Purpose Energy Inc, hereafter referred to as the applicant, is requesting to amend a
previously approved plan for a 57,137 sq. ft. light manufacturing facility (brewery). The
amendment consists of: 1) relocating a previously approved driveway on the west end of
the property, 2) changing the originally approved phases of the digester facility by
constructing westerly tank in phase 1 and the easterly tank in phase II, and 3)
reconfiguring the footprint of the digester building by adding 750 sq. ft., , 5 Bartlett Bay
Road.
Based on the plans and supporting materials contained in the document file for this
application, the Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
The applicant is requesting to amend a previously approved plan for a 57,137 sq.
ft. light manufacturing facility (brewery). The amendment consists of: 1)
relocating a previously approved driveway on the west end of the property, 2)
changing the originally approved phases of the digester facility by constructing
westerly tank in phase 1 and the easterly tank in phase II, and 3) reconfiguring
the footprint of the digester building by adding 750 sq. ft., 5 Bartlett Bay Road.
2. The owner of record of the subject property is the Pomerleau Foundation.
3. The subject property is located in the Commercial 2 (C2) Zoning District.
4. The plan submitted is entitled, "Proposed Anaerobic Digester Facility 5 Bartlett
Bay Road South Burlington Vermont", prepared by Civil Engineering Associates,
Inc., dated Sept 2007, last revised on 10/15/08.
- 1 -
#SP-08-100
Zoning District & Dimensional Requirements:
Table 1. Dimensional Re uirements
C2 Zoning District
Required
Proposed
Min. Lot Size
40,000 SF
5.22 acres
Max. Building Coverage
40%
27.7% (PUD)
�l Max. Overall Coverage
70%
58.7% (PUD)
�• Max. Front Yard Coverage (Bartlett Bay
Road
46.4%
46.4%
Min. Front Setback
1 30 ft.
Approx 70 ft
�l Min. Side Setback
10 ft.
Approx 60 ft
�1 Min. Rear Setback
30 ft.
Approx 80 ft
�l Max. Building Height
n/a
n/a
q zoning compliance
+ preexisting noncompliance, not made worse by this proposal
The only change proposed is an increase in building coverage from 27.4% to 27.7%.
Overall coverage and front yard coverages are remaining the same. Setback requirements
are being met.
SITE PLAN REVIEW STANDARDS
Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations,
any PUD shall require site plan approval. Section 14.06 of the South Burlington Land
Development Regulations establishes the following general review standards for all site
plan applications:
(a) The site shall be planned to accomplish a desirable transition from structure
to site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
Fifty-three (53) parking spaces are required and 63 spaces are provided. Three parking
spaces shall be handicapped accessible. Three are shown as such.
The applicant is proposing to relocate a previously approved driveway (one-way truck exit)
on the southwesterly portion of the property accessing Bartlett Bay Road. The proposed
location is acceptable.
A bicycle rack is noted on the plan.
(b) Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
All existing and proposed parking is located to the side and rear of the building with the
exception of 13 previously approved spaces to the front of the building.
-2-
#SP-08-100
(c) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and
existing or adjoining buildings.
This issue has already been addressed above.
(a) Newly installed utility services and service modifications necessitated by
exterior alterations or building expansions shall, to the extent feasible, be
underground.
Newly installed utility services and service modifications necessitated by exterior alterations
or building expansions shall, to the extent feasible, be underground.
(e) The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual
interruptions to create attractive transitions between buildings of different
architectural styles.
(fl Proposed structures shall be related harmoniously to themselves, the terrain,
and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures.
Elevations are not warranted for this building. The building is located in a densely
developed commercial area and the existing building is harmonious to the surrounding
structures.
Site plan applications shall meet the following specific standards as set forth in Section
14.07 of the South Burlington Land Development Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial of collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation
in the area.
Again, no additional access shall be required at this time.
(b) Electric, telephone and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall
be located so as to have a harmonious relation to neighboring properties and
to the site.
It has already been stated that all new utility lines shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not
escape the enclosure(s).
The existing dumpster is not proposed to be relocated. It is shown as appropriately
-3-
I
#SP-08-100
screened and fenced.
(d) Landscaping and Screening Requirements.
There are no landscaping changes as required by this application.
The snow storage area is noted on the plan.
Lighting
There are no lighting changes as part of this application.
Traffic
There are no traffic changes as a result of this application.
DECISION
Based on the above Findings of Fact, the Administrative Officer herby approves Site
Plan Application #SP-08-100 of Purpose Energy, Inc., subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this
approval shall remain in effect.
2. This project shall be completed as shown on the plans and submitted by the
applicant and on fine in the South Burlington Department of Planning and Zoning.
3. The Development Review Board grants a period of five (5) years for approval of
phase 2 of the proposed development (second tank). At such time as the five years
is reached and the applicant has not sought a zoning permit for phase 2, they shall
be eligible, per Section 17.04 of the South Burlington Land Development
Regulations, for one (1) extension to an approval if reapplication takes place before
the approval has expired and if the Development Review Board determines that
conditions are essentially unchanged from the time of the original approval. In
granting such an extension, the Development Review Board may specify a period
of time of up to one (1) year for the extension.
4. The applicant shall obtain a zoning permit within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and
void.
5. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to the use or occupancy of the digester building.
6. Any change to the site plan shall require approval of by the South Burlington
Development Review Board or the South Burlington Administrative Officer.
-4-
#SP-08-100
Signed on this day of �C��l✓� 2008 by
r, Administrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this
decision by filing a Notice of Appeal with the secretary of the Development Review
Board. This Notice of Appeal must be accompanied with a $110 filing fee and be filed
within 15 days of the date of this decision.