Loading...
HomeMy WebLinkAboutSP-07-61 - Decision - 0005 Bartlett Bay RoadCITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING MAGIC HAT BREWING CO — 5 BARTLETT BAY ROAD SITE PLAN #SP-07-61 FINDINGS OF FACT AND DECISION Magic Hat Brewing Co, hereinafter referred to as the applicant, is seeking approval to amend a previously approved site plan for three (3) industrial buildings on two (2) parcels totaling 6.73 acres. The amendment consists of: 1) adding five (5) parking spaces, 2) minor site modifications, and 3) minor landscaping changes, 5 Bartlett Bay Road. Based on the plans and supporting material contained in the document file for this application, the Administrative Officer finds, concludes, and decides as follows: FINDINGS OF FACT 1. The applicant is seeking approval to amend a previously approved site plan for three (3) industrial buildings on two (2) parcels totaling 6.73 acres. The amendment consists of: 1) adding five (5) parking spaces, 2) minor site modifications, and 3) minor landscaping changes, 5 Bartlett Bay Road. 2. The owner of record of the subject property is Antonio B. Pomerleau and Rita Pomerleau Foundation. 3. The subject property is located in the Commercial 2 (C2) Zoning District. 4. The application was received on August 14, 2007. 5. The plan submitted is entitled, "Pomerleau Foundation C/O Pomerleau Real Estate Magic Hat Brewing Co. Site Plan Modifications Bartlett Bay Road South Burlington Vermont", prepared by Civil Engineering Associates, Inc., dated May, 2003, with a last revised date of 8/6/07. DIMENSION REQUIREMENTS 6. Coverages are not changing as a result of this application. All requirements are being met. 7. Setback requirements are being met. -1- 1 #SP-07-61 SITE PLAN REVIEW STANDARDS Vehicular access 8. Access is provided via a curb cut off Bartlett Bay Road. No changes are proposed. Circulation 9. Circulation on the site is adequate. Parking 10. The applicant is proposing to add five (5) parking spaces, for a total of 48 parking spaces which are shown on the plan, including the required two (2) spaces marked as handicapped. The current uses in the building require 37 parking spaces. The parking requirement is being met. 11. Pursuant to Section 13.01(G)(5) of the Land Development Regulations, bicycle parking shall be provided on the subject property. A bicycle rack is shown on the plan in a revised location. 12. Pursuant to Section 13.01(B) of the Land Development Regulations, internal landscaping of the parking area does not apply. Landscaping 13. The applicant has proposed to screen a transformer with three (3) Cedar trees. This is acceptable. The applicant also has swapped the location of trees and bushes along the eastern side of the property which is also acceptable. 14. Pursuant to Section 13.06(B)(4) of the Land Development Regulations, snow storage areas must be shown on the plan. Snow storage areas are shown on the plan. Outdoor Lighting 15. There are no changes to outdoor lighting proposed. Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the following review standards shall apply to the site plan applications: -2- #SP-07-61 Traffic 16. Traffic will not be affected by this application. (a) The relationship of the proposed development to goals and objects set forth in the City of South Burlington Comprehensive Plan. 17. The Comprehensive Plan states that the City should encourage development while protecting natural resources and promoting a healthy and safe environment. The proposed project is in keeping with the recommended actions of the Comprehensive Plan. (b)The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. 18. The building is existing and no changes are proposed. (c) Parking shall be located to the rear or sides of buildings to the greatest extent practicable. 19. Parking is located on the side and front of the building. All parking is existing with no additional parking proposed. 20. As noted above, bicycle rack location(s) are noted on the plan. (d) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. 21. The building is existing and no changes are proposed. (e) Newly installed utility service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. 22. The plans do not indicate changes in utility service. (f) The combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to cerate attractive transitions between buildings or different architectural styles shall be encouraged. 23. The building is existing and no changes are proposed. (g) Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. -3- #SP-07-61 24. The building is existing and no changes are proposed. In addition, to the above general review standards, site plan applications shall meet the following specific standards set forth in Section 14.07 of the Land Development Regulations: (a) The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. 25. The reservation of land is not necessary. (b) Electric, telephone, and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. 26. No changes to existing underground utilities. (c) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). 27. Pursuant to Section 13.06(C)(1) of the Land Development Regulations, screened dumpster locations must be shown on the plans. Screened dumpster storage locations are shown on the plan. DECISION Based on the above Findings of Fact, the Administrative Officer hereby approves site plan application #SP-07-61 of Magic Hat Brewing Co., to amend a previously approved site plan for three (3) industrial buildings on two (2) parcels totaling 6.73 acres. The amendment consists of: 1) adding five (5) parking spaces, 2) minor site modifications, and 3) minor landscaping changes, 5 Bartlett Bay Road, subject to the following conditions: 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2) This project shall be completed as shown on the plan and shall be on file in the South Burlington Department of Planning and Zoning. 3) The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. #SP-07-61 4) The Applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to the use of the site modifications which are the subject of this decision. 5) Any change to the site plan shall require approval by the South Burlington Development Review Board or the Administrative Officer. Ir-IAI Signed on this Q day of kaS , 2007 by R m nd I Belair, Administrative Officer Please note: Pursuant to 24 VSA § 4465, an interested person may appeal this decision by filing a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be accompanied with a $110 filing fee and be filed within 15 days of the date of this decision. Ism