Loading...
HomeMy WebLinkAboutSD-22-07 - Supplemental - 0047 Cheesefactory Lane (2)1 Marla Keene From:Christine Gingras Sent:Friday, May 27, 2022 3:54 PM To:Marla Keene; Dave Wheeler Subject:RE: SD-22-07 47 Cheesefactory Rd Final Plat - for review Hi Marla, EPSC plans and permanent soil stabilization details for 47 Cheesefactory Rd were reviewed. Please see the following comments. - Per the page 117, of the VT Standards and Specifications for Erosion Prevention and Sediment Control Manual (VTDEC, Feb 2020), the maximum allowable slope length of contributing runoff to a silt fence placed on the slope shown on the site plans (~8%) is 100ft. The site length exceeds 100’ and a second row of silt fence should be added closer to the building construction activities. - Plans should show the limit of construction disturbance. - It is not clear where on the site the stone-lined swale labeled section A-A on the Stone Check Dam detail on page 4 is to go. This detail shows rock size of 2”-6”. The typical ditch detail shown on page 3 looks to be the one intended for the stone-lined ditch that outlets stormwater to the south/east. This typical calls out Type 1 Stone (up to 12” rock size). Plans should be clear about which typical detail is intended for each swale. - It is not clear where on the site plan the typical stone spillway detail is intended to be placed. - It is not clear if the ditch on the north side of the private road is to be stone-lined or vegetated between stone check dams. - Plans should include a detail for rock outlet protection for both 15” drainage outlets. Have a nice weekend! Christine From: Marla Keene <mkeene@southburlingtonvt.gov> Sent: Wednesday, May 25, 2022 1:46 PM To: Dave Wheeler <dwheeler@southburlingtonvt.gov> Cc: Christine Gingras <CGingras@southburlingtonvt.gov> Subject: SD-22-07 47 Cheesefactory Rd Final Plat - for review Hi Dave, this is non jurisdictional for stormwater. Would you or Christine be able to give the EPSC a once-over for any issues by this Friday? It looked halfway decent to me in terms of silt fence but I didn’t check the detail sheet. Do we require a limit of work fence? \\city-adserver\apps\USERS\Planning & Zoning\Development Review Board\Applications\2022\SD-22-07_47 Cheesefactory Rd_Hickory Hillside_FP_2022-06-07\plans 2 Marla Keene, PE Development Review Planner City of South Burlington 180 Market Street South Burlington, VT 05403 (802) 846-4106 www.southburlingtonvt.gov Notice - Under Vermont’s Public Records Act, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your cooperation.