Loading...
HomeMy WebLinkAboutSP-23-027 - Plans - Record - 0550 Dorset StreetWWSSSOHEOHEUGESDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDWWWSDSDSDSDSDSDSDSDSDSDSDGASGASWWWWWUGEGASGASGASGASGASGASWWWWWGASGASGASGASSDSDSDSDSDSDSSDSDSDSDSDSDSSS SSDSSD SD SDSDSD WUGEUGEUTUTWWWWWWWWWGASOHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHESSSSS SSSS SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSDSDSDSD SDLEGENDSheet Title:Project Title:StampEV Project #No.DescriptionDateS:\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG PLOTTED: 8/17/2023 8:19 AM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comENGINEERINGVENTURESPCSOUTH BURLINGTON HIGH SCHOOLOUTDOOR BASKETBALL COURTJGZ1.0PB1"=200'2023-05-3122714OVERALL SITE PLANNOTES1 ADDED SNOW STORAGE & EPSC NOTES 8/16/23WITH SNOW STORAGE AREASZ1.1 WWSSSOHEOHEUGESDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDWWWSDSDSDSDSDSDSDSDSDSDSDGASGASWWWWWUGEGASGASGASGASGASGASWWWWWGASGASGASGASSDSDSDSDSDSDSSDSDSDSDSDSDSSS SSDSSD SD SDSDSD WUGEUGEUTUTWWWWWWWWWGASOHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHESSSSS SSSS SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSDSDSDSD SDLEGENDSheet Title:Project Title:StampEV Project #No.DescriptionDateS:\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG 6/15/2023 4:39 PM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comENGINEERINGVENTURESPCSOUTH BURLINGTON HIGH SCHOOLOUTDOOR BASKETBALL COURTJGZ1.0PB1"=200'2023-05-3122714OVERALL SITE PLANExisting Trash andRecycling Area,UnfencedProposed 20'x24' Trash& Recycling Area, 8'Chainlink Fence WithPrivacy SlatsExisting / ProposedTrash & RecyclingArea, New 8' ChainlinkFence Enclosure WithPrivacy Slats 20'x24'Existing BikeRack, 10 BikeCapacity, To BeBolted In PlaceExisting BikeRack, 6 BikeCapacity (Each),to be bolted inplaceExisting BikeRack, 12 BikeCapacity, BoltedExisting BikeRack, 12 BikeCapacity, to bebolted in place1 Revised to include bike storage and trash area notes 6/20/23Proposed BikeRack, 10 BikeCapacity,Compliant, to bebolted ontoconcrete footingsProposed BikeRack, 10 BikeCapacity,Compliant, to bebolted ontoconcrete footings2 Revised to further outline bike storage 6/26/23Bicycle Parking Notes:- 75 spaces required- Space count for older style racksinclude 1 at each end plus 1 for each 6'of length along the sides.- With proposed U-racks, total compliantspaces will be 76. REFUSE AREA DETAILSheet Title:Project Title:EV Project #\\192.168.75.15\SERVER\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG PLOTTED: 6/29/2023 11:29 AM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comFigure:227142023 BASKETBALL COURT PROJECTSouth BurlingtonSchool District550 Dorset StreetSouth Burlington, VT05403ENGINEERINGVENTURESPCJGPB2023-04-27REFUSE AREA DETAIL Sheet Title:Project Title:EV Project #S:\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG PLOTTED: 5/17/2023 12:05 PM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comFigure:227142023 BASKETBALL COURT PROJECTSouth BurlingtonSchool District550 Dorset StreetSouth Burlington, VT05403ENGINEERINGVENTURESPCJGPB1"=20'2023-04-27SITE PLAN BASKETBALL COURT SECTIONSITE/EARTHWORK SPECIFICATIONSBASKETBALL POST FOOTING DETAILBASKETBALL COURT DIAGRAMSTORMWATER MANAGEMENT AREA DETAIL·······················SOIL RESTORATION NOTESSheet Title:Project Title:EV Project #S:\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG PLOTTED: 5/17/2023 9:15 AM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comFigure:227142023 BASKETBALL COURT PROJECTSouth BurlingtonSchool District550 Dorset StreetSouth Burlington, VT05403ENGINEERINGVENTURESPCJGPB2023-04-27SITE DETAILS Sheet Title:Project Title:EV Project #S:\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG PLOTTED: 5/17/2023 11:00 AM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comFigure:227142023 BASKETBALL COURT PROJECTSouth BurlingtonSchool District550 Dorset StreetSouth Burlington, VT05403ENGINEERINGVENTURESPCJGPB1"=20'2023-04-27PRE-DEVELOPMENT DRAINAGE PLAN Sheet Title:Project Title:EV Project #S:\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG PLOTTED: 5/17/2023 10:58 AM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comFigure:227142023 BASKETBALL COURT PROJECTSouth BurlingtonSchool District550 Dorset StreetSouth Burlington, VT05403ENGINEERINGVENTURESPCJGPB1"=20'2023-04-27POST-DEVELOPMENT DRAINAGE PLAN Sheet Title:Project Title:EV Project #S:\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG PLOTTED: 7/24/2023 2:22 PM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comFigure:227142023 BASKETBALL COURT PROJECTSouth BurlingtonSchool District550 Dorset StreetSouth Burlington, VT05403ENGINEERINGVENTURESPCJGPB1"=20'2023-04-27EPSC PLANEROSION CONTROL LEGEND SIDE VIEWTOP VIEWTYPICAL BIKE RACK DETAILSheet Title:Project Title:EV Project #S:\PROJECTS\0-2022\22714 SBHS OUTDOOR BASKETBALL COURT\DWG\REFERENCES\22714 X-BASE.DWG PLOTTED: 6/26/2023 5:00 PM Date:Scale:Drawn By:Checked By:208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-622585 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333414 Union Street, Schenectady, NY 12305 s 518-630-9614www.engineeringventures.comFigure:227142023 BASKETBALL COURT PROJECTSouth BurlingtonSchool District550 Dorset StreetSouth Burlington, VT05403ENGINEERINGVENTURESPCJGPB2023-04-27SITE DETAILS