Purpose Energy Inc, hereafter referred to as the applicant, is requesting to amend a
previously approved plan for a 57,137 sq. ft. light manufacturing facility (brewery). The
amendment consists of constructing a 5100 sq. ft. digester (accessory structure), 5
Bartlett Bay Road.
The Development Review Board held a public hearing on Tuesday, September 16,
2008. Matt Wamsganz of Civil Engineering Associates represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is requesting to amend a previously approved plan for a 57,137 sq.
ft. light manufacturing facility (brewery). The amendment consists of constructing
a 5100 sq. ft. digester (accessory structure), 5 Bartlett Bay Road.
2. The owner of record of the subject property is the Pomerleau Foundation.
3. The subject property is located in the Commercial 2 (C2) Zoning District.
4. The plans submitted consist of a two (2) page set of plans, page one (1) entitled,
"Proposed Anaerobic Digester Facility 5 Bartlett Bay Road South Burlington
Vermont", prepared by Civil Engineering Associates, Inc., dated Sept 2007, last
revised on 8/8/08.
- 1 -
#SP-08-78
Zoning District & Dimensional Requirements:
Table 1. Dimensional Requirements
C2 Zoning District
Required
Proposed
4 Min. Lot Size
40,000 SF
5.22 acres
4 Max. Building Coverage
40%
27.4% (PUD)
4 Max. Overall Coverage
70%
58.7% (PUD)
+ Max. Front Yard Coverage (Bartlett Bay
Road
46.4%
46.4%
�l Min. Front Setback
30 ft.
Approx 70 ft
�l Min. Side Setback
10 ft.
Approx 60 ft
�l Min. Rear Setback
30 ft.
Approx 80 ft
�l Max. Building Height
35 ft.
24 ft
q zoning compliance
+ preexisting noncompliance, not made worse by this proposal
The height of the proposed digester is 34 feet. These are higher than the permissible 15
feet for accessory structures and therefore the applicant is requesting a height waiver of
nineteen (19) feet. Existing fermentation tanks on site are 42 feet in height.
PLANNED UNIT DEVELOPMENT STANDARDS
Pursuant to Section 15.18 of the South Burlington Land Development Regulations, PUDs
shall comply with the following standards and conditions:
(a) Sufficient water supply and wastewater disposal capacity is available to meet
the needs of the project
The South Burlington Water Department reviewed the plans and stated the following:
"1 have reviewed the plans for the Magic Hat Anaerobic Digester and had several
concerns with the proposed water line relocation design. I met with Matt W. from CEA to
discuss my concerns and make some suggestions. Since that meeting Matt has made
some changes to the water line design and continues to work on the project with the
owners and project managers.
Since he has already made some changes to the plans, I will not comment on those that
I have in hand, but will wait until I see the next set with the new changes."
The applicant shall continue to work with the South Burlington Water Department and
shall adhere to any future comments related to this proposal.
(b) Sufficient grading and erosion controls will be utilized during and after
construction to prevent soil erosion and runoff from creating unhealthy or
dangerous conditions on the subject property and adjacent properties.
-2-
l
i
#SP-08-78
(c) The project incorporates access, circulation, and traffic management
strategies sufficient to prevent unreasonable congestion of adjacent roads.
Access and circulation will not be affected by this proposal.
(d) The project's design respects and will provide suitable protection to
wetlands, streams, wildlife habitat as identified in the Open Space Strategy,
and any unique natural features on the site.
There are no wetlands or other unique natural features on the site.
(e) The project is designed to be visually compatible with the planned
development patterns in the area, as specified in the Comprehensive Plan
and the purpose of the zoning district(s) in which it is located.
The proposed expansion, and current use, is in keeping with the planned development of
the C2 Zoning District.
(t) Open space areas on the site have been located in such a way as to maximize
opportunities for creating contiguous open spaces between adjoining parcels
and/or stream buffer areas.
The subject lot is located within a densely developed commercial district. There are no
natural open space areas on the site.
(g) The layout of a subdivision or PUD has been reviewed by the Fire Chief or
(designee) to ensure that adequate fire protection can be provided.
The Fire Chief has stated that he does not need to review the proposed project.
(h) Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility
lines and lighting have been designed in a manner that is compatible with the
extension of such services and infrastructure to adjacent landowners.
(i) Roads, utilities, sidewalks, recreation paths, and lighting are designed in a
manner that is consistent with City utility and roadway plans and
maintenance standards.
There are no changes to the city roads or sidewalks. There are no realistic opportunities for
connections to adjacent properties.
U) The project is consistent with the goals and objectives of the Comprehensive
plan for the affected district(s).
The project is consistent with the goals and objectives of the Comprehensive Plan as they
relate to the C2 Zoning District.
SITE PLAN REVIEW STANDARDS
Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations,
any PUD shall require site plan approval. Section 14.06 of the South Burlington Land
-3-
C
#SP-08-78
Development Regulations establishes the following general review standards for all site
plan applications:
(a) The site shall be planned to accomplish a desirable transition from structure
to site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
The proposed building, based on the proposed 56,157 SF GFA and 25 employees per
shift, shall require 53 parking spaces. 63 spaces are provided. Three parking spaces shall
be handicapped accessible. Three are shown as such.
(b) Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
All existing and proposed parking is located to the side and rear of the building with the
exception of 13 previously approved spaces to the front of the building.
(c) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and
existing or adjoining buildings.
This issue has already been addressed above.
(d) Newly installed utility services and service modifications necessitated by
exterior alterations or building expansions shall, to the extent feasible, be
underground.
Newly installed utility services and service modifications necessitated by exterior alterations
or building expansions shall, to the extent feasible, be underground.
(e) The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual
interruptions to create attractive transitions between buildings of different
architectural styles.
(f) Proposed structures shall be related harmoniously to themselves, the terrain,
and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures.
Elevations are not warranted for this building. The building is located in a densely
developed commercial area and the existing building is harmonious to the surrounding
structures.
Site plan applications shall meet the following specific standards as set forth in Section
14.07 of the South Burlington Land Development Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial of collector street, to provide additional access for
-4-
#S P-08-78
emergency or other purposes, or to improve general access and circulation
in the area.
Again, no additional access shall be required at this time.
(b) Electric, telephone and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall
be located so as to have a harmonious relation to neighboring properties and
to the site.
It has already been stated that all new utility lines shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not
escape the enclosure(s).
The existing dumpster is not proposed to be relocated. It is shown as appropriately
screened and fenced.
(d) Landscaping and Screening Requirements.
Based on projected building costs of $1,000,000, the minimum landscaping budget shall
be $17,500. The applicant is proposing additional landscaping of $17,500.
The South Burlington City Arborist has reviewed the plans and stated that they look
acceptable.
Lighting
The applicant has submitted proposed lighting fixtures which have full cut off visors and
are therefore in compliance with the South Burlington Land Development Regulations.
� ) DECISION
Motion by GAL� `� CdW , seconded by
to approve Site Plan Application SP-08-78 of Purpose Energy, Inc., subject to the
following conditions:
1. All previous approvals and stipulations which are not superseded by this
approval shall remain in effect.
2. This project shall be completed as shown on the plans and submitted by the
applicant and on fine in the South Burlington Department of Planning and Zoning.
3. The plans shall be revised to show the changes below and shall require approval
of the Administrative Officer. Three (3) copies of the approved revised plans shall
be submitted to the Administrative Officer prior to permit issuance.
-5-
#S P-08-78
a. The plans shall be revised to adhere to the requests of the South
Burlington Water Department if necessary.
4. The South Burlington Water Department shall review the revised plans and
provide comments.
5. The Board grants a height waiver of 19 feet for the proposed digester for a
maximum of 34 feet in height.
6. Prior to permit issuance, the applicant shall post a $17,500 landscaping bond. This
bond shall remain in full effect for three (3) years to assure that the landscaping has
taken root and has a good chance of survival.
7. Newly installed utility services and service modifications necessitated by exterior
alterations or building expansions shall, to the extent feasible, be underground.
8. The Development Review Board grants a period of five (5) years for approval of
phase 2 of the proposed development (second tank). At such time as the five years
is reached and the applicant has not sought a zoning permit for phase 2, they shall
be eligible, per Section 17.04 of the South Burlington Land Development
Regulations, for one (1) extension to an approval if reapplication takes place before
the approval has expired and if the Development Review Board determines that
conditions are essentially unchanged from the time of the original approval. In
granting such an extension, the Development Review Board may specify a period
of time of up to one (1) year for the extension.
9. The applicant shall obtain a zoning permit within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and
void.
10. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to the use or occupancy of the digester building.
11. Any change to the site plan shall require approval of by the South Burlington
Development Review Board or the South Burlington Administrative Officer.
#SP-08-78
Mark Behr —9/nay/abstain/not present
Matthew Birmingham —yea/nay/abstain of ;pre:s:e-n>
John Dinklage — e nay/abstain/not presen
Roger Farley — e nay/abstain/not present
Eric Knudsen — Wnay/abstain/not present
Peter Plumeau — e _ nay/abstain/not present
Gayle Quimby — e ay/abstain/not present
Motion carried by a vote of 0 - U
Signed this J--2 day of L- 2008, by
/ John Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRECP 5 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).