculations will increase, the overall percentages will remain the same. We appreciate your feedback on this application and we look forward to working through this project with you. Thank you. Sincerely, Andrew Gill, Director of Development Enclosures